U.S. patent number RE35,386 [Application Number 08/290,195] was granted by the patent office on 1996-12-03 for method for drilling directional wells.
This patent grant is currently assigned to Baker Hughes Incorporated. Invention is credited to Macmillan M. Wisler, Jian-Qun Wu.
United States Patent |
RE35,386 |
Wu , et al. |
December 3, 1996 |
Method for drilling directional wells
Abstract
A method for detecting and sensing boundaries between strata in
a formation during directional drilling so that the drilling
operation can be adjusted to maintain the drillstring within a
selected stratum is presented. The method comprises the initial
drilling of an offset well from which resistivity of the formation
with depth is determined. This resistivity information is then
modeled to provide a modeled log indicative of the response of a
resistivity tool within a selected stratum in a substantially
horizontal direction. A directional (e.g., horizontal) well is
thereafter drilled wherein resistivity is logged in real time and
compared to that of the modeled horizontal resistivity to determine
the location of the drill string and thereby the borehole in the
substantially horizontal stratum. From this, the direction of
drilling can be corrected or adjusted so that the borehole is
maintained within the desired stratum.
Inventors: |
Wu; Jian-Qun (Houston, TX),
Wisler; Macmillan M. (Kingwood, TX) |
Assignee: |
Baker Hughes Incorporated
(Houston, TX)
|
Family
ID: |
24873951 |
Appl.
No.: |
08/290,195 |
Filed: |
August 15, 1994 |
Related U.S. Patent Documents
|
|
|
|
|
|
|
Application
Number |
Filing Date |
Patent Number |
Issue Date |
|
Reissue of: |
715417 |
Jun 14, 1991 |
05230386 |
Jul 27, 1993 |
|
|
Current U.S.
Class: |
175/45; 175/62;
175/61; 324/338; 324/369 |
Current CPC
Class: |
G01V
3/30 (20130101); E21B 7/06 (20130101); E21B
7/046 (20130101); E21B 47/022 (20130101) |
Current International
Class: |
E21B
47/02 (20060101); E21B 47/022 (20060101); E21B
7/04 (20060101); E21B 7/06 (20060101); G01V
3/18 (20060101); G01V 3/30 (20060101); E21B
007/04 () |
Field of
Search: |
;175/45,61,62
;324/338,369 |
References Cited
[Referenced By]
U.S. Patent Documents
Foreign Patent Documents
|
|
|
|
|
|
|
327422 |
|
Aug 1989 |
|
FR |
|
2194345 |
|
Mar 1988 |
|
GB |
|
Other References
"Logging While Drilling Keeps Horizontal Well on Small Target", Oil
and Gas Journal Oct. 23, 1991. .
"Bed Boundary Detection Using Resistivity Sensor in Drilling
Horizontal Wells", Annual Logging Symposium, Jun. 16-19, 1991.
.
"Features of Logging-While-Drilling (LWD) in Horizontal Wells",
SPE/IADC, Mar. 11-13, 1991. .
Gianzero et al., "Induction, Resistivity, and MWD Tools in
Horizontal Wells", May 1990, pp. 158-171. .
Anderson et al., "Response of 2-MHz LWD Resistivity and Wireline
Induction Tools in Dipping Beds and Laminated Formations", Jun.
1990, pp. 1-25. .
Huang et al., "Computation of Induction Logs in Multiple-Layer
Dipping Formation", IEEE Trans. on Geoscience and Remote Sensing.
vol. 27, No.3 (1989), pp. 259-267. .
Wisler, "Real-Time Electromagnetic Propagation Resistivity and
Memory For MWD", Technical Paper--11th European Formation
Evaluation Symposium, Sep. 1988. .
Anderson et al., "Effects of Dipping Beds on the Response of
Induction Tools", Society of Petroleum Engineers, Oct. 1986. .
Barber et al., "Correcting the Induction Log for Dip Effect",
Society of Petroleum Engineers, Oct. 1989. .
Clark et al., "A Dual Depth Resistivity Measurement for FEWD",
SPWLA Twenty-Ninth Annual Logging Symposium, Jun. 1988. .
Allen et al., "Integration of Wireline Resistivity Data With Dual
Depth of Investigation 2-MHz MWD Resistivity Data", SPWLA Thirtieth
Annual Logging Symposium, Jun. 1989..
|
Primary Examiner: Dang; Hoang C.
Attorney, Agent or Firm: Fishman, Dionne & Cantor
Claims
What is claimed is:
1. A method of locating a substantially horizontal bed of interest
in a formation and maintaining a drillstring therein during the
drilling operation, said drillstring including a
measurement-while-drilling (MWD) electromagnetic propagation
resistivity sensor, comprising the steps of:
drilling a substantially vertical offset well in a formation having
at least one selected substantially horizontal bed therein;
measuring resistivity in the formation at the offset well to
provide a first resistivity log as a function of depth;
modeling the substantially horizontal bed to provide a modeled
resistivity log indicative of the resistivity taken along the
substantially horizontal bed, said modeling being based on said
first resistivity log;
drilling a directional well in said formation near said offset
well, a portion of said directional well being disposed in said
substantially horizontal bed;
measuring resistivity in said directional well using the MWD
electromagnetic propagation resistivity sensor to provide a second
log of resistivity taken substantially horizontally;
comparing said second log to said modeled log to determine the
location of said directional well; and
adjusting the directional drilling operation so as to maintain said
drillstring within said substantially horizontal bed during the
drilling of said directional well in response to said comparing
step.
2. The method of claim 1 wherein said second log and said modeled
log comprises:
at least one resistivity horn being indicative of a boundary
between said bed and an adjacent bed.
3. The method of claim 2 wherein said horn is a phase difference
resistivity horn.
4. The method of claim 2 wherein said horn is an amplitude ratio
resistivity horn.
5. The method of claim 1 wherein said second log and said modeled
log are phase difference resistivity logs.
6. The method of claim 1 wherein said second log and said modeled
resistivity log are amplitude ratio resistivity logs.
7. The method of claim 1 wherein said adjusting step further
includes:
maintaining said drillstring within the upper portion of said bed
during the drilling of said directional well in response to said
comparing.
8. A method of locating a substantially horizontal bed of interest
in a formation and maintaining a drillstring therein during the
drilling operation, said drillstring including a
measurement-while-drilling (MWD) electromagnetic propagation
resistivity sensor, comprising the steps of:
drilling a substantially vertical offset well in a formation having
at least one selected substantially horizontal bed therein;
measuring resistivity in the formation at the well to provide a
first resistivity log as a function of depth;
modeling the substantially horizontal bed to provide a modeled
resistivity log indicative of the resistivity taken along the
substantially horizontal bed, said modeling being based on said
first resistivity log;
drilling a substantially horizontal well within said substantially
horizontal bed;
measuring resistivity in said horizontal well using the MWD
electromagnetic propagation resistivity sensor to provide a second
log of resistivity taken substantially horizontally;
comparing said second log to said modeled log to determine the
location of said horizontal well; and
adjusting the horizontal drilling operation so as to maintain said
drillstring within said substantially horizontal bed during the
drilling of said well in response to said comparing step.
9. A method of locating a substantially horizontal bed of interest
in a formation and maintaining a drillstring therein during the
drilling operation, said drillstring including a
measurement-while-drilling (MWD) electromagnetic propagation
resistivity sensor, comprising the steps of:
generating a first resistivity log for a substantially horizontal
bed using assumed resistivity values for a desired course of
drilling in a preselected dipping bed model to provide a modeled
resistivity log indicative of the resistivity taken along the
substantially horizontal bed in a formation;
drilling a directional well in said formation, a portion drilling a
directional well in said formation, a portion of said directional
well being disposed in said substantially horizontal bed;
measuring resistivity in said directional well using the MWD
electromagnetic propagation resistivity sensor to provide a second
log of resistivity taken substantially horizontally;
comparing said second log to said modeled first log to determine
the location of said directional well; and
adjusting the directional drilling operation so as to maintain said
drillstring within said substantially horizontal bed during the
drilling of said directional well in response to said comparing
step.
10. The method of claim 9 wherein said second log and said modeled
log comprises:
at least one resistivity horn being indicative of a boundary
between said bed and an adjacent bed.
11. The method of claim 10 wherein said horn is a phase difference
resistivity horn.
12. The method of claim 10 wherein said horn is an amplitude ratio
resistivity horn.
13. The method of claim 9 wherein said second log and said modeled
log are phase difference resistivity logs.
14. The method of claim 9 wherein said second log and said modeled
resistivity log are amplitude ratio resistivity logs.
15. The method of claim 9 wherein said adjusting step further
includes:
maintaining said drillstring within the upper portion of said bed
during the drilling of said directional well in response to said
comparing.
16. A method of locating a substantially horizontal bed of interest
in a formation and maintaining a drillstring therein during the
drilling operation, said drillstring including a
measurement-while-drilling (MWD) electromagnetic propagation
resistivity sensor, comprising the steps of:
generating a group of dipping bed model logs for various expected
downhole conditions;
drilling a directional well in a formation, a portion of said
directional well being disposed in a substantially horizontal
bed;
measuring resistivity in said directional well using the MWD
electromagnetic propagation resistivity sensor to provide a real
time log of resistivity taken substantially horizontally;
comparing said real time log to at least one of the model logs in
said group of dipping bed model logs until one of said model logs
substantially matches said real time log defining a matched model
log;
using input parameters from said matched model log to determine the
location of said directional well; and
adjusting the directional drilling operation so as to maintain said
drillstring within said substantially horizontal bed during the
drilling of said directional well in response to said comparing
step.
17. A method of locating a substantially horizontal bed of interest
in a formation and maintaining a drillstring therein during the
drilling operation, said drillstring including a
measurement-while-drilling (MWD) electromagnetic propagation
resistivity sensor, comprising the steps of:
drilling a directional well in a formation, a portion of said
directional well being disposed in a substantially horizontal
bed;
measuring resistivity in said directional well using the MWD
electromagnetic propagation resistivity sensor to provide a real
time log of resistivity taken substantially horizontally;
generating a model resistivity log from a preselected dipping bed
model for a substantially horizontal bed using input values
selected so that the model resistivity log will substantially match
the real time log defining a matched model log;
using input parameters from said matched model log to determine the
location of said directional well; and
adjusting the directional drilling operation so as to maintain said
drillstring within said substantially horizontal bed during the
drilling of said directional well in response to said comparing
step. .Iadd.
18. A method of locating a bed of interest in a formation and
maintaining a drillstring therein during the drilling operation,
said drillstring including a measurement-while-drilling (MWD)
resistivity sensor, comprising the steps of:
(1) modeling at least one substantially horizontal bed to provide a
modeled resistivity log indicative of the resistivity taken along
the substantially horizontal bed, said modeling being based on
information related to said substantially horizontal bed;
(2) drilling a directional well, a portion of said directional well
intended to be disposed in said substantially horizontal bed;
(3) measuring resistivity in said directional well using the MWD
resistivity sensor to provide a measured log of resistivity;
and
(4) comparing the measured log to said modeled log to determine the
location or position of said directional well with respect to said
substantially horizontal bed. .Iaddend..Iadd.19. The method of
claim 18 including the step of:
adjusting the directional drilling operation so as to maintain said
drillstring within said substantially horizontal bed during the
drilling of said directional well in response to said comparing
step. .Iaddend..Iadd.20. The method of claim 18 wherein:
said information is selected from at least one of (a) data from an
offset well which intersects with said horizontal bed, (b) seismic
data, (c) assumptions of the horizontal bed, and (d) prior
geological knowledge of
the horizontal bed. .Iaddend..Iadd.21. The method of claim 18
including the steps of:
identifying at least one resistivity horn in said measured log;
and
using said resistivity horn as an indicator of a boundary between
said substantially horizontal bed and an adjacent bed.
.Iaddend..Iadd.22. The method of claim 21 wherein said comparing
step further includes:
comparing said measured resistivity horn to said modeled
resistivity log to determine the location or position of said
directional well. .Iaddend..Iadd.23. The method of claim 21 wherein
said horn is a phase difference resistivity horn.
.Iaddend..Iadd.24. The method of claim 21 wherein said horn is an
amplitude ratio resistivity horn. .Iaddend..Iadd.25. The method of
claim 18 wherein said measured log and said modeled log are phase
difference resistivity logs. .Iaddend..Iadd.26. The method of claim
18 wherein said measured log and said modeled log are amplitude
ratio resistivity logs. .Iaddend..Iadd.27. The method of claim 18
wherein said measured log and said modeled log include both phase
difference resistivity logs and amplitude ratio resistivity
logs.
.Iaddend..Iadd.28. The method of claim 19 wherein said adjusting
step further includes:
maintaining said drillstring within the upper portion of said bed
during the drilling of said directional well. .Iaddend..Iadd.29.
The method of claim 18 wherein said measured log includes
resistivity from phase difference and resistivity from amplitude
ratio and including the steps of:
identifying separations between said phase difference and amplitude
ratio in said measured log; and
using said separations as an indicator of a boundary between said
substantially horizontal bed and an adjacent bed.
.Iaddend..Iadd.30. The method of claim 18 including the steps
of:
identifying resistivity drops in said measured log; and
using said resistivity drops as an indicator of a boundary between
said bed and an adjacent bed. .Iaddend..Iadd.31. The method of
claim 18 wherein:
said MWD resistivity sensor comprises an electromagnetic
propagation resistivity tool. .Iaddend..Iadd.32. The method of
claim 18 wherein:
said measured log and said modeled log are derived from at least
one of phase and amplitude measurements of an electromagnetic
propagation
resistivity tool. .Iaddend..Iadd.33. The method of claim 18
wherein:
said measured log and said modeled log are derived from at least
one of phase and amplitude measurements of an electromagnetic
propagation
resistivity tool. .Iaddend..Iadd.34. A method of locating a bed of
interest in a formation and maintaining a drillstring therein
during the drilling operation, said drillstring including a
measurement-while-drilling (MWD) resistivity sensor, comprising the
steps of:
measuring resistivity in the formation at an offset well to provide
a first resistivity log as a function of depth, the offset well
having at least one selected substantially horizontal bed
therein;
modeling the substantially horizontal bed to provide a modeled
resistivity log indicative of the resistivity taken along the
substantially horizontal bed, said modeling being based on said
first resistivity log;
drilling a directional well in said formation near said offset
well, a portion of said directional well intended to be disposed in
said substantially horizontal bed;
measuring resistivity in said directional well using the MWD
resistivity sensor to provide a second log of resistivity taken
substantially horizontally; and
comparing said second log to said modeled log to determine the
location or position of said directional well with respect to said
substantially horizontal bed. .Iaddend..Iadd.35. The method of
claim 34 including the step of:
adjusting the directional drilling operation so as to maintain said
drillstring within said substantially horizontal bed during the
drilling of said directional well in response to said comparing
step.
.Iaddend..Iadd.36. The method of claim 34 wherein said adjusting
step further includes:
maintaining said drillstring within the upper portion of said bed
during
the drilling of said horizontal well. .Iaddend..Iadd.37. A method
of locating a bed of interest in a formation and maintaining a
drillstring therein during the drilling operation, said drillstring
including a measurement-while-drilling (MWD) resistivity sensor,
comprising the steps of:
(1) modeling at least one substantially horizontal bed to provide a
modeled resistivity log indicative of the resistivity taken along
the substantially horizontal bed, said modeling being based on
information related to said substantially horizontal bed;
(2) drilling a substantially horizontal well within said
substantially horizontal bed, a portion of said horizontal well
intended to be disposed in said substantially horizontal bed;
(3) measuring resistivity in said horizontal well using the MWD
resistivity sensor to provide a measured log of resistivity taken
substantially horizontally; and
(4) comparing the measured log to said modeled log to determine the
location or position of said horizontal well with respect to said
substantially horizontal bed. .Iaddend..Iadd.38. The method of
claim 37 including the step of:
adjusting the directional drilling operation so as to maintain said
drillstring within said substantially horizontal bed during the
drilling of said horizontal well in response to said comparing
step. .Iaddend..Iadd.39. The method of claim 37 wherein:
said information is selected from at least one of (a) data from an
offset well which bed, and (d) prior geological knowledge of the
horizontal bed.
.Iaddend..Iadd.40. The method of claim 37 including the steps
of:
identifying at least one resistivity horn in said measured log;
and
using said resistivity horn as an indicator of a boundary between
said substantially horizontal bed and an adjacent bed.
.Iaddend..Iadd.41. The method of claim 40 wherein said comparing
step further includes:
comparing said measured resistivity horn to said modeled
resistivity log to determine the location or position of said
directional well. .Iaddend..Iadd.42. The method of claim 40 wherein
said horn is a phase difference resistivity horn.
.Iaddend..Iadd.43. The method of claim 40 wherein said horn is an
amplitude ratio resistivity horn. .Iaddend..Iadd.44. The method of
claim 37 wherein said measured log and said modeled log are phase
difference resistivity logs. .Iaddend..Iadd.45. The method of claim
37 wherein said measured log and said modeled log are amplitude
ratio resistivity logs. .Iaddend..Iadd.46. The method of claim 37
wherein said measured log and said modeled log include both phase
difference resistivity logs and amplitude ratio resistivity
logs.
.Iaddend..Iadd.47. The method of claim 37 wherein said measured log
includes resistivity from phase difference and resistivity from
amplitude ratio and including the steps of:
identifying separations between said phase difference and amplitude
ratio in said measured log; and
using said separations as an indicator of a boundary between said
bed and an adjacent bed. .Iaddend..Iadd.48. The method of claim 37
including steps of:
identifying resistivity drops in said measured log; and
using said resistivity drops as an indicator of a boundary between
said bed
and an adjacent bed. .Iaddend..Iadd.49. A method of locating a
substantially horizontal bed of interest in a formation and
maintaining a drillstring therein during the drilling operation,
said drillstring including a measurement-while-drilling (MWD)
resistivity sensor, comprising the steps of:
generating a modeled resistivity log for a substantially horizontal
bed using assumed resistivity values for a desired course of
drilling from a preselected dipping bed model, said modeled
resistivity log being indicative of the resistivity taken along the
substantially horizontal bed in a formation;
drilling a directional well in said formation, a portion of said
directional well intended to be disposed in said substantially
horizontal bed;
measuring resistivity in said directional well using the MWD
resistivity sensor to provide a log of resistivity taken
substantially horizontally; and
comparing said measured log to said modeled log to determine the
location or position of said directional well with respect to said
substantially horizontal bed. .Iaddend..Iadd.50. The method of
claim 49 including the steps of:
adjusting the directional drilling operation so as to maintain said
drillstring within said substantially horizontal bed during the
drilling of said directional well in response to said comparing
step.
.Iaddend..Iadd.51. A method of locating a substantially horizontal
bed of interest in a formation and maintaining a drillstring
therein during the drilling operation, said drillstring including a
measurement-while-drilling (MWD) resistivity sensor, comprising the
steps of:
generating a group of dipping bed model logs for various expected
downhole conditions;
drilling a directional well in a formation, a portion of said
directional well intended to be disposed in a substantially
horizontal bed;
measuring resistivity in said directional well using the MWD
resistivity sensor to provide a real time log of resistivity taken
substantially horizontally;
comparing said real time log to at least one of the model logs in
said group of dipping bed model logs until one of said model logs
substantially matches said real time log defining a matched model
log; and
using input parameters from said matched model log to determine the
location or position of said directional well with respect to said
substantially horizontal bed. .Iaddend..Iadd.52. The method of
claim 51 including the step of:
adjusting the directional drilling operation so as to maintain said
drillstring within said substantially horizontal bed during the
drilling of said directional well in response to said comparing
step.
.Iaddend..Iadd.53. A method of locating a substantially horizontal
bed of interest in a formation and maintaining a drillstring
therein during the drilling operation, said drillstring including a
measurement-while-drilling (MWD) resistivity sensor, comprising the
steps of:
drilling a directional well in a formation, a portion of said
directional well being disposed in a substantially horizontal
bed;
measuring resistivity in said directional well using the MWD
resistivity sensor to provide a real time log of resistivity taken
substantially horizontally;
generating a model resistivity log from a preselected dipping bed
model for a substantially horizontal bed using input values
selected so that the model resistivity log will substantially match
the real time log defining a matched model log; and
using input parameters from said matched model log to determine the
location or position of said directional well with respect to said
substantially horizontal bed. .Iaddend..Iadd.54. The method of
claim 53 including the step of:
adjusting the directional drilling operation so as to maintain said
drillstring within said substantially horizontal bed during the
drilling of said directional well in response to said comparing
step.
.Iaddend..Iadd.55. For use in connection with an earth borehole
drilling apparatus that includes a drilling rig, a drillstring
operating from said drilling rig for drilling an earth borehole,
said drillstring including a bottom hole arrangement comprising a
drill bit, a downhole resistivity measuring subsystem for measuring
downhole formation resistivity near said bit by propagating
electromagnetic energy into earth formations near said bit,
receiving electromagnetic energy that has propagated through the
formations and producing measurement signals that depend on the
received signals; a method for directing the drilling of a well
bore with respect to a geological bed boundary in said earth
formations, comprising the steps of:
producing from said measurement signals a recording of downhole
formation resistivity as a function of borehole depth, said
formation resistivity being in the form of a log depicting phase
difference and amplitude ratio;
identifying separations between said phase difference and amplitude
ratio in said log; and
implementing a change in the drilling direction of said drill bit
in response to said identification of any separations between said
phase
difference and amplitude ratio. .Iaddend..Iadd.56. For use in
conjunction with an earth borehole directional drilling apparatus
that includes a drilling rig, a drillstring operating from said
drilling rig for drilling an earth borehole, said drillstring
including a bottom hole arrangement comprising a drill bit, a
downhole resistivity measuring subsystem for measuring downhole
earth formation resistivity near said bit by propagating
electromagnetic energy into earth formations near said bit,
receiving electromagnetic energy that has propagated through the
formations and producing measurement signals that depend on the
received signals and downhole telemetry means for transmitting the
measurement signals; wherein said apparatus has initiated drilling
a well bore within a first geological bed in said formations and
approximately adjacent a geological bed boundary between said first
bed and a second geological bed in said formations; a method for
maintaining drilling of the well bore in said first bed, comprising
the steps of:
deriving from said measurement signals, downhole formation
resistivity, said formation resistivity being in the form of a log
depicting phase difference and amplitude ratio;
monitoring said resistivity, as a function of the borehole depth of
the drill bit position;
identifying separations between said phase difference and amplitude
ratio in said log; and
implementing changes in the drilling direction of said drill bit in
response to the identification of any separations between said
phase
difference and amplitude ratio. .Iaddend..Iadd.57. For use in
conjunction with an earth borehole drilling apparatus that includes
a drilling rig, a drillstring operating from said drilling rig for
drilling an earth borehole, said drillstring including a bottom
hole arrangement comprising a drill bit, a downhole resistivity
measuring subsystem for measuring downhole formation resistivity
near said bit, receiving electromagnetic energy that has propagated
through the formations and producing measurement signal that depend
on the received signals;
a method for directing the drilling of a well bore with respect to
a geological bed boundary in said earth formations, comprising the
steps of:
producing from said measurement signals a recording of downhole
formation resistivity as a function of borehole depth;
identifying resistivity drops in said resistivity recording;
and
implementing a change in the drilling direction of said drill bit
in response to said identification of any resistivity drops.
.Iaddend..Iadd. . For use in conjunction with an earth borehole
directional drilling apparatus that includes a drilling rig, a
drillstring operating from said drilling rig for drilling an earth
borehole, said drillstring including a bottom hole arrangement
comprising a drill bit, a downhole resistivity measuring subsystem
for measuring downhole earth formation resistivity near said bit by
propagating electromagnetic energy into earth formations near said
bit, receiving electromagnetic energy that has propagated through
the formations and producing measurement signals that depend on the
received signals, and downhole telemetry means for transmitting the
measurement signals uphole and uphole telemetry means for receiving
the measurement signals; wherein said apparatus has initiated
drilling a well bore with a first geological bed in said formations
and approximately adjacent a geological bed boundary between said
first bed and a second geological bed in said formations; a method
for maintaining drilling of the well bore ins aid first bed,
comprising the steps of:
deriving from said measurement signals, downhole formation
resistivity;
monitoring said resistivity as a function of the borehole depth of
the drill bit position to detect any resistivity drops; and
implementing changes in the drilling direction of said drill bit
in
response to the detection of any resistivity drops.
.Iaddend..Iadd.59. A method of locating a bed of interest in a
formation and maintaining a drillstring therein during the drilling
operation, said drillstring including a measurement-while-drilling
(MWD) sensor, comprising the steps of:
(1) modeling at least one substantially horizontal bed to provide a
modeled log of a set of parameters indicative of the response taken
as the MWD sensor traverses or moves within the bed, said modeling
being based on information related to said substantially horizontal
bed and the path of the MWD sensor;
(2) drilling a directional well, a portion of said directional well
intended to be disposed in said substantially horizontal bed;
(3) measuring and recording MWD sensor output parameters indicative
of the formation parameters in said directional well using the MWD
sensor to provide a measured log of said output parameters; and
(4) comparing the measured log to said modeled log to determine the
location or position of said directional well with respect to said
substantially horizontal bed. .Iaddend..Iadd.60. The method of
claim 59 including the step of:
adjusting the directional drilling operation so as to maintain said
drillstring within said substantially horizontal bed during the
drilling of said directional well in response to said comparing
step. .Iaddend..Iadd.61. The method of claim 59 wherein:
said information is selected from at least one of (a) data from an
offset well which intersects with said horizontal bed, (b) seismic
data, (c) assumptions of the horizontal bed, and (d) prior
geological knowledge of the horizontal bed. .Iaddend.
Description
BACKGROUND OF THE INVENTION
This invention relates generally to borehole formation evaluation
instrumentation and methods of using such instrumentation in the
drilling of directional wells. More particularly, this invention
relates to a method for measuring the position of a drillstring
while drilling a horizontal borehole and maintaining the
drillstring within desired boundaries using electromagnetic
propagation based earth formation evaluation tools.
Borehole formation evaluation tools are known which measure phase
and/or amplitude of electromagnetic waves to determine an
electrical property (such as resistivity or permitivity) of a
section of a borehole. Typically, the existing tools used for this
application are composed of one or more transmitting antennas
spaced from one or more pairs of receiving antennas. An
electromagnetic wave is propagated from the transmitting antenna
into the formation surrounding the borehole and is detected as it
passes by the two receiving antennas. In a resistivity measuring
tool, magnetic dipoles are employed which operate in the mf and
lower hf spectrum. In contrast, permitivity tools utilize electric
dipoles in the VHF or UHF and microwave ranges.
In a known resistivity sensor of the type hereinabove discussed
which is used by Teleco Oilfield Services, Inc., assignee of the
present application, the resistivity sensor measures both phase
difference and amplitude ratio to provide two resistivities with
different depths of investigation. A signal received in a first
(far) receiving antenna is shifted in phase and its amplitude will
be less than the signal received in a second (near) receiving
antenna. Resistivities are then derived from both the phase
difference (R.sub.pd) and the amplitude ratio (R.sub.ar) of the
received signals. The differential measurement is primarily
responsive to the formation opposite the receiving antennas and is
less sensitive to the borehole and/or variations in the transmitted
signal as in prior art sensing devices. An example of a formation
evaluation instrument of this type is described in FIGS. 1 and 2 of
U.S. Pat. No. 5,001,675 which is assigned to the assignee hereof
and fully incorporated herein by reference. The formation
evaluation tool acquires the resistivity data in real time and then
transmits this information to the drilling operator using any
suitable measurement-while-drilling transmission technique such as
mud pulse telemetry (see U.S. Pat. Nos. 3,982,431, 4,013,945 and
4,021,774) or the information is stored downhole for review after
retrieval of the tool.
In drilling a horizontal well, the goal is to drill the well in
such a way that the well stays within the pay zone (i.e., a
selected bed or stratum) for as long as possible in order to
achieve a higher recovery rate. Before drilling a horizontal well,
a course of drilling is planned based on knowledge about the pay
zone and the boundaries between the pay zone and its neighboring
beds. Because of the uncertainties in the knowledge about the bed
boundaries and the errors in directional drilling, the well being
drilled often can not stay in the pay zone as desired. It is,
therefore, very important to know the relative position of the
drill bit and the well with respect to the bed boundary in real
time so that when the well is very close to the bed boundary,
proper action is taken, ensuring that the well will stay within the
pay zone.
SUMMARY OF THE INVENTION
The above-discussed and other drawbacks and deficiencies of the
prior art are overcome or alleviated by the method for drilling
directional wells (e.g., horizontal wells) of the present
invention. In accordance with the present invention, this drilling
method comprises drilling a substantially vertical well (generally
referred to as an offset well) and generating a first log of
resistivity as a function of depth or, as will be discussed later,
an assumed log is generated from knowledge other than a vertical
well. Using any one of a number of known dipping bed modeling
techniques, this first log is then modeled to provide a second log
which is indicative of resistivity of a selected bed (or stratum)
along a horizontal or substantially horizontal direction. A
directional well (a second well or borehole) is then drilled near
the offset well. The directional well is initially vertical and
turns substantially horizontal in the substantially horizontal
(previously selected) bed. A measurement-while-drilling (MWD)
electromagnetic propagation tool is employed during the directional
drilling to provide a third log (i.e., a horizontal log) while
drilling (e.g., in real time). The third log is compared to the
second log (i.e. the modeled horizontal log) so that the location
of the drillstring (and therefore the horizontal well) can be
determined and the direction of drilling corrected or adjusted
accordingly so that the drillstring is maintained within the
desired stratum.
Bed boundaries (i.e., where adjacent beds meet) cause three
distinct features (i.e., separation, dips and horns) in the
horizontal logs. In accordance with the above-described method of
this invention, these features can be used to detect the presence
of the bed boundaries in drilling horizontal or nearly horizontal
wells (i.e., the directional well).
In another embodiment of this invention, no initial vertical well
is drilled. Instead, assumptions are made about the resistivities
of the vertical strata from other information such as geological
knowledge of the area or siesmic measurements. These assumed
resistivities are used in the aforementioned dipping bed model to
generate the modeled log of the substantially horizontal stratum.
Thereafter, as in the first embodiment, the real time resistivity
log of the directional well is compared to the modeled log to
correct or adjust the drilling operation so as to maintain the
drillstring within a desired substantially horizontal stratum.
Modeling can also be carried out on site with the position of the
resistivity tool relative to the bed boundary as an input to the
model. The tool's position relative to the bed boundaries is varied
in the model calculations until the real time resistivity log is
reproduced. By so doing, the tool's Position, and therefore the
drill bit and well relative to the bed, is determined.
The above-discussed and other features and advantages of the
present invention will be appreciated and understood by those
skilled in the art from the following detailed description and
drawings.
BRIEF DESCRIPTION OF THE DRAWINGS
Referring now to the drawings, wherein like elements are numbered
alike in the several FIGURES:
FIG. 1 is front elevation view, partly in cross section, of a
portion of an electromagnetic propagation resistivity tool in a
substantially vertical borehole;
FIG. 2 is a front elevation view, partly in cross section, of the
electromagnetic propagation resistivity tool in a substantially
horizontal portion of a directional borehole;
FIG. 2A is a schematic diagram of an electromagnetic propagation
resistivity tool shown passing through several bed boundaries at a
selected dipping angle;
FIG. 3 is a schematic diagram of the electromagnetic propagation
resistivity tool in the directional well of FIG. 2A;
FIGS. 4A-4E are charts showing the phase difference resistivity and
amplitude ratio resistivity of the electromagnetic propagation
resistivity tool in the directional borehole of FIG. 2A, FIG. 4A
shows resistivity as the tool travels into and out of a 50
ohm-meter bed in a vertical well (0 degree dipping angle) FIG. 4B
shows resistivity as the tool travels into and out of the 50
ohm-meter bed at a 45 degree dipping angle, FIG. 4C shows
resistivity as the tool travels into and out of the 50 ohm-meter
bed at a 60 degree dipping angle, FIG. 4D shows resistivity as the
tool travels into and out of the 50 ohm-meter bed at a 75 degree
dipping angle, and FIG. 4E shows resistivity as the tool travels
into and out of the 50 ohm-meter bed at a 90 degree dipping angle
(horizontal well);
FIG. 5 is a modeled response of phase difference resistivity and
amplitude ratio resistivity of the electromagnetic propagation
resistivity tool of FIG. 2A in a 200 ohm-meter bed at a 90 degree
dip angle;
FIG. 6 is a log chart of a first experimental directional well in
accordance with the present invention;
FIG. 7 is a log chart of a second experimental directional well in
accordance with the present invention; and
FIG. 8 is a chart of a model of the log of FIG. 7.
DESCRIPTION OF THE PREFERRED EMBODIMENT
Naturally formed geological bed boundaries are not necessarily
horizontal and may not be perfect planes. During directional
drilling (i.e., horizontal drilling), a predetermined course of
drilling cannot ensure that the well being drilled stays in the
producing bed. Thus, an important concern in horizontal drilling is
early detection of the bed boundary so that the well can be
maintained in the hydrocarbon producing bed.
Referring to FIG. 1, a substantially vertical well 10 (i.e.,
borehole or dipping bed) is drilled near a desired well location in
accordance with well known methods. Well 10 is a vertical offset
well from which formation resistivity information is initially
collected (i.e., a log). An electromagnetic propagation resistivity
tool 12 (generally incorporated into a drill string 14 for
measurement-while-drilling) is shown disposed in well 10. Tool 12
is typically two MHz. Well 10 extends across several formations
identified at 15, 16, 17 and 18. Well 10 has drilling fluid 19
flowing therein. Tool 12 includes a transmitter antenna 20, a near
receiver antenna 22 and a far receiver antenna 24. In this example,
the distances between transmitter antenna 20 and near and far
receiver antennas 22,24 are 27.5 and 34.5 inches, respectively.
Antennas 20, 22 and 24 are disposed on a drill collar which houses
the electronics for transmitting a electromagnetic wave by antenna
20 to be detected by antennas 22 and 24. Tool 12 is known in the
art and described in FIG. 1 of aformentioned U.S. Pat. No.
5,001,675.
In accordance with a first embodiment of the method of this
invention, resistivity as a function of depth is logged by tool 12
so that the resistivities in the formations 15-18 and the bed
boundaries which separate them can be determined. This resistivity
measurement is then used in dipping bed modeling to approximate the
response of tool 12 during horizontal drilling. As will be
discussed with reference to FIG. 2, during actual drilling of
horizontal or near horizontal wells using a drillstring which
incorporates tool 12, resistivity readings from tool 12 are
compared to the model and used to detect bed boundaries in
horizontal and near horizontal wells. Based on these comparisons,
adjustments to the directional drilling operations can be made to
maintain the drillstring within a desired pay zone or stratum.
The model approximates the antennas 20, 22, 24 as dipoles (the
steel drill string 14 and borehole effects are not included). The
dipole approximation provides a good approximation except when the
tool is within a few inches of a bed boundary (e.g., between strata
17 and 18) and the dipping angle is large (as described
hereinafter). There are different, well known methods which can be
used to carry out dipping bed model calculations. In the following
example, the model described in an article entitled "Computation of
Induction Logs in Multiple-Layer Dipping Formation", IEEE Trans. on
Geoscience and Remote Sensing, Vol. 27, No. 3 (1989), p. 259, by
Ming Huang and Liang C. Shen is used, the entire contents of which
is incorporated herein by reference.
Referring now to FIG. 2, a second well or borehole 26 (i.e., a
directional well) is drilled which is initially vertical and is
thereafter directed generally horizontally into a pay zone (i.e.,
hydrocarbon producing bed 17) selected from the the offset well 10
resistivity log or otherwise. By comparing the modeled tool
response to the real time tool response during horizontal drilling,
it can be determined approximately where in well 26 the tool 12'
is, and thereby the location of the borehole. The direction of
drilling is shown by arrow 28. Based on this comparison, the
drilling operator can adjust and/or correct the directional
drilling operations to maintain the drilling in a desired stratum.
2A is a diagrammatic view of the direction well at any angle
.theta. with FIG. 2 being the special case where .theta. equals 90
degrees.
EXAMPLES
In this example the thickness of the hydrocarbon producing bed 17
is 60 feet. Bed 17 and the shoulder resistivities are 50 and 2
ohm-meters, respectively. A schematic plot of the formation
geometry and the tool is shown in FIG. 3. The true vertical depth
32 is defined as the distance between the upper bed boundary 34 and
the midpoint between the two receiver antennas 36 (the tool measure
point). A negative true vertical depth means that the midpoint is
in the upper shoulder bed. In the following, the distance between
the tool and the bed boundary is the magnitude of the true vertical
depth.
Referring to FIGS. 4A-4E, apparent resistivities are plotted as
functions of vertical depth for 0, 45, 60, 75, and 90 degree
dipping angles, respectively. Dipping angle 38 (FIG. 3) is defined
as the angle between the borehole and the perpendicular to the
bedding plane. On a vertical depth plot, the effect of dipping is
negligible for dipping angles from 0 degrees up to about 45 degrees
(FIG. 4A and 4B). At about 60 degrees (FIG. 4C), horns 40 in
apparent resistivities (i.e., phase difference resistivity and
amplitude ratio resistivity) appear around the bed boundaries.
Horns 40 are produced by the interference between the
electromagnetic wave generated by the transmitter antenna 20 as
well as the bulk eddy currents and the electromagnetic wave
generated by the surface charges on the bed boundary caused by the
discontinuity. A solid line 42 represents phase difference
resistivity and a dashed line 44 represent amplitude ratio
resistivity. As the dipping angle 38 increases, the horns 40 become
more pronounced (e.g., at 75 degrees, FIG. 4D). Near 90 degrees
(FIG. 4E), the values of horns 40 are off scale and the width of
the phase resistivity horn is about 1.5 feet. Near 90 degrees, the
response does not change very much with the dipping angle. For
example, the response at 85 degrees is almost identical to that of
90 degrees as functions of true vertical depth. In horizontal well
26 inside a relatively resistive bed, the phase difference
resistivity readings drop when the tool is about 4 feet away from
the conductive boundary and then rise drastically as the tool
approaches the bed boundary. Phase and amplitude resistivities
separate when the tool is about 10 feet away from the boundary. The
separation becomes significant when the distance between the tool
and the boundary is 6 feet.
In this particular example, three features can be used to detect a
conductive bed boundary is a horizontal well; resistivity horns 40;
resistivity drops; and phase and amplitude resistivity separation.
The phase resistivity horns 40 are detectable when the tool is
about 1 foot away from the bed boundary. The resistivity drops can
identify the bed boundary presence when tools are about 4 feet
away. Bed boundaries cause a significant phase and amplitude
resistivity separation when tools are up to 6 feet away.
The phase and amplitude resistivity separation feature are
preferred to identify the bed boundary since it provides the
earliest detection. When the tool 12 is 6.5 feet away from the bed
boundary, the separation between the phase and amplitude
resistivities is about 20 percent of the true bed resistivity. If
the phase and the amplitude resistivity separation caused by other
factors (e.g., invasion, tool eccentering or dielectric effects) is
less than 20 percent, the bed boundary can be detected when the
boundary is 6.5 feet away. At 87 or 93 degree dipping angle, 6.5
foot vertical depth corresponds to 130 feet in measured hole depth.
If 30 percent separation criteria is used, the bed boundary can be
detected when the tool is 5 feet away from the boundary. In
practice, however, many factors may cause phase and amplitude
resistivity separations. Amplitude resistivity readings of tool 12
may not be reliable at very high resistivities. Therefore,
separation of phase and amplitude curves can provide early bed
boundary detection in a limited number of situations.
When amplitude resistivity readings are not reliable, the phase
resistivity drop feature is preferred for the detection of
conductive bed boundaries. The phase resistivity is 8 percent lower
than the bed resistivity if the tool is 4 feet away from the bed
boundary. If 20 percent drop criteria is used, the bed boundary can
be identified when tool 12 is 2.5 feet away. At 87 or 93 degrees.
2.5 feet in vertical depth corresponds to 50 feet in measured
depth. If the drill bit is 20 feet ahead of the tool, the bed
boundary can be detected when the drill bit is 1 foot away from the
bed boundary.
The horns in resistivity readings provide the most unambiguous
signature of the bed boundary presence since no other known
physical effect can produce a horn of this magnitude in apparent
resistivity readings. However, the tool has to be about 1.5 feet or
closer to the bed boundary to detect these horns. In most cases,
when a horn 40 shows up in the resistivity log, the drill bit has
already crossed the boundary. In situations where the penalty for
the bit's crossing the bed boundary is small or none, horns 40 can
be used as the bed boundary detector. In any case, horns 40 on
resistivity logs signify with certainty the presence of a bed
boundary.
In a second example similar to the first example, the bed thickness
and the shoulder resistivity are same as those of the first
example. The bed resistivity is 200 ohm-meters. In FIG. 5, phase
and amplitude resistivities 42',44' are plotted as functions of
true vertical depth. The dipping angle is 90 degrees. The three
features are similar to those in the first example (FIGS. 4A-D)
with only quantitative differences. The Phase and amplitude
resistivity separation is 20 percent of the bed resistivity when
the tool is 12 feet from the boundary. At 10 feet the separation is
30 percent. The phase resistivity drop is 20 percent at 4 feet. The
horn width is about the same as that in the first example.
Therefore horns, resistivity drops, and phase and amplitude
resistivity separations can be used to detect the presence of a bed
boundary. It will be appreciated that this method of maintaining a
directional borehole in a bed (i.e., detection of bed boundaries)
can be employed without the offset well and, thus without the
vertical resistivity logs for comparison. The horns provide the
most reliable detection, but the tool has to be about 1.5 feet from
the boundary. The phase and amplitude resistivity separation
feature can detect the boundary from a relatively large distance.
This feature can not be used when other factors cause large phase
and amplitude resistivity separations or when the amplitude
resistivity readings are not reliable.
FIELD TEST
Referring to FIG. 6, in a first field test, a wireline induction
log 46 of a vertical well (in accordance with a first step of the
method of this invention and corresponding to the vertical drilling
shown in FIG. 1) indicates that there is a 60 foot thick gas
producing sand bed located at about 1700 feet below the sea level.
The upper shoulder is shale whose resistivity is about 2
ohm-meters. The lower shoulder is a water and sand stratum with a
resistivity of 0.6 ohm-meters. The induction resistivity in the bed
varies significantly. The average is about 50 ohm-meters, without
shoulder bed effect correction. The bed is not completely
horizontal, but the dip is at most a few degrees.
In order to avoid water coning, it is desired that the horizontal
wells should stay in the top third of the producing bed. In
drilling the horizontal portions of the wells, 2 MHz
electromagnetic resistivity MWD tools of the type described with
reference to U.S. Pat. No. 5,001,675 are used.
Resistivity log 46 shows phase difference resistivity (RPD),
amplitude ratio resistivity (RAR), true vertical depth (TVD),
natural gamma ray, and inclination are plotted as a function of
measured hole depth. Two horns are present on the phase resistivity
curve 48. From the vertical depth reading, one can see that both
horns indicate the upper bed boundary crossing at 40. The first
horn 52 signifies the tool entering into the pay bed from the upper
shoulder. The second horn 54 shows the tool leaving the bed and
entering the upper shoulder. Unfortunately, since 200 ohm-meters is
above the range of the amplitude ratio resistivity measurement, the
phase and amplitude resistivity separation feature can not be seen.
The phase resistivity drop feature is present. Since the phase
resistivity reading in the bed fluctuates somewhat, one must be
cautious when using the phase resistivity drop feature to detect
the bed boundary in situations like this.
Referring to FIG. 7, a log 56 from a second field test is shown. As
in the previous well log (FIG. 6), the tool entered the bed from
the upper shoulder and again exited the bed into the upper
shoulder. Two horns 58 appear when the tool crosses the upper bed
boundary. The double horns are likely caused by another layer of
sand in the upper shoulder.
In accordance with a second step of this-invention, the log 56 in
FIG. 7 is modeled in a dipping bed model (such as the
aforementioned model by Huang and Shen). FIG. 8 shows the model
response obtained with a one foot sand layer located 3 feet above
the 60 foot sand bed. The well enters the pay sand at 87 degrees
and leaves the pay sand at 93 degrees. The hole depth offset is
arbitrarily chosen. The well path as a function of hole depth is
also shown. As mentioned, the model response in FIG. 8 reproduces,
at least qualitatively, the log 56 in FIG. 7. The amplitude
resistivity under the first phase resistivity horn, according to
the model, is measurable, but it is not around 20 ohm-meters which
is shown in log 56.
Log 56 (FIG. 7) is essentially symmetrical about an midpoint of
3425 feet measured depth. This phenomenon is due to the fact that
this depth corresponds to the deepest stratigraphic penetration
into the producing sand. At measured depths below 3435, the well
has turned upward (an inclination greater than 90 degrees) and is
drilling stratigraphically upwards out of the top of the producing
sand. The section below 3435 is compressed with respect to the
section above this point due to a greater apparent dip angle
between the borehole and the formation. Similar symmetry can be
seen in log 46 (FIG. 6), which reaches its deepest stratigraphic
penetration at roughly 3600 feet measured depth. Also note the
similarity between these actual logs 46, 56 and the modeled log
response of FIG. 8.
The model response study shows that the horns, the resistivity
drops, and the phase and amplitude resistivity separations in
horizontal well logs are due to the bed boundary presence. The
three features (resistivity horns, resistivity drops and phase and
amplitude resistivity separations) can be used to detect the
presence of bed boundaries. The resistivity horns and the phase
resistivity drop feature are present in both horizontal well logs
46, 56.
As a bed boundary is detected, this information is passed on to the
directional drilling operator who will adjust the drilling
parameters to alter the drilling direction and thereby maintain the
drillstring within the desired horizontal stratum.
In a second embodiment of this invention, no vertical well is
required. Instead, assumptions are made about the resistivities of
the vertical strata from other information such as geological
knowledge of the area or seismic measurements. These assumed
resistivities are used in the aforementioned dipping bed model to
generate the modeled log of the substantially horizontal stratum.
Thereafter, as in the first embodiment, the electromagnetic
propagation resistivity tool is used in the directional well to
obtain a real time resistivity log of the substantially horizontal
stratum. That log is then compared to the modeled log with the
comparison being used to adjust or correct the drilling operations
to maintain the drillstring within the desired stratum.
In a third embodiment of this invention, either the actual dipping
bed model or a library of the output resistivity logs of the
dipping bed model for varying conditions is employed in real time
as the well is actually being drilled. The term "library" means a
group of previously generated dipping bed model log outputs for
various expected downhole conditions (similar to a "look-up"
table). As the real time resistivity log is the real time generated
model resistivity logs or with the library of modeled resistivity
logs. Input parameters to the model or to the library are then
modified until the output agrees or matches with the real time
resistivity log. At that time the input parameters are assumed to
be correct. The input parameters consist of a selected combination
of the bed resistivities, the bed thicknesses and the dipping
angle. The input parameters from the matched modeled log can be
used to assist the drilling operator in maintaining the drillstring
within the selected stratum.
While the the preferred embodiments have been shown and described,
various modifications an substitutions may be made thereto without
departing from the spirit and scope of the invention. Accordingly,
it is to be understood that the present invention has been
described by way of illustrations and not limitations.
* * * * *