Methods and arrangements for planning and scheduling change
management requests in computing systems
Abstract
Methods and arrangements for planning and scheduling change
management requests in computing systems are disclosed. Included
are an arrangement for deciding whether or not an RFC should be
done, an arrangement for assigning individual tasks to acceptable
servers for each RFC to be done, and an arrangement for assigning
the start times to said individual tasks for each RFC to be
done.
Inventors: |
Hellerstein; Joseph L.
(Ossining, NY), Keller; Alexander (New York, NY),
Krishnan; Vijaya (Stamford, CT), Wolf; Joel L. (Katonah,
NY), Wu; Kun-Lung (Yorktown Heights, NY) |
Assignee: |
International Business Machines
Corporation (Armonk, NY)
|
Family
ID: |
34919704 |
Appl.
No.: |
10/789,099 |
Filed: |
February 27, 2004 |
Prior Publication Data
|
|
|
|
Document
Identifier |
Publication Date |
|
US 20050204358 A1 |
Sep 15, 2005 |
|
Current U.S.
Class: |
718/105 |
Current CPC
Class: |
G06F
8/60 (20130101) |
Current International
Class: |
G06F
9/46 (20060101) |
Field of
Search: |
;718/102 |
References Cited
[Referenced By]
U.S. Patent Documents
Other References
A Duality Approach to Admission and Scheduling Controls of Queues
Susan H. Xu Queuing Systems, Feb. 7, 1994. cited by examiner .
Games, Critical Paths and Assignment Problems in Permutation Flow
Shops and Cyclic Scheduling Flow Line Environments Karabati,
Kouvelis, Kiran The Journal of the Operational Research Society,
Mar. 1992. cited by examiner .
J. Blazewicz, K. Ecker, G. Schmidt, J. Weglarz, Scheduling in
Computer and Manufacturing Systems, Springer-Verlag, 1993. cited by
other .
E. Coffman, editor, Computer and Job-Shop Scheduling Theory, John
Wiley and Sons, 1976. cited by other .
M. Pindeo, Scheduling: Theory Algorithms and Systems, Prentice Hall
1995. cited by other .
E. Lawler, Combinatorial Optimization: Networks and Matroids, Holt,
Rinehart and Winston, 1976. cited by other .
W. Press, B. Flanner, S. Teukolsk, W. Vetterling, Numerical
Recipes: The Art of Scientific Computing, Cambridge University
Press, 1986. cited by other .
M. Garey, D. Johnson, Computers & Intractability: A Guide to
the Theory of NP-Completeness, W. H. Freeman & Company, 1979.
cited by other .
R. Motwani, P. Raghavan, Randomized Algorithms, Cambridge
University Press, 1995. cited by other .
The Institute of Electrical and Electronics Engineers, Inc., 1996,
IEEE Standard for Information Technology--Portable Operating System
Interface (POSIX) System Administration. cited by other .
Part 2: Software Administration. cited by other .
CAE Specification, Systems Management: Distributed Software
Administration (XDSA), The Open Group, Jan. 1998. cited by
other.
|
Primary Examiner: Lee; Thomas
Assistant Examiner: Zhe; Mengyao
Attorney, Agent or Firm: Ference & Associates LLC
Claims
What is claimed is:
1. A method for planning and scheduling tasks within a plurality of
requests for change within a change window in a computing system
comprising the steps of: deciding whether or not a request for
change should be done with respect to maximizing a profit value
expressed as a value of performing the plurality of requests for
change minus a value of associated costs, wherein a request for
change comprises a set of tasks interrelated by temporal and
location-specific dependencies; for each request for change to be
done, assigning individual tasks within each request for change to
acceptable servers; for each request for change to be done,
assigning a start time to said individual tasks; wherein the set of
tasks comprises hardware changes and/or software changes; wherein
the change window describes a period of time during which a request
for change is to be done; wherein precedence constraints among
tasks within a request for change are enforced; wherein each task
of a request for change that is performed is assigned to a single
acceptable server; and wherein no acceptable server can work on
more than one task at any time.
2. The method of claim 1, further comprising the step of reserving
all servers involved for a duration that begins at the start of a
first task and ends at the finish of a last task for each request
for change that should be done.
3. The method of claim 1 further comprising the step of maximizing
the number of requests for change done.
4. The method of claim 1 further comprising the step of minimizing
total downtime.
5. The method of claim 1 further comprising the step of minimizing
at least one cost associated with downtime.
6. The method of claim 1 further comprising the step of minimizing
a total execution time in implementing a task.
7. The method of claim 1 further comprising the step of maximizing
the number of requests for change meeting their deadlines.
8. The method of claim 1 further comprising the step of minimizing
multiple deadline penalties associated with requests for change
and/or their respective tasks.
9. The method of claim 1 further comprising the step of minimizing
an average response time of each request for change.
10. The method of claim 1 further comprising the step of minimizing
a weighted average response time of each request for change.
11. A system for planning and scheduling tasks within a plurality
of requests for change within a change window in a computing system
comprising: a processor; an arrangement for deciding whether or not
a request for change should be done with respect to maximizing a
profit value expressed as a value of performing the plurality of
requests for change minus a value of associated costs, wherein a
request for change comprises a set of tasks interrelated by
temporal and location-specific dependencies; an arrangement for
assigning individual tasks to acceptable servers for each request
for change to be done; and an arrangement for assigning a start
time to said individual tasks for each request for change to be
done; wherein the set of tasks comprises hardware changes and/or
software changes; wherein the change window describes a period of
time during which a request for change is to be done; wherein
precedence constraints among tasks within a request for change are
enforced; wherein each task of a request for change that is
performed is assigned to a single acceptable server; and wherein no
acceptable server can work on more than one task at any time.
12. The system of claim 11, further comprising an arrangement for
reserving all the servers involved for a duration that begins at
the start of the first task and ends at the finish of the last task
for each request for change that should be done.
13. The system of claim 11, further comprising an arrangement for
maximizing the number of requests for change done.
14. The system of claim 11, further comprising an arrangement for
minimizing total downtime.
15. The system of claim 11, further comprising an arrangement for
minimizing at least one cost associated with downtime.
16. The system of claim 11, further comprising an arrangement for
minimizing a total execution time in implementing a task.
17. The system of claim 11, further comprising an arrangement for
maximizing the number of requests for change meeting their
deadlines.
18. The system of claim 11, further comprising an arrangement for
minimizing multiple deadline penalties associated with requests for
change and/or their respective tasks.
19. The system of claim 11, further comprising an arrangement for
minimizing an average response time of each request for change.
20. The system of claim 11, further comprising an arrangement for
minimizing a weighted average response time of each request for
change.
21. A program storage device readable by machine, tangibly
embodying a program of instructions executable by the machine to
perform a method for planning and scheduling tasks within a
plurality of requests for change within a change window in a
computing system comprising the steps of: deciding whether or not a
request for change should be done with respect to maximizing a
profit value expressed as a value of performing the plurality of
requests for change minus a value of associated costs, wherein a
request for change comprises a set of tasks interrelated by
temporal and location-specific dependencies; for each request for
change to be done, assigning individual tasks within each request
for change to acceptable servers; for each request for change to be
done, assigning a start time to said individual tasks; wherein the
set of tasks comprises hardware changes and/or software changes;
wherein the change window describes a period of time during which a
request for change is to be done; wherein precedence constraints
among tasks within a request for change are enforced; wherein each
task of a request for change that is performed is assigned to a
single acceptable server; and wherein no acceptable server can work
on more than one task at any time.
22. The program storage device according to claim 21, wherein:
start-to-finish constraints between tasks of a request for change
are enforced; finish-to-finish constraints between tasks of a
request for change are enforced; colocation task/server assignment
constraints are enforced for all requests for change; exlocation
task/server assignment constraints are enforced for all requests
for change; resource capacity constraints are enforced on each
acceptable server executing one or more tasks for one or more
requests for change; requests for change with a deadline that falls
within the change window must be performed; all tasks of all
requests for change that are performed must be performed during the
change window.
23. The method according to claim 1, wherein: start-to-finish
constraints between tasks of a request for change are enforced;
finish-to-finish constraints between tasks of a request for change
are enforced; colocation task/server assignment constraints are
enforced for all requests for change; exlocation task/server
assignment constraints are enforced for all requests for change;
resource capacity constraints are enforced on each acceptable
server executing one or more tasks for one or more requests for
change; requests for change with a deadline that falls within the
change window must be performed; all tasks of all requests for
change that are performed must be performed during the change
window.
Description
FIELD OF THE INVENTION
The present invention relates generally to planning and scheduling,
and more particularly, to techniques for providing plans and
schedules which maximize profits when accommodating change
management requests in a computing system.
BACKGROUND OF THE INVENTION
Change Management is central to ensuring the availability,
reliability, and quality of information technology (IT) services.
Change Management signifies the process by which IT systems are
modified to accommodate considerations such as software fixes,
hardware upgrades and performance enhancements. The change
management process typically starts with the submission of a
Request For Change (RFC), which can be viewed as a job in
scheduling terms. Many RFCs may be considered for execution
concurrently. Some or all of these RFCs may be chosen to be done
during a period of time known as a change window. The RFC describes
what is to be done, usually in terms of hardware/software artifacts
to change (deploy, install, configure, uninstall). It might also
indicate the deadline by which the change needs to be completed.
Examples include changing the schema of a database table in a
running application and installing a new release of a web
application server in a multi-tiered eCommerce system. An important
observation is that many changes are not explicitly included in the
RFC. Rather, they are merely implied. For example, applications
must be recompiled if they use a database table whose schema is to
change. Implicit changes are a result of various kinds of
relationships, such as service dependencies and resource sharing.
There is a well-established methodology for change management. Some
key steps in this methodology are:
1. Assess the impact of changes in terms of the resources and
services affected;
2. Create a Change Plan that dictates how the change should be
implemented;
3. Verify the Change Plan (for example, through review by a change
management team in discussions with affected departments);
4. Test the Change Plan by doing "dry runs", especially for very
disruptive and/or high risk changes;
5. Ultimately implement the change by executing the plan.
A Change Plan typically consists of a set of tasks needed to
complete the RFC, such as "bring down application server 1" and
"copy x.ini to server 2". The plan itself specifies the partial
order of tasks. Note that items (2)-(5) relate to creating,
evaluating, and implementing the Change Plan.
In the current state of the art Change Plans are created manually,
not automatically. But this manual creation process is time
consuming, difficult and error prone. For a large computing system
it may be almost impossible. A need therefore exists for automating
change management.
SUMMARY OF THE INVENTION
In accordance with at least one presently preferred embodiment of
the present invention, there is broadly contemplated a system and
method for providing plans and schedules which maximize profits
when accommodating change management requests in a computing
system.
In summary, one aspect of the invention provides a method for
planning and scheduling tasks within at least one request for
change (RFC) within a change window in a computing system,
comprising the steps of deciding whether or not an RFC should be
done; for each RFC to be done, assigning individual tasks within
each RFC to acceptable servers; and for each RFC to be done,
assigning the start times to said individual tasks.
Another aspect of the present invention provides a system for
planning and scheduling tasks within at least one request for
change (RFC) within a change window in a computing system,
comprising an arrangement for deciding whether or not an RFC should
be done; an arrangement for assigning individual tasks to
acceptable servers for each RFC to be done; and an arrangement for
assigning the start times to said individual tasks for each RFC to
be done.
An additional aspect of the present invention provides a program
storage device readable by machine, tangibly embodying a program of
instructions executable by the machine to perform a method for
planning and scheduling tasks within at least one request for
change (RFC) within a change window in a computing system, said
method comprising the steps of: deciding whether or not an RFC
should be done; for each RFC to be done, assigning individual tasks
within each RFC to acceptable servers; for each RFC to be done,
assigning the start times to said individual tasks.
For a better understanding of the present invention, together with
other and further features and advantages thereof, reference is
made to the following description, taken in conjunction with the
accompanying drawings, and the scope of the invention will be
pointed out in the appended claims.
BRIEF DESCRIPTION OF THE DRAWINGS
FIG. 1a is a schematic diagram of the overall system architecture
in accordance with the present invention.
FIG. 1b is a block diagram illustrating various schemes in
accordance with the present invention.
FIG. 2 is a flowchart illustrating the operation of the main scheme
of the planner and scheduler (P&S).
FIG. 3 is a flowchart illustrating the operation of the phase 1
scheme.
FIG. 4 is a flowchart illustrating the operation of the task
assignment scheme.
FIG. 5 is a flowchart illustrating the operation of the objective
function estimation scheme.
FIG. 6 is a flowchart illustrating the operation of the phase 2
scheme.
FIG. 7 is a flowchart illustrating the operation of the objective
function improvement scheme.
DESCRIPTION OF THE PREFERRED EMBODIMENTS
Several other copending and commonly owned U.S. patent
applications, filed concurrently herewith, disclose various
processes and arrangements whose details may, in the role of
background information, help provide a better understanding of one
or more of the embodiments disclosed and contemplated herein.
Accordingly, those applications are hereby fully incorporated by
reference as if set forth in their entirety herein, and are as
follows (including the title and attorney docket number for each
one): "Methods And Arrangements for Ordering Changes in Computing
Systems"; and "Methods and Arrangements for Automated Change Plan
Construction and Impact Analysis".
Referring now to FIG. 1a, in accordance with the present invention,
the overall system architecture preferably consists of a Task Graph
Builder (TGB) 1140 and a Planner and Scheduler (P&S) 1170. The
Task Graph Builder 1140 determines the temporal and location
constraints of tasks needed to complete the RFC 1110. Such a Task
Graph is preferably constructed based on dependency information
1120 and installation policies 1130 (for example, time-of-day
considerations for making changes). The P&S 1170 uses the Task
Graph 1160 and other data 1150 to construct the Change Plan 1180.
Examples of other data include cost-related information. Planning
specifies the partial order of tasks and binds logical to physical
resources (for example, selecting which of several available
machines should become the application server). Scheduling
determines the times at which actions take place.
In accordance with the present invention, P&S is viewed as an
optimization problem wherein the goal is to maximize the profits
derived from performing the jobs associated with a selected subset
of the RFCs. The profit for each RFC is expressed as the value of
performing the job minus the associated costs. The generic nature
of the objective function incorporates a large number of practical
variants as special cases. In addition, the resulting P&S obeys
a variety of realistic temporal, location-specific and other types
of constraints. This very general formulation differs from the
state of the art of scheduling theory as defined by J. Blazewicz,
K. Ecker, G. Schmidt and J. Weglarz, Scheduling in Computer and
Manufacturing Systems, Springer-Verlag, 1993; E. Coffman, editor,
Computer and Job-Shop Scheduling Theory, John Wiley and Sons, 1976;
and M. Pinedo, Scheduling: Theory, Algorithms and Systems, Prentice
Hall, 1995.
However, the formulation described in this invention is
mathematically intractable in the sense that it is effectively
impossible for the scheme described in a preferred embodiment (or
that of any other scheme) to find an exact optimal solution in a
reasonable amount of time. For information on difficult problems of
this sort see M. Garey and D. Johnson, Computers and
Intractability, W.H. Freeman and Company, 1979. The optimization
techniques employed in the preferred embodiment of this invention
determine a very high quality solution in a time which scales
nicely with the problem size. They do so by decoupling the problem
into two components, with the results of the first component fed
into the second. The first component decides which RFCs to do
during a change window, and for those that are done, plans and
provides relativized schedules for the various tasks which comprise
those RFCs. That is, the tasks are assigned to servers and are
assigned times which are known offsets from the (as yet unknown)
start time of the overall RFC itself. The second component solves
the problem of scheduling the start times of the executed RFCs
themselves. (Taken together, the start time of an individual task
within the RFCs can be computed as the start time of the relevant
RFC plus the task time offset.) Both of these problem components
are solved by schemes which fall generally into the category of
randomized algorithms. For information on such schemes see R.
Motwani and P. Raghavan, Randomized Algorithms, Cambridge
University Press, 1995.
In accordance with the present invention, the Planner and Scheduler
(P&S) optimization problem formulation emphasizes the generic
nature of the formulation, as it pertains to the objective function
and the constraints. The formulation allows a large collection of
interesting and useful variants to be solved as special cases.
Naturally, this generic formulation causes the overall optimization
problem solution to be that much harder. However most reasonable
special cases are mathematically intractable in the same sense
anyway. The P&S therefore employs heuristic solution
techniques, achieving high quality but not typically strictly
optimal solutions. The invention is hierarchical in nature. Each
Request For Change (RFC) corresponds to a job which may or may not
be done during the particular window of time, called the change
window under consideration. Associated with each job are a set of
tasks which are interrelated by temporal and location-specific
dependencies arising from the TGB, and a variety of other
constraints as well. The P&S solution respects this hierarchy,
effectively decoupling the problems of planning and scheduling the
various tasks which comprise each job from the problem of
scheduling the jobs themselves. Let {1, . . . , J} be the set of
jobs, indexed by j. Let I.sub.j={1, . . . , I.sub.j} be the set of
tasks in job j, indexed by i. In general terms, the present
invention attempts to maximize the value associated with the jobs
that will be done within a given change window minus the total
costs of jobs that will be done (and thus optimizing the overall
profits), while satisfying the following extensive set of
constraints:
1. Precedence constraints among tasks within a job are respected.
In other words, if task i.sub.1 of job j is required to finish
before task i.sub.2 of job j starts, the scheduler will enforce
this. (This could be called a finish-to-start (FS) constraint.)
2. Similarly, start-to-start (SS) constraints are respected for
each job. Thus task i.sub.1 of job j may required to start before
task i.sub.2 of job j starts.
3. Start-to-finish (SF) constraints are respected for each job.
Thus task i.sub.1 of job j may be required to start before task
i.sub.2 of job j finishes.
4. Finish-to-finish (FF) constraints are respected for each job.
Thus task i.sub.1 of job j may be required to finish before task
i.sub.2 of job j finishes.
5. Tasks only get assigned to acceptable servers. The list of
acceptable servers may be as big or as small as desired. In
particular, the list may consist of all the servers or just one. It
might also consist of a specific class of servers.
6. Colocation (CL) task/server assignment constraints are met for
all jobs. Thus, tasks i.sub.1 and i.sub.2 of job j may be required
to be performed on the same server.
7. Exlocation (EL) task/server assignment constraints are met for
all jobs. Thus, tasks i.sub.1 and i.sub.2 of job j may be required
to be performed on different servers.
8. Resource capacity constraints are met on each server. These
constraints might be used to enforce CPU utilization, memory and
disk capacity requirements, for example.
9. Jobs get done if they are required. For example, those jobs with
a deadline that falls within the change window must be performed.
Others might be postponed for the time being, and thus might be
regarded as optional. (They might, for example, get done during a
subsequent change window.)
10. Each task of a job that gets done is assigned to a single
server.
11. No server can work on more than one task at any time.
12. All tasks on all jobs that get done must be performed during
the change window.
In the above list, constraints (1)-(4) are temporal, and arise from
the TGB. Constraints (5)-(8) are location-specific, and may arise
from the RFCs themselves, by virtue of policy, or from the system
state. Constraint (9) ensures that required jobs get scheduled.
Constraints (10)-(12) are technical but standard scheduling
requirements.
In order to formalize these concepts the following additional
notation is required. Let .sub.j denote the precedence relation for
job j derived from the TGB. (Without loss of generality assume
tasks are in topological order.) Let {1, . . . , P} be the set of
servers, indexed by p, and {1, . . . , R} be the set of resource
types, indexed by r. Let T denote the length of the change
window.
There will be a set .kappa..sub.j={1, . . . , K.sub.j} of cost
summands for job j, indexed by k. Each summand k will last from the
start of task .alpha..sub.j,k.di-elect cons.I.sub.j to the end of
task .beta..sub.j,k.di-elect cons.I.sub.j. The objective function
will integrate these cost summands for this duration of time, and
then add these integrals together to obtain the cost component of
the objective function. Special cases include costs which run
through the duration of the entire job (.kappa..sub.j=1,
.alpha..sub.j,1=1, .beta..sub.j,1=I.sub.j) and costs which are
task-specific
(.kappa..sub.j=I.sub.j.alpha..sub.j,k=.beta..sub.j,k=k), define
X.sub.j to be 1 if job j must be done, and 0 otherwise. The
precedence relation .sub.j for job j yields a finish/start set
FS.sub.j.OR right.I.sub.j.times.I.sub.j: (i.sub.1,
i.sub.2).di-elect cons.FS.sub.ji.sub.1.sub.ji.sub.2. Similarly
there is a start/start set SS.sub.j.OR right.I.sub.j.times.I.sub.j,
a start/finish set SF.sub.j.OR right.I.sub.j.times.I.sub.j and a
finish/finish set FF.sub.j.OR right.I.sub.j.times.I.sub.j. (Of
these four types of temporal constraints, the precedence, or
finish-to-start, constraints are the most common.) Let A.sub.i,j
denote the acceptable server set for task (i,j). Let CL.sub.j.OR
right.I.sub.j.times.I.sub.j be the colocation set for job j, and
EL.sub.j.OR right.I.sub.j.times.I.sub.j be the exlocation set. Let
t.sub.i,j,p denote the execution time of task (i, j) if assigned to
server p. (That is, the invention allows for heterogeneous servers.
It also allows for servers which cannot handle certain tasks.
Specifically, the execution time of such a task and server can be
set to infinity.) Let W.sub.p,r denote the available (spare)
capacity on server p of resource r. Assume that the net effect on
resource r utilization of doing task (i, j) on server p is
W.sub.i,j,r. Let the value of doing job j be V.sub.j. On the other
hand suppose that the k th cost summand for doing job j at time t
is given by C.sub.j,k(t). (The invention will typically be employed
in scenarios where this function is constant within given
intervals, for example, half hour periods, though this assumption
is not strictly necessary.)
The P&S employs three types of decision variables: The first
two are binary, namely:
.times..times..times..times..times..times..times..times..times..times..ti-
mes..times..times..times..times..times..times..times..times..times..times.-
.times..times..times..times..times..times. ##EQU00001## The last is
a real variable: s.sub.i,j is the start time of task (i, j).
Together these describe whether or not the job will be done, and,
if done, where and when its various tasks will be performed.
The following dependent variables can be derived easily from these,
and make the overall optimization problem easier to formulate: The
finish time of task (i, j) if done on server p is given by
f.sub.i,j,p=s.sub.i,j+t.sub.i,j,p. And there is an execution
indicator function for task (i, j) given by
.function..times..times..ltoreq..ltoreq. ##EQU00002##
Now the optimization problem at the heart of the P&S can be
defined as follows:
Maximize
.times..times..times..times..times..times..times..beta..times..times..int-
g..alpha..times..times..times..beta..times..times..times..function..times.-
.times.d ##EQU00003## such that
.ltoreq..times..times..di-elect
cons..times..times..times..times..A-inverted..ltoreq..times..times..di-el-
ect
cons..times..times..times..A-inverted..ltoreq..times..times..di-elect
cons..times..times..times..times..A-inverted..ltoreq..times..times..di-el-
ect
cons..times..times..times..times..times..times..times..times..times..A-
-inverted..times..times..times..times..times..di-elect
cons..times..times..times..A-inverted..times..times..times..times..times.-
.di-elect
cons..times..times..times..A-inverted..times..times..times..time-
s..times..ltoreq..times..A-inverted..gtoreq..times..A-inverted..times..tim-
es..times..A-inverted..times..times..times..times..function..ltoreq..times-
..A-inverted..ltoreq.<.ltoreq..times..times..times..times..times..A-inv-
erted. ##EQU00004##
The objective function and the various constraints mimic in formal
terms the scheduler definition given above. In particular, the
numbering of the constraints corresponds exactly. The extra
generality in the definition of the objective function now realizes
its intended payoff: By judicious choices of the parameters, the
present invention can solve many different scheduling problems
which might appear at first to be unrelated. For example, within
the context of this formulation the value or the number of all jobs
done could be maximized. Downtime or the costs associated with
downtime could be minimized. (See D. Patterson, A Simple Way to
Estimate the Cost of Downtime, LISA 2002, Philadelphia, Pa., for
simple techniques to estimate the cost of downtime.) Similarly, the
effects of reduced performance could be minimized. The total
execution time could also be minimized. The number of jobs which
meet their deadlines could also be maximized. By employing a few
additional tricks, easily understood by those skilled in the art,
such as the use of "dummy" tasks and such, one could minimize
multiple deadline penalties associated with the jobs and/or tasks,
for example those arising from customer service level agreements
(SLAs). One could minimize the average response time or the
weighted average response time of the various jobs. (These tricks,
moreover, would all be performed under the covers in a preferred
embodiment of the present invention. The user of the present
invention need only choose from a set of menu alternatives to
accomplish any of these optimization alternatives.)
One preferred embodiment of the present P&S invention consists
of a main scheme. This scheme falls in the category of so-called
randomized algorithms, and employs both a phase 1 and a phase 2
scheme. The phase 1 scheme, in turn, employs a task assignment
scheme and an objective function estimation scheme. The phase 2
scheme, on the other hand, employs an objective function
improvement scheme. These schemes are each described below and are
schematically illustrated in FIG. 1b. It should be noted that the
invention differs slightly in terms of its notation from that of
the mathematical description offered above. Specifically, the
flowcharts use terminology more suitable for a coded
embodiment.
Referring now to FIG. 2, the preferred main scheme of an embodiment
of the invention will now be discussed. The main scheme starts by
obtaining the input data in step 201. In step 202 the random seed X
is initialized and Xseed is set equal to it. Random number schemes
and their seeds are discussed in W. Press, S. Teukolsky and W.
Vetterling, Numerical Recipes, Cambridge University Press, 1986.
The value of the winning profit term winprofit is also initialized,
to -.infin., and the iteration number exp of the phase 1 randomized
experiment is initialized to 1. Then the phase 1 scheme is invoked
with seed X in step 203. It returns an estimated value profit, a
bound on the actual profit, and simultaneously modifies the value
of X. In step 204 the scheme determines if profit is greater than
winprofit. If it is, step 205 sets winprofit to be profit, and sets
the winning seed winX to be Xseed. Then the scheme proceeds to step
206. If profit is not greater than winprofit in step 204 the scheme
proceeds directly to step 206. Step 206 increments the experiment
iteration number exp by 1. In step 207 the scheme determines
whether exp is less than or equal to the number of phase 1
randomized experiments nexp1. If it is the scheme returns to step
203. If not the scheme proceeds to step 208. Step 208 determines if
winprofit is greater than -.infin.. If it is not, the scheme exits
at step 209: No feasible solution can be found. If it is, the
scheme proceeds to step 210, where X is set to winX. Then step 211
reinvokes the phase 1 randomized scheme with this seed, to
recompute the best solution. (Those skilled in the art will
recognize that the entire output of the best solution could be
stored during the experiments themselves, rather than recomputing
the best solution afterwards. The tradeoff is using extra memory
versus using slightly more computation time. In a preferred
embodiment the latter choice is made.) In step 212 the scheme sets
Xseed to be X, initializes the value of winprofit to be -.infin.,
and the iteration number exp of the phase 2 randomized experiment
to 1. Then the phase 2 scheme is invoked with seed X in step 213.
It returns a the actual value profit and simultaneously modifies
the value of X. In step 214 the scheme determines if profit is
greater than winprofit. If it is, step 215 sets winprofit to be
profit, and sets the winning seed winX to be Xseed. Then the scheme
proceeds to step 216. If profit is less than or equal to winprofit
in step 214 the scheme proceeds directly to step 216. Step 216
increments the experiment iteration number exp by 1. In step 217
the scheme determines whether exp is less than or equal to the
number of phase 2 randomized experiments nexp2. If it is the scheme
returns to step 213. If not the scheme proceeds to step 218. Step
218 sets X to winX. Then step 219 reinvokes the phase 2 randomized
scheme with this seed, to recompute the best solution. In step 220
the resulting plan and schedule is output. Then the main scheme
exits at step 221.
Referring now to FIG. 3, a preferred phase 1 scheme will now be
discussed. The phase 1 scheme starts in step 301 by choosing a
random number ranpick between 0 and 1. The generation of this
random number will modify the value of X. This number will be used
during the task assignment scheme. In step 302 the scheme sets the
value profit to be 0. Then step 303 initializes the server serv to
be 1. In step 304 the scheme initializes the value ptimecon[serv]
to be 0. This array will track time consumption on the servers.
Then step 305 initializes the resource res to be 1. In step 306 the
value prcon[serv][res] to be 0. This array will track resource
consumption on the servers. Then step 307 increments the value of
res by 1. In step 308 the scheme checks to see if res is less than
or equal to the number of resources nres. If it is the scheme
returns to step 306. If it is not the scheme proceeds to step 309,
where serv is incremented by 1.
Step 310 checks to see if serv is less than or equal to the number
nserv of servers. If it is the scheme returns to 304. If it is not
the scheme proceeds to step 311, where the value job is initialized
to 1. In step 312 the scheme initializes checked[job] to be 0. This
array will indicate whether or not a job has been evaluated thus
far. In step 313 the scheme increments the value job by 1. Then
step 314 checks to see if job is less than or equal to the number
njobs of jobs. If it is the scheme returns to step 312. Otherwise
the scheme proceeds to step 315, where it is checked if the number
nrjobs of required jobs is positive. The case where there are no
required jobs will be deferred for the moment. If there are
required jobs step 316 initializes the value rjob to 1. Then step
317 sets jcount equal to nrjobs-rjob+1.
In step 318 a random integer r between 1 and jcount is chosen. The
generation of this random number will modify the value of X. Then
step 319 initializes the value s to be 0. In step 320 the scheme
initializes job to be 1. Then step 321 checks to see if both
dojob[job] is 1 and checked[job] is 0. The array dojob is input
data. It keeps track of required and optional jobs as a 1 or 0,
respectively. If the check in step 321 is positive, step 322
increments the value of s by 1. Then step 323 checks to see if s
equals r. If it is not, or if the check in step 321 is negative,
step 324 increments the value of job by 1. Then the scheme returns
to step 321. If s equals r in step 323 the scheme proceeds to step
325, where checked[job] is set to 1. Then step 326 invokes the task
assignment scheme for job. Among other things this scheme computes
the value of feas. If feas is 1 it also assigns tasks and to
servers, denoting utilized and non-utilized servers via an array
userv[job][serv], as 1 or 0, respectively. Additionally it computes
the length makespan[job] from the beginning to the end of the job.
A 1 indicates feasibility and a 0 indicates infeasibility. Step 327
checks the value of feas. If feas is 0 step 328 sets profit to be
-.infin.. This is because no feasible solution has been discovered,
even considering only the required jobs. Then step 329 returns to
the main scheme, causing the experiment to fail. If feas is 1 in
step 328 then the scheme proceeds to step 330, where serv is
initialized to 1.
In step 331 the scheme checks if userv[job][serv] is 1. If it is,
step 332 increments the value of ptimecon[serv] by the length
makespan[job] of the job. Step 333 initializes the value of res to
1. Then step 334 increments the value of prcon[serv][res] by the
resource jprcon[job][serv][res] consumed. In step 335 the value of
res is incremented by 1. Then step 336 checks to see if res is less
than or equal to the number of resources nres. If it is the scheme
returns to step 334. Otherwise step 337 increments the value of
serv by 1. Step 337 can also be reached if the test in step 331
fails. Step 338 checks to see if serv is less than or equal to the
number nserv of servers. If it is the scheme returns to step 331.
Otherwise step 339 increments the value of rjob by 1. Then step 340
checks to see if rjob is less than or equal to the number nrjobs of
required jobs. If it is the scheme returns to step 317. Otherwise
the scheme proceeds to step 341, where it is checked if the number
nojobs of optional jobs is positive. This step may also be reached
from step 315, if there are no required jobs. The case where there
are no optional jobs in step 341 will be deferred for the moment.
If there are optional jobs step 342 initializes the value ojob to
1. Then step 343 sets jcount equal to nojobs-ojob+1.
In step 344 a random integer r between 1 and jcount is chosen. The
generation of this random number will modify the value of X. Then
step 345 initializes the value s to be 0. In step 346 the scheme
initializes job to be 1. Then step 347 checks to see if both
dojob[job] is 0 and checked[job] is 0. If the check in step 347 is
positive, step 348 increments the value of s by 1. Then step 349
checks to see if s equals r. If it is not, or if the check in step
347 is negative, step 350 increments the value of job by 1. Then
the scheme returns to step 347. If s equals r in step 349 the
scheme proceeds to step 351, where checked[job] is set to 1. Then
step 352 invokes the task assignment scheme for job.
Among other things this scheme computes the value of feas. If feas
is 1 it also assigns tasks and to servers, denoting utilized and
non-utilized servers via an array userv[job][serv], as 1 or 0,
respectively. Additionally it computes the length makespan[job]
from the beginning to the end of the job. Step 353 checks the value
of feas. The case where feas is 0 is deferred for the moment. This
optional job will not, however, be done in this experiment. If feas
is 1 in step 353 then the scheme proceeds to step 354, where serv
is initialized to 1. In step 355 the scheme checks if
userv[job][serv] is 1. If it is, step 356 increments the value of
ptimecon[serv] by the length makespan[job] of the job.
Step 357 initializes the value of res to 1. Then step 358
increments the value of prcon[serv][res] by the resource
prcon[job][serv][res] consumed. In step 359 the value of res is
incremented by 1. Then step 360 checks to see if res is less than
or equal to the number of resources nres. If it is the scheme
returns to step 358. Otherwise step 361 increments the value of
serv by 1. Step 362 checks to see if serv is less than or equal to
the number nserv of servers. If it is the scheme returns to step
355. Otherwise step 363 increments the value of ojob by 1. This
step can also be reached if the test in step 353 fails. Then step
364 checks to see if ojob is less than or equal to the number
nojobs of optional jobs. If it is the scheme returns to step 343.
Otherwise the objective function estimation scheme is invoked. This
scheme provides an estimate of the profit than can be achieved by
an actual schedule employing the task assignments and relative
schedules obtained in phase 1. Then in step 366 phase 1 returns to
the main scheme.
The preferred task assignment scheme will now be described with
reference to FIG. 4. This scheme starts in step 401 by initializing
the value of task to 1. Step 402 initializes nok[task] to 0 and
place[task] to be 0. Then step 403 initializes serv to be 1. In
step 404 the scheme sets userv[job][serv] to be 0, aserv[job][task]
to be 0, and watermark[serv] to be 0. Then step 405 sets
tok[task][serv] equal to ok[job][task][serv]. Step 406 checks to
see if tok[task][serv] equals 1. If it is, step 407 sets nok[task]
equal to 1 and step 408 increments serv by 1. Step 408 can also be
reached if tok[task][serv] equals 0 in step 406. In step 409 the
scheme checks to see if serv is less than or equal to the number
nserv of servers. If it is the scheme returns to step 404.
Otherwise the scheme proceeds to step 410, where task is
incremented by 1. Then step 411 checks to see if task is less than
or equal to the number ntasks[job] of tasks for job. If it is the
scheme returns to step 402. Otherwise it proceeds to step 412,
which initializes nplaced to 0, ctime to 0 and makespan[job] to
0.
Step 413 initializes serv to be 1 and step 414 initializes res to
be 1. In step 415 the scheme sets jprcon[job][serv][res] to be 0.
Step 416 increments res by 1. Step 417 checks to see if res is less
than or equal to the number nres of resources. If it is, the scheme
returns to step 415. Otherwise the scheme proceeds to step 418,
which increments serv by 1. Then step 419 tests to see if serv is
less than or equal to the number nserv of servers. If it is, the
scheme returns to step 414. Otherwise it invokes the ready list
scheme for job and ctime in step 420. Those skilled in the art will
understand that ready lists are part of many scheduling schemes.
See, for example, E. Coffman, editor, Computer and Job-Shop
Scheduling Theory, John Wiley and Sons, 1976. For a task to be on
the ready list at time ctime means in this case that all FS and all
SS dependencies have been met. The number nready of ready tasks is
returned. Then step 421 sets success to be 0, and step 422 tests to
see if nready is greater than 0. If it is not the scheme invokes a
next event scheme, which returns the next event time on the event
list, updating ctime. Those skilled in the art will recognize that
keeping track of the next event is part of the bookkeeping of a
ready list scheme. Then the scheme returns to step 420. If nready
is greater than 0 in step 422, step 424 invokes a weighted random
number generator to obtain a random task task on the ready list.
The weight for each task A is the following ratio: The numerator is
the maximum over all tasks B for which AB, based on the FS
constraints, of the minimum time to complete all tasks from A to B.
The denominator is the earliest deadline of task B minus the
current time ctime. The earliest deadline is computed over the SF
and FF constraints for all tasks satisfying BC, backtracking via
the minimum task time to complete all tasks beyond B to C. The
maximum value of this denominator is taken to be T minus ctime, and
the minimum value is taken to be 0. (All tasks which are at or
beyond their deadline thus have infinite weight, meaning that the
weighted random number will choose arbitrarily from one of these
with probability 1.) The generalization of this random number will
modify the value of X. The minimum time to complete all tasks from
one task to another is based on an all nodes shortest path scheme
where the path distances are the minimum task execution times
amongst all currently acceptable servers. Those skilled in the art
will recognize that shortest path schemes are widely used in a
variety of schemes. For details see E. Lawler, Combinatorial
Optimization, Holt, Rinehart and Winston, 1976.
Step 425 checks to see if aserv[job][task] is greater than 0. This
can occur because of the acceptable server colocation and
exlocation constraints, and can be explicit or implicitly derived
based on previous task assignments. The case where aserv[job][task]
is 0 is deferred for the moment. If it is the scheme proceeds to
step 426, where winserv is set to aserv[job][task]. Then step 427
sets success to 1 and increments nplaced by 1. Step 428 sets
placed[task] to be 1 and step 429 sets userv[job][winserv] to be 1.
Then step 430 updates the value of makespan[job] and
watermark[winserv]. Step 431 adds watermark[winserv] to the event
list. In step 432 the value of serv is initialized to 1. Step 433
checks to see if userv[job][serv] is 1. If it is, step 434 checks
to see if ptimecon[serv]+makespan[job] is greater than T. If it is,
there is no feasible solution, and the scheme returns in step 435.
If not, or if userv[job][serv] is 0 in step 433, step 436
initializes res to be 1.
In step 437 the scheme increments jprcon[job][winserv][res] by
jtrcon[job][task][res]. Step 438 checks to see if
jprcon[job][winserv][res]+prcon[winserv][res] is greater than
prcap[winserv][res]. If so, step 439 checks to see if dojob[job] is
1. If this is true, the feasibility test has failed on a required
job, and the scheme returns in step 440. Otherwise, or if the test
in step 438 fails, step 441 increments the value of res by 1. Then
step 442 checks to see if res is less than or equal to the number
nres of resources. If it is the scheme returns to step 431.
Otherwise it proceeds to step 443, which increments the value of
serv by 1. Then step 444 checks to see if serv is less than or
equal to the number nserv of servers. If it is, the scheme returns
to step 433. Otherwise it proceeds to step 445, which checks to see
if nplaced is less than or equal to the number ntasks[job] of tasks
for job. If it is, the scheme returns to step 420. Otherwise the
scheme proceeds to step 446, which initializes serv to be 1.
Step 447 sets makespan[job][serv] to be 0 and step 448 checks to
see if userv[job][serv] equals 1. If it is, step 449 sets
makespan[job][serv] equal to makespan[job]. Then step 450
increments serv by 1. Step 450 can also be reached from step 448 if
userv[job][serv] equals 0. Step 451 checks to see if serv is less
than or equal to the number nserv of servers. If it is the scheme
returns to step 447. If it is not the scheme has found a feasible
solution and returns in step 452. If aserv[job][task] equals 0 in
step 425 the scheme proceeds to step 453, which initializes winserv
to be 0, winws to be .infin. and winmf to be .infin.. The value
winws will approximate "wasted space", while the value winmf will
be a maximum feasibility fraction, greater than 1 for infeasible
solutions and less than or equal to 1 for feasible solution.
Step 454 initializes serv to be 1. Then step 455 checks to see if
tok[task][serv] is 1. The case where it is not is deferred for the
moment. If it is, step 456 sets rs to be the max(watermark[serv],
ctime). Then step 457 sets rf to be rs+etime[job][task][serv]. Step
458 sets ws to be rf-watermark[serv]. Then step 459 checks to see
if ws is less than or equal to winws. The case where it is not is
deferred for the moment. If it is, step 460 sets mf [0] to be
(ptimecon[serv]+max(makespan[job], rf))/T. Then step 461 tests to
see if mf [0] is greater than 1. The case where it is is deferred
for the moment. If it is not the scheme proceeds to step 462 where
serv1 is initialized to 1. Then step 463 checks to see if
userv[job][serv] equals 1. If it is, the scheme proceeds to step
464, which sets mf [0] equal to max(mf [0],
(ptimecon[serv]+max(makespan[job], rf))/T).
Step 465 checks to see if mf [0] is greater than 1. The case where
it is deferred for the moment. Otherwise, the scheme proceeds to
step 466, which increments serv1 by 1. Step 466 can also be reached
from step 463, if userv[job][serv] is 0. Then step 467 checks to
see if serv1 is less than or equal to the number nserv of servers.
If it is, the scheme returns to step 463. Otherwise step 468
initializes res to 1. Then step 469 sets mf [res] equal to
(prcon[serv][res]+jprcon[job][serv][res]+jtrcon[job][task][res])/prcap[se-
rv][res]. Step 470 checks to see if mf [res] is greater than 1. The
case where it is deferred for the moment. Otherwise the scheme
increments res by 1 in step 471. Then step 472 checks to see if res
is less than or equal to the number nres of resources. If it is the
scheme returns to step 469. Otherwise it proceeds to step 473,
which tests to see if ws is less than winws. The case where it is
not is deferred for the moment. Otherwise step 474 sets winserv
equal to serv, winws equal to ws and winnp equal to 0. Then step
475 checks to see if userv[job][serv] is 0. If it is, step 476 sets
winnp equal to 1. Then step 477 increments serv by 1. Step 477 can
also be reached if the test in step 455 fails, the test in step 459
fails, the test in step 461 succeeds, the test in 465 succeeds, the
test in step 475 fails or the test in step 470 succeeds. Then step
478 checks to see if serv is less than or equal to the number nserv
of servers. If it is the scheme returns to step 463. The case where
it is not is deferred for the moment. If ws is greater than or
equal to winws in step 473 the scheme proceeds to step 479, which
sets np to be 0. Then step 480 checks to see if userv[job][serv] is
0. If it is, step 481 sets np equal to 1. Then step 482 sets tmf
equal to mf [0] and initializes res to be 1. Step 482 can also be
reached if userv[job][serv] is 1 in step 480. Then step 483 sets
tmf equal to max(tmf, mf [res]) and step 484 increments res by
1.
Step 485 checks to see if res is less than or equal to the number
nres of resources. If it is the scheme returns to step 483.
Otherwise it proceeds to step 486, which picks a random number u
between 0 and 1. The generation of this random number will modify
the value of X. Then step 487 checks to see if u is less than or
equal to ranpick. This test will guide the order of the two
subsequent checks. So if the test in step 487 succeeds, step 488
tests to see if np equals 1 and winnp equals 0. If it is not, step
489 checks to see if np equals 0 and winnp equals 1. If it is not,
step 490 checks to see if tmf is less than winmf. If the test in
step 487 fails, step 491 checks to see if tmf is less than winmf.
If not, step 492 checks to see if tmf equals winmf. If it is step
493 checks to see if np equals 0 and winnp is 1.
Now the cases of success in step 488, failure in step 490 and
failure in step 493 represent a failure for this server, and the
scheme returns to step 477. The cases of success in step 489,
success in step 490, success in step 491 and failure in step 492
represent a current success for this server, and the scheme returns
to step 474. If serv is greater than nserv in step 478, step 494
checks to see if winserv is equal to 0. If it is not the scheme
returns to step 427. Otherwise step 495 checks to see if dojob[job]
is 1. If it is, no feasible solution can be found, and the scheme
returns in step 496. Otherwise a relaxed solution is attempted, and
step 497 sets winms equal to .infin. and wintmf equal to .infin..
Then step 498 initializes serv to be 1. Then step 499 checks to see
if tok[task][serv] equals 1. The case where it is not is deferred
for the moment. If it is, step 4100 sets rs equal to
max(makespan[job],ctime) and step 4101 sets rf equal to
rs+etime[job][task][serv]. Then step 4102 sets ws equal to
rf-makespan[job] and step 4103 sets tmf equal to
(ptimecon[serv]+max(makespan[job],rf))/T. Then step 4104
initializes serv1 to be 1. In step 4105 a check is made to see if
userv[job][serv1] equals 1. If it is, step 4106 sets tmf equal to
max(tmf, (ptimecon[serv1]+max(makespan[job], rf))/T. Then step 4107
increments serv1 by 1. Step 4107 can also be reached from step 4105
if userv[job][serv1] equals 0. Then step 4108 checks to see if
serv1 is less than or equal to the number nserv of servers. If it
is the scheme returns to step 4105. If not, the scheme proceeds to
step 4109, which initializes res to be 1.
Then step 4110 sets tmf equal to
prcon[serv][res]+jprcon[job][serv][res]+jtrcon[job][task][res])/prcap[ser-
v][res]. Step 4111 increments res by 1 and step 4112 tests to see
if res is less than or equal to the number nres of resources. If it
is the scheme returns to step 4110. Otherwise it proceeds to step
4113, which checks if tmf is less than or equal to wintmf. If it
is, step 4114 checks to see if tmf equals wintmf and ws is less
than winws. If the test in step 4113 or step 4114 succeeds the
scheme sets winserv equal to serv, winws equal to ws and wintmf
equal to tmf. It then proceeds to step 4116, which can also be
reached if the test in step 499 fails, the test in step 4113
succeeds or the test in step 4114 succeeds. Step 4116 increments
serv by 1. Then step 4117 checks to see if serv is less than or
equal to the number nserv of servers. If it is, the scheme returns
to step 4105. Otherwise it proceeds to step 4118, which checks to
see if winserv equals 0. If not, there is a relaxed feasible
solution, and the scheme returns to step 427. The case where
winserv equals 0 represents failure to find even a relaxed feasible
solution, and the scheme returns in step 4119.
The preferred objective function estimation scheme used by Phase 1
will now be described with reference to FIG. 5. The preferred
scheme starts in step 501 by setting the value of profit to 0. Step
502 initializes job to be 1. Step 503 initializes done[job] to be
0. Step 504 increments job by 1. Then step 505 checks to see if job
is less than or equal to the number njobs of jobs. If it is the
scheme returns to step 503. Otherwise the scheme proceeds to step
506 where serv is initialized to 1. Then step 507 initializes res
to 1. In step 508 the resource prcon[serv][res] is initialized to
0.
Step 509 increments res by 1. Then step 510 checks to see if res is
less than or equal to the number nres of resources. If it is the
scheme returns to step 508. Otherwise the scheme proceeds to step
511, where serv is incremented by 1. In step 512 the scheme checks
to see if serv is less than or equal to the number nserv of
servers. If it is the scheme returns to step 507. Otherwise the
scheme proceeds to step 513, which checks if the number nrjobs of
required jobs is greater than 0. The case where there are no
required jobs is deferred for the moment. If there are required
jobs step 514 initializes rjob to 1. Then step 515 initializes s to
0. In step 516 job is initialized to 1.
Step 517 checks to see if dojob[job] is 1. If it is, the job is
required, and step 518 increments s by 1. Then step 519 checks if s
equals rjob. If it is not, step 520 increments job by 1 and returns
to step 517. Step 520 is also reached if dojob[job] is 0in step
517. If s equals rjob in step 519, step 521 invokes a best time
scheme for job. Those skilled in the art will recognize that this
scheme will examine all meaningful start times which fit in the
change window for the one which minimizes the value loss[job]. Then
step 522 sets done[job] to be 1 and increments profit by
gain[job]-loss[job]. Step 523 increments rjob by 1 and step 524
checks to see if rjob is less than or equal to the number nrjobs of
required jobs. If it is the scheme returns to step 515. Otherwise
it proceeds to step 525.
Step 525 checks if the number nojobs of optional jobs is greater
than 0. The case where there are no optional jobs is deferred for
the moment. Step 525 is also reached from step 513 if there are no
required jobs. If there are optional jobs in step 525, step 526
initializes ojob ojobs to be 1. Then step 527 initializes s to be
0. Step 528 initializes job to be 1. Step 529 checks to see if
dojob[job] is 0. If it is not step 530 increments s by 1 and step
531 checks to see if s equals ojob. If it is not step 532
increments job by 1. Step 532 can also be reached from step 529 if
dojob is 0. Then step 533 invokes a best time scheme for job.
In step 534 it is checked to see if gain[job]-loss[job] is greater
than or equal to 0. If it is, the optional job is profitable, and
step 535 checks if constraint[job] is 1. If it is, step 536 sets
done[job] to be 1 and increments profit by gain[job]-loss[job].
Then step 537 increments ojob by 1. This step can also be reached
if step 534 finds the job to be unprofitable. Then step 538 checks
if ojob is less than or equal to the number nojobs of optional
jobs. If it is, the scheme returns to step 527. If step 535 finds
constraint[job] equal to 0 then step 539 sets done[job] equal to
-1. Then the scheme returns to step 537. If step 538 finds that
ojob equals nojobs the scheme proceeds to step 540, which
initializes maxnf to be 1. This variable will check for
infeasibilities. Step 540 can also be reached if there are no
optional jobs in step 525. Then step 541 initializes serv to be
1.
Step 542 sets frac to be ptimecon[serv]/T, the time consumed on
server serv divided by the total change window time. Then step 543
checks to see if frac is greater than maxnf. If so, step 544 sets
maxnf to be frac, winserv to be serv and winres to be 0. The last
variable will point to the resource with the worst infeasibility,
or 0 if time is the worst infeasibility. Step 545 initializes res
to be 1. This step can also be reached from step 543 if frac is
less than or equal to maxnf. Then step 546 sets frac to be
prcon[serv][res]/prcap[serv][res], the resource consumed divided by
the capacity. In step 547 it is checked to see if frac is greater
than maxnf. If so, step 548 sets maxnf to be frac, winserv to be
serv and winres to be res. Then it proceeds to step 549 which
increments res by 1. This step can also be reached from step 547 if
frac is less than or equal to maxnf.
Step 550 checks to see if res is less than or equal to the number
nres of resources. If it is the scheme returns to step 546. If not,
the scheme proceeds to step 551, where serv is incremented by 1.
Then step 552 checks to see if serv is less than or equal to the
number nserv of servers. If it is the scheme returns to step 542.
Otherwise the scheme proceeds to step 553, which checks in the
maxnf is greater than 1. If not, the solution is feasible, and the
scheme returns at step 554. If so, the solution is not currently
feasible, and step 555 sets wintprofit equal to -.infin. and
initializes exp to be 1. Then step 556 sets tprofit to be profit,
tmaxnf to be maxnf, twinserv to be winserv and twinres to be
winres. Then step 557 initializes job to be 1.
Step 558 sets tdone[job] to be done[job]. Then step 559 increments
the value of job by 1 and step 560 tests to see if job is less than
or equal to the number njobs of jobs. If it is the scheme returns
to step 558. Otherwise it proceeds to step 561, where ncands is
initialized to 0. Step 562 initializes job to be 1 and step 563
checks to see if dojob[job] is 0 and tdone[job] is 1. If so, step
564 checks to see if twinres is 0. If it is, step 565 checks to see
if makespan[job][twinserv] is greater than 0. Otherwise, step 566
checks to see if jprcon[job][twinserv][twinres] is greater than 0.
If the test in either step 565 or 566 succeeds, step 567 increments
ncand by 1 and sets cand[job] equal to 1. If the test in either
step 565 or 566 fails, step 568 sets cand[job] equal to 0. Then
both step 567 and 568 proceed to step 569, which increments job by
1. This step can also be reached from step 563 if that test
fails.
Step 570 tests to see if job is less than or equal to the number
njobs of jobs. If it is the scheme returns to step 563. Otherwise
the scheme proceeds to step 571, which picks a random integer r
between 1 and ncands. The generation of this random number will
modify the value of X. Then step 572 initializes s to be 0 and step
573 initializes job to be 1. Step 574 tests to see if dojob[job] is
1, tdone[job] is 1 and cand[job] is 1. If this test succeeds step
575 increments s by 1. Then step 576 checks to see if s equals r.
If not, step 577 increments job by 1. This step can also be reached
from step 574 if the test fails. Then the scheme proceeds to step
574. If s equals r in step 576 the scheme proceeds to step 578,
which sets tdone[job] equal to 0 and decrements profit by
gain[job]-loss[job].
Step 579 initializes serv to be 1. In step 580 ptimecon[serv] is
decremented by makespan[job][serv]. Step 581 initializes res to be
1. In step 582 prcon[serv][res] is decremented by
jprcon[job][serv][res]. In step 583 res is incremented by 1 and in
step 584 it is checked to see if res is less than or equal to the
number nres of resources. If so, the scheme returns to step 582.
Otherwise step 585 increments serv by 1. Then step 586 checks to
see if serv is less than or equal to the number nserv of servers.
If so the scheme returns to step 580. Otherwise it proceeds to step
587, which initializes tmaxnf to be 1.
Step 588 initializes serv to be 1. Step 589 sets frac to be
ptimecon[serv]/T, the time consumed on server serv divided by the
total change window time. Then step 590 checks to see if frac is
greater than tmaxnf. If so, step 591 sets tmaxnf to be frac,
winserv to be serv and winres to be 0. The last variable will point
to the resource with the worst infeasibility, or 0 if time is the
worst infeasibility. Step 592 initializes res to be 1. This step
can also be reached from step 590 if frac is less than or equal to
tmaxnf. Then step 593 sets frac to be
prcon[serv][res]/prcap[serv][res], the resource consumed divided by
the capacity. In step 594 it is checked to see if frac is greater
than maxnf. If so, step 595 sets tmaxnf to be frac, winserv to be
serv and winres to be res. Then it proceeds to step 596 which
increments res by 1. This step can also be reached from step 594 if
frac is less than or equal to tmaxnf.
Step 597 checks to see if res is less than or equal to the number
nres of resources. If it is the scheme returns to step 593. If not,
the scheme proceeds to step 598, where serv is incremented by 1.
Then step 599 checks to see if serv is less than or equal to the
number nserv of servers. If it is the scheme returns to step 589.
Otherwise the scheme proceeds to step 5100, which checks in the
tmaxnf is greater than 1. If it is the scheme returns to step 561.
Otherwise step 5101 tests to see if tprofit is greater than
wintprofit. The case where it is not is deferred for the moment. If
it is, the experiment is a success, and the step 5102 sets
wintprofit equal to tprofit. Then step 5103 initializes job to be 1
and step 5104 sets ttdone[job] equal to tdone[job].
In step 5105 job is incremented by 1, and step 5106 tests to see if
job is less than or equal to the number njobs of jobs. If so the
scheme returns to step 5104. Otherwise step 5107 increments the
value of exp by 1. This step can also be reached from step 5101 if
tprofit is less than or equal to wintprofit. Then step 5108 tests
to see if exp is less than or equal to the number nexpe of
estimator experiments. If so the scheme returns to step 556.
Otherwise it proceeds with step 5109, which sets profit to be
wintprofit. Then step 5110 initializes job to be 1. Step 5111 sets
done[job] to be ttdone[job] and step 5112 increments job by 1. Step
5113 checks to see if job is less than or equal to the number njobs
of jobs. If so the scheme returns to step 5111. Otherwise it
returns in step 5114.
The preferred phase 2 scheme will now be described with reference
to FIG. 6. This scheme starts in step 601 by setting the value
profit to be 0. In step 602 the value job is initialized to 1. In
step 603 the scheme initializes done[job] to be 0 and checked[job]
to be 0. The first array will indicate whether the job will be done
in this experiment and the second array will indicate whether or
not a job has been evaluated thus far. In step 604 the scheme
increments the value job by 1. Then step 605 checks to see if job
is less than or equal to the number njobs of jobs. If it is the
scheme returns to step 603. Otherwise the scheme proceeds to step
606, where the value serv is initialized to 1. In step 607 the
value res is initialized to 1. Then in step 608 the value of
prcon[serv][res] is initialized to 0. This array will track
resource consumption on the servers.
In step 609 the value of res is incremented by 1. Then step 610
checks to see if res is less than or equal to the number nres of
resources. If it is the scheme returns to step 608. Otherwise the
scheme proceeds to step 611, where the value of serv is incremented
by 1. Then step 612 checks to see if serv is less than or equal to
the number nserv of servers. If it is the scheme returns to step
607. Otherwise the scheme proceeds to step 613 where it is checked
if the number nrjobs of required jobs is positive. The case where
there are no required jobs will be deferred for the moment. If
there are required jobs step 614 initializes the value rjob to 1.
Then step 615 sets jcount equal to nrjobs-rjob+1.
In step 616 a random integer r between 1 and jcount is chosen. The
generation of this random number will modify the value of X. Then
step 617 initializes the value s to be 0. In step 618 the scheme
initializes job to be 1. Then step 619 checks to see if both
dojob[job] is 1 and checked[job] is 0. The array dojob is input
data. It keeps track of required and optional jobs as a 1 or 0,
respectively. If the check in step 619 is positive, step 620
increments the value of s by 1. Then step 621 checks to see if s
equals r. If it is not, or if the check in step 619 is negative,
step 622 increments the value of job by 1. Then the scheme returns
to step 619. If s equals r in step 621 the scheme proceeds to step
623, where checked[job] is set to 1. Then step 624 invokes a best
time scheme for job. Those skilled in the art will recognize that
this scheme will examine all meaningful start times which fit in
the change window amongst the previously assigned jobs for the one
which minimizes the value loss [job]. If the job cannot fit this
scheme will set fits[job] to be 0. Otherwise it will be set to 1.
If the job fits but cannot meet the constraints the scheme will set
constraint[job] to be 0. Otherwise it will be set to 1.
Step 625 checks the value offits[job]. If fits [job] is 1 the
scheme proceeds to step 626, which checks the value of
constraint[job]. If constraint[job] is 0, or if fits[job]equals 0
in step 625, the scheme proceeds to step 627, where profit is set
to be -.infin.. This is because no solution has been discovered,
even considering only the required jobs. Then step 628 returns to
the main scheme, causing the experiment to fail. If constraint[job]
equals 1 in step 626 then the scheme proceeds to step 629, where
profit is incremented by gain[job]-loss [job] and done [job] is set
to 1. Then step 630 increments the value of rjob by 1. Step 631
checks to see if rjob is less than or equal to the number nrjobs of
required jobs. If it is the scheme returns to step 615. Otherwise
the scheme proceeds to step 632, where it is checked if the number
nojobs of optional jobs is positive. This step may also be reached
from step 613, if there are no required jobs. The case where there
are no optional jobs in step 632 will be deferred for the moment.
If there are optional jobs step 633 initializes the value ojob to
1. Then step 634 sets jcount equal to nojobs-ojobs+1.
In step 635 a random integer r between 1 and jcount is chosen. The
generation of this random number will modify the value of X. Then
step 636 initializes the value s to be 0. In step 637 the scheme
initializes job to be 1. Then step 638 checks to see if both
dojob[job] is 0 and checked[job] is 0. If the check in step 638 is
positive, step 639 increments the value of s by 1. Then step 640
checks to see if s equals r. If it is not, or if the check in step
638 is negative, step 641 increments the value of job by 1. Then
the scheme returns to step 638. If s equals r in step 640 the
scheme proceeds to step 642, where checked[job] is set to 1.
Step 643 invokes the best time scheme for job. Step 644 checks the
value of fits [job]. If it equals 1 step 645 checks the value of
constraint[job]. If it equals 1 step 646 increments profit by
gain[job]-loss[job] and done[job] is set to 1. If either fits[job]
or constraint[job] is found equal to 0 in steps 644 or 645, step
617 sets done[job] to be 0. After either step 646 or 647 the scheme
increments the value of ojob by 1 in step 648. Then step 649 checks
to see if ojob is less than or equal to the number nojobs of
optional jobs. If it is the scheme returns to step 634. Otherwise
the objective function improvement scheme is invoked in step 650.
This scheme attempts to further improve the value of profit. Then
in step 651 phase 2 returns to the main scheme.
The preferred objective function improvement scheme utilized in
phase 2 will now be described with reference to FIG. 7. This scheme
starts in step 701 by initializing winprofit to be profit and mjobs
to be 0. The latter counts the number of jobs that are not
contiguous with other jobs at the start of the job, the finish of
the job, or both. These are the "movable" jobs. Then step 702
initializes job to be 1. Step 703 checks to see if done [job] is 1.
If it is, step 704 invokes the check as to whether or not job is
movable. It sets mjob[job] to be 1 or 0, according to whether job
is movable or not. So step 705 checks mjob[job] to see if it is 1.
If it is, step 706 increments mjobs by 1. It then proceeds to step
707, where job is incremented by 1. Step 707 can also be reached if
done [job] is 0 in step 703 or if mjob[job] is 0 in step 705. Then
step 708 checks to see if job is less than or equal to the number
njobs of jobs. If it is, the scheme returns to step 703. Otherwise
it proceeds to step 709, where the scheme checks if mjobs is
greater than 0. If not, no improvement is possible, and the scheme
returns in step 710. Otherwise, step 711 initializes exp to be
1.
Step 712 initializes tprofit to be profit. Step 713 initializes job
to be 1, and step 714 checks to see if done[job] is 1. If it is,
step 715 sets checked[job] to be 0 and tloss[job] to be loss[job].
Then step 716 increments job by 1. This step can also be reached if
done[job] is 0 in step 714. Step 717 checks to see if job is less
than or equal to the number njobs of jobs. If it is the scheme
returns to step 714. Otherwise it proceeds to step 718, where
firsttime is initialized to 1 and imp is initialized to 0. Then
step 719 initializes job to be 1.
In step 720 the value rj[job] is initialized to 0. Then step 721
increments job by 1 and step 722 checks to see if job is less than
or equal to the number njobs of jobs. If it is the scheme returns
to step 720. Otherwise it proceeds to step 723, where rjob is
initialized to 1. Step 724 checks to see if firsttime is 1. Since
all jobs are in a locally optimal position the objective function
improvement scheme treats the first move differently from the
others. The first move will involve an increase in the objective
function value, while the subsequent moves are required to decrease
the value of the objective function. The latter case is deferred
for the moment. If firsttime is 1 in step 724, step 725 chooses a
random integer job1 between 1 and mjobs. The generation of this
random number will modify the value of X. Step 726 initializes job2
to be 0 and step 727 initializes job to be 1.
Then step 728 checks to see if both done[job] is 1 and mjob[job] is
1. If so, step 729 increments job2 by 1 and step 730 tests to see
if job1 equals job2. If so, step 731 sets rj[job] to be 1. If not,
step 732 increments job by 1 and returns to step 728. Step 732 can
also be reached if the test in step 728 fails. After step 731 the
scheme proceeds to step 733, where a random start time greater than
or equal to the latest job which finishes before job but has a
finish time less than or equal to the earliest job which starts
after job. The generation of this random number will modify the
value of X. The value newloss of the loss if job starts at this
time is computed. Step 734 sets firsttime to be 0, tloss[job] to be
newloss, and tprofit is set equal to profit-loss [job]+newloss.
Then step 735 increments the value of rjob by 1 and step 736 tests
to see if rjob is less than or equal to the number djobs of jobs
that are done. If it is the scheme returns to step 724. Otherwise
it proceeds to step 737, which tests to see if imp is 1. If it is
the scheme returns to step 723. The case where imp is 0 is deferred
for the moment. If step 724 finds that firsttime is 0, step 738
checks to see if checked[job] is 1. If it is, the scheme returns to
step 735. If not, step 739 picks a random integer job1 between 1
and djobs-rjob+1.
Step 740 then initializes job2 to be 0 and step 741 initializes job
to be 1. In step 742 a check is made as to whether both done[job]
is 1 and rj[job] is 0. If it is job2 is incremented by 1 in step
743. Then step 744 checks to see if job1 equals job2. If so, step
745 sets rj[job] equal to 1. Otherwise, step 746 increments the
value of job by 1 and returns to step 742. Step 746 can also be
reached from step 742 and from step 744, in both cases if the test
fails. After step 745 the scheme proceeds to step 747, which finds
the best loss bestloss for job with a revised start time which is
greater than or equal to the latest job which finishes before job
but has a finish time less than or equal to the earliest job which
starts after job.
Step 748 tests whether tloss[job] is greater than bestloss. If it
is, step 749 sets imp to be 1, and increments tprofit by
tloss[job]-bestloss. Then step 750 sets tloss[job] to be bestloss.
Step 751 initializes the value job1 to be 1 and step 752 checks to
see if done[job1] is 1. If it is, step 753 checks to see if job
equals job1. If so, step 754 sets checked[job1] to be 1. If not,
step 755 sets checked[job1] to be 0. Then, in either case, step 756
increments job1 by 1. Step 756 can also be reached from step 752 if
done [job] equals 0. Step 757 checks to see if job1 is less than or
equal to the number njobs of jobs. If not the scheme returns to
step 735. Otherwise the scheme returns to step 752. If tloss is
less than or equal to bestloss in step 748, step 758 sets
checked[job] equal to 1 and the scheme returns to step 735.
If imp equals 0 in step 737, the scheme proceeds with step 759,
which tests to see if tprofit is greater than winprofit. If it is,
step 760 sets winprofit equal to tprofit and step 761 initializes
job to be 1. Then step 762 tests to see if done [job] is 1. If it
is, step 763 sets loss[job] equal to tloss[job] and step 764
increments job by 1. Step 764 can also be reached from step 762 if
done [job] is 0. Step 765 checks to see if job is less than or
equal to the number njobs of jobs. If it is the scheme returns to
step 762. Otherwise it proceeds to step 766, which increments the
value of exp by 1. Then step 767 checks to see if exp is less than
or equal to the number nexpsi of objective function improvement
experiments. If it is the scheme returns to step 712. Otherwise
step 768 sets profit equal to winprofit and returns in step
769.
It is to be understood that the present invention, in accordance
with at least one presently preferred embodiment, the present
invention includes an arrangement for deciding whether or not an
RFC should be done; an arrangement for assigning individual tasks
to acceptable servers for each RFC to be done; and an arrangement
for assigning the start times to said individual tasks for each RFC
to be done. Together, these may be implemented on at least one
general-purpose computer running suitable software programs. These
may also be implemented on at least one Integrated Circuit or part
of at least one Integrated Circuit. Thus, it is to be understood
that the invention may be implemented in hardware, software, or a
combination of both.
If not otherwise stated herein, it is to be assumed that all
patents, patent applications, patent publications and other
publications (including web-based publications) mentioned and cited
herein are hereby fully incorporated by reference herein as if set
forth in their entirety herein.
Although illustrative embodiments of the present invention have
been described with reference to the accompanying drawings, it is
to be understood that the invention is not limited to those precise
embodiments, and that various other changes and modifications may
be affected therein by one skilled in the art without departing
from the scope or spirit of the invention.
* * * * *