Abstract
A method of placing circuit elements in an integrated circuit.
The chip area is divided into a grid. In an initial pass, the
elements are randomly placed in the grid locations, and these
placements are recorded. Thereafter, the elements are sequentially
replaced in each of the grid locations, and a score is calculated
for the wiring interconnections to the remaining elements as they
were last recorded. The placement yielding the best score is
recorded for that element. This placement is repeated for each of
the elements. Once all the elements have been replaced, a final
score is compared with the last best score. If the recent final
score is better, the placements associated with that score are
saved as the best placements. Then the process of replacement is
repeated until a given number of iterations fails to yield a better
score.
Inventors: |
Carpenter; Kurt D. (Essex
Junction, VT), Jackson; Roger K. (Longmont, CO), Lallier;
Keith W. (Essex Junction, VT) |
Assignee: |
International Business Machines
Corporation (Armonk, NY)
|
Family
ID: |
25178749 |
Appl.
No.: |
06/800,569 |
Filed: |
November 21, 1985 |
Current U.S.
Class: |
716/123 |
Current CPC
Class: |
G06F
30/392 (20200101) |
Current International
Class: |
G06F
17/50 (20060101); G06F 015/60 () |
Field of
Search: |
;364/491,300,489,520,488,492 |
References Cited
[Referenced By]
U.S. Patent Documents
Other References
IBM Technical Disclosure Bulletin, vol. 13, No. 1, Jun., 1970, pp.
274-276, T. C. Raymond. .
IBM Technical Disclosure Bulletin, vol. 17, No. 10, Mar., 1974, pp.
3121-3125, W. E. Donath. .
IBM Burlington Technical Bulletin, TR 19.90024, "A System for
Automatic Layout of Gate Array Chips", Sep. 1981, Lallier, Hickson
and Jackson..
|
Primary Examiner: Lall; Parshotam S.
Assistant Examiner: Goldman; David C.
Attorney, Agent or Firm: Sughrue, Mion, Zinn, Macpeak &
Seas
Claims
What is claimed is:
1. A method of determining the placement of a plurality of
interrelated elements to be placed in fixed physical location and
thereafter interconnected to form a functional integrated system,
said method comprising the steps of:
a. randomly determining for each of a plurality of elements a
respective different one of plural physical locations to establish
a preliminarily determined location for each element, said randomly
determining being an intermediate placement determining;
b. recording said randomly determined locations;
c. scoring a placement interconnection score for all of the
elements according to said randomly determined locations, said
score being a first score;
d. establishing a predetermined order of placement for each
element;
sequentially placing, according to said predetermined order, an
element in all available locations, scoring said placement with
respect to all other elements based on the last recorded locations
of said all other elements, and recording the placement of said
placed element in the location obtaining the best score;
f. repeating step "e" for all said elements;
g. if the final score of steps "e" and "f" is better than said
first score, in an intermediate placement determining, determining
the placement of all said circuit elements according to the last
occurring recorded placement of steps "e" and "f" and setting said
first score to said final score, otherwise maintaining the current
intermediate determined placement; and
h. repeating steps "e", "f" and "h" until the final score in step
"g" is no better than said first score for a predetermined number
of sequential repetitions, the intermediate determined placements
at the end of this step being the finally determined
placements.
2. A method according to claim 1, wherein said elements are to be
interconnected to form a functional integrated system which is a
two-dimensional integrated circuit, said elements are circuit
elements and said interconnection score is a wiring score.
3. A method according to claim 2, wherein said scoring comprises
calculating the sum of the maximum lengths of all interconnecting
wirings.
4. A method according to claim 1, further comprising the step of
dividing an area for placement into grid locations and wherein said
placing step comprises placing said elements into said grid
locations.
5. A method according to claim 4, further comprising memorizing an
occupancy of each said grid location by said elements, and wherein
an available grid location for a given element is a first grid
location for which the sum of the memorized occupancy for said
first grid location and an occupancy required for said given
element does not exceed a maximum occupancy for said first grid
location.
6. A method according to claim 4, wherein steps "a" through "h" are
executed for grid locations of a first grid size and steps "e"
through "h" are repeated for grid locations of a second grid size
smaller than said first grid size.
7. A method according to claim 6, further comprising the step of
reserving portions of said grid locations for elements having a
maximum dimension larger than a predetermined relationship to the
current grid size, any element having said reserved portions
thereafter not being placed in step "e".
Description
BACKGROUND
This invention relates generally to the layout of integrated
circuits. In particular, this invention relates to a method of
ordering elements within an integrated circuit in order to minimize
the length of connections between the elements of the integrated
circuit.
In many types of integrated circuits there are a large number of
well defined elements which need to be interconnected. Often the
interconnections are such that there is not readily apparent
sequence in which the elements should be arranged. At first glance,
the elements can be randomly placed on the chip, and then the
necessary interconnections can be made. This situation is in sharp
contrast to semiconductor memories in which there is a natural
order of the memory cells, the attached drive circuitry and the
input/output circuitry. However, it is obvious that a random
placement of the elements is likely to produce an unacceptably high
complexity in the interconnections. Thus, it is desirable that the
elements be place intelligently in order to simplify the
interconnection problem. There are several possible scores that may
be applied to evaluate a required set of interconnections. The one
which will be addressed here is a score that approximates the
distance of wiring extending from any element and sums these
distances for all elements. A minimum score is, therefore, desired.
Other scoring techniques are, of course, possible.
Once all the elements have been placed on the chip, the score of
that particular placement can be evaluated. Of course, better
scores may exist for different placement arrangements.
Unfortunately, there are typically too many elements to allow the
scoring for all possible arrangements. Hence, the problem exists of
finding in a reasonable time near optimal or acceptable placement,
as measured by the score.
One class of integrated circuits which require this type of
placement are LSI and VLSI chips using structured arrays, that is,
gate arrays. The layout requires fast and effective methods to
automatically place large number of interrelated discrete elements.
The individual elements must be placed on a two dimensional
surface, and the elements have different lengths and widths.
Accordingly, an associated problem is fitting these elements
together so as to minimize the amount of chip area that is not
being utilized.
Two methods commonly used for moving placement elements are
"pair-wise interchange" and "insert and bump". These techniques
have inherent deficiencies when applied to a very large two
dimensional problem, especially when there are differently sized
placement elements.
The "pair-wise interchange" method involves the process of finding
two size-compatible elements or groups of elements that will yield
an improvement in score when interchanging locations. The
restriction of finding two compatibly sized objects limits the
flexibility as to where an object can be placed. The additional
restriction of finding two objects that will mutually improve the
score also constrains the flexibility of movement. These
restrictions often limit the number of possible moves, thus slowing
down and inhibiting the heuristic process of evolution. The
computational time required when using this method has been
historically excessive when applied to large problems.
The other commonly used method, "insert and bump", provides
flexibility to element movement because the elements are
individually placed and inserted into new positions one at a time.
This technique is generally used to solve a one dimensional
placement problem where the elements need only "bump" in one
direction to preserve legality. The scoring of each move includes
the direct effect of inserting the element in a new position and
the secondary effect of elements being offset by the move. When
applying this technique to a two dimensional problem, all elements
may bump both in the "x" and the "y" directions. The resolution of
the overlap caused by inserting an element will involve the
evaluation in both dimensions and perhaps cause a significant
ripple effect. The lack of effective and fast techniques for this
accommodation procedure makes this method unattractive for two
dimensional placement.
Besides the above two general techniques, there are many other
known methods for placing elements in a two dimensional array.
Freitag in U.S. Pat. No. 3,654,615 discloses a method in which all
the elements are ordered in a priority sequence according to the
greatest relationship of connectivity to the remaining elements.
Then the first element in the priority list is placed in a
predetermined central position, and the second element is placed in
an adjacent position. Thereafter, the remaining elements in the
priority list are sequentially placed in positions which produce
the best connnectivity score so that the placement progresses
outwards.
Ballas et al in U.S. Pat. No. 3,654,072 and Eskew et al in U.S.
Pat. No. 3,702,004 disclose a method in which devices associated
with connectors are positioned next to the connectors. Thereafter,
the devices are scored according to the percentage of connections
to already placed devices. The device with the highest score is
then placed in the position with the best wireability. The scores
are recomputed, and the process is repeated to place all devices.
Once all the devices have been initially placed, a pair-wise
interchange is performed to improve the score even further.
Somewhat similarly, Isett et al in U.S. Pat. No. 3,621,208 disclose
a method for interconnecting devices in preassigned rows by
considering the devices in a sequence according to their length of
interconnections.
Raymond discloses a placement method in IBM Technical Disclosure
Bulletin, Vol. 13, No. 1, June 1970 at pages 274-276. In this
method, the elements are initially randomly placed. Thereafter,
each device is tentatively placed in another socket. If the newly
placed device is connected to a device already in that socket, then
the devices are interchanged. Thereby, a wiring matrix is generated
which denotes the wire length necessary for placement in every
location which can be used in a linear assignment problem. The
process can be iterated to obtain better scores although the scores
may not be monotonically improving.
Donath in a technical article appearing in the IBM Technical
Disclosure Bulletin, Vol. 17, No. 10, March 1974 at pages 3121-3125
discloses a placement method in which elements are clustered in a
higher level of a hierarchy and are divided progressively in the
lower levels. Initially, the elements are randomly assigned at each
node of the hierarchical tree. Thereafter, interchange is used in a
graph theory approach to improve the connectivity.
Lallier, Hickson and Jackson have presented a paper entitled "A
System for Automatic Layout of Gate Array Chips" at the Electronic
Design Automation Conference in England, Sept. 1-4, 1981 which has
been distributed in TR 19.90024 by IBM in its Burlington Technical
Bulletin. This method clusters associated elements in a higher
hierarchical level. Elements can be initially randomly placed.
Thereafter, scores can be improved by pair-wise interchange or by
movement of single elements to calculate a provisional score before
choosing the best placement.
Gelatt, Jr. et al in U.S. Pat. No. 4,495,559 disclose an iterative
interchange method which is allowed to converge
non-montonically.
SUMMARY OF THE INVENTION
Accordingly, it is an object of this invention to provide a method
of placement which tends to provide the best score.
It is another object of the invention to perform the nearly optimal
placement in a small number of steps.
It is a further object of this invention to provide a placement
method which allows for the rearrangement of sub-elements within
larger elements without unduly complicating the placement
procedure.
The invention can be summarized as a placement method in which the
elements are first randomly placed and this random placement is
scored. A priority sequence is assigned to the elements. The
elements are then inserted, in the sequence of the priority, into
available space which provides the best score. This new
arrangement, after all elements have been replaced, is then
compared with the last best score. If the new score is better, the
new arrangement is saved. Otherwise, additional rearrangements are
attempted until a set number of rearrangements does not result in
an improvement in the score.
BRIEF DESCRIPTION OF THE DRAWINGS
FIG. 1 illustrates a grid on a semiconductor chip.
FIG. 2 illustrates another grid but with a finer grid size.
FIG. 3 is a flow chart illustrating one method of practicing the
invention.
FIGS. 4-6 are flow charts detailing parts of the flow chart of FIG.
3.
FIG. 7 illustrates the precipitation of shaped elements on a
grid.
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
In this invention, a chip area 10, as shown in FIG. 1, is divided
into grid locations 12 of equal area arranged in checkerboard
fashion. The array which is to have its constituent elements placed
on the chip area 10 is typically modeled by placing the individual
elements in a selected one of the grid locations 12. The placement
of an element within a particular grid location 12 is legal if the
grid location can accomodate the element.
The invention contemplates a hierarchical grid system. At a first
or highest level, the grid structure is relatively coarse, as shown
in FIG. 1. The placement is performed at each level of the
hierarchy. Therafter, the grid is subdivided, as shown in FIG. 2,
in which second level grid locations 14 have one-quarter the size
of the grid locations 12 of the previous level. The hierarchical
grid approach is accompanied by a clustering technique which
associates many sub-elements in a larger element. The larger
element has a well defined size but an undefined shape. The
clustered element can be placed in a large grid location 12 without
regard to its shape. However, at some point in the hierarchy,
perhaps at the second level of FIG. 2, both the sizes and shapes of
the elements to be placed become important. However, the previous
placement of all the sub-elements of the cluster within the larger
grid location 12 provides a good starting point without an unduly
long process. Finding first a solution for the higher levels of the
hierarchy allows the placement to focus on and solve the global
placement relationships without being constrained by the more
detailed, localized placement relationships. This technique becomes
especially effective when the number of grids and the number of
placement elements become very large. The placement of unshaped
elements at the higher levels allows placement techniques that are
more approximate and forgiving, and therefore are faster to
execute.
At each level of the hierarchical placement, an iterative placement
process is performed. A scoring algorithm is required which gives a
definite measure of the benefits of the placement arrangement. The
elements are prioritized according to some measure of importance.
The higher priority element is placed into the grid location which
yields the best score with respect to the other elements, as
located in previous steps. Then the process is sequentially
repeated for each element in the priority list. Once all the
elements have been replaced, a total score is computed and compared
with the score obtained before this sequencing through the priority
list had been performed. If the score is better, the new locations
are stored as the best placement to date. Then the iterative
process is repeated, beginning with the last arrangement, even if
the last arrangement resulted in a worse score. The iterative
placement process is repeated at a level of the hierarchy until
further rearrangement produces no further improvement in the score
after a set number of iterations, or until a predetermined number
of iterations have been tried. Then the grid size is reduced, and
the next level of the hierarchy is executed.
The scoring criteria used for moving an element should be both
computationally fast and a meaningful model of wirability. Although
there are many possible scoring algorithms, the one to be described
here involves the length of wiring interconnections.
A net is an interconnection to which two or more elements must be
connected. Associated with each net will be a wiring list for every
element connected to that net. Whenever a score is required, for
each net a rectangle is computed which includes all elements to
which that net is connected. The half-perimeter of that rectangle
is a measure of the extent of that net. The sum of the
half-perimeters of all the nets will be the total score. Of course,
the lower the score, the better the score since shorter
interconnects are then required.
The flowchart for the operation at a single level of the hierarchy
of the invention is shown in FIG. 3. In the first step 16, data is
input, and the program is initialized. For the higher levels of the
hierarchy, the data consists of the elements, their size, and the
interconnections to the set of nets. Then, in the second step 18,
the grid assignment of the elements is performed. At the highest
level of the hierarchy, this assignment is a random assignment. At
lower levels, the assignment involves a grid transposition based
upon the previous level of the hierarchy. Associated with each grid
location is an occupancy memory which records how much of that
location is filled with placed elements. An element can be legally
placed in a location only if the occupancy memory shows that there
is space remaining sufficient to accommodate the size of that new
element. Once an element is placed in the location, the occupancy
memory of that location is adjusted to reflect the placement. In
this type of placement, the shape of the element is immaterial. It
is only in the lower levels of the hierarchy that the shape becomes
important, as will be described later.
In the initial placement, the elements are randomly placed in the
grid locations 12. Theinventors have found that, if the initial
placement is performed according to some preconceived concept of
how the elements should be arranged, then the presented algorithm
is unlikely to produce its best arrangement. That is, the initial
score is relatively good, and the algorithm will give only modest
improvement upon it. However, they have found that, if the initial
placement is random, the initial score is bad, but then the
algorithm can improve the score significantly, resulting in a
better final arrangement.
The details of the initial random placement procedure are shown in
FIG. 4. The space used in each of the grid locations 12 is erased
so that no elements are assigned to any of the grid locations and
the occupancy of all grid locations is zero. Then, a loop is
entered for sequentially processing all the elements. If there are
elements remaining to be processed, then the next element in an
arbitrary sequence is obtained. A random grid location is chosen
and is tested for its percentage occupancy to determine if there is
space remaining for the area of the element being processed. If
there is insufficient space in that grid location, the process is
repeated until a grid location is found which does provide the
necessary space. Once the space has been found, the element is
recorded as occupying that grid location, and the occupancy of that
grid location is incremented to reflect the size of the element now
occupying that location.
The loop is repeated until all the elements have been placed. It
should be obvious that, if the element sizes are not equal, a
situation could arise where there are not grid locations separately
having sufficient space to accomodate the final elements. This
problem is handled by means of population control. A grid is
allowed to borrow space from its neighbors. If even this is
insufficient, the element is paced in "some" location, borrowing
space from other grids. Thus the space allocation model allows
approximation to avoid the discrete area fracture problem.
Once all the elements have been placed, the placement is scored in
step 20 of FIG. 3. The scoring algorithm is given in FIG. 5. The
placement score is first initialized to zero. Then a loop is
entered for sequentially processing all the nets for the integrated
circuit. One of the nets is obtained, and the net score for that
net is calculated. Associated with each net is a list of the
elements connected to that net. The elements are now associated
with grid locations in which they have been placed. The grid
locations associated with the net are thus determined. A rectangle
is computed which encompasses all the grid locations associated
with the net being processed. The rectangle can be easily
determined by finding the minimum and maximum positions in two
dimensions for the associated grid locations. The rectangle will
have a resolution of the size of the grid then being processed.
That is, for example, wiring lengths will be the same for devices
immediately separated by a grid boundary as for devices at the far
corners of the grid locations. The placement score is incremented
by the net score, and the loop is repeated for all the nets of the
integrated circuit. The placement score is the total of all net
scores.
The mobility of a placement element is dependent on the relative
position of the element in the placement order. Elements placed
early in the pass are free to move to almost any location since
space is initially available in all of the grid locations. This
mobility gradually decreases as objects are placed and the number
of grids with available space for element placement decreases. This
order dependency favors elements placed early in the placement
pass.
As shown by step 22 in FIG. 3, the elements are placed in a
preferred order for placement. This priority list is arranged in
descending order of importance. Some type of score is calculated
for each of the elements relative to the rest of the elements to be
placed. The criteria for importance may vary and are usually based
on a combination of element size, electrical performance and the
connectivity to other elements. The value of the score determines
the ranking in the priority list. It is not essential that a
priority list for preferred order be used in the method of this
invention, but it has been found that better scores are achieved
and that the placement converged on a solution faster when this
type of ordering scheme is used.
Once the initial steps described above have been performed, a
series of loops are entered. At the start of the outer loop, in
step 24 a variable NO PROGRESS is initialized to zero which
indicates the number of iterations that have been attempted at
improving the score with a new placement arrangement but without
resulting in an improvement in the score over the best previous
score. At the start of an inner loop in step 26, NO PROGRESS is
compared with a predetermined variable N to decide if no progress
has been accomplished in the preceding N iterations of the inner
loop. If there has been no progress in the preceding N iterations,
then the placement is completed at this level of the hierarchy. If
the test of step 26 is not passed so that another attempt will be
made to improve the score, then in step 28 all the elements are
replaced and the result is scored. This important step 28 is shown
in detail in FIG. 6.
The occupancy memory associated with each grid location is first
initialized to zero so that all the space is initially available.
Then a loop is entered for sequentially processing the elements
according to the preferred order in the priority list. If there are
elements remaining to be processed, the next element of descending
importance is obtained. That element is then placed in each of the
grid locations and a score is calculated for each of these
placements, according to an algorithm similar to that of FIG. 5.
For purposes of scoring, the locations of the elements other than
the one being currently placed are the locations most recently
recorded. That is, the locations are not necessarily those of the
arrangement which resulted in the best score to date. A recorded
location for an element can be either that recorder in this
replacement step or the recorded location from the previous step.
That is, recorded locations are being continuously updated. Once
the scores for all grid locations for the element being placed have
been calculated, the grid location which results in the best score
is chosen for that element. However, a test is made of the
occupancy memory associated with that location to determine if
there is space available therein to place an element of the size of
the current element. If the space is not available, then the grid
location is marked as unusable, and the grid locations are again
searched for the placement resulting in the best score.
Once a legal grid location has been found, the element is recorded
as being positioned at that location, and the occupancy memory
associated with that grid location is incremented by the size of
the element being placed. These recorded positions are used for
subsequent scorings even if there is an intermediate determination
that the placement arrangement does not produce the best score.
Then the next element in the priority list is replaced in another
iteration of the loop. Finally, when all the elements have been
replaced, the final arrangement is scored.
Referring again to FIG. 3, the score of the final arrangement is
compared with the previous best score. If the current score is
better than the previous best score, then the best score is
replaced by the current score and the positions of the elements on
the grid that produced the current score are saved as the best
positions. That is, the recorded positions become the new best
position. Execution then returns to the beginning of the outer loop
to see if the best score can be improved even further.
However, if the current score is no better than the previous best
score, then the NO PROGRESS variable is incremented by one and
execution returns to the beginning of the inner loop. On subsequent
executions of the inner loop, the recorder positions of the
elements are those positions resulting from the previous execution
of the inner loop, but the best score and best locations remain
those existing before the inner loop was entered. At some point, N
consecutive iterations of the inner loop will not result in an
improvement in the score so that the NO PROGRESS test will cause
execution to pass out of the loops of FIG. 3. Multiple attempts at
improving the score are allowed because it has been observed that a
partial rearrangement may degrade the score but that further
rearrangments may yield a score better than the last best score.
That is, the scoring manifests local maxima and minima in the
rearranging sequence. At some point, however, the rearranging is
discontinued and the last best arrangement is taken to be the final
arrangement for this level of the hierarchy.
By the use of the above process, there results the gradual building
of a new placement solution in which element movement is based on
the latest recorded positions of the elements and on the
availability of grid locations with enough space to contain the
element. Initially, all of the grid locations will be empty so that
element movement will be based entirely upon past history. The
population model and placement solution then become progressively
more realistic and meaningful as the elements are placed and occupy
the available space in the grid locations. The assignments become
completely current when all of the elements are placed.
This process also minimizes legality constraints and thus increases
the mobility of element movement and makes the computation for
scoring and evaluating a move very simple and fast. Using
"progressive insertion", each element need only search and find the
best location with enough available space for the element being
placed. The algorithm does not have to spend time or be limited to
finding compatible countermoves as in "pair-wise interchange" or
have to find some type of "bumping" pattern to accommodate the
overlapping space of an inserted object as in the "insert and bump"
technique. The "progressive insertion" technique provides the
elements with additional flexibility so that moves can be based
more on wirability and less on the fit of the elements,
particularly during the early parts of a placement pass when
"global" evolution occurs.
The progressive insertion process creates a situation where the
placement elements continually migrate locally among positions from
pass to pass. This constant movement occurs when an element is
placed in a location different from the last pass and absorbs the
available space in the new grid. The element previously located in
the new grid may be then forced to be displaced to a different
location when it is placed somewhat later. This indirect bumping
propagates throughout the rest of the placement pass as the rest of
the elements are placed. The result is a constantly changing
environment.
This constant movement has both good and bad effects. It is
beneficial in that the continual migration prevents the process of
placement from getting prematurely stuck. The detrimental effect
occurs during the final stages of placement when local optimization
is desired. The constant bumping inhibits the development of a
stabilized detailed environment from which element moves can be
scored for localized improvements. Such improvements in the
placement result can usually be found if the progressive insertion,
described above, is followed by some other more constrained
technique, such as pair-wise interchange, which maintains a legal
population model for each placement move. These other methods are
computationally more costly so a trade-off must be made betweeen
the improvement in quality and the computation resources
required.
Another approach is to perform the progressive insertion in an
hierarchical system. The above described progressive insertion can
be repeated a number of times with progressively smaller grid
sizes. Of course, the placement of elements is not randomized at
the beginning of lower level of hierarchy except to place the
elements within one of the smaller grid locations occupying the
larger grid location that previously accommodated the elements.
A significant improvement can be obtained if the elements are
clustered together for a higher hierarchical level but are broken
apart into the constituent elements at a lower level of hierarchy.
The clusters would consist of elements which have a high degree of
connectivity between them but have a relatively low degree of
connectivity to other elements. Clusters of elements are
particularly appropriate for the progressive insertion described
above since a cluster has a well defined size but its shape is
somewhat arbitrary. Accordingly, at a high level of the hierarchy,
several clusters can be positioned in a large grid location with no
consideration given to how those clusters will fit together in the
grid location. It is necessary only that there be space available
for that sized cluster.
At some point in the hierarchy, the shape of the elements becomes
important. This happens when the grid size approaches the size of
the detailed physical elements being placed. A flip-flop would be
an example. When the grid size is approaching these sizes, both the
shape and size of the elements need to be considered. For instance,
an element 16, shown in FIG. 7, has an area of only one grid
location, but it must occupy at least two vertically adjacent grid
locations 14 due to its shape.
Accordingly, when shapes of the elements become important, the
progressive insertion needs to be modified. It has been found that
elements can continually be placed on the basis of area alone as
long as the elements do not overlap more than two cells. That is,
the maximum dimension of an element is no more than twice the grid
size. Of course in this situation, an element can be placed only
where two neighboring cells have the requisite space. When the grid
size is reduced even further, any elements having too large a size
are precipitated at legal positions occupying neighboring grid
elements. The precipitation is final and the elements no longer
move. As illustrated in FIG. 7, the precipitation can divide the
then current grid size. Attempts should be made to position any
precipitated element within the legal grid locations in positions
immediately adjacent already precipitated elements so as to
minimize available space fragmentation for the unplaced
elements.
At the final level of the hierarchy, all elements are precipitated,
whether or not the size limit has been exceeded. The process
continues until all elements are precipitated.
The "progressive insertion" described above is a new method for
rapidly converging, high quality placement solutions. It allows the
use of relaxed legality constraints, thereby making the method very
useful for global evolution. The applicability to a problem with
various sized objects makes the method attractive when macro cells
may be present and when an approximate placement of element
clusters is desired. The computationally fast and mobile element
movement makes this method a very effective placement tool for the
VLSI placement problem. Of course, it is to be appreciated that the
method can be used for other types of placement than integrated
circuit design.
* * * * *