U.S. patent application number 15/346431 was filed with the patent office on 2017-02-23 for target supply device, target material refining method, recording medium having target material refining program recorded therein, and target generator.
This patent application is currently assigned to Gigaphoton Inc.. The applicant listed for this patent is Gigaphoton Inc.. Invention is credited to Tsukasa HORI, Fumio IWAMOTO, Yutaka SHIRAISHI, Osamu WAKABAYASHI.
Application Number | 20170053780 15/346431 |
Document ID | / |
Family ID | 55018575 |
Filed Date | 2017-02-23 |
United States Patent
Application |
20170053780 |
Kind Code |
A1 |
IWAMOTO; Fumio ; et
al. |
February 23, 2017 |
TARGET SUPPLY DEVICE, TARGET MATERIAL REFINING METHOD, RECORDING
MEDIUM HAVING TARGET MATERIAL REFINING PROGRAM RECORDED THEREIN,
AND TARGET GENERATOR
Abstract
A target supply device may be provided with a tank configured to
contain a metal as a target material, a nozzle having a nozzle hole
through which the target material is output from the tank, a filter
disposed in a communication portion for conducting the target
material from the tank to the nozzle hole, a temperature adjuster
configured to change the temperature of the target material in the
tank, and a controller controlling the temperature adjuster to
change the temperature of the target material in the tank such that
oxygen in the target material is precipitated as metal oxide.
Inventors: |
IWAMOTO; Fumio; (Oyama-shi,
JP) ; SHIRAISHI; Yutaka; (Oyama-shi, JP) ;
HORI; Tsukasa; (Oyama-shi, JP) ; WAKABAYASHI;
Osamu; (Oyama-shi, JP) |
|
Applicant: |
Name |
City |
State |
Country |
Type |
Gigaphoton Inc. |
Tochigi |
|
JP |
|
|
Assignee: |
Gigaphoton Inc.
Tochigi
JP
|
Family ID: |
55018575 |
Appl. No.: |
15/346431 |
Filed: |
November 8, 2016 |
Related U.S. Patent Documents
|
|
|
|
|
|
Application
Number |
Filing Date |
Patent Number |
|
|
PCT/JP2014/067382 |
Jun 30, 2014 |
|
|
|
15346431 |
|
|
|
|
Current U.S.
Class: |
1/1 |
Current CPC
Class: |
H05G 2/005 20130101;
H05G 2/008 20130101; H05G 2/00 20130101; H05G 2/006 20130101; H01J
37/32449 20130101 |
International
Class: |
H01J 37/32 20060101
H01J037/32 |
Claims
1. A target supply device comprising: a tank configured to contain
target material of metal; a nozzle having a nozzle hole configured
to output the target material from the tank; a filter disposed in a
communication portion for conducting the target material from the
tank to the nozzle hole; a temperature adjuster configured to
change temperature of the target material in the tank; and a
controller configured to control the temperature adjuster to change
the temperature of the target material in the tank so as to cause
oxygen in the target material to precipitate as metal oxide.
2. The target supply device as defined in claim 1, wherein the
controller is configured to control the temperature adjuster to
change the temperature of the target material in the tank for at
least one time between a first temperature higher than a melting
point of the target material and a second temperature lower than
the first temperature.
3. The target supply device as defined in claim 2, wherein the
second temperature is lower than the melting point of the target
material.
4. A target supply device comprising: a tank configured to contain
target material of metal; a nozzle having a nozzle hole configured
to output the target material from the tank; a filter disposed in a
communication portion for conducting the target material from the
tank to the nozzle hole; a temperature adjuster configured to
change a temperature of the target material in the tank; and a
controller configured to control the temperature adjuster to
changing the temperature of the target material in the tank for at
least one time between a first temperature higher than a melting
point of the target material and a second temperature lower than
the first temperature while the target material is not contained
between the filter and the nozzle hole.
5. The target supply device as defined in claim 4, wherein the
second temperature is lower than the melting point of the target
material.
6. A target supply device comprising: a tank configured to contain
target material of metal; a nozzle having a nozzle hole configured
to output the target material from the tank; a filter disposed in a
communication portion for conducting the target material from the
tank to the nozzle hole; a temperature adjuster configured to
change a temperature of the target material in the tank; a gas
exhauster configured to exhaust gas from the tank; and a controller
configured to control the temperature adjuster to change the
temperature of the target material in the tank for at least one
time between a first temperature higher than a melting point of the
target material and a second temperature lower than the first
temperature while the gas exhauster is controlled to set a pressure
in the tank lower than an atmospheric pressure.
7. The target supply device as defined in claim 6, wherein the
second temperature is lower than the melting point of the target
material.
8. A target material refining method for refining a target material
by use of a target generator and a temperature adjuster, the target
generator having a tank configured to contain the target material
of a metal, a nozzle having a nozzle hole configured to output the
target material from the tank, and a filter disposed in a
communication portion for conducting the target material from the
tank to the nozzle hole, the temperature adjuster being configured
to change a temperature of the target material in the tank, the
target material refining method comprising steps of: causing oxygen
in the target material to precipitate as metal oxide by changing
the temperature of the target material in the tank by the
temperature adjuster; and filtrating the target material as being
liquefied and containing the precipitated metal oxide through the
filter.
9. The target material refining method as defined in claim 8,
wherein the step of causing oxygen in the target material to
precipitate as metal oxide includes controlling the temperature
adjuster to change the temperature of the target material in the
tank for at least one time between a first temperature higher than
a melting point of the target material and a second temperature
lower than the first temperature.
10. The target material refining method as defined in claim 9,
wherein the second temperature is lower than the melting point of
the target material.
11. A recording medium configured to store a target material
refining program in a computer readable manner, the target material
refining program enabling a computer to execute operations for
controlling the temperature adjuster in the target material
refining method as defined in claim 8.
12. A target generator configured to contain a target material that
is solidified after refined by the target material refining method
as defined in claim 8.
Description
CROSS-REFERENCE TO RELATED APPLICATION
[0001] This application is a Continuation of PCT International
Application PCT/JP2014/067382 filed on 30 Jun. 2014, the entire
content of which is incorporated herein by reference.
BACKGROUND
[0002] 1. Technical Field
[0003] The present invention relates to a target supply device, a
target material refining method, a recording medium having target
material refining program recorded therein, and a target
generator.
[0004] 2. Related Art
[0005] In recent years, semiconductor production processes have
become capable of producing semiconductor devices with increasingly
fine feature sizes, as photolithography has been making rapid
progress toward finer fabrication. In next generation of
semiconductor production processes, microfabrication with feature
sizes of 45 to 70 nm, and further, microfabrication with feature
sizes of 32 nm or less will be required. In order to meet the
demand for microfabrication with feature sizes of 32 nm or less,
for example, an exposure apparatus is needed in which an apparatus
for generating extreme ultraviolet (EUV) light at a wavelength of
approximately 13 nm is combined with a reduced projection
reflective optical system.
[0006] Three kinds of apparatuses for generating EUV light are
known in general, which include a Laser Produced Plasma (LPP) type
apparatus in which plasma generated by irradiating a target
material with a laser beam is used, a Discharge Produced Plasma
(DPP) type apparatus in which plasma generated by electric
discharge is used, and a Synchrotron Radiation (SR) type apparatus
using synchrotron radiation.
SUMMARY
[0007] According to one aspect of the present invention, a target
supply device may include a tank, a nozzle, a filter, a temperature
adjuster and a controller. The tank may be configured to contain a
target material of a metal. The nozzle may have a nozzle hole
configured to output the target material from the tank. The filter
may be disposed in a communication portion for conducting the
target material from the tank to the nozzle hole. The temperature
adjuster may be configured to change a temperature of the target
material in the tank. The controller may be configured to control
the temperature adjuster to change the temperature of the target
material in the tank so as oxygen dissolved in the target material
to precipitate as metal oxide.
[0008] According to another aspect of the present invention, a
target supply device may include a tank, a nozzle, a filter, a
temperature adjuster and a controller. The tank may be configured
to contain a target material of a metal. The nozzle may have a
nozzle hole configured to output the target material from the tank.
The filter may be disposed in a communication portion for
conducting the target material from the tank to the nozzle hole.
The temperature adjuster may be configured to change a temperature
of the target material in the tank. The controller may be
configured to control the temperature adjuster to change the
temperature of the target material in the tank for at least one
time between a first temperature higher than a melting point of the
target material and a second temperature lower than the first
temperature while the target material is not contained between the
filter and the nozzle hole.
[0009] According to one aspect of the present invention, a target
supply device may include a tank, a nozzle, a filter, a temperature
adjuster, a gas exhauster and a controller. The tank may be
configured to contain a target material of a metal. The nozzle may
have a nozzle hole configured to output the target material from
the tank. The filter may be disposed in a communication portion for
conducting the target material from the tank to the nozzle hole.
The temperature adjuster may be configured to change a temperature
of the target material in the tank. The gas exhauster may be
configured to exhaust gas from the tank. The controller may be
configured to control the temperature adjuster to change the
temperature of the target material in the tank for at least one
time between a first temperature higher than a melting point of the
target material and a second temperature lower than the first
temperature while the gas exhauster is controlled to set a pressure
in the tank lower than an atmospheric pressure.
[0010] According to still another aspect of the present invention,
a target material refining method of refining a target material by
use of a target generator and a temperature adjuster may be
provided, the target generator having a tank configured to contain
the target material of a metal, a nozzle having a nozzle hole
configured to output the target material from the tank, and a
filter disposed in a communication portion for conducting the
target material from the tank to the nozzle hole, the temperature
adjuster being configured to change a temperature of the target
material in the tank. The target material refining method may
include a step of causing oxygen in the target material to
precipitate as metal oxide by changing the temperature of the
target material in the tank by the temperature adjuster, and a step
of filtrating the target material of a liquid phase containing the
precipitated metal oxide through the filter.
[0011] According to another aspect of the present invention, a
target material refining program may enable a computer to perform
operations for controlling the temperature adjuster in the target
material refining method as defined above.
[0012] According to one aspect of the present invention, a
recording medium may be configured to store a target material
refining program in a computer readable manner, the target material
refining program enabling a computer to perform operations for
controlling the temperature adjuster in the target material
refining method as defined above.
[0013] According to another aspect of the present invention, a
target generator may be configured to contain a target material
that is solidified after refined by the target material refining
method as defined above.
BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Hereinafter, selected embodiments of the present disclosure
will be described with reference to the accompanying drawings.
[0015] FIG. 1 is an explanatory view in a cross section of an LPP
type EUV light generation apparatus;
[0016] FIG. 2 schematically illustrates the EUV light generation
apparatus having a target supply device of a first embodiment;
[0017] FIG. 3 schematically illustrates the target supply
device;
[0018] FIG. 4 is a graph illustrating the solubility of oxygen
atoms to tin;
[0019] FIG. 5 schematically illustrates a state of a target
material heated up to a temperature equal to or higher than a
melting point of the target material;
[0020] FIG. 6 schematically illustrates a state after the state of
FIG. 5;
[0021] FIG. 7 schematically illustrates a state after the state of
FIG. 6;
[0022] FIG. 8 is a flow chart illustrating a method for refinement
of the target material;
[0023] FIG. 9 is a timing chart illustrating the refinement of the
target material;
[0024] FIG. 10 is a flow chart illustrating a metal oxide
precipitation treatment;
[0025] FIG. 11 schematically illustrates a state at the end of the
metal oxide precipitation treatment;
[0026] FIG. 12 schematically illustrates a state when the steps for
the refinement of the target material are complete;
[0027] FIG. 13 is a flow chart illustrating a metal oxide
precipitation treatment in a variation of the first embodiment;
[0028] FIG. 14 is a timing chart illustrating a method for
refinement of the target material;
[0029] FIG. 15 schematically illustrates a target supply device of
a second preferred embodiment;
[0030] FIG. 16 is a flow chart illustrating a method for refinement
of the target material in the second embodiment;
[0031] FIG. 17 is a flow chart illustrating a metal oxide
precipitation treatment;
[0032] FIG. 18 is a flow chart illustrating a process for checking
solidification of the target material;
[0033] FIG. 19 is a flow chart illustrating a process for checking
melting of the target material;
[0034] FIG. 20 is a flow chart illustrating a process for checking
solidification of the target material in a variation of the second
embodiment;
[0035] FIG. 21 is a timing chart illustrating the process for
checking solidification of the target material;
[0036] FIG. 22 is a flow chart illustrating a process for checking
melting of the target material;
[0037] FIG. 23 is a timing chart illustrating the process for
checking melting of the target material;
[0038] FIG. 24 schematically illustrates a target supply device of
a third preferred embodiment;
[0039] FIG. 25 is a flow chart illustrating a metal oxide
precipitation treatment in the third embodiment;
[0040] FIG. 26 is a timing chart illustrating a method for
refinement of the target material;
[0041] FIG. 27 is a flow chart illustrating temperature control for
a first area;
[0042] FIG. 28 is a flow chart illustrating temperature control for
a second area;
[0043] FIG. 29 is a flow chart illustrating temperature control for
a third area;
[0044] FIG. 30 is a flow chart illustrating temperature control for
a fourth area;
[0045] FIG. 31 schematically illustrates a phenomenon that can
occur when the ingot is melted in the order from the first to
fourth areas;
[0046] FIG. 32 is a flow chart illustrating a metal oxide
precipitation treatment in a variation of the third embodiment;
[0047] FIG. 33 is a timing chart illustrating a method for
refinement of the target material;
[0048] FIG. 34 is a flow chart illustrating temperature control for
the third and fourth areas;
[0049] FIG. 35 schematically illustrates a target supply device of
a fourth embodiment, which includes a feed tank and a reservoir
thank; and
[0050] FIG. 36 is a block diagram schematically illustrating a
controller.
DETAILED DESCRIPTION
[0051] Contents
1. Overview
[0052] 2. Overview of EUV light generation apparatus
2.1 Configuration
2.2 Operation
[0053] 3. EUV light generation apparatus with a target supply
device
3.1 Terms
[0054] 3.2 First embodiment
3.2.1 Overview
3.2.2 Configuration
[0055] 3.2.3 Solubility of oxygen atoms to tin
3.2.4 Operation
[0056] 3.2.5 Variation of the first embodiment
3.2.5.1. Operation
[0057] 3.3 Second embodiment
3.3.1 Configuration
3.3.2 Operation
[0058] 3.3.3 Variation of the second embodiment
3.3.3.1 Configuration
3.3.3.2 Operation
[0059] 3.4 Third embodiment
3.4.1 Configuration
3.4.2 Operation
[0060] 3.4.3 Variation of the third embodiment
3.4.3.1 Operation
[0061] 4. Target supply device with tanks 4.1 Fourth embodiment
4.1.1 Configuration
4.1.2 Operation
5. Controller
5.1 Configuration
5.2 Operation
[0062] 6. Other variations
[0063] Hereinafter, selected embodiments of the present disclosure
will be described in detail with reference to the accompanying
drawings. The embodiments to be described below are merely
illustrative in nature and do not limit the scope of the present
disclosure. Furthermore, the configurations and operations
described in the embodiments are not necessarily all essential in
implementing the present disclosure. Among the elements shown in
FIG. 1, those elements which are not essential to the description
of the present disclosure may be omitted from the embodiments
described with the drawings other than FIG. 1. The same elements
are designated by the same reference numerals, to omit duplicated
explanations.
1. Overview
[0064] According to an embodiment of the present disclosure, a
target supply device may include a tank, a nozzle, a filter, a
temperature adjuster and a controller. The tank may be configured
to contain a target material of a metal. The nozzle may have a
nozzle hole configured to output the target material from the tank.
The filter may be disposed in a communication portion for
conducting the target material from the tank to the nozzle hole.
The temperature adjuster may be configured to change the
temperature of the target material in the tank. The controller may
be configured to control the temperature adjuster to change the
temperature of the target material in the tank so as oxygen
dissolved in the target material to precipitate as metal oxide.
[0065] According to an embodiment of the present disclosure, a
target supply device may include a tank, a nozzle, a filter, a
temperature adjuster and a controller. The tank may be configured
to contain a target material of a metal. The nozzle may have a
nozzle hole configured to output the target material from the tank.
The filter may be disposed in a communication portion for
conducting the target material from the tank to the nozzle hole.
The temperature adjuster may be configured to change the
temperature of the target material in the tank. The controller may
be configured to control the temperature adjuster to change the
temperature of the target material in the tank for at least one
time between a first temperature higher than a melting point of the
target material and a second temperature lower than the first
temperature while the target material is not contained between the
filter and the nozzle hole.
[0066] According to another embodiment of the present disclosure, a
target supply device may include a tank, a nozzle, a filter, a
temperature adjuster, a gas exhauster and a controller. The tank
may be configured to contain a target material of a metal. The
nozzle may have a nozzle hole configured to output the target
material from the tank. The filter may be disposed in a
communication portion for conducting the target material from the
tank to the nozzle hole. The temperature adjuster may be configured
to change the temperature of the target material in the tank. The
gas exhauster may be configured to exhaust gas from the tank. The
controller may be configured to control the temperature adjuster to
change the temperature of the target material in the tank for at
least one time between a first temperature higher than a melting
point of the target material and a second temperature lower than
the first temperature while the gas exhauster is controlled to set
the pressure in the tank lower than an atmospheric pressure.
[0067] According to an embodiment of the present disclosure, a
target material refining method uses a target generator and a
temperature adjuster. The target generator has a tank configured to
contain a target material of a metal, a nozzle having a nozzle hole
configured to output the target material from the tank, and a
filter disposed in a communication portion for conducting the
target material from the tank to the nozzle hole. The temperature
adjuster is configured to change the temperature of the target
material in the tank. The target material refining method may
include a step of causing oxygen in the target material to
precipitate as metal oxide by changing the temperature of the
target material in the tank by the temperature adjuster, and a step
of filtering the target material as being liquefied and containing
the precipitated metal oxide through the filter.
[0068] According to an embodiment of the present disclosure, a
target material refining program may enable a computer to perform
operations for controlling the temperature adjuster in the target
material refining method as defined above.
[0069] According to an embodiment of the present disclosure, a
recording medium storing a target material refining program may be
configured to store the abovementioned target material refining
program in a computer readable manner.
[0070] According to another embodiment of the present disclosure,
the target generator may be configured to contain the target
material that is solidified after refined by the target material
refining method as defined above.
2. Overview of EUV Light Generation Apparatus
2.1 Configuration
[0071] FIG. 1 schematically illustrates an exemplary configuration
of an LPP type EUV light generation system. An EUV light generation
apparatus 1 may be used with at least one laser apparatus 3. In the
present application, a system that includes the EUV light
generation apparatus 1 and the laser apparatus 3 is referred to as
an EUV light generation system 11. As illustrated in FIG. 1 and
described in detail below, the EUV light generation apparatus 1 may
include a chamber 2 and a target supply device 7. The chamber 2 may
be sealed airtight. The target supply device 7 may be mounted onto
the chamber 2, for example, so as to put through a wall of the
chamber 2. A target material to be supplied by the target supply
device 7 may include, but is not limited to, tin, terbium,
gadolinium, lithium, xenon, or any combination of two or more of
those.
[0072] The chamber 2 may have at least one through hole or opening
formed in its wall. The chamber 2 may have a window 21 formed in
its wall, through which a pulse laser beam 32 output from the laser
apparatus 3 may travel into the chamber 2. An EUV collector mirror
23, for example, having a spheroidal reflecting surface may be
provided inside the chamber 2. The EUV collector mirror 23 can have
a first focus and a second focus. The EUV collector mirror 23 may
have a multi-layered reflective film formed on the surface thereof,
the reflective film having, for example, a molybdenum layer or
layers and a silicon layer or layers alternately laminated on one
another. The EUV collector mirror 23 is preferably positioned such
that the first focus lies in a plasma generation region 25 and the
second focus lies in an intermediate focus (IF) region 292. The EUV
collector mirror 23 may have a through hole 24 formed at the center
thereof so that a pulse laser beam 33 may travel through the
through hole 24.
[0073] The EUV light generation apparatus 1 may further include an
EUV light generation control system 5, a target sensor 4, and the
like. The target sensor 4 may have an imaging function and may be
configured to detect the presence, trajectory, position, speed, and
the like of a droplet 27 as a target.
[0074] Further, the EUV light generation apparatus 1 may include a
connection section 29 for allowing the interior of the chamber 2 to
be in communication with the interior of an exposure apparatus 6. A
wall 291 having an aperture 293 may be provided in the connection
section 29. The wall 291 may be positioned such that the second
focus of the EUV collector mirror 23 lies in the aperture 293
formed in the wall 291.
[0075] The EUV light generation apparatus 1 may also include a
laser beam direction control unit 34, a laser beam focusing mirror
22, a target collector 28 for collecting droplets 27, and the like.
The laser beam direction control unit 34 may include an optical
element for defining the direction into which the pulse laser beam
travels and an actuator for adjusting the position and the
orientation or posture of the optical element.
2.2 Operation
[0076] With reference to FIG. 1, a pulse laser beam 31 output from
the laser apparatus 3 may pass through the laser beam direction
control unit 34 and be output therefrom as the pulse laser beam 32
so as to travel through the window 21 and enter the chamber 2. The
pulse laser beam 32 may travel inside the chamber 2 along at least
one laser beam path, and may be reflected by the laser beam
focusing mirror 22, so as to be projected as a pulse laser beam 33
toward at least one droplet 27.
[0077] The target supply device 7 may be configured to output the
droplets 27 toward the plasma generation region 25 in the chamber
2. The droplet 27 may be irradiated with at least one pulse of the
pulse laser beam 33. Upon being irradiated, the droplet 27 can be
turned into plasma, and radiation light 251 can be emitted from the
plasma. EUV light 252 included in the radiation light 251 may be
reflected selectively by the EUV collector mirror 23. The EUV light
252, which is reflected by the EUV collector mirror 23, may travel
through the intermediate focus region 292 and be output to the
exposure apparatus 6. Here, the droplet 27 may be irradiated with
multiple pulses included in the pulse laser beam 33.
[0078] The EUV light generation control system 5 may be configured
to integrally control the EUV light generation system 11. The EUV
light generation control system 5 may be configured to process
image data of the droplet 27 captured by the target sensor 4.
Further, the EUV light generation control system 5 may be
configured to control the timing when the droplet 27 is output, the
direction into which the droplet 27 is output, or the like, for
example. Furthermore, the EUV light generation control system 5 may
be configured to control the timing when the laser apparatus 3
oscillates, the direction in which the pulse laser beam 32 travels,
the position at which the pulse laser beam 33 is focused, or the
like, for example. The various controls mentioned above are merely
examples, and other controls may be added as necessary.
3. EUV Light Generation Apparatus with a Target Supply Device
3.1. Terms
[0079] Hereinafter, in the descriptions that refer to the drawings,
terms regarding directions may be described on the basis of XYZ
axes illustrated in the drawings. These terms representing the
directions, however, have no relation to gravity direction 10B. In
a case where tin is a target material 270, an oxidized material of
tin may be expressed as "metal oxide". Oxygen dissolved in tin as a
solid solution, or oxygen dissolved in a supersaturated state in a
metal may be expressed simply as "oxygen". Among pressures applied
to the target material 270, a minimum pressure that enables the
target material 270 to infiltrate in a filter 831A (refer to FIG.
3) or a filter 884D (refer to FIG. 35) may be expressed as
"penetration pressure". Among pressures applied to the target
material 270, a minimum pressure that enables the target material
270 to output from a nozzle 86A (refer to FIG. 3) at a
predetermined speed may be expressed as "output pressure". A
process according to the target material refining method may be
expressed as "target material refinement". A temperature level,
which is equal to or higher than a melting point of the target
material 270 and which is high enough to output the target material
270 from a target supply device 7A, may be expressed as "output
temperature". In the drawings, a reservoir tank 84A and a feed tank
87D (refer to FIG. 35), which are the tanks of the present
disclosure, may be expressed simply as "tanks".
3.2 First Embodiment
3.2.1 Overview
[0080] In a target supply device of a first embodiment of the
present disclosure, the controller may be configured to control the
temperature adjuster for changing the temperature of the target
material in the tank for at least one time between a first
temperature higher than a melting point of the target material and
a second temperature lower than the first temperature.
[0081] In a target material refining method of the first embodiment
of the present disclosure, the oxygen precipitation step for the
target material may include controlling the temperature adjuster
for changing the temperature of the target material in the tank for
at least one time between a first temperature higher than a melting
point of the target material and a second temperature lower than
the first temperature.
[0082] In the target supply device or target material refining
method of the first embodiment of the present disclosure, the
second temperature may be lower than the melting point of the
target material.
3.2.2 Configuration
[0083] FIG. 2 schematically illustrates a configuration of an EUV
light generation apparatus that includes a target supply device
according to the first embodiment. FIG. 3 schematically illustrates
a configuration of the target supply device are schematically
illustrated.
[0084] As shown in FIG. 2, an EUV light generation apparatus 1A may
include a chamber 2 and a target supply device 7A. The target
supply device 7A may include a target generating section 70A and a
target controller 71A as a controlling section. An EUV light
generation control system 5A, the laser apparatus 3 and the target
sensor 4 may be electrically connected to the target controller
71A.
[0085] The target generating section 70A in FIGS. 2 and 3 may
include a target generator 8A, a pressure adjuster 75A, a gas
exhauster 77A, a temperature adjuster 78A and a piezoelectric
actuator 79A.
[0086] The target generator 8A may include a device main unit 80A,
a lid 81A, a nozzle head 82A and a filter unit 83A.
[0087] The device main unit 80A may include a reservoir tank 84A of
a substantially cylindrical shape with a wall on a first side
thereof that is on the +Z direction side. The reservoir tank 84A
may be the tank of the present disclosure. A room in the reservoir
tank 84A may be a space for containment 840A for containing the
target material 270.
[0088] The reservoir tank 84A may include a nozzle body 85A. The
nozzle body 85A may be of a substantially cylindrical shape and
extend from the center of the first side of the reservoir tank 84A
in the +Z direction. A hollow in the nozzle body 85A may be a
through hole 850A for feeding the target material 270 from the
space for containment 840A to the nozzle head 82A therethrough.
[0089] The lid 81A may be formed in a substantially disk shape and
close a second side of the reservoir tank 84A, which is on the -Z
direction side. The lid 81A may be so provided as to tightly
contact with the second side of the reservoir tank 84A.
[0090] The nozzle head 82A may be formed in a substantially disk
shape. The outer diameter of the nozzle head 82A may be
substantially equal to that of the nozzle body 85A. The nozzle head
82A may be disposed in tight contact with the nozzle body 85A at
the end of the +Z direction side. A nozzle tip 820A may protrude
from the center of the nozzle head 82A in a conically tapered
shape. A through channel 821A is formed through the center of the
nozzle head 82A to extend vertically or along the Z axis. The
through channel 821A may communicate with the through hole 850A.
The through channel 821A may be formed to decrease its diameter in
the +Z direction. An end of the through channel 821A, which is
located on the +Z direction side, may be a nozzle hole 822A. The
diameter of the nozzle hole 822A may be 1 to 15 .mu.m. The through
hole 850A and the through channel 821A may constitute a
communication portion 860A for conducting the target material 270
in the reservoir tank 84A to the nozzle hole 822A.
[0091] The nozzle body 85A and the nozzle head 82A may constitute
the nozzle 86A that is provided to communicate the communication
portion 860A with the space for containment 840A. The nozzle 86A
can protrude from the first end wall of the reservoir tank 84A into
the chamber 2.
[0092] The nozzle head 82A is preferably formed from a material
that provides a contact angle of not less than 90 degrees between
the nozzle head 82A and the target material 270. Alternatively, at
least a surface of the nozzle head 82A may be coated with a
material that will make the contact angle equal to or more than 90
degrees. If the target material 270 is tin, the material which will
provide the contact angle of not less than 90 degrees may be SiC,
SiO.sub.2, Al.sub.2O.sub.3, molybdenum, and tungsten.
[0093] The filter unit 83A may include the filter 831A and a holder
832A.
[0094] The filter 831A may be disposed in the communication portion
860A of the nozzle 86A. The filter 831A may have a first filter
(filter element), which may be formed from a porous material for
collecting metal oxide. A great number of pores with a diameter of
approximately 3 to 10 .mu.m may be formed in the first filter. The
pores may be bent or curved in various directions to extend through
the first filter.
[0095] The first filter may be formed from a material having a low
reactivity to the target material 270. The difference between a
linear thermal expansion coefficient of a material of the first
filter and a linear thermal expansion coefficient of a material of
the target generator 8A can be smaller than 20% of the linear
thermal expansion coefficient of the material of the target
generator 8A.
[0096] When the target generator 8A formed from molybdenum or
tungsten, the material of the first filter may be Shirasu Porous
Glass (SPG) provided by SPG Technology Co., Ltd. The SPG may be
porous glass formed from white volcanic ash and sand.
[0097] The filter 831A may further include a second filter disposed
on one side of a first filter, at a position closer to the nozzle
hole 822A. The second filter may be formed by bundling multiple
capillaries into a plate shape. Through holes of the capillaries
may extend in the vertical direction (the Z-axis direction). An
inner diameter of the capillaries may be 0.1 to 2 .mu.m.
[0098] Also, the second filter may be formed from glass which can
react with the target material 270 in the liquid phase to create a
solid reaction product. The glass forming the capillaries of the
second filter may be a low-melting-point glass. Making the
capillaries of a low-melting-point glass can permit forming the
capillaries with smaller diameter in comparison with the
capillaries made of quartz glass having a high melting point. Also,
the low-melting-point glass may contain metal lead.
[0099] In a case where the target material 270 is tin, forming the
second filter (filter element) from a low-melting-point glass can
cause reductive reaction of the metal lead contained in the
low-melting-point glass with the tin, precipitating the metal lead
in the solid form. The precipitation of the metal lead from the
low-melting-point glass may result in breaking the structure of the
remaining glass, producing solid SiO.sub.2.
[0100] As a result, particles of SnO, SnO.sub.2, SiO.sub.2 and the
like can be created through the reaction between the
low-melting-point glass of the second filter and the tin as the
target material 270.
[0101] To suppress the creation of these particles, a coating layer
may be formed on an inner surface of the through holes of the
capillaries. The coating layer can be formed by applying a coating
of a material with a low reactivity to the target material 270 of a
liquid phase.
[0102] Note that the filter 831A may include only one of the first
and second filters.
[0103] The holder 832A may be formed into a tubular shape. In a
case where tin is the target material 270, the holder 832A may be
formed from molybdenum having low reactivity with the tin. The
holder 832A may hold the filter 831A so as to close the
communication portion 860A. The communication portion 860A may be
partitioned with the filter 831A into a first communication passage
861A and a second communication passage 862A. The first
communication passage 861A is on the side of the reservoir tank
84A. The second communication passage 862A is on the side of the
nozzle hole 822A.
[0104] The output direction predetermined for the droplets 27 does
not necessarily coincide with the gravity direction 10B but depends
on how the chamber 2 is arranged. The predetermined output
direction of the droplet 27 may be equal to the direction of the
center axis of the nozzle hole 822A, and hereinafter will be
referred to as the predetermined output direction 10A. A
configuration may be possible wherein the output direction of the
droplets 27 is horizontal or aslant to the gravity direction 10B.
In the first embodiment, the chamber 2 may be arranged such that
the predetermined output direction 10A coincides with the gravity
direction 10B.
[0105] A flow line 754A may be provided through the lid 81A of the
target generator 8A. A first end of the flow line 754A, which is on
the +Z direction side, may be positioned in the device main unit
80A. A second end of the flow line 754A, which is on the -Z
direction side, may be connected to a first end of a flow line 755A
through a valve V3. A second end of the flow line 755A may be
connected to an inert gas cylinder 751A through the pressure
adjuster 75A. Thus, inert gas from the inert gas cylinder 751A can
be supplied to the target generator 8A.
[0106] The pressure adjuster 75A may be provided in the flow line
755A. The pressure adjuster 75A may have a first valve V1, a second
valve V2, a pressure controller 752A and a pressure sensor
753A.
[0107] The first valve V1 may be provided in the flow line
755A.
[0108] A flow line 756A may be connected to the flow line 755A at a
position between the target generator 8A and the first valve V1. A
first end of the flow line 756A may be joined to the flow line 755A
at a side portion thereof. A second end of the flow line 756A may
be connected to the gas exhauster 77A.
[0109] The second valve V2 may be provided in the flow line
756A.
[0110] The first and second valves V1 and V2 may be any of gate
valves, ball valves, butterfly valves and the like. The first valve
V1 and the second valve V2 may be of the same type or different
types+.
[0111] The pressure controller 752A may be connected electrically
to the first and second valves V1 and V2. The target controller 71A
may send the pressure controller 752A signals for the first and
second valves V1 and V2. The first and second valves V1 and V2 may
be changed over between open and closed positions, independently
from each other according to the signal sent from the pressure
controller 752A.
[0112] When the first valve V1 opens, the inert gas in the inert
gas cylinder 751A can be supplied to the target generator 8A
through the flow lines 754A and 755A. While the second valve V2 is
closed, the inert gas in the flow lines 754A and 755A and the
target generator 8A can be prevented from being exhausted to the
outside of the flow line 756A through the second end thereof. Thus,
by opening the first valve V1 and closing the second valve V2, it
may be possible to raise the pressure in the target generator 8A up
to a pressure set by a regulator or the like which may be provided
in the inert gas cylinder 751A. Thereafter, it may also be possible
to maintain the pressure in the target generator 8A at the level
set by the regulator or the like.
[0113] When the first valve V1 is closed, the inert gas in the
inert gas cylinder 751A can be prevented from being supplied to the
target generator 8A through the flow lines 754A and 755A. When the
second valve V2 opens and the gas exhauster 77A is driven, the
inert gas can be exhausted from the flow lines 754A and 755A and
the target generator 8A. Thus, it may also be possible to reduce
the pressure in the target generator 8A by closing the first valve
V1, opening the second valve V2 and driving the gas exhauster
77A.
[0114] A flow line 757A may be connected to the flow line 755A at a
position between the target generator 8A and the flow line 756A. A
first end of the flow line 757A may be connected to the flow line
755A at a side portion thereof. A second end of the flow line 757A
may be provided with the pressure sensor 753A. The pressure
controller 752A may be electrically connected to the pressure
sensor 753A. The pressure sensor 753A may detect the pressure of
the inert gas inside the flow line 757A, and send a pressure signal
of the detected pressure to the pressure controller 752A. The
pressure in the flow line 757A may be substantially equal to the
pressure in the flow lines 754A and 755A and the target generator
8A.
[0115] The flow lines 754A, 755A, 756A and 757A may be made of
stainless steel, for example.
[0116] The gas exhauster 77A may be a pump. The gas exhauster 77A
may be connected electrically to the target controller 71A. The gas
exhauster 77A may exhaust the gas from the flow lines 754A, 755A
and 756A and the target generator 8A according to a signal sent
from the target controller 71A.
[0117] The temperature adjuster 78A may be configured to control
the temperature of the target material 270 contained in the target
generator 8A. The temperature adjuster 78A may have a heater 781A,
a heater power supply 782A, a temperature sensor 783A and a
temperature controller 784A. The heater 781A may be disposed on an
outer surface of the reservoir tank 84A. The heater power supply
782A may supply power to the heater 781A to generate heat according
to a signal from the temperature controller 784A. Thus, the target
material 270 in the reservoir tank 84A can be heated through the
wall of the reservoir tank 84A.
[0118] The temperature sensor 783A may be disposed on the outer
circumferential surface of the reservoir tank 84A, at a position
close to the nozzle body 85A, or may be located within the
reservoir tank 84A. The temperature sensor 783A may be configured
to detect the temperature at a location where the temperature
sensor 783A is installed as well as the vicinity thereof in the
reservoir tank 84A, and to send a signal of the detected
temperature to the temperature controller 784A. The temperature at
and around the installed position of the temperature sensor 783A
can be substantially equal to the temperature of the target
material 270 in the reservoir tank 84A.
[0119] The temperature controller 784A may also be configured to
output, to the heater power supply 782A, a signal for controlling
the temperature of the target material 270 to be a predetermined
temperature on the basis of the signal from the temperature sensor
783A.
[0120] The piezoelectric actuator 79A may have a piezoelectric
element 791A and a power source 792A. The piezoelectric element
791A may be provided on an outer circumferential surface of the
nozzle body 85A at the distal end thereof in the chamber 2. As an
alternative to the piezoelectric element 791A, a mechanism capable
of applying vibrations to the nozzle 86A at a high rate may be
provided. A feedthrough unit 793A may connect the power source 792A
to the piezoelectric element 791A electrically. The power source
792A may be electrically connected to the target controller
71A.
[0121] The target generating section 70A may be configured to
generate a jet 27A of the target material according to a continuous
jet method, and vibrate the jet 27A at the output from the nozzle
86A so as to form the droplets 27.
3.2.3 Solubility of Oxygen Atoms to Tin
[0122] FIG. 4 is a graph showing solubility of oxygen atoms to
tin.
[0123] Oxygen atoms are soluble in the target material 270
contained in the target generator 8A. Solubility of oxygen atoms to
tin, a case of the target material 270, may decrease as the
temperature of tin decreases, as illustrated in FIG. 4. If the tin
is solidified after being heated up to a first melting temperature,
and then melted again at a second melting temperature lower than
the first melting temperature, undissolved oxygen atoms will remain
in an amount that is equal to a result of subtraction by the amount
of the oxygen atoms soluble to the tin at the second melting
temperature from the amount of the oxygen atoms soluble to the tin
at the first melting temperature. Then the undissolved oxygen atoms
can bond with tin, to be precipitated as tin oxide as metal
oxide.
3.2.4 Operation
[0124] FIG. 5 schematically illustrates a phenomenon that can occur
when the target material is heated up to a predetermined
temperature equal to or higher than the melting point of the target
material. In FIG. 6, a phenomenon after the phenomenon of FIG. 5 is
schematically illustrated. In FIG. 7, a phenomenon after the
phenomenon of FIG. 6 is schematically illustrated. FIG. 8 is a flow
chart illustrating a method of refinement of the target material.
FIG. 9 is a timing chart illustrating the refinement method. FIG.
10 is a flow chart illustrating a process of precipitation
treatment for metal oxide. FIG. 11 schematically illustrates a
state after the precipitation treatment being complete. In FIG. 12,
a state after the completion of the treatment based on the target
material refinement method.
[0125] The operation of the target supply device 7A will
hereinafter be described with reference to an example where tin is
the target material 270.
[0126] At first, phenomena that can occur in a target supply device
will be described, the target supply device having the same
structure as the target supply device 7A of the first embodiment
except for the target controller.
[0127] As shown in FIG. 5, an operator can load an ingot 275 of the
target material 270 in the reservoir tank 84A of the target
generator 8A. It is not necessary to put the ingot 275 in the
communication portion 860A and the filter 831A in the target
generator 8A.
[0128] The target controller may send a signal to the temperature
controller 784A, to heat the ingot 275 in the target generator 8A
up to a predetermined temperature equal to or higher than the
melting point of the ingot 275. Thus, the ingot 275 can melt to be
the target material 270 of a liquid phase. The target controller
may send a signal of a predetermined frequency to the piezoelectric
element 791A. The piezoelectric element 791A can thereby vibrate so
as to generate the droplets 27 from the jet 27A periodically.
[0129] The target controller may send a signal to the pressure
controller 752A to set the pressure in the reservoir tank 84A at an
output pressure P2. Inert gas in the inert gas cylinder 751A is
thereby supplied to the reservoir tank 84A, making it possible to
stabilize the pressure in the reservoir tank 84A at the output
pressure P2.
[0130] When the pressure in the reservoir tank 84A becomes higher
than a penetration pressure, the target material 270 of the liquid
phase in the reservoir tank 84A can penetrate through the filter
831A and enter the second communication passage 862A, as shown in
FIG. 6.
[0131] The ingot 275 may be produced by a material manufacturer.
The temperature in a refining process of the ingot 275 may be
approximately 490.degree. to 600.degree. C. during the manufacture
of the ingot 275 of high purity by the material manufacturer.
According to the relationship shown in FIG. 4, oxygen can be
dissolved in the ingot 275 in an amount around 0.6 to 5 ppm (weight
ratio).
[0132] When the tin is the target material 270, the melting point
of the target material 270 can be 232.degree. C. In order to output
the droplet 27, the target material 270 in the target generator 8A
can be heated up to 240.degree. to 290.degree. C. Solubility of
oxygen to the target material 270 in this temperature range can be
0.0001 to 0.001 ppm (weight ratio).
[0133] Accordingly, a certain amount of oxygen can theoretically
remain undissolved in the target material 270 of the liquid phase
obtained by heating the ingot 275 at temperatures in the range of
approximately 240.degree. to 290.degree. C.
[0134] However, while the ingot 275 is being heated at
approximately 240.degree. to 290.degree. C., such oxygen that
cannot theoretically be dissolved in the target material 270 at
said temperatures can be dissolved in and thus supersaturate the
target material 270 with oxygen.
[0135] Thus, precipitation of metal oxide 278 (FIG. 7) can be
suppressed, as illustrated in FIG. 6, and the target material 270
of the supersaturated state can enter the second communication
passage 862A.
[0136] When the pressure in the reservoir tank 84A reaches the
output pressure P2, the jet 27A can be output from the nozzle 86A
and formed into the droplets 27 according to the vibration of the
nozzle 86A.
[0137] When terminating the creation of the droplet 27, the target
controller may send signals to the pressure controller 752A and the
piezoelectric element 791A so as to reduce inner pressure in the
target generator 8A to the atmospheric pressure, and to stop the
vibration of the piezoelectric element 791A. Thus, the output of
the jet 27A may be stopped. The creation of the droplets 27 may be
completed. The target controller may send a signal to the
temperature controller 784A so as to decrease the temperature of
the target material 270 down to the room temperature in the
reservoir tank 84A. Thus, the target material 270 may solidify in
the reservoir tank 84A, the communication portion 860A and the
filter 831A.
[0138] When restarting creating the droplets 27, the target
controller can operate to heat the solidified target material 270
at temperatures in the range of approximately 240.degree. to
290.degree. C. According to the findings of the inventors, metal
oxide 278 can precipitate when the target material 270 is heated
again after being solidified. As shown in FIG. 7, the oxygen
dissolved in the target material 270 in the supersaturated state
can be considered to react with the target material 270, causing
the precipitation of metal oxide 278 in the reservoir tank 84A and
the first and second communication passages 861A and 862A. The
metal oxide 278 precipitated in the second communication passage
862A can clog or narrow the nozzle hole 822A.
[0139] To solve this problem, the target controller 71A may perform
the following control in the target supply device 7A.
[0140] The operator, after putting the ingot 275 in the reservoir
tank 84A of the target generator 8A, may close the lid 81A for
sealing. As shown in FIG. 8, the target controller 71A may
determine whether precipitation of metal oxide 278 should be
performed (step S1). The step S1 may be executed at a time point R0
in FIG. 9. The target controller 71A may make the determination in
step S1 depending upon whether a signal for executing the
precipitation treatment is input from the EUV light generation
control system 5A or from an external apparatus.
[0141] If, in the step S1, the target controller 71A determines
that no signal for executing the precipitation treatment is input,
the target controller 71A may repeat the step S1 after a
predetermined time interval. However, if the target controller 71A
determines that there is an input of the signal for executing the
precipitation treatment in the step S1, then the target controller
71A may control the pressure adjuster 75A and the gas exhauster 77A
to exhaust air from the reservoir tank 84A (step S2). Thus, as
shown in FIG. 9, the pressure P in the reservoir tank 84A can
decrease to a pressure level P0. While the pressure P in the
reservoir tank 84A is at the pressure P0, the reservoir tank 84A
may be in a substantially vacuum state where the internal pressure
is lower than the atmospheric pressure.
[0142] The target controller 71A may perform the precipitation
treatment for metal oxide 278 (step 3).
[0143] In the step S3 as shown in FIG. 10, the target controller
71A may set the number N of times of the conducted thermal cycles
of heating and cooling the target material to 0 (step S11). The
target controller 71A may control the temperature adjuster 78A so
as to make the temperature T in the reservoir tank 84A equal to a
temperature TH (step S12). The step S12 may be executed at a time
point R1 in FIG. 9. The temperature TH may be higher than the
melting point Tmp of the target material 270 and in a level in
which reaction between the reservoir tank 84A and the target
material 270 is inhibited. Preferably, the temperature TH may be in
the range of 280.degree. to 300.degree. C., for example,
290.degree. C. The temperature TH may correspond to the first
temperature of the present disclosure. When the temperature in the
reservoir tank 84A becomes higher than the melting point Tmp of the
target material 270, the ingot 275 can melt to become the target
material 270 of a liquid phase. As the pressure P in the reservoir
tank 84A is at the pressure P0 that is not higher than the
penetration pressure, the target material 270 of the liquid phase
cannot enter or pass the filter 831A, but is located only in the
reservoir tank 84A and the first communication passage 861A, as
shown in FIG. 11.
[0144] The temperature controller 784A in the temperature adjuster
78A may receive a signal from the temperature sensor 783A and send
the signal to the target controller 71A. Referring to FIG. 10, the
target controller 71A may determine by the signal from the
temperature adjuster 78A whether the temperature T is equal to or
higher than the temperature TH (step S13). If it is determined in
the step S13 that the temperature T is not yet equal to or higher
than the temperature TH, then the target controller 71A may repeat
step S13 after a lapse of predetermined time. If it is determined
in the step S13 that the temperature T has become equal to or
higher than the temperature TH, then the target controller 71A may
control the temperature adjuster 78A to maintain the temperature T
at the temperature TH for a period H1 (step S14). The step S14 may
be performed from a time point R2 to a time point R3 in FIG. 9. The
period H1 may range from 1 hour to 10 hours, for example. More
preferably, the period H1 may range from 4 to 8 hours, for example.
As described above with reference to FIG. 6, also those oxygen
which cannot be dissolved in the target material 270 at the
temperature TH can be dissolved in the target material 270 under
this condition, bringing the target material 270 into a
supersaturated state. Thus, the precipitation of metal oxide 278
can be inhibited.
[0145] The target controller 71A may control the temperature
adjuster 78A so as to set the temperature T in the reservoir tank
84A equal to a temperature TL (step S15). The step S15 may be
executed at the time point R3 in FIG. 9. The temperature TL may be
a temperature at which metal oxide 278 can precipitate but the
target material 270 of the liquid phase does not solidify, or a
temperature at which the target material 270 solidifies and metal
oxide 278 precipitates in the solidified target material 270. The
temperature TL may be a predetermined temperature that is equal to
or higher than but near the melting point Tmp and in the range of
232.degree. to 240.degree. C. The temperature TL may also be a
predetermined temperature that is lower than the melting point Tmp
and in the range of 20.degree. to 220.degree. C. in which the
target material 270 solidifies. Preferably, the temperature TL may
be a predetermined temperature in the range of 30.degree. to
60.degree. C. Setting the temperature TL lower than the melting
point Tmp is more preferable because the precipitation of metal
oxide 278 can be facilitated in comparison with the case where the
temperature TL is equal to or higher than the melting point Tmp.
The temperature TL may be a second temperature of the present
disclosure. Furthermore, the temperature TL may be lower than the
melting point Tmp and equal to the room temperature TR.
[0146] The target controller 71A may determine whether the
temperature T is equal to or lower than the temperature TL on the
basis of a signal from the temperature adjuster 78A, (step S16). If
it is determined in the step S16 that the temperature T has not
become equal to or lower than the temperature TL, then the target
controller 71A may repeat the step S16 after a lapse of
predetermined time. If it is determined in the step S16 that the
temperature T has become equal to or lower than the temperature TL,
then the target controller 71A may control the temperature adjuster
78A to maintain the temperature T at the temperature TL for a
period H2 (step S17). The step S17 can be performed from a time
point R4 to a time point R5 in FIG. 9. The period H2 may range from
1 hour to 20 hours, and more preferably 6 hours to 13 hours, for
example. By maintaining the temperature T at the temperature TL in
the reservoir tank 84A, such oxygen that has been dissolved in the
target material 270 in the supersaturated state but cannot be
dissolved therein at the temperature TL can be precipitated as
metal oxide 278, as shown in FIG. 11.
[0147] As shown in FIG. 10, the target controller 71A may add 1 to
the number N of times of the thermal cycles of heating and cooling
(step S18). The target controller 71A may determine whether the
number N of times of the thermal cycles has reached or exceeds an
upper limit number Nmax (step S19). If it is determined in the step
S19 that the number N of times of the thermal cycles has not
reached the upper limit number Nmax, the target controller 71A may
perform the step S12. In contrast, if it is determined that the
number N of times of the thermal cycles has reached or exceeds the
upper limit number Nmax, the target controller 71A may perform the
step S4 in FIG. 8. The upper limit number Nmax may be set at 1 or a
number between 2 and 30 inclusive. Preferably, the upper limit
number Nmax may be set in the range of 3 to 17.
[0148] When the upper limit number Nmax of thermal cycles is 2, the
step S12 may be executed at time points R1 and R5 in FIG. 9. The
step S14 may be performed during a period between the time points
R2 and R3 and during a period between time points R6 and R7. The
step S15 may be executed at time points R3 and R7. The step S17 may
be performed during a period between time points R4 and R5 and
during a period between time points R8 and R9. Thus, the
precipitation treatment for precipitating oxygen as metal oxide 278
may end at the time point R9.
[0149] Through the above precipitation treatment for metal oxide
278, oxygen dissolved in the target material 270 of the
supersaturated state but not dissolvable therein at the temperature
TL can be precipitated as metal oxide 278. Thus, after the
precipitation treatment for metal oxide 278, the target material
270 can be free from the supersaturated state. In other words, the
target material 270 after the precipitation treatment can contain
no such oxygen that cannot be dissolved therein at the temperature
TL.
[0150] In step S4 as shown in FIG. 8, the target controller 71A may
control the temperature adjuster 78A so as to keep the temperature
T in the reservoir tank 84A equal to the output temperature Top.
The output temperature Top may be a predetermined temperature
between the melting point Tmp and the temperature TH. The target
controller 71A may control the pressure adjuster 75A so as to set
the pressure P in the reservoir tank 84A equal to a penetration
pressure P1 (step S5). The step S5 may be executed at a time point
R11 later than a time point R10 in FIG. 9. The penetration pressure
P1 may, for example, be 2 MPa. Through the step S5, the metal oxide
278 can be trapped in the filter 831A, and the target material 270
free from the supersaturated state can pass through the filter 831A
and enter the second communication passage 862A. As shown in FIG.
12, the target material 270 downstream of the filter 831A can reach
the nozzle hole 822A at a time point R12 in FIG. 9.
[0151] The target controller 71A may control the pressure adjuster
75A so that the pressure P inside the reservoir tank 84A can become
the output pressure P2 (step S6). The step S6 may be executed at
the time point R12 in FIG. 9. An example of the output pressure P2
may be 10 MPa. The target material 270 can be output as a jet 27A
by means of the step S6.
[0152] In addition, the target controller 71A may control the
piezoelectric element 791A to create the droplet 27 in a
predetermined form (step S7). Thus, the refinement of the target
material can be completed.
[0153] After refining the target material 270, the EUV light
generation system 11 may transit to a process for generating the
EUV light 252. Alternatively, the target controller 71A, after the
refinement of the target material, may lower the temperature T in
the reservoir tank 84A to the room temperature TR, to solidify the
target material 270 in the target generator 8A. In another
alternative, the target material 270 may be refined by a device
specific to the above-described refining treatment, which is not
provided in the EUV light generation apparatus 1A. In that case,
the target generator 8A containing the target material 270 may be
transferred from the specific device and attached to the EUV light
generation apparatus 1A, after the target material 270 is refined
and solidified in the specific device.
[0154] Furthermore, the target controller 71A in the first
embodiment may perform the following steps for precipitation of
metal oxide 278. The target controller 71A may control the
temperature T of the target material 270 in the reservoir tank 84A
so that the oxygen having been dissolved in the target material 270
of the supersaturated state can precipitate as metal oxide 278. The
target controller 71A may change the temperature T of the target
material 270 in the reservoir tank 84A at least one time between
the temperature TH and the temperature TL while the target material
270 is not contained in the second communication passage 862A. For
example, the target controller 71A may perform this change while
making the inside of the reservoir tank 84A in a substantially
vacuum state.
[0155] After the precipitation treatment for metal oxide 278
described above, the target controller 71A may control pressure in
the reservoir tank 84A so as the target material 270 to pass
through the filter 831A in the reservoir tank 84A.
[0156] Through the processes described as far, the metal oxide 278
can be trapped in the filter 831A, and the target material 270 free
from the supersaturated state can enter the second communication
passage 862A. Thus, solidifying and thereafter re-melting the
target material 270 in the target generator 8A can suppress
precipitation of the metal oxide 278 from the target material 270
which has entered the second communication passage 862A. It is
possible to inhibit the metal oxide 278 from clogging or narrowing
the nozzle hole 822A.
[0157] It is also possible for the target controller 71A to change
the temperature T of the target material 270 in the reservoir tank
84A multiple times between the temperature TH and the temperature
TL. This can help the metal oxide 278 grow larger in comparison
with a single change of the temperature T between the temperature
TH and the temperature TL. As a result, the content of oxygen in
the target material 270 can be more reduced after the precipitation
treatment for metal oxide 278, and thus precipitation of the metal
oxide 278 from the target material 270 in the second communication
passage 862A can be suppressed.
3.2.5 Variation of the First Embodiment
3.2.5.1. Operation
[0158] In FIG. 13, a flow chart of a metal oxide precipitation
treatment according to a variation of the first embodiment is
illustrated. In FIG. 14, a timing chart illustrating a target
material refining method is illustrated.
[0159] The variation of the first embodiment may include the same
steps for metal oxide precipitation treatment as in the first
embodiment except but further include steps S21, S22 and S23.
[0160] As shown in FIG. 13, the target controller 71A, after
performing the steps S11 to S14 of the first embodiment, may
control the temperature adjuster 78A to set the temperature T in
the reservoir tank 84A equal to a temperature TB (step S21). The
step S21 can be executed at the time point R3 in FIG. 14. The
temperature TB may be a temperature at which the metal oxide 278
can grow larger after the precipitation. An example of the
temperature TB may be equal to or higher than the melting point
Tmp, and may be 240.degree. C., for example.
[0161] The target controller 71A may determine whether the
temperature T has become equal to or lower than the temperature TB
on the basis of a signal from the temperature adjuster 78A (step
S22). If it is determined in the step S22 that the temperature T
has not become equal to or lower than the temperature TB, then the
target controller 71A may repeat the step S22 after a lapse of
predetermined time. If it is determined in the step S22 that the
temperature T has become equal to or lower than the temperature TB,
then the target controller 71A may control the temperature adjuster
78A to maintain the temperature T at the temperature TB for a
period H3 (step S23). The step S23 may be performed from a time
point R21 to a time point R22 in FIG. 14. The period H3 may range
from 10 minutes to 2 hours, and may be 30 minutes, for example. By
maintaining the temperature T at the temperature TB in the
reservoir tank 84A, a certain amount of oxygen that has been
dissolved in a supersaturated state in the target material 270 but
cannot be dissolved therein at the temperature TB can be
precipitated as metal oxide 278, and then the metal oxide 278 can
grow larger.
[0162] Then the target controller 71A may perform the steps S15 to
S19, as with the first embodiment. The precipitation treatment of
the metal oxide 278 can be terminated by the step S19. After the
step S19, the target controller 71A may perform the steps S4 to S7
of the first embodiment.
[0163] When the upper limit number Nmax of thermal cycles is 2, for
example, the step S12 may be executed at time points R1 and R24 in
FIG. 14. The step S14 may be performed during a period between the
time points R2 and R3 and during a period between time points R25
and R26. The step S21 may be executed at the time points R3 and
R26. The step S23 may be performed during a period between time
points R21 and R22 and during a period between time points R27 and
R28. The step S15 may be executed at the time points R22 and R28.
The step S17 may be performed during a period between the time
points R23 and R24 and during a period between time points R29 and
R30. The precipitation treatment of the metal oxide 278 may be
completed at the time point R30. The step S5 may be executed at a
time point R31.
[0164] In the variation of the first embodiment, the target
controller 71A may maintain the temperature at the temperature TB
for a predetermined time in the course of lowering the temperature
T of the target material 270 in the reservoir tank 84A from the
temperature TH to the temperature TL. Thus, the metal oxide 278 can
grow larger in comparison with the first embodiment. As a result,
the content of oxygen in the target material 270 after the
precipitation treatment for metal oxide 278 can decrease to inhibit
precipitation of metal oxide 278 from the target material 270 in
the second communication passage 862A.
3.3 Second Embodiment
3.3.1 Configuration
[0165] FIG. 15 schematically shows a configuration of a target
supply device according to a second embodiment.
[0166] As shown in FIG. 15, the target supply device 7B of the
second embodiment may include a target generating section 70B, and
a target controller 71B as a controlling section.
[0167] To the target generating section 70B, it is possible to
apply the same configuration as the target generating section 70A
of the first embodiment, except that a window 811B is provided in a
lid 81A of a target generator 8A, and a camera 761B as an imaging
section is further included therein.
[0168] The camera 761B may be disposed outside the target generator
8A and in face to the window 811B, and may be connected
electrically to the target controller 71B. The camera 761B may be a
CCD camera, and is capable of imaging solidification or melting of
the target material 270 in the reservoir tank 84A through the
window 811B. The camera 761B may send a signal corresponding to an
acquired image to the target controller 71B.
[0169] When the target material 270 in the reservoir tank 84A
solidifies, the target material 270 can also solidify in the
communication portion 860A. When the target material 270 in the
reservoir tank 84A melts, the target material 270 can also melt in
the communication portion 860A.
3.3.2 Operation
[0170] FIG. 16 is a flow chart illustrating a method for refinement
of the target material according to the second embodiment. FIG. 17
is a flow chart illustrating a metal oxide precipitation treatment.
FIG. 18 is a flow chart illustrating a process for checking
solidification of the target material. FIG. 19 is a flow chart
illustrating a process for checking melting of the target
material.
[0171] The target supply device 7B will be described hereinafter
with reference to an example wherein tin is the target material
270.
[0172] The metal oxide precipitation treatment of the second
embodiment may include the same steps as the metal oxide
precipitation treatment of the first embodiment except but further
includes a step of checking if the target material 270 is
solidified. The refinement of the target material of the second
embodiment may include the same steps for the refinement of the
target material as in the first embodiment except but further
include a step of checking if the target material 270 is
melted.
[0173] As shown in FIG. 16, the target controller 71B may perform
the steps S1 to S4 of the first embodiment and then check the state
of melting of the target material 270 (step S31).
[0174] In the step S3, as shown in FIG. 17, the target controller
71B may control the temperature adjuster 78A so as to keep the
temperature T in the reservoir tank 84A at the temperature TL after
performing the steps S11 to S16 of the first embodiment (step S41).
The target controller 71B may check the state of solidification of
the target material 270 (step S42).
[0175] In step S42, as shown in FIG. 18, the target controller 71B
may visually detect the state of the target material 270 with the
camera 761B through the window 811B (step S51). On the basis of the
result of the visual detection in the step S51, the target
controller 71B may determine whether the target material 270 has
completed solidification (step S52). The target controller 71B may
determine whether the target material 270 has completed
solidification, by processing the image acquired by the camera
761B.
[0176] If it is determined in the step S52 that the solidification
of the target material 270 is complete, the target controller 71B
may set 1 for a solidified state flag F1 (step S53). If, in the
step S52, it is determined that the solidification of the target
material 270 is not complete, the target controller 71B may set 0
for the solidified state flag F1 (step S54). The check of the
solidification of the target material 270 is completed by
performing the step S53 or S54.
[0177] After performing the step S42 in FIG. 17, the target
controller 71B may determine whether all the target material 270
has been solidified (step S43). If the solidified state flag F1=1,
the target controller 71B can determine that all the target
material 270 has been solidified. If the solidified state flag
F1=0, the target controller 71B can determine that at least part of
the target material 270 has not been solidified. If it is
determined in the step S43 that at least part of the target
material 270 has not been solidified, then the target controller
71B may perform the step S42. If it is determined in the step S43
that all the target material 270 has been solidified, then the
target controller 71B may perform the step S18.
[0178] The precipitation treatment for the metal oxide 278 can be
terminated by performing the steps S18 and S19.
[0179] Upon completion of the step S3, the target controller 71B
may perform the step S4, as shown in FIG. 16. Thereafter, the
target controller 71B may check the melting state of the target
material 270 (step S31).
[0180] In step S31, as shown FIG. 19, the target controller 71B may
visually detect the state of the target material 270 with the
camera 761B through the window 811B (step S61). On the basis of the
result of the visual detection in the step S61, the target
controller 71B may determine whether the target material 270 has
completed melting (step S62). Also, the target controller 71B may
determine whether the melting of the target material 270 has
completed, by processing the image acquired by the camera 761B.
[0181] If the target controller 71B determines that the target
material 270 completes melting in the step S62, the target
controller 71B may set 1 for a melted state flag F2 (step S63). If
the target controller 71B determines in the step S62 that the
target material 270 has not completely melted, the target
controller 71B may set 0 for the melted state flag F2 (step S64).
The check of melting of the target material 270 can be completed by
performing the step S63 or S64.
[0182] Referring to FIG. 16, the target controller 71B may
determine, after the step S31, whether all the target material 270
has melted (step S32). When the melted state flag F2 is 1, the
target controller 71B may determine that the target material 270
has entirely melted. When the melted state flag F2 is 0, the target
controller 71B may determine that at least part of the target
material 270 has not melted. If it is determined in the step S32
that at least part of the target material 270 has not melted, the
target controller 71B may perform the step S31. In contrast, if it
is determined in the step S32 that the target material 270 has
entirely melted, the target controller 71B may perform the steps S5
to S7.
[0183] If the upper limit number Nmax of times of the thermal
cycles is set at 2, the steps S41 to S43 may be performed between
time points R4 and R5 and between time points R8 and R9 in FIG.
9.
3.3.3 Variation of the Second Embodiment
3.3.3.1 Configuration
[0184] A target generating section 70B in the variation of the
second embodiment may have the same configuration as the target
generating section 70B except but a temperature sensor 762B as
indicated by a phantom line in FIG. 15 is provided as an
alternative to the camera 761B and no window 811B is provided in
the lid 81A.
[0185] The temperature sensor 762B may be disposed to extend
through the lid 81A into the target material 270 contained in the
reservoir tank 84A. The temperature sensor 762B may be connected
electrically to the target controller 71B. The temperature sensor
762B may be coated with a material of low reactivity to the target
material 270. The temperature sensor 762B may detect a temperature
of the target material 270 in the reservoir tank 84A and send a
temperature signal corresponding to the detected temperature to the
target controller 71B.
3.3.3.2 Operation
[0186] FIG. 20 is a flow chart illustrating a process for checking
solidification of the target material in the variation of the
second embodiment. FIG. 21 is an explanatory diagram illustrating a
method for checking solidification of the target material. FIG. 22
is a flow chart illustrating a process for checking melting of the
target material. FIG. 23 is an explanatory diagram illustrating a
method for checking melting of the target material.
[0187] The target material refinement according to the variation of
the second embodiment may include the same steps as the target
material refinement of the second embodiment except but steps shown
in FIG. 20 are carried out instead of the steps shown in FIG. 18,
and steps shown in FIG. 22 instead of the steps shown in FIG.
19.
[0188] For checking solidification of the target material 270, the
target controller 71B in FIG. 20 may measure the change in
temperature Td with time detected by the temperature sensor 762B
(step S71). According to the result of measurement in the step S71,
the target controller 71B may determine whether the solidification
of the target material 270 is completed (step S72).
[0189] For example, when the temperature adjuster 78A is controlled
in the step S41 at the time point R3 so as to maintain the
temperature T in the reservoir tank 84A at the temperature TL, the
temperature of the target material 270 can start decreasing, as
shown in FIG. 21. During a period between time points R41 and R43,
the target material 270 can be cooled too much in the course of
cooling. As a result, the temperature of the target material 270
can get lower than the melting point Tmp while the target material
270 stays in the liquid form. For example, the temperature of the
target material 270 can decrease during a period H4 between time
points R41 and R42 and, thereafter, increase during a period
between the time points R42 and R43.
[0190] The temperature of the target material 270 may be kept
stable at the melting point Tmp for a period between the time
points R43 and R44 while the target material 270 is being
solidified. When the solidification of the target material 270 is
complete at the time point R44, the temperature of the target
material 270 restarts decreasing and can reach the temperature TL
at the time point R4.
[0191] If the detected temperature Td becomes lower than the
melting point Tmp, the target controller 71B may measure the time
duration until the detected temperature Td restarts increasing,
and, if the measured time duration is equal to or shorter than the
period H4, the target controller 71B may determine that
solidification of the target material 270 has not completed. If the
measured time duration exceeds the period H4, the target controller
71B may determine that solidification of the target material 270 is
complete. The period H4 may preferably be obtained previously by
experiments, and stored in the target controller 71B.
[0192] Also, the target controller 71B may perform the step S53 or
S54 depending on the result in the step S72, as illustrated in FIG.
20.
[0193] As shown in FIG. 22, the target controller 71B may measure
the change with time in the detected temperature Td by the
temperature sensor 762B as a step for checking the melting state of
the target material 270 (step S81). On the basis of the result of
measurement in the step S81, the target controller 71B may
determine whether the target material 270 has completely melted
(step S82).
[0194] For example, when the temperature adjuster 78A is controlled
so as to maintain the temperature T in the reservoir tank 84A at
the output temperature Top in the step S4 at the time point R9, as
shown in FIG. 23, the temperature of the target material 270 starts
increasing. For a period between time points R51 and R52 during the
temperature increase, the temperature of the target material 270
may be temporarily kept stable at the melting point Tmp. The target
material 270 can continue melting while the temperature of the
target material 270 is kept stable at the melting point Tmp. When
the melting of the target material 270 is complete at the time
point R52, the temperature of the target material 270 begins to
increase again and can reach the output temperature Top at the time
point R10.
[0195] Furthermore, if the target controller 71B determines that
the detected temperature Td detected by the temperature sensor 762B
continues to increase from the melting point Tmp in the period from
the time point R52 to the time point R10, the target controller 71B
can determine that the melting of the target material 270 is
complete.
[0196] Referring to FIG. 22, the target controller 71B may perform
the step S63 or S64 depending on the result of determination in the
step S82.
[0197] In the above embodiment, the solidification and melting of
the target material 270 are checked on the basis of the temperature
of the target material 270 detected by the temperature sensor 762B.
However, the solidification and melting of the target material 270
may be checked on the basis of the temperature of the reservoir
tank 84A detected by the temperature sensor 783A without the
temperature sensor 762B being provided.
[0198] It may be possible to check one of the solidification and
melting processes of the target material 270 on the basis of the
temperature of the target material 270 detected by the temperature
sensor 762B, and to check the other of the solidification and
melting processes of the target material 270 one the basis of the
temperature of the reservoir tank 84A detected by the temperature
sensor 783A.
3.4 Third Embodiment
3.4.1 Configuration
[0199] In FIG. 24, a target supply device 7C of a third embodiment
may include a target generating section 70C, and a target
controller 71C as a controlling section.
[0200] To the target generating section 70C, it is possible to
apply the same configuration as the target generating section 70A
of the first embodiment except but the target generating section
70C includes a first temperature adjuster 91C, a second temperature
adjuster 92C, a third temperature adjuster 93C and a fourth
temperature adjuster 94C in place of the temperature adjuster
78A.
[0201] The first temperature adjuster 91C may change the
temperature of a first area AR1 located on the -Z direction side in
the reservoir tank 84A of the target generator 8A. The second
temperature adjuster 92C may change the temperature of a second
area AR2 located on the +Z direction side in the reservoir tank
84A. The third temperature adjuster 93C may change the temperature
of a third area AR3 located on the -Z direction side in the nozzle
86A in the target generator 8A. The fourth temperature adjuster 94C
may change the temperature of a fourth area AR4 located on the +Z
direction side in the nozzle 86A.
[0202] The first temperature adjuster 91C may include a first
heater 911C, a first heater power supply 912C, a first temperature
sensor 913C and a first temperature controller 914C. The second
temperature adjuster 92C may include a second heater 921C, a second
heater power supply 922C, a second temperature sensor 923C and a
second temperature controller 924C. The third temperature adjuster
93C may include a third heater 931C, a third heater power supply
932C, a third temperature sensor 933C and a third temperature
controller 934C. The fourth temperature adjuster 94C may include a
fourth heater 941C, a fourth heater power supply 942C, a fourth
temperature sensor 943C and a fourth temperature controller
944C.
[0203] The first to fourth heaters 911C, 921C, 931C and 941C may be
disposed on the outer circumferential surface of the target
generator 8A in the first, second, third and fourth areas AR1, AR2,
AR3 and AR4, respectively.
[0204] The first to fourth heater power supplies 912C, 922C, 932C
and 942C may receive signals from the first to fourth temperature
controllers 914C, 924C, 934C and 944C, and supply power to the
first to fourth heaters 911C, 921C, 931C and 941C, to cause the
first to fourth heaters 911C, 921C, 931C and 941C to generate heat,
respectively. Thus, the target material 270 in the first to fourth
areas AR1 to AR4 can be heated under the control of the target
generator 8A.
[0205] The first to fourth temperature sensors 913C, 923C, 933C and
943C may be disposed on the outer circumferential surface of the
target generator 8A or inside the target generator 8A in the first
to fourth areas AR1 to AR4, respectively. The temperatures detected
respectively by the first to fourth temperature sensors 913C, 923C,
933C and 943C can be substantially equal to the temperatures of the
target material 270 in the first to fourth areas AR1 to AR4 within
the target generator 8A, respectively.
[0206] The first to fourth temperature controllers 914C, 924C, 934C
and 944C may be electrically connected to the target controller
71C. The first to fourth temperature controllers 914C, 924C, 934C
and 944C may be so configured as to control the first to fourth
heaters 911C, 921C, 931C and 941C by controlling the first to
fourth heater power supplies 912C, 922C, 932C and 942C according to
signals from the first to fourth temperature sensors 913C, 923C,
933C and 943C.
[0207] The target controller 71C may control the first and second
temperature adjusters 91C and 92C to melt the ingot 275 in the
reservoir tank 84A in such a manner that the part of the ingot 275
within the first area AR1 distant from the filter 831A can melt
faster than the part of the ingot 275 within the second area AR2
nearer to the filter 831A.
3.4.2 Operation
[0208] In FIG. 25, a metal oxide precipitation treatment according
to the third embodiment is illustrated. FIG. 26 is a timing chart
illustrating a method of refinement of the target material. FIG. 27
is a flow chart illustrating temperature control for the first area
AR1. In FIGS. 28 to 30, flow charts of temperature control for the
second, third and fourth areas AR2, AR3 and AR4 are illustrated,
respectively.
[0209] The operation of the target supply device 7C is hereinafter
described with an example wherein tin is the target material
270.
[0210] The refinement of the target material in the third
embodiment may include the same steps as the refinement of the
target material in the first embodiment except that the metal oxide
precipitation treatment is different from that illustrated in FIG.
10.
[0211] If the target controller 71C controls such that a first
portion of the ingot 275 in the reservoir tank 84A, the first
portion being disposed in the second area AR2 nearer to the filter
831A, melt faster than a second portion of the ingot 275, the
second portion being disposed in the first area AR1 distant from
the filter 831A, the following problem can occur. When the first
portion of the ingot 275 in the second area AR2 melts to be the
target material 270 of the liquid phase, the liquefied target
material 270 can expand from the volume in the solid state. As the
second portion of the ingot 275 in the first area AR1 stays solid,
the target material 270 in the second area AR2 may expand toward
the filter 831A, not toward the first area AR1. Even while the
reservoir tank 84A is kept substantially in a vacuum state, the
target material 270 of the supersaturated state in the second area
AR2 can then pass through the filter 831A and enter the second
communication passage 862A. When the target material 270 in the
target generator 8A is solidified and then melted again, metal
oxide 278 can be precipitated in the reservoir tank 84A and the
first and second communication passages 861A and 862A as well. The
metal oxide 278 precipitated in the second communication passage
862A can clog or narrow the nozzle hole 822A.
[0212] In order to inhibit these phenomena, the target controller
71C may perform the control as described below.
[0213] The target controller 71C may perform the steps S1 to S3
shown in FIG. 8 while the ingot 275 is contained in the reservoir
tank 84A of the target generator 8A. Also, the target controller
71C may perform steps shown in FIG. 25 for metal oxide
precipitation treatment in the step S3.
[0214] In FIG. 25, the target controller 71C after the step S11 may
perform a step S91 of controlling the temperature in the first area
AR1, a step S92 of controlling the temperature in the second area
AR2, a step S93 of controlling the temperature in the third area
AR3, and a step S94 of controlling the temperature in the fourth
area AR4. The target controller 71C may start the steps S91 to S94
at a time point R1 in FIG. 26.
[0215] In the step S91, as shown in FIG. 27, the target controller
71C may control the first temperature adjuster 91C to set the
temperature T1 in the area AR1 equal to the temperature TH, (step
S111). The target controller 71C may determine whether the
temperature T1 is equal to or higher than the temperature TH on the
basis of a signal from the first temperature adjuster 91C (step
S112). If it is determined in the step S112 that the temperature T1
has not become equal to or higher than the temperature TH, then the
target controller 71C may perform the step S112 after a lapse of
predetermined time. If it is determined in the step S112 that the
temperature T1 has become equal to or higher than the temperature
TH, then the target controller 71C may control the first
temperature adjuster 91C to maintain the temperature T1 at the
temperature TH for a period H1 (step S113). The step S113 may be
performed from a time point R2 to a time point R3 in FIG. 26. Under
this condition, as described above with FIG. 6, such an amount of
oxygen that cannot otherwise dissolve in the target material 270 at
the temperature TH can dissolve in the target material 270, making
the target material 270 a supersaturated state. Thus, precipitation
of metal oxide 278 can be inhibited.
[0216] In FIG. 28, the target controller 71C in the step S92 may
control the second temperature adjuster 92C to set the temperature
T2 in the area AR2 equal to the temperature TH2, (step S121). The
target controller 71C may determine whether the temperature T2 is
equal to or higher than the temperature TH2 on the basis of a
signal from the second temperature adjuster 92C (step S122). Note
that the temperature TH2 may be lower than the temperature TH and
higher than the output temperature Top. If it is determined in the
step S122 that the temperature T2 has not become equal to or higher
than the temperature TH2, then the target controller 71C may repeat
the step S122 after a lapse of predetermined time. If it is
determined that the temperature T2 has become equal to or higher
than the temperature TH2, then the target controller 71C may
control the second temperature adjuster 92C to maintain the
temperature T2 at the temperature TH2 for a period H11 (step S123).
Note that the period H11 may be shorter than the period H1. The
step S123 may be performed from the time point R2 to a time point
R61 in FIG. 26.
[0217] The target controller 71C may control the second temperature
adjuster 92C to set the temperature T2 equal to the temperature TH
(step S124). The target controller 71C may determine whether the
temperature T2 is equal to or higher than the temperature TH on the
basis of the signal from the second temperature adjuster 92C (step
S125). If it is determined in the step S125 that the temperature T2
has not become equal to or higher than the temperature TH, then the
target controller 71C may repeat the step S125 after a lapse of
predetermined time. If it is determined in the step S125 that the
temperature T2 has become equal to or higher than the temperature
TH, then the target controller 71C may control the second
temperature adjuster 92C to maintain the temperature T2 at the
temperature TH until the end of the period H1 from the time point
R2 (step S126).
[0218] In FIG. 29, the target controller 71C in the step S93 may
control the third temperature adjuster 93C to set the temperature
T3 in the area AR3 equal to the temperature TH3, (step S131). The
target controller 71C may determine whether the temperature T3 is
equal to or higher than the temperature TH3 on the basis of a
signal from the third temperature adjuster 93C (step S132). Note
that the temperature TH3 may be lower than the temperature TH2 and
higher than the output temperature Top. If it is determined in the
step S132 that the temperature T3 has not become equal to or higher
than the temperature TH3, then the target controller 71C may repeat
the step S132 after a lapse of predetermined time. If it is
determined in the step S132 that the temperature T3 has become
equal to or higher than the temperature TH3, then the target
controller 71C may control the third temperature adjuster 93C to
maintain the temperature T3 at the temperature TH3 during the
period H11 (step S133). The step S133 may be performed from the
time point R2 to the time point R61 in FIG. 26.
[0219] The target controller 71C may control the third temperature
adjuster 93C to set the temperature T3 equal to the temperature TH
(step S134). The target controller 71C may determine whether the
temperature T3 is equal to or higher than the temperature TH on the
basis of the signal from the third temperature adjuster 93C (step
S135). If it is determined in the step S135 that the temperature T3
has not become equal to or higher than the temperature TH, then the
target controller 71C may repeat the step S135 after a lapse of
predetermined time. If it is determined in the step S135 that the
temperature T3 has become equal to or higher than the temperature
TH, then the target controller 71C may control the third
temperature adjuster 93C to maintain the temperature T3 at the
temperature TH until the end of the period H1 from the time point
R2 (step S136).
[0220] In FIG. 30, the target controller 71C in the step S94 may
control the fourth temperature adjuster 94C to set the temperature
T4 in the area AR4 equal to the temperature TH4, (step S141). The
target controller 71C may determine whether the temperature T4 is
equal to or higher than the temperature TH4 on the basis of a
signal from the fourth temperature adjuster 94C (step S142). Note
that the temperature TH4 may be lower than the output temperature
Top and higher than the temperature TB. If it is determined in the
step S142 that the temperature T4 has not become equal to or higher
than the temperature TH4, then the target controller 71C may repeat
the step S142 after a lapse of predetermined time. If it is
determined in the step S142 that the temperature T4 has become
equal to or higher than the temperature TH4, then the target
controller 71C may control the fourth temperature adjuster 94C to
maintain the temperature T4 at the temperature TH4 during the
period H11 (step S143). The step S143 may be performed from the
time point R2 to the time point R61 in FIG. 26.
[0221] The target controller 71C may control the fourth temperature
adjuster 94C to set the temperature T4 equal to the temperature TH
(step S144). The fourth temperature controller 944C (in the fourth
temperature adjuster 94C) may determine whether the temperature T4
is equal to or higher than the temperature TH (step S145). If it is
determined on the basis of the signal from the fourth temperature
adjuster 94C in the step S145 that the temperature T4 has not
become equal to or higher than the temperature TH, then the target
controller 71C may repeat the step S145 after a lapse of
predetermined time. If it is determined in the step S145 that the
temperature T4 has become equal to or higher than the temperature
TH, then the target controller 71C may control the fourth
temperature adjuster 94C to maintain the temperature T4 at the
temperature TH until the end of the period H1 from the time point
R2 (step S146).
[0222] Provided that SP1, SP2, SP3 and SP4 represent temperature
increase rates in the first to fourth areas AR1 to AR4 in FIG. 26,
respectively, the relationship between the temperature increase
rates according to the steps S91 to S94 may satisfy a condition
represented by expression (1):
SP1>SP2>SP3>SP4 (1)
[0223] Therefore, the temperatures can come up to the melting point
Tmp in a sequence from the first area AR1, the second area AR2, the
third area AR3 to the fourth area AR4. The target controller 71C
can control the first and second temperature adjusters 91C and 92C
to melt the ingot 275 in the reservoir tank 84A so that the part of
the ingot 275 in the first area AR1 that is distant from the filter
831A may melt faster than the part of the ingot 275 in the second
area AR2 nearer to the filter 831A. Also, the inner space of the
reservoir tank 84A can become a substantially vacuum state by
performing the step S2. Finally, the part of the ingot 275 of the
target material 270 in the first area AR1 can liquefy faster than
the part of the ingot 275 in the second area AR2. The liquefied
part of the target material 270 in the second area AR2 can expand
toward the first area AR1 because the target material 270 is being
liquefied in the first area AR1. Thus, while the first to fourth
areas AR1 to AR4 are being heated, the target material 270 in the
supersaturated state in the second area AR2 can be inhibited from
passing through the filter 831A and entering the second
communication passage 862A.
[0224] After performing the steps S91 to S94, the target controller
71C in FIG. 25 may control the first to fourth temperature
adjusters 91C to 94C to make the temperatures T1 to T4 equal to the
temperature TB in the first to fourth areas AR1 to AR4 (step S95).
The step S95 may be executed at the time point R3 in FIG. 26.
[0225] The first to fourth temperature controllers 914C to 944C of
the first to fourth temperature adjusters 91C to 94C may transmit
the signals from the first to fourth temperature sensors 913C to
943C to the target controller 71C. The target controller 71C may
determine whether all conditions of the following expressions (2)
to (5) are satisfied, on the basis of the signals from the first to
fourth temperature adjusters 91C to 94C (step S96).
T1.ltoreq.TB (2)
T2.ltoreq.TB (3)
T3.ltoreq.TB (4)
T4.ltoreq.TB (5)
[0226] If the target controller 71C determines that at least one of
the conditions of expressions (2) to (5) is not satisfied in the
step S96, then the step S96 can be performed after a lapse
predetermined time. If the target controller 71C determines that
all the conditions of expressions (2) to (5) are satisfied in the
step S96, then the first to fourth temperature adjusters 91C to 94C
are controlled to keep the temperatures T1 to T4 in the first to
fourth areas AR1 to AR4 equal to the temperature TB during the
period H3 (step S97). The step S97 may be performed from a time
point R21 to a time point R22 in FIG. 26. By keeping the
temperatures T1 to T4 in the first to fourth areas AR1 to AR4 at
the temperature TB, such part of oxygen that has been dissolved in
the target material 270 in the supersaturated state but cannot
remain dissolved therein at the temperature TB can precipitate as
metal oxide 278 and the precipitated metal oxide 278 can grow
larger.
[0227] In step S98, the target controller 71C may control the first
to fourth temperature adjusters 91C to 94C so as to make the
temperatures T1 to T4 in the first to fourth areas AR1 to AR4 equal
to the temperature TL. The step S98 may be executed at the time
point R22 in FIG. 26.
[0228] In step S99, the target controller 71C may determine whether
all conditions of the following expressions (6) to (9) are
satisfied, on the basis of signals from the first to fourth
temperature adjusters 91C to 94C.
T1.ltoreq.TL (6)
T2.ltoreq.TL (7)
T3.ltoreq.TL (8)
T4.ltoreq.TL (9)
[0229] If it is determined in the step S99 that at least one of the
conditions of expressions (6) to (9) is not satisfied, then the
target controller 71C may perform the step S99 after a lapse of
predetermined time. If it is determined that all the conditions of
expressions (6) to (9) are satisfied, then the target controller
71C may control the first to fourth temperature adjusters 91C to
94C to keep the temperatures T1 to T4 in the first to fourth areas
AR1 to AR4 at the temperature TL during the period H2 (step
S100).
[0230] The target controller 71C may perform the steps S18 and S19
of the first embodiment after performing the step S100.
[0231] When the upper limit number Nmax of times of the thermal
cycles is 2, the steps S91 to S94 may be performed from the time
point R1 and from a time point R24 in FIG. 26. The steps S123, S133
and S143 may be performed between the time points R2 and R61 and
between time points R25 and R62. The step S113 may be performed
between the time points R2 and R3 and between time points R25 and
R26. The step S95 may be performed from the time points R3 and R26.
The step S97 may be performed between the time points R21 and R22
and between time points R27 and R28. The step S98 may be performed
from the time points R22 and R28. The step S100 may be performed
between the time points R23 and R24 and between time points R29 and
R30. The precipitation treatment of the metal oxide 278 may be
completed at the time point R30. The step S5 may be performed from
a time point R31.
3.4.3 Variation of the Third Embodiment
3.4.3.1 Operation
[0232] In FIG. 31, a phenomenon that can occur when the ingot melts
sequentially from the first to fourth areas is illustrated. In FIG.
32, a flow chart of metal oxide precipitation treatment according
to a variation of the third embodiment is illustrated. In FIG. 33,
a timing chart of a target refining method is illustrated. In FIG.
34, a flow chart of temperature control in the third and fourth
areas is illustrated.
[0233] In the third embodiment, even when the temperatures reach
the melting point Tmp in the order from the first to fourth areas
AR1, AR2, AR3 and AR4 while the pressure P in the reservoir tank
84A is kept at the pressure P0, there is a possibility for the
target material 270 in the supersaturated state to pass through the
filter 831A and stand in the second communication passage 862A, as
shown in FIG. 31. In that case, when the target material 270 in the
target generator 8A is solidified and then melted again, metal
oxide 278 can precipitate from the target material 270 in the
second communication passage 862A, which can result in clogging or
narrowing the nozzle hole 822A.
[0234] In order to inhibit the phenomenon above, the target
controller 71C may perform the following control.
[0235] After performing the steps S1 to S3 shown in FIG. 8, the
target controller 71C may perform a process as illustrated in FIG.
32 for the metal oxide precipitation treatment in the step S3.
[0236] In FIG. 32, the target controller 71C may perform, after the
step S11, the step S91 of controlling the temperature in the first
area AR1, the step S92 of controlling the temperature in the second
area AR2, and a step S151 of controlling the temperatures in the
third and fourth areas AR3 and AR4. The steps S91, S92 and S151 may
be started at a time point R1 in FIG. 33 by the target controller
71C.
[0237] In FIG. 34, the target controller 71C in the step S151 may
control the third and fourth temperature adjusters 93C and 94C to
set the temperatures T3 and T4 equal to the temperature Tmpu in the
third and fourth areas AR3 and AR4 (step S161). The temperature
Tmpu may be a temperature at which neither precipitation of metal
oxide 278 nor solidification of the target material 270 of the
liquid phase can occur. The temperature Tmpu may be a temperature
from the melting point Tmp to the temperature TB. The temperature
Tmpu may be a predetermined temperature ranging from 232.degree. to
240.degree. C.
[0238] Also, the target controller 71C may determine whether both
conditions of the following expressions (10) and (11) are
satisfied, on the basis of the signals from the third and fourth
temperature adjusters 93C and 94C (step S162).
T3.gtoreq.Tmpu (10)
T4.gtoreq.Tmpu (11)
[0239] If it is determined in the step S162 that at least one of
the conditions of expressions (10) and (11) is not satisfied, then
the target controller 71C may perform the step S162 after a lapse
of predetermined time. If it is determined that both the conditions
of expressions (10) and (11) are satisfied, then the target
controller 71C may control the third and fourth temperature
adjusters 93C and 94C to keep the temperatures T3 and T4 in the
third and fourth areas AR3 and AR4 at the temperature Tmpu (step
S163).
[0240] The target controller 71C may determine whether the number N
of times of the thermal cycles of heating and cooling is equal to
or more than an upper limit number Nmax (step S164). If it is
determined in the step S164 that the number N of times of the
thermal cycles is less than the upper limit number Nmax, the target
controller 71C may perform the step S164 after a lapse of
predetermined time. In contrast, if it is determined that the
number N of the thermal cycles is equal to or more than the upper
limit number Nmax, the target controller 71C may complete the step
of temperature control of the third and fourth areas AR3 and AR4.
Note that the number N of times of the thermal cycles, to be
checked, may be the latest value updated suitably by the sequence
from the steps S91 and S92 to the step S19, which are performed in
parallel to the step S151.
[0241] The relationship between temperature increase rates SP1,
SP2, SP3 and SP4 in the first to fourth areas AR1 to AR4 may
satisfy the abovementioned condition of expression (1).
[0242] The temperatures reache the melting point Tmp in the order
from the first to fourth areas AR1 to AR4. As a result, for the
reasons described above, it is possible to inhibit the target
material 270 of the supersaturated state from passing through the
filter 831A and entering the second communication passage 862A in
the course of heating the first to fourth areas AR1 to AR4.
[0243] In FIG. 32, the target controller 71C after the steps S91
and S92 may control the first and second temperature adjusters 91C
and 92C to set the temperatures T1 and T2 in the first and second
areas AR1 and AR2 down to the temperature TB (step S152).
[0244] Also, the target controller 71C may determine whether both
the conditions of expressions (2) and (3) are satisfied (step
S153), on the basis of signals from the first and second
temperature adjusters 91C and 92C.
[0245] If it is determined in the step S153 that at least one of
the conditions of expressions (2) and (3) is not satisfied, then
the target controller 71C may perform the step S153 after a lapse
of predetermined time. If it is determined that both of the
conditions of expressions (2) and (3) are satisfied, then the
target controller 71C may control the first and second temperature
adjusters 91C and 92C to keep the temperatures T1 and T2 in the
first and second areas AR1 and AR2 at the temperature TB during the
period H3 (step S154).
[0246] The target controller 71C may control the first and second
temperature adjusters 91C and 92C to set the temperatures T1 and T2
in the first and second areas AR1 and AR2 down to the temperature
TL (step S155). The target controller 71C may determine whether
both the conditions of expressions (6) and (7) are satisfied, on
the basis of the signals from the first and second temperature
adjusters 91C and 92C (step S156).
[0247] If the target controller 71C determines that at least one of
the conditions of expressions (6) and (7) is not satisfied in the
step S156, the step S156 may be performed after a lapse of
predetermined time. The target controller 71C, if it is determined
that both of the conditions of expressions (6) and (7) are
satisfied, may control the first and second temperature adjusters
91C and 92C to keep the temperatures T1 and T2 in the first and
second areas AR1 and AR2 at the temperature TL during the period H2
(step S157). The temperatures T3 and T4 in the third and fourth
areas AR3 and AR4 may be kept at the temperature Tmpu during the
period H2.
[0248] After completing the step S157, the target controller 71C
may perform the steps S18 and S19 as in the first embodiment.
[0249] If the upper limit number Nmax of times of the thermal
cycles is set at 2, the same process as in the third embodiment may
be carried out except that the temperatures T3 and T4 in the third
and fourth areas AR3 and AR4 are kept at the temperature Tmpu after
reaching the temperature Tmpu through to the time point R30.
[0250] Consequently, it is possible in the precipitation treatment
for the metal oxide 278 to inhibit solidification of the target
material 270 in the second communication passage 862A even if the
target material 270 of the supersaturated state stands in the
second communication passage 862A, like as shown in FIG. 31. As a
result, precipitation of metal oxide 278 from the target material
270 in the second communication passage 862A can be inhibited.
Accordingly, when the EUV light generation system 11 transits to
the process for generating the EUV light 252 without solidifying
the target material 270 after the precipitation of metal oxide 278,
the target material 270 of the supersaturated state can be output
as droplets 27. Thus, it is possible to inhibit the metal oxide 278
from clogging or narrowing the nozzle hole 822A.
4. Target Supply Device with Tanks
4.1 Fourth Embodiment
4.1.1 Configuration
[0251] In FIG. 35, a target supply device having a feed tank and a
reservoir tank is illustrated.
[0252] A target supply device 7D in FIG. 35 may have a target
generating section 70D, and a target controller 71D as a
controlling section.
[0253] The target generating section 70D may include a target
generator 8D, a pressure adjuster 75D, a pressure adjuster 75A, a
gas exhauster 77A, a temperature adjuster 78A, a temperature
controller 97D and a piezoelectric actuator 79A.
[0254] The target generator 8D may include a feed tank 87D, a
transfer section 88D, a device main unit 80A, a lid 81A, a nozzle
head 82A and a filter unit 83A. In the fourth embodiment, the tank
of the present disclosure may be the feed tank 87D instead of the
reservoir tank 84A of the device main unit 80A.
[0255] The feed tank 87D may have a tank body 871D and a lid 872D.
The tank body 871D may be substantially cylindrical and have a
first end wall on the +Z direction side. The lid 872D may be of a
substantially disk shape to close a second end of the tank body
871D on the -Z direction side. The lid 872D may be positioned in
tight contact with the second end of the tank body 871D. A room in
the feed tank 87D may be a space for containment 870D for
containing the target material 270.
[0256] A transfer line 881D may be provided in the transfer section
88D. The transfer line 881D may be formed into a pipe. The hollow
in the transfer line 881D may constitute a communication portion
860D. The transfer line 881D may be disposed to penetrate through
the first end wall of the tank body 871D and the lid 81A of the
device main unit 80A. A downstream end of the transfer line 881D on
the +Z direction side may be located in the vicinity of the first
end wall of the reservoir tank 84A. Thus, the target material 270
in the feed tank 87D can be transferred to the reservoir tank 84A
of the device main unit 80A through the communication portion
860D.
[0257] A valve 882D may be provided in the transfer line 881D. The
target controller 71D may be connected electrically to the valve
882D. The valve 882D may be so configured as to change over between
open and closed states under the control of the target controller
71D, the open state being for drawing the target material 270 from
the feed tank 87D to the reservoir tank 84A, the closed state being
for blocking the flow of the target material 270.
[0258] A filter unit 883D may be disposed in the transfer line 881D
at a position between the valve 882D and the device main unit 80A.
The filter unit 883D may include the filter 884D and a holder 885D.
In the fourth embodiment, not a filter 831A of the filter unit 83A
but the filter 884D may be the filter of the present
disclosure.
[0259] The filter 884D may be configured in the same manner as the
filter 831A. For example, the filter 884D may have at least one of
first and second filters (filter elements).
[0260] The holder 885D may be configured in the same manner as a
holder 832A of the filter unit 83A. The holder 885D may hold the
filter 884D such that the filter 884D blocks the communication
portion 860D. The communication portion 860D may be divided by the
filter 884D into a first communication passage 861D and a second
communication passage 862D, the first communication passage 861D
being on one side close to the feed tank 87D, the second
communication passage 862D being on the other side close to the
nozzle hole 822A.
[0261] A flow line 754D may be provided through the lid 872D of the
feed tank 87D. A flow line 755D may be provided through the lid
81A.
[0262] The flow line 754D may be provided with the pressure
adjuster 75D. The pressure adjuster 75D may be configured in the
same manner as the pressure adjuster 75A. A pressure controller
(not shown) included in the pressure adjuster 75D may be
electrically connected to the target controller 71D. The pressure
adjuster 75D may be configured to supply inert gas from an inert
gas cylinder 751A to the feed tank 87D in response to a control
signal from the target controller 71D. Also, the pressure adjuster
75D may be configured to adjust the pressure in the feed tank 87D
in response to a control signal from the target controller 71D.
[0263] The flow line 755D may be provided with the pressure
adjuster 75A.
[0264] The gas exhauster 77A may be configured to exhaust gas from
the device main unit 80A and the feed tank 87D in response to a
signal from the target controller 71D.
[0265] A temperature sensor 783A of the temperature adjuster 78A
may be disposed on the outer circumferential surface of the tank
body 871D at a position close to the first end wall, or may be
disposed inside the tank body 871D.
[0266] The temperature controller 97D may be configured in the same
manner as the temperature adjuster 78A. The temperature controller
97D may include a heater 971D, a heater power supply 972D, a
temperature sensor 973D and a temperature controller 974D.
[0267] The temperature sensor 973D may be disposed on the outer
circumferential surface of the reservoir tank 84A at a position
close to the nozzle body 85A, or may be disposed in the reservoir
tank 84A. The temperature controller 974D may be configured to
output a control signal to the heater power supply 972D, for
controlling the target material 270 at a predetermined temperature
on the basis of a signal from the temperature sensor 973D.
4.1.2 Operation
[0268] The target controller 71D may control the temperature
adjuster 78A and the pressure adjuster 75D to refine the target
material 270 while the ingot 275 is contained in the feed tank 87D
and the valve 882D of the transfer section 88D is closed. The
refinement of the target material 270 may be the same as that in
the first embodiment in FIG. 8. In the step S2, however, gas may be
exhausted from the reservoir tank 84A and the feed tank 87D as
well.
[0269] Through the same process for precipitation of metal oxide
278 as in the step S3 shown in FIG. 8, metal oxide 278 can be
precipitated from the target material 270 in the feed tank 87D, as
illustrated in FIG. 35.
[0270] Then the target controller 71D may perform the step S4. In
the step S4, the target controller 71D may control the temperature
adjuster 78A and the temperature controller 97D. Performing the
step S4 can keep the temperature in the feed tank 87D and the
reservoir tank 84A at the output temperature Top. The target
controller 71D may open the valve 882D after performing the step
S4.
[0271] The target controller 71D may perform the step S5. In the
step S5, the target controller 71D may control the pressure
adjuster 75D. Thus, the metal oxide 278 can be trapped in the
filter 884D, and the target material 270 getting out of the
supersaturated state can pass through the filter 884D, to be
supplied to the reservoir tank 84A through the second communication
passage 862D.
[0272] Also, the target controller 71D may perform the step S6. The
target controller 71D in the step S6 may control the pressure
adjuster 75A. Thus, the target material 270 can be output as a jet
27A. Furthermore, the target controller 71D may perform the step
S7.
[0273] The fourth embodiment makes it possible to inhibit the metal
oxide 278 from clogging or narrowing the nozzle hole 822A, without
the need for subjecting the target material 270 to the
precipitation treatment for the metal oxide 278 in the reservoir
tank 84A.
5. Controller
5.1 Configuration
[0274] FIG. 36 is a block diagram illustrating the overall
configuration of a controller.
[0275] In each of the abovementioned embodiments, the controller
may constitute the EUV light generation control system 5, the
target controller 71A, the target controllers 71B to 71D, the
pressure controller 752A, the temperature controllers 784A, 914C,
924C, 934C, 944C and 974D and the like. The controller may be
constructed by a generic control device such as a computer, a
programmable controller, or the like. The controller may, for
example, be configured as follows:
[0276] The controller may be constituted of a processing unit 1000
and devices connected to the processing unit 1000, including a
storage memory 1005, a user interface 1010, a parallel I/O
(input/output) controller 1020, a serial I/O controller 1030, and
an A-D/D-A (analog-to-digital/digital-to-analog) converter 1040. An
example of the storage memory 1005 may be a recording medium for
storing a refining program for refining the target material. The
processing unit 1000 may be constituted of a CPU (Central
Processing Unit) 1001, and a memory 1002, a timer 1003 and a GPU
(Graphics Processing Unit) 1004, which are connected to the CPU
1001.
5.2 Operation
[0277] The processing unit 1000 may read the program stored in the
storage memory 1005. In addition, the processing unit 1000 may
execute the read program and, according to the executed program,
read out data from the storage memory 1005, store data in the
storage memory 1005, and so on.
[0278] The parallel I/O controller 1020 may be connected to
communicable devices 1021 to 102X via parallel I/O ports. The
parallel I/O controller 1020 may control digital signal
communication via the parallel I/O ports, carried out during the
execution of the program by the processing unit 1000.
[0279] The serial I/O controller 1030 may be connected to
communicable devices 1031 to 103X via serial I/O ports. The serial
I/O controller 1030 may control digital signal communication via
the serial I/O ports, carried out during the execution of the
program by the processing unit 1000.
[0280] The A-D/D-A converter 1040 may be connected to communicable
devices 1041 to 104X via analog ports. The A-D/D-A converter 1040
may control analog signal communication, carried out during the
execution of the program by the processing unit 1000, via the
analog ports.
[0281] The user interface 1010 may be configured to display the
progress of the execution of the program by the processing unit
1000 to an operator, and allow the operator to instruct the
processing unit 1000 to stop the program execution or make an
interruptive process or the like.
[0282] The CPU 1001 of the processing unit 1000 may carry out
arithmetic processing for the program. The memory 1002 may
temporarily store the program or temporarily store data during the
computation while the CPU 1001 is executing the program. The timer
1003 may measure a current time and an amount of elapsed time, and
output the current time or the amount of elapsed time to the CPU
1001 in accordance with the execution of the program. When image
data is input into the processing unit 1000, the GPU 1004 may
process the image data in accordance with the execution of the
program, and may output a result thereof to the CPU 1001.
[0283] The communicable devices 1021 to 102X connected to the
parallel I/O controller 1020 via the parallel I/O ports may be the
EUV light generation control system 5, another controller, and the
like.
[0284] The communicable devices 1031 to 103X connected to the
serial I/O controller 1030 via the serial I/O ports may be the
pressure controller 752A, the temperature controllers 784A, 914C,
924C, 934C, 944C and 974D, and the like.
[0285] The communicable devices 1041 to 104X connected to the
A-D/D-A converter 1040 via the analog ports may be various types of
sensors, including the temperature sensors 783A, 762B, 913C, 923C,
933C, 943C and 973D, the pressure sensor 753A, a vacuum gauge.
[0286] As being configured in the above-described manner, the
controller can execute the operations indicated in the respective
flow charts. For example, the target controllers 71A, 71B, 71C and
71D as the controller can perform the steps in the flow charts
according to a program for the refinement of the target material,
which is stored in the storage memory 1005.
6. Other Variations
[0287] It is possible in the second embodiment or in the variation
thereof to maintain the temperature T at the temperature TB for a
predetermined time in the course of lowering the temperature T from
the temperature TH to the temperature TL. It is possible in the
third embodiment not to define a period for maintaining the
temperatures T1 to T4 at the temperature TB. It is possible in the
variation of the third embodiment not to define a period for
maintaining the temperatures T1 and T2 at the temperature TB. In
the third embodiment, the third and fourth temperature adjusters
93C and 94C may not be disposed. In the third embodiment or in the
variation thereof, at least one of the third and fourth temperature
adjusters 93C and 94C may not be disposed. Three or more
temperature adjusters may be disposed at least on one of the outer
circumferential surfaces of the reservoir tank 84A and the nozzle
86A.
[0288] In the fourth embodiment, the treatment for precipitation of
metal oxide 278 is performed on the target material 270 in the feed
tank 87D. In addition, it is possible to process the target
material 270 in the reservoir tank 84A for precipitation of metal
oxide 278. This is more effective for inhibiting clogging or
narrowing the nozzle hole 822A by the metal oxide 278.
[0289] Also, in the fourth embodiment, the precipitation treatment
of metal oxide 278 may be performed on the target material 270 in
the feed tank 87D when the target material 270 in the reservoir
tank 84A is reduced by the step S7. Then, the target material 270
free from the supersaturated state may be fed to the reservoir tank
84A.
[0290] The refinement of the target material 270 in the fourth
embodiment can be performed in the same manner as in any one of the
variation of the first embodiment, the second embodiment, and the
variation of the second embodiment.
[0291] Furthermore, two temperature adjusters can be disposed on an
outer circumferential surface of the feed tank 87D in the fourth
embodiment so that the target controller 71D may perform the
precipitation treatment of metal oxide 278 in the way as follows:
the target controller 71D may control the temperature adjusters to
melt the ingot 275 in the feed tank 87D such that part of the ingot
275 located distant from the filter 884D will melt faster than part
of the ingot 275 located closer to the filter 884D.
[0292] In the first to fourth embodiments and the respective
variations described above, the temperature of the tank is changed
by the heater(s) as the temperature adjuster of the present
disclosure. As an alternative to the heater, a Peltier device with
heating and cooling capabilities may be disposed on the tank. Thus,
it is possible to change the temperature in the tank by adjusting
the value or direction of a current applied to the Peltier device
for heating and cooling. Furthermore, a water flow path for cooling
may be provided as the temperature adjuster of the present
disclosure on the tank in addition to the heater(s). Thus, it is
possible to change the temperature in the tank by adjusting the
value of the current applied to the heater or the amount of cooling
water flowing in the water flow path.
[0293] Furthermore, the precipitation treatment of metal oxide 278
according to the first to fourth embodiments and their variations
may be performed after the output of the target material 270
through the nozzle 86A or the creation of the EUV light 252 is
stopped for a long period, or after making an operation that
exposes the ingot 275 in the reservoir tank 84A or the feed tank
87D to air.
[0294] The above-described embodiments and the modifications
thereof are merely examples for implementing the present
disclosure, and the present disclosure is not limited thereto.
Making various modifications according to the specifications or the
like is within the scope of the present disclosure, and other
various embodiments are possible within the scope of the present
disclosure. For example, the modifications illustrated for
particular ones of the embodiments can be applied to other
embodiments as well (including the other embodiments described
herein).
[0295] The terms used in this specification and the appended claims
should be interpreted as "non-limiting". For example, the terms
"include" and "be included" should be interpreted as "including the
stated elements but not limited to the stated elements". The term
"have" should be interpreted as "having the stated elements but not
limited to the stated elements". Further, the modifier "one (a/an)"
should be interpreted as "at least one" or "one or more".
* * * * *