U.S. patent number 3,925,182 [Application Number 05/486,492] was granted by the patent office on 1975-12-09 for method for continuous production of sputter-coated glass products.
This patent grant is currently assigned to Shatterproof Glass Corporation. Invention is credited to Donald C. Carmichael, Douglas L. Chambers, Chong T. Wan.
United States Patent |
3,925,182 |
Carmichael , et al. |
December 9, 1975 |
Method for continuous production of sputter-coated glass
products
Abstract
A method and apparatus for the continuous production of
sputter-coated glass products; such as glass sheets, or other
substrates, involving supporting one or more substrates to be
coated on a rigid support-platen, passing the platens and
substrates horizontally through a series of successive chambers
aligned with one another, including an entrance chamber, a coating
chamber and a discharge chamber, sealing compartments at the
opposite ends of the coating chamber, at the entry end of the
entrance chamber and at the exit end of the discharge chamber for
sealing said chambers from one another and from the atmosphere,
conveyor means in said chambers for carrying the platens and
substrates therethrough, and means responsive to movement of the
platens through said chambers for automatically and in timed
sequence initiating and controlling the complete cycle of
operations of the apparatus, including the travel of the platens
through the successive chambers, the opening and closing of the
sealing compartments and the sputter-coating of one or more
continuous films of a selected material or materials on the
substrates as they pass through the coating chamber.
Inventors: |
Carmichael; Donald C.
(Columbus, OH), Chambers; Douglas L. (Columbus, OH), Wan;
Chong T. (Columbus, OH) |
Assignee: |
Shatterproof Glass Corporation
(Detroit, MI)
|
Family
ID: |
27017093 |
Appl.
No.: |
05/486,492 |
Filed: |
July 8, 1974 |
Related U.S. Patent Documents
|
|
|
|
|
|
|
Application
Number |
Filing Date |
Patent Number |
Issue Date |
|
|
400561 |
Sep 25, 1973 |
|
|
|
|
305877 |
Nov 13, 1972 |
|
|
|
|
70143 |
Sep 8, 1970 |
|
|
|
|
Current U.S.
Class: |
204/192.27;
118/718; 118/719; 204/192.15 |
Current CPC
Class: |
C03C
17/00 (20130101); C23C 14/568 (20130101) |
Current International
Class: |
C03C
17/00 (20060101); C23C 14/56 (20060101); C23C
015/00 (); C03C 017/06 (); C23C 013/08 () |
Field of
Search: |
;204/192,298
;118/49.1,49.5 |
References Cited
[Referenced By]
U.S. Patent Documents
Other References
B J. Williams, et al., "Practical Design Aspects of a Continuous
Vacuum RF Sputtering Machine," J. Vacuum Sci. & Tech., 7,
278-281, (1970)..
|
Primary Examiner: Mack; John H.
Assistant Examiner: Weisstuch; Aaron
Attorney, Agent or Firm: Nobbe; William E.
Parent Case Text
REFERENCE TO RELATED APPLICATIONS
This is a division of application Ser. No. 400,561, filed Sept. 25,
1973.
This application is a continuation-in-part of pending application
Ser. No. 305,877, filed Nov. 13, 1972, now abandoned which was a
continuation of application Ser. No. 70,143, filed Sept. 8, 1970
(now abandoned).
Claims
We claim:
1. A method for the production of sputter-coated glass sheets,
which comprises:
a. freely supporting a glass sheet to be coated in a horizontal
position on the upper substantially continuous surface of a support
platen,
b. freely supporting said platen and glass sheet horizontally upon
a conveyor means,
c. conveying the platen and sheet horizontally into a coating
chamber,
d. maintaining a predetermined pressure in said coating
chamber,
e. sputter-coating a continuous film of a selected coating material
on the upper surface of said sheet when supported in the coating
chamber, and
f. removing the platen and coated sheet from said chamber.
2. The method of claim 1 in which an inert gas is continuously
introduced into the central region of said coating chamber and
continuously withdrawn laterally therefrom adjacent the opposite
ends thereof to remove gas that is leaked into said chamber and
thereby maintain a constant pressure therein.
3. The method of claim 1, in which the sputter-coating means
comprises a plurality of cathodes connected to individual power
sources, and in which the power level to each individual cathode is
independently controlled by movement of the platen.
4. A method for the production of sputter-coated glass sheets, (and
the like), which comprises:
a. freely supporting a glass sheet to be coated in a horizontal
position on the upper substantially continuous surface of a support
platen,
b. freely supporting said platen and glass sheet horizontally upon
a conveyor means,
c. conveying the platen and sheet horizontally into and through a
series of at least three successive chambers having communication
with one another and in which the central chamber is a coating
chamber,
d. sealing the coating chamber from the adjacent chambers when the
platen and sheet are received therein,
e. maintaining a predetermined pressure in the coating chamber,
f. continuously circulating an inert gas through the coating
chamber to maintain an inert gas atmosphere therein,
g. sputter-coating a continuous film of a selected coating material
on the upper surface of said sheet as it is conveyed through the
coating chamber, and
h. establishing communication between the coating chamber and the
adjacent chambers in response to movement of the platen and sheet
prior to and during delivery of the platen and sheet into the
coating chamber and the subsequent discharge thereof from said
coating chamber while maintaining the pressure in said coating
chamber.
5. The method of claim 4 wherein, in response to movement of the
platen, a pressure is established and maintained in the chambers
adjacent the coating chamber equal to the pressure in the coating
chamber prior to and during the transfer of the platen into said
coating chamber and its discharge therefrom, and in which the
pressure in the chambers adjacent the coating chamber is
subsequently released while the pressure in said coating chamber is
maintained.
6. The method of claim 4, in which a desired pressure is created in
the chambers adjacent the coating chamber, and then introducing an
inert gas into the adjacent chambers to equalize the pressures
therein with the pressure in the coating chamber prior to and
during transfer of the platen and sheet into the coating chamber
and its discharge therefrom by by-passing inert gas from the
coating chamber into the adjacent chambers.
7. The method of claim 4, including the steps of heating the glass
sheet and then cleaning said sheet by means of a glow discharge
cleaning electrode prior to sputter-coating, and in which the power
level to the cleaning electrode is controlled by movement of the
support platen to guard against over-heating of said electrode.
8. A method for the production of sputter-coated glass sheets,
which comprises:
a. freely supporting a glass sheet to be coated in a horizontal
position on the upper substantially continuous surface of a support
platen,
b. freely supporting said platen and glass sheet horizontally upon
a conveyor means,
c. conveying the platen and sheet horizontally into and through a
series of at least three chambers having communication with one
another and including an entrance chamber, a coating chamber and a
discharge chamber,
d. sealing the coating chamber from the entrance and discharge
chambers when the platen and sheet are received therein,
e. maintaining a predetermined pressure in the coating chamber,
f. sputter-coating a continuous film of a selected coating material
on the upper surface of the sheet as it is conveyed through said
coating chamber, and
g. effecting in timed sequence in response to movement of the
platen the sealing of the entrance chamber and discharge chamber to
the ambient atmosphere and the creation of a pressure in said
chambers equal to that in the coating chamber prior to establishing
communication between said chambers and conveying the platen and
sheet from the entrance chamber into the coating chamber and from
the coating chamber into the discharge chamber.
9. The method of claim 8, including the steps of introducing an
inert gas into the coating chamber, pumping down the entrance
chamber and discharge chamber to a desired vacuum, backfilling the
entrance and discharge chambers with an inert gas until the
pressures therein are substantially equal to the pressure in the
coating chamber, and then bringing the pressures in said entrance,
coating and discharge chambers into equilibrium by by-passing inert
gas from the coating chamber into the entrance and discharge
chambers.
10. A method for the production of sputter-coated glass sheets,
which comprises:
a. freely supporting a glass sheet to be coated in a horizontal
position on the upper substantially continuous surface of a support
platen,
b. freely supporting said platen and glass sheet horizontally upon
a conveyor means,
c. conveying the platen and sheet horizontally into and through a
series of at least three chambers having communication with one
another and including an entrance chamber, a coating chamber and
discharge chamber,
d. sealing the coating chamber from the entrance chamber and
discharge chamber when the platen and sheet are received
therein,
e. maintaining a predetermined pressure in the coating chamber,
f. continuously circulating an inert gas through the coating
chamber to maintain an inert gas atmosphere therein,
g. sputter-coating a continuous film of a selected coating material
on the upper surface of the sheet as it is conveyed through said
coating chamber,
h. establishing communication between the coating chamber and the
entrance and discharge chambers in response to movement of said
platen prior to and during transfer of the platen and sheet from
the entrance chamber into the coating chamber and from the coating
chamber into the discharge chamber,
i. sealing the entrance chamber and discharge chamber from the
ambient atmosphere in response to movement of said platen prior to
and during such transfer to maintain the pressure in the coating
chamber, and
j. in timed sequence and in response to movement of the platen
re-establishing communication between the entrance and discharge
chambers and the ambient atmosphere after the platen and sheet have
been conveyed from the entrance chamber into the coating chamber
and from the coating chamber into the discharge chamber.
11. The method of claim 10, wherein the pressure in the entrance
chamber and discharge chamber is equalized with the pressure in the
coating chamber prior to and during transfer of the platen and
sheet from the entrance chamber into the coating chamber and from
the coating chamber into the discharge chamber, and wherein the
pressure in the entrance chamber and discharge chamber is released
after the platen is received in the coating chamber and
subsequently discharged therefrom respectively in timed response to
movement of said platen.
12. The method of claim 10, in which an initial pressure is first
established in the entrance and discharge chambers, and in which
the said chambers are then backfilled with an inert gas to equalize
the pressure therein with the pressure in the coating chamber piror
to and during the conveying of the platen and sheet from the
entrance chamber into the coating chamber and from the coating
chamber into the discharge chamber.
13. A method for the production of sputter-coated glass sheets,
which comprises:
a. supporting a sheet to be coated in a horizontal position on the
upper surface of a support platen,
b. passing the platen and sheet horizontally through a series of at
least three chambers having communication with one another and
including an entrance chamber, a coating chamber and a discharge
chamber,
c. sealing the coating chamber from the entrance chamber and
discharge chamber when the platen and sheet are received
therein.
d. maintaining the coating chamber at a constant pressure in the
range of 2 to 6 .times. 10.sup..sup.-2 torr,
e. circulating an inert gas through the coating chamber to maintain
an inert gas atmosphere therein,
f. sputter-coating a continuous film of a selected coating material
on the upper surface of the sheet as it is carried through said
coating chamber,
g. establishing communication between the coating chamber and the
entrance and discharge chambers during transfer of the platen and
sheet from the entrance chamber into the coating chamber, and
h. sealing the entrance chamber and discharge chamber from the
atmosphere during such transfer to maintain the pressure in the
coating chamber,
i. in which the sputter-coating means comprises a plurality of
cathodes and in which the power level to each indicidual cathode is
independently controlled by movement of the platen.
14. A method for production of sputter-coating glass sheets, which
comprises:
a. freely supporting a glass sheet to be coated in a horizontal
position on the upper substantially continuous surface of a support
platen,
b. freely supporting said platen and glass sheet horizontally upon
a conveyor means,
c. conveying the platen and sheet horizontally into, through and
out of a series of at least three chambers having communication
with one another and including an entrance chamber, a coating
chamber and a discharge chamber,
d. maintaining a predetermined pressure in the coating chamber,
and
e. sputter-coating a continuous film of a selected coating material
on the upper surface of the sheet as it is conveyed through said
coating chamber,
and in which, in timed sequence, and in response to movement of
said platen through successive chambers, the following process
steps are initiated and controlled:
i. sealing the coating chamber from the entrance chamber and
discharge chamber during the sputter-coating of the glass
sheet,
ii. sealing the entrance chamber and discharge chamber to the
ambient atmosphere when the platen and sheet are received
therein,
iii. establishing and maintaining a pressure in the entrance
chamber and discharge chamber equal to the pressure in the coating
chamber prior to and during transfer of the platen and sheet from
the entrance chamber into the coating chamber and from the coating
chamber into the discharge chamber,
iv. establishing communication between the coating chamber and
entrance and discharge chambers during conveying of the platen and
sheet from the entrance chamber into the coating chamber and from
the coating chamber into the discharge chamber,
v. resealing the coating chamber from the entrance and discharge
chambers respectively after the platen and sheet have been received
in the coating chamber and subsequently moved from said coating
chamber into the discharge chamber, and
vi. opening the entrance chamber and discharge chamber to the
ambient atmosphere after the coating chamber has been resealed.
Description
BACKGROUND OF THE INVENTION
This invention relates to sputter-coating of glass products
(especially window panes) and more particularly to a method and
apparatus for sputter-coating such products by a continuous
process.
The architectural trend toward using more glass in commercial
buildings has been enhanced by the availability of special coated
and tinted glasses which not only serve an aesthetic purpose but
are also functional. The most significant advantages of the special
coated glasses are in the area of air conditioning. Since it
generally costs from 3 to 6 times more to cool a building one
degree than to heat it by the same amount (depending on the amount
of glass used on the exterior of a building), the use of an
exterior glass which will reduce the amount of solar radiation
entering a building can provide substantial savings since less air
conditioning equipment is required and its operation is less
costly.
Over the past decade the market for colored and reflective glass in
commercial construction has grown significantly. Basically two
types of glass are in use -- tinted and coated. Tinted glass is
made by adding selected metals such as iron, cobalt, and nickel to
the molten glass during production. This method is time consuming
and wasteful in that when a different color of glass is desired, a
four- or five-day run of glass must be discarded while the change
is made and the new batch stabilized. Also, large quantities of
different colors and types of glass must be inventoried. In
addition, although tinted glass does reduce glare, it also absorbs
solar heat and the absorbed heat is re-radiated from both sides of
the glass. Therefore, a greater amount of heat is allowed to enter
the building than with coated glass.
Coated or reflective glass is produced by depositing a thin
continuous film of a reflective substance such as a metal on at
least one of the surfaces of a glass sheet to reflect solar
radiation. Coated glass reflects solar radiation much more
effectively than tinted glass and coated glass absorbs much less
radiation and therefore less heat is reradiated into the building.
The glass sheet is preferably installed with the thin film on the
outside of the building to reflect the maximum radiation. However,
a durable exterior coating which will not rub or wear off the glass
sheet has not yet been perfected. Most companies sell coated glass
only in double glazing (two panes separated by an air space) and
laminated forms with the thin film protected by an overlying second
sheet of glass. The second sheet prevents the film from being worn
off or scratched during window washing or by airborn objects or
other causes.
There are several processes available for depositing a thin film of
reflective coating on a glass substrate. One process that is being
used commercially is the vacuum evaporation process. In this
process, the coating material source is heated in a vacuum
environment to a temperature at which the energy of the atoms of
the source material gain sufficient thermal energy to evaporate
from the source. The substrate to be coated is placed within the
line of sight of the source and the evaporated vapor condenses on
its surface. The source is essentially a point source and therefore
the coating deposited on a flat substrate will have a thickness
distribution dependent on distances from the source. In order to
deposit coatings of uniform thickness on large glass windows, the
distance between the source and the substrate must be several feet
and multiple sources must be used.
Another process for depositing a thin-film coating is called
sputtering or sputter-coating. The process of sputter-coating has
been known for some time. This process involves ion bombarding a
target of the coating material in low-pressure gaseous glow
discharge to cause atomic particles of coating material to be
dislodged and deposited on the substrate to be coated. We have
found that the sputter-coating technique as applied in the present
invention produces a product having superior optical properties and
improved adhesion. In addition, sputtering also has the advantage
over thermal evaporation techniques in that the source (the target
or cathode) is not a point or line source but a surface source.
This is a particularly important advantage in the present
application involving coating of large-area substrates. If a target
surface in sputtering is made to be parallel to the substrate
surface over all areas of the substrate (like a flat target placed
parallel to a flat substrate), the coating thickness will be
extremely uniform. Any edge effect in the thickness uniformity can
be minimized by making the target dimensions 2 to 4 inches larger
than the substrate dimensions. The distance between the target and
the substrate surfaces can thus be as close as 2 inches and a
relatively small vacuum chamber is required. Sputtering is a
somewhat slower process than the thermal vacuum-evaporation
process. but for the thin optical coatings of interest this process
results in superior control of coating thickness and the rate is
satisfactory for commercial production. Because the source
(coating) material forming the target will last for a long time,
sputtering is adaptable to a semicontinuous or continuous
manufacturing operation.
Sputtering has the following advantages over the vacuum evaporation
techniques currently in use for production of coated window
glass;
A smaller deposition chamber can be used. The vacuum evaporation
technique uses one or more point sources which must scan the
surface during deposition and with larger substrates the necessary
spacing between the sources and the substrate correspondingly
increases. The target used in sputtering may be placed much closer
to the substrate since point sources are not involved. This reduces
the size and expense of the coating equipment.
Sputterng appears to be more reliable and maintenance free as a
production system.
Sputtering allows more versatility as the materials may be easily
changed from batch to batch. Also a multiple-layer coating of
several materials may be deposited during a single run simply by
incorporating a sequence of targets in the system. An example of
this is the coating of a siliceous material or aluminum oxide
protective layer over the reflective film immediately after
deposition of the reflective film.
In sputter-coating according to the prior art, the substrate to be
coated is placed in an enclosure containing a cathode (target) of
the material to be sputtered and an anode which is positively
biased with respect to the cathode to establish a gaseous discharge
(ion plasma) between the anode and cathode. The enclosure is then
sealed and evacuated and later backfilled with a low
partial-pressure atmosphere of an ionizable gas such as argon.
During operation of the apparatus, the coating material is
deposited on the surface of the substrate as a uniform continuous
film. After deposition, the apparatus is shut down and the coated
substrate is allowed to cool under vacuum. The enclosure is then
brought back up to atmospheric pressure, the seal broken, and the
coated substrate removed. The next substrate to be coated is then
placed in the enclosure which is re-sealed and again evacuated to
the required pressure for operation. This process is time
consuming, inefficient, and is not adapted to mass production.
Several semi-continuous, batch-type processes have been developed
to increase the capacity of presently used apparatus. The
semi-continuous processes generally involve rotating or indexing
substrate holders which are loaded on a batch basis. These
processes require complicated control systems and still have only
limited capacity.
SUMMARY OF THE INVENTION
The present invention provides a process and apparatus for
sputter-coating glass products on a continuous production basis.
The invention involving placing one or more sheets of glass or
other products, to be coated in a horizontally disposed position on
the upper surface of a support-platen and continuously passing the
platen and sheet or sheets carried thereby horizontally through a
series of three successive low pressure regions or chambers. An
inert gas is continuously admitted into the central or coating
chamber to maintain an inert gas atmosphere in said chamber such
that a continuous flow of gas away from the coating chamber is
maintained. A continuous film of a selected coating material is
sputter-coated on the upper surface of the sheet or sheets as they
pass through the coating chamber.
The products to be coated may be heated prior to coating to promote
outgassing at the product surface and minimize thermal stresses.
Typically the surface of the products are ion bombarded prior to
coating to clean the surface. A continuous layer of protective
material such as siliceous glass may be radio-frequency
sputter-coated over the continuous film as the products pass
through the coating chamber.
The apparatus of the present invention includes a first or entrance
chamber having entry and exit openings, a second or coating chamber
adjacent the entrance chamber and having entry and exit openings,
the entry opening of the coating chamber being in communication
with the exit opening in the entrance chamber, and a third or
discharge chamber adjacent the coating chamber and having entry and
exit openings, the entry opening of the discharge chamber being in
communication with the exit opening of the coating chamber.
Located between the entry and exit ends of the coating chamber and
the adjacent ends of the entrance and discharge chambers are
sealing compartments containing valve means operable to place the
coating chamber in vacuum-tight relation to the entrance and
discharge chambers or for establishing communication therebetween.
Sealing compartments are also located at the entry end of the
entrance chamber and at the exit end of the discharge chamber and
contain valve means for placing said chambers in vacuum-tight
relation with respect to the atmosphere or for opening said
chambers to the atmosphere.
The apparatus includes means for evacuating the chambers and for
providing an inert gas atmosphere in at least the coating chamber.
The sputter coating means are mounted in the coating chamber and
conveyor means move the platens and sheets carried thereby to be
coated through the successive chambers. Heating means and ion
bombardment means and radio-frequency sputter-coating means may,
and preferably are, provided in the coating chamber.
The advantages of the present invention include continuous
operation, simple feed-through means for transfer of the products
through the successive chambers, and less vacuum pumping is
required, especially diffusion pumping (where required). The
present invention also reduces contamination of the coating
material as it is deposited onto the glass substrate since the
continuous flow of gas away from the central region of the coating
chamber prevents atmospheric dust and other contaminants from
mixing into the coating during deposition.
A typical product produced using the method and apparatus of the
present invention would be a sheet of glass with a smooth
continuous surface on which a continuous metallic film is
sputter-coated, preferably to a thickness of from 50 to 400 A. The
products of primary concern as architectural glass, vehicle
windows, and oven windows, although the process and apparatus may
be used to sputtercoat other types of products. The substrates are
preferably conventional silicate glass including window glass,
plate glass, and float glass, although any of the conventional or
special purpose glasses may be used. The process may also be used
to sputter-coat other types of materials such as ceramics and
plastic sheets and strips.
In the production of window glass, the continuous film is
preferably sputter-coated to a thickness of from about 50 to about
400A. Films having a thickness less than about 50 A do not provide
any significant reduction in solar radiation transmittance and
those having a thickness greater than about 400 A will impair the
transmission of visible light. A smooth continuous layer of
transparent protective material may be deposited overlying the
continuous film to protect the film from wear. The protective
material is preferably a siliceous material such as silicon dioxide
(including quartz), silicon monoxide, or any of the conventional or
special purpose glasses such as Pyrex. The protective glass may be
clear or it may be tinted to modify the color of the finished
article. Any of the forms of aluminum oxide may also be used as the
protective material. The protective layer is preferably from about
0.01 to about 1 micron in thickness. Layers less than 0.01 micron
in thickness do not provide any significant protection for the film
and those in excess of 1 micron are uneconomical and may involve
problems where materials having coefficients of thermal expansion
different from the substrate are employed.
BRIEF DESCRIPTION OF THE DRAWINGS
FIG. 1 is a side elevation of the apparatus for continuously
sputter-coating glass sheets or other substrates according to this
invention;
FIG. 2 is a fragmentary perspective view of a glass or other
substrate provided with a reflective coating layer and a layer of a
protective material thereon;
FIG. 3 is a top view of the entrance chamber and the first portion
of the coating chamber;
FIG. 4 is a top view of the rear portion of the coating chamber and
the discharge chamber;
FIG. 5 is a side elevation of the entrance chamber and the first
and second sealing compartments at the opposite ends thereof;
FIG. 6 is a longitudinal section through the coating chamber;
FIG. 7 is a side elevation of the discharge chamber and the third
and fourth sealing compartments at opposite ends thereof;
FIG. 8 is a front view of the coating apparatus looking into the
first sealing compartment;
FIG. 9 is a plan view of the first sealing compartment and a
portion of the entrance chamber;
FIG. 10 is a vertical transverse section of the entrance chamber
taken on line 10--10 of FIG. 1;
FIG. 11 is a detail view of the drive end of each of the conveyors
in the entrance, coating and discharge chambers;
FIG. 12 is a vertical, longitudinal sectional view of the sealing
compartment at the entry end of the entrance chamber taken on line
12--12 of FIG. 3;
FIG. 13 is an enlarged detail view of the valve unit provided in
each of the sealing components;
FIG. 14 is a detail view of the switches and control member
employed with each of the valve units;
FIG. 15 is a vertical, longitudinal sectional view of the sealing
compartment between the entrance and coating chambers, taken on
line 15--15 of FIG. 3;
FIG. 16 is an enlarged sectional view of the sealing compartment
between the entrance and coating chambers and portions of said
chambers;
FIG. 17 is a top view of the sealing compartments at the entry and
exit ends of the coating chamber;
FIG. 18 is a vertical transverse sectional view of the coating
chamber taken on line 18--18 of FIG. 1;
FIG. 19 is a vertical transverse sectional view of the coating
chamber taken on line 19--19 of FIG. 6;
FIG. 20 is a vertical view, partly in section, of one of the
sputtering cathodes taken on line 20--20 of FIG. 18;
FIG. 21 is a top view of the sealing compartment at the exit end of
the discharge chamber and a portion of said chamber;
FIG. 22 is a diagrammatic view of the hydraulic and electrical
control systems associated with the entrance and coating chambers;
and
FIG. 23 is a similar diagrammatic view of the systems associated
with the coating and discharge chambers.
The coating apparatus of this invention comprises generally a
unitary elongated tunnel-like structure which, as illustrated in
FIG. 1, embodies an entrance chamber E, a coating chamber C and an
exit or discharge chamber D in alignment with one another. The
successive chambers E, C and D are isolated from one another and
from the ambient atmosphere and are separated from one another by
interposed sealing compartments V1, V2, V3 and V4.
With reference to FIG. 2, the letter P designates a fragmentary
section of a support platen which supports the substrate S to be
coated, said substrate preferably consisting of a sheet or sheets
of glass or other siliceous material. The support platen preferably
comprises a rigid metal plate of aluminum of magnesium alloy 1/4 to
1/2 inch thick. One or more layers L of a selected metal, such as
nickel or a nickel alloy, is sputter-coated upon the upper surface
of the substrate as the platen moves through the successive
chambers E, C and D. If desired, a protective layer PL of a
siliceous material such as Pyrex glass may be deposited upon the
base coating by radio-frequency sputtering.
In accordance with the invention, and by means of suitably actuated
controls to be more fully hereinafter described, a platen supported
glass sheet or substrate to be coated is carried on a loading cart
T (FIG. 5) and delivered to the entry end of the first sealing
compartment V1 and moved therethrough onto a conveyor located in
the entrance chamber E. When the entire platen is located in the
entrance chamber E, the sealing compartment V1 is closed to the
atmosphere and, at this time, the sealing compartment V2 is also
closed. The entrance chamber E is then pumped down to the desired
vacuum then backfilled with an inert gas, preferably argon, to a
desired pressure and, by means of communicating conduits between
chambers E and C, the vacuum in said chamber E is equalized with
that continuously maintained in the coating chamber C.
When this equalization has been attained, the sealing compartment
V2 is opened and the substrate carried and guided forwardly
therethrough into the coating chamber C where it is received on a
conveyor. As the platen continues its forward movement through
coating chamber C, there is sputter-coated upon the upper surface
of the substrate one or more layers of the desired metal or metals.
During coating of the substrate, the desired argon pressure is
established in the discharge chamber D and this argon pressure is
equalized with that in coating chamber C, at which time sealing
compartment V3 is open and sealing compartment V4 remains closed.
The platen P is advanced continuously through coating chamber C,
and then passes through sealing compartment V3 into the discharge
chamber D. After the entire platen P is on chamber D, the sealing
compartment V3 is closed. The said chamber D is then vacuum broken
to the atmosphere, the sealing compartment V4 opened and the coated
substrate S and platen P removed from the apparatus.
However, while the sealing compartment V4 is open, the walls of the
discharge chamber D are dried by a warm-air purge unit which is
vented to the atmosphere through the sealing compartment V4.
Likewise, after the sealing compartment V2 is closed, the entrance
chamber E is vacuum broken, after which the compartment V1 is
opened to the atmosphere.
FIRST SEALING COMPARTMENT
The sealing compartment V1 (FIGS. 5, 8, 9 and 12) is formed by a
body structure or housing 100 supported on the floor F by pedestals
101 made up of a front vertically disposed transverse wall 102, an
oppositely disposed vertical rear wall 103, and side walls 104 and
105. The housing 100 further includes a horizontal bottom wall 106
integrally jointed to the walls 102-105. The bottom wall 106 has a
lower panel 107 spaced therebeneath to provide a hollow chamber 108
through which a coolant is adapted to be circulated from an inlet
pipe 109 to an outlet pipe 110. The top wall 113 of housing 100 is
formed by panels 114 and 115 angularly disposed with respect to one
another. Thus, the panel 114 angles upwardly from the front wall
102 while the panel 115 slopes downwardly and is joined at its
lower edge to the rear wall 103.
The front wall 102 is provided with a horizontal, elongated opening
117 through which the platen P and substrates S to be coated pass
in entering the sealing compartment V1, while the rear wall 103 has
a similar aligned opening 118 for passage of the platen from
compartment V1 into the entrance chamber E.
Extending forwardly from the front wall 102 is a horizontal
platform 120 secured to said wall by bolts 123. The platform 120
supports at least two roller devices 124 for supporting the platen
P as it is being moved from the cart T into the sealing compartment
V1 through opening 117 in said front wall (FIG. 5). A limit switch
125, mounted on the platform 120, is actuated by the leading end of
the platen and controls an electric circuit which prevents
accidental closure of the compartment V1 until the trailing end of
the platen P has been received within the entrance chamber E (FIG.
5).
A hood H is secured to the front wall 102 above the platform 120,
said hood being connected to an exhaust system to draw off the
heated air that is introduced into the entrance chamber E by a warm
air purge unit for the purpose of warming and drying the interior
of said chamber to prevent moisture from condensing on the chamber
walls.
The top panel 114 of housing 100 mounts a pair of transverse
aligned hydraulic cylinders 127 and 128 that are substantially
identical with one another (FIGS. 8 and 9). These cylinders are
mounted on a base plate 130 secured to a frame 131 (FIG. 12)
affixed to the angularly disposed panel 114. Carried by the base
plate 130 are tubular pedestals 133 and 134 for supporting the
cylinders 127 and 128.
The lower end of the cylinder 127 is supplied with pressure and for
exhaust through a pipe 138 while the cylinder 128 is equipped with
a like pipe 139. The upper end of cylinder 127 is connected to
pressure and/or exhaust sources by a pipe 140, with the upper end
of cylinder 128 having connected thereto a pipe 141 for the same
purpose. A piston rod 143, having a piston 144 within the cylinder
127, projects outwardly therefrom to actuate a limit switch 145
located at the upper end of its movement and a limit switch 146 at
the lower end of its movement by means of a control member 147
carried by said piston rod. The switches 145 and 146 are mounted on
a bracket 148 affixed to the body of cylinder 127.
As best seen in FIGS. 8 and 9, the piston rod 150 having a piston
contained in cylinder 128 is equipped at its outer end with a
control member 152 to similarly actuate (FIG. 14) a limit switch
153 at the upper end of its movement and a limit switch 154 at the
lower end of its movement, said switches 153 and 154 being mounted
by a bracket 155 on the cylinder 128. As will also be seen in FIG.
9, the pipes 138 and 139 are supplied with hydraulic pressure
through suitable valves from a common distributor pipe 157. The
pipe 140, however, is independently supplied through a distributor
pipe 158, while the pipe 141 is supplied through a distributor pipe
159.
In this connection, the piston rods 143 and 150 enter the sealing
compartment V1 through the pedestals 133 and 134 respectively and
similar glands 160; heat dissipating units 161 being provided at
the inner ends of said glands. The piston rods 143 and 150 of the
respective cylinders are connected at their inner ends by means of
pins 165 to blocks 166 secured to the upper surface of a plate 167
which forms the top component of a valve member generally
designated by the numeral 168, a plate 169 forming the lower
component and spaced from the plate 167 by bars 170.
The plates 167 and 169 are secured together by a continuous weld
171 thereby forming a hermetically sealed chamber 172 within the
valve member 168. The chamber 172 is supplied with a circulating
coolant through pipes 173 and 174 to maintain the valve member 168
within a suitable temperature range and to prevent deterioration of
an O-ring 175 located in a groove in the bottom surface of the
plate 169. To facilitate connection of the valve member 168 to the
pipes 173 and 174 and enable freedom of reciprocal movements of
said valve member, flexible hoses 176 are employed between the
fittings 177 in the plate 130 and the plate 167.
The sealing compartment V1 is closed when it is desired to preclude
entry of outside air into the entrance chamber E by the application
of hydraulic pressure to the upper ends of the cylinders 127 and
128 to actuate the pistons 144 and 151 to move the valve members
168 into surface-to-surface contact with a fixed angular valve seat
179 secured to a base plate 180 that is sealed about its perimeter
to the side walls 104 and 105, the bottom wall 106 and the panel
115 of top wall 113. The valve plate 180 is provided with a recess
in which the valve seat 179 is secured by screws; 183; the valve
seat 179 having a groove in its lower face to receive an O-ring 184
which is forced by the screws 183 against the plate 180. The plate
180 is kept at the desired temperature by means of a U-shaped
tubular element 185 fixed to the under surface of said plate and
connected to a source of supply through pipes 186 and 187. A
horizontally elongated opening 188 is formed in the panel 179 and
is longitudinally aligned with the openings or passages 117 and 118
at the opposite ends of the sealing compartment V1. As viewed in
FIG. 8, the pipes 186 and 187 project outwardly through the side
walls 104 and 105 of said sealing compartment.
THE ENTRANCE CHAMBER
The entrance chamber E (FIGS. 3, 5, 12, 15 and 16) embodies a
horizontal, elongated housing designated in its entirety by the
numeral 200 and comprising a bottom wall 201, a top wall 202, side
walls 203 and 204 and vertically disposed front and rear walls 205
and 206 respectively. The top wall 202 consists of a horizontal
perimeter flange 207 which provides an open area 208 that is
hermetically sealed by a top plate 209. The front wall 205 is
sealingly secured to a rear wall 103 of the sealing compartment V1
by bolts or the like 210. In FIG. 16, wherein the structural
details are shown in enlarged scale, the rear wall 206 is secured
to the front wall 302 of the sealing compartment V2 by bolts 211.
The desired seal is effected by an O-ring 212 located in a
peripheral groove formed in the opposed surfaces of either or both
the front and rear walls 206 and 302. The front wall 205 of
entrance chamber E is provided with an opening 213 registering with
the opening 118 in the rear wall 103 of sealing compartment V1,
while the rear wall 206 thereof has an opening 214 aligned with the
opening 317 in the front wall 302 of the sealing compartment
V2.
A conveyor system 215 is provided in the entrance chamber E for
carrying the platens P and substrates S supported thereon from the
roller devices 214 on receiving platform 120 through the sealing
compartment V1 and said entrance chamber E. This conveyor includes
a pair of transversely spaced, endless roller-type chains 215 and
217 (FIGS. 3, 9, 11 and 12). These chains are trained about idler
sprockets 218 keyed to a shaft 219 journaled in bearings 220 at the
entry end of entrance chamber E and at the exit end thereof around
sprockets 222 keyed to a driven shaft 223 journaled in bearings 224
(FIG. 11). Between the pairs of sprockets 218 and 222, the upper
flights of the chains 216 and 217 traverse similar tracks 225 to
adequately support the platens and substrates.
The shaft 223 is projected outwardly through the side wall 204 of
entrance chamber E throuh a suitable sealing gland 226 and
connected to an electrically energized clutch 227 (FIG. 3) to
operatively connect shaft 223 to the drive shaft 228 of a motor 230
provided with a brake 231 (FIG. 3). The motor 230 is variably
controlled to vary the speed of the conveyor, as will be
hereinafter described, by means of a resistance unit 232. Driving
power to the motor 230 can be discontinued by the clutch 227 and
the brake 231 automatically applied as the platen approaches the
sealing compartment V2 in the event that the same is closed. As
will be more fully hereinafter noted, the operation of the motor
230 is initiated and/or halted by the use of suitable switches
responsive to the movement of the platen P.
In the operation of the apparatus, the conveyor 215 is halted when
the platen and substrate to be coated has been carried to a point
adjacent the exit end of the entrance chamber E. The sealing
compartment V1 is then closed, (with the sealing compartment V2
being also closed at this time) and the chamber E pumped down to
the desired vacuum. The entrance chamber E is then backfilled with
an inert gas (preferably argon) until the pressure in said chamber
is equalized with the pressure continually maintained in the
coating chamber C. When this has been achieved, with the sealing
compartment V3 being closed, the sealing compartment V2 is opened
and the conveyor 215 started to move the platen and substrate onto
the conveyor 415 within the coating chamber C; both conveyors 215
and 415 being operated at the same speed. In order to effectively
control the sequence of operations of the apparatus, the entrance
chamber E is provided adjacent its entry end with a limit switch
235 which is connected into the circuit of the switch 125 on the
receiving platform 120. This arrangement prevents inadvertent
closure of the sealing compartment V1 until the trailing end of the
platen has been received in the entrance chamber E.
A limit switch 236 located adjacent the exit end of entrance
chamber E is actuated by the leading end of the platen to initiate
several important functions. Firstly, the switch 236 (FIG. 22)
causes actuation of the resistance unit 232 to decrease the speed
of the conveyor 215 from a relatively high speed of around 60 FPM
to a stop by deenergizing the clutch 227 and energizing the brake
231. After the sealing compartment V2 has been opened, the
resistance unit starts the conveyor 215 to move the platen onto the
conveyor 415 in the coating chamber at its high speed.
Secondly, switch 236 controls the introduction of hydraulic
pressure to the upper ends of the cylinders 127 and 128 (FIGS. 8
and 9) to close the sealing compartment V1; the pressure being
terminated upon the closing of the switches 146 and 154 by the
control members 147 and 152 carried by the piston rods 143 and 150
respectively. This closing of the switches 146 and 154 also starts
the pump down of the entrance chamber E, and activates a timer
which will, at the end of the pump down period, stop the pumping
and start the backfill cycle with an inert gas until a vacuum gauge
(not shown) is satisfied. An equalizing conduit system is then
opened between chambers E and C to bring the vacuous conditions
into equilibrium with one another. After this has been
accomplished, the sealing compartment V2 can be opened.
As illustrated in FIGS. 13 and 5, the entrance chamber E is
connected to a central vacuum pumping system by conduit 245 through
a valve 246 and also to a backfill unit (not shown) by conduit 249
through a valve 250 and further to a "vacuum break" unit by conduit
253 and valve 254 to a baffling chamber 255 (FIG. 5) which is
employed to reduce any air turbulence as the vacuum in the chamber
E is relieved preparatory to opening of the sealing compartment V1.
This, of course, occurs after the platen has been moved into the
coating chamber C and the sealing compartment V2 is closed.
Thus, while the sealing compartment V1 is closed, the valve 246 is
opened to connect the entrance chamber E to a vacuum pump through
the conduit 245. Through a timing device, when the valve 246 is
closed, the valve 250 is opened to the backfill unit to admit an
inert gas, such as argon, into the entrance chamber E until a
vacuum gauge indicates that the required pressure therein has been
reached. The backfill unit operates to raise the pressure in the
chamber E to equalize the pressure therein with that in coating
chamber C. Communication between the chambers E and C to achieve
equilibrium is made through a conduit 260 while the equalization
valve 261 is open to a main conduit system 262, as will be more
fully hereinafter explained.
The entrance chamber E is also connected, by conduit 265 through a
valve 266, to a warm air blower system to dry the interior of
chamber E. This system includes generally a blower unit, a heater
and an air purge unit. Between the heater and air purge unit, the
system is connected by means of a by-pass valve that is adapted to
"shunt" the warm air into the atmosphere while the chamber E is
closed and under vacuum.
SECOND SEALING COMPARTMENT
With reference particularly to FIGS. 3, 5, 10, 15, 16 and 17, the
sealing compartment V2 is formed by a housing 300, supported by
pedestals 301 on the floor F. The housing has a front vertically
disposed wall 302, a vertical rear wall 303 and side walls 304 and
305. The bottom 306 of the housing is provided with a chamber 308
through which a coolant is passed from the inlet pipe 309 to the
outlet pipe 310 (FIG. 10) in the same manner as described with
reference to sealing compartment V1. Similarly, the top wall 313
consists of the angularly disposed panels 314 and 315. The front
wall 302 is provided with an elongated horizontal opening 318
registering with the opening 214 of the entrance chamber E and
through which the platen and substrate pass upon entering the
sealing compartment V2. The rear wall 303 of sealing compartment V2
has an elongated horizontal opening 317 which is aligned with a
similar opening in the front wall of the coating chamber C and
through which the platen and substrate pass into the coating
chamber.
Carried by the top panel 314 of housing 300 is a pair of
transversely aligned sealing mechanisms 327 and 328 (FIG. 17)
similar to sealing mechanisms 127 and 128. The sealing mechanisms
327 and 328 are mounted on a base plate 330 secured to a frame 331
on the top panel 314 by means of tubular pedestals 332 and 334
supporting hydraulically operated cylinders 327 and 328. The lower
end of the cylinder 327 is supplied with pressure through a pipe
338 while the lower end of the cylinder 328 is supplied by a pipe
339 for the same purpose. The upper end of cylinder 327 is likewise
connected to a pressure source through the pipe 340, with the upper
end of cylinder 328 being connected to a pressure source by pipe
341.
The piston rod 343 of a piston in cylinder 327 projects outwardly
to actuate a limit switch 345 at the upper limit of its movement
and a limit switch 346 at the lower limit of its movement through a
control member 347 carried by said piston rod. The switches 346 and
347 are mounted on a bracket 348 secured to the cylinder 327. The
piston rod 350 of a piston in cylinder 328 likewise carries a
control member 352 to similarly actuate a limit switch 353 at the
upper limit of its movement and a limit switch 354 at the lower
limit of its movement, said switches being mounted by a bracket 355
on the cylinder 328.
As shown in FIG. 17, the pipes 338 and 339 to cylinders 355 and 356
are supplied with pressure from a common distributor pipe 357. On
the other hand, the pipe 340 to cylinder 327 is supplied from a
pipe 358, while the pipe 341 to cylinder 328 is supplied through a
pipe 359. The piston rods 343 and 350 enter the sealing compartment
V2 through the pedestals 333 and 334 and glands 360; heat
dissipating units 361 being provided at the inner ends of said
glands. The piston rods 343 and 350 are connected at their inner
ends by pins 365 to blocks 366 secured to a plate 367 which forms
the top component of a valve member 368 having a chamber 372
therein. This chamber is supplied by pipes 373 and 374 with a
cooling fluid to maintain the valve member within an acceptable
range of temperature. To enable reciprocal movement of the valve
member 368, flexible hoses 376 are connected between fittings 377
in the base plate 330 and the plate 367.
The sealing compartment V2 is closed when the sealing compartment
V1 is open to the atmosphere and the sealing compartment V1 then
closed during pumping down of the entrance chamber E. The sealing
compartment V2 is closed upon application of hydraulic pressure to
the upper ends of cylinders 327 and 328 to move the valve member
368 into contact with the fixed panel 379 which is formed in the
same manner as the previously described panel 179 in sealing
compartment V1. The plate 380 is kept at the desired temperature by
means of a U-shaped tubular element 385 fixed to the under surface
of said plate and connected to a source of coolant through pipes
386 and 387. A horizontal opening 388 is provided in the panel 379
and is horizontally aligned with the opening 317 in the frontwall
302 of sealing compartment V2 and the opening 318 in the rear wall
303 of the housing 300.
COATING CHAMBER
With particular reference to FIGS. 1, 3, 4, 5, 6, 16, 18, 19 and
20, the coating chamber C embodies an elongated housing 400 which
comprises a bottom wall 401, a top wall 402, side walls 403 and 404
and front and rear walls 405 and 406 respectively. The top wall 402
has an inwardly directed flange 407 to provide an open area 408
that is hermetically sealed by a top plate 409, which will be more
fully hereinafter described.
The front wall 405 (FIG. 16) of housing 400 is sealingly secured to
the rear wall of the sealing compartment V2 by bolts 410, with the
seal being effected by an "O" ring 412. The front wall 405 is
provided with an opening 413 which registers with the opening 318
in the rear wall 303 of sealing compartment V2, while the rear wall
of the coating chamber C has an opening 414 (FIG. 17) aligned with
an opening in the front wall of the sealing compartment V3.
A conveyor 415 is provided within the housing 400 for receiving and
carrying the platen P and substrate S as they pass through the
openings 318 and 413 from the sealing compartment V2. The conveyor
415 comprises a pair of transversely spaced, horizontal endless
roller-type chains 416 and 417 (FIGS. 3, 4 and 18). At the entry
end of the coating chamber C, the chains are trained about idler
sprockets 418 (FIG. 15) keyed to a shaft 419 journaled in bearings
420, while the opposite looped ends of the chains are trained about
sprockets 422 keyed on a driven shaft 423, journaled in gearings
424. Between the sprockets 418 and 422, the upper flights of the
chains traverse similar tracks 425 to support the platen. The
driven shaft 423 projects outwardly through the side wall 404 of
the housing and gland 426 and is joined by an electrically
energized clutch 427 to the drive shaft 428 of a motor 430 equipped
with a brake 431 (FIGS. 4 and 22). The motor 430 is variably
controlled to reduce and/or increase the speed thereof by means of
a resistance unit 432. Normally, the conveyer 415 is operated by
the motor 430 at a relatively low speed such as, for example,
around 8 FPM until the substrate has been completely coated. The
resistance unit 432 then increases the speed of the conveyor to,
for example, around 60 FPM until the platen P an coated substrate S
is received on a conveyor in the exit or discharge chamber D.
Thereafter, the resistance unit 432 again reduces the conveyor to
its slow speed before "timing out."
The sequence of conveyor operations and the progressively occurring
phases of the coating operations are automatically controlled by
electrically operated means responsive to movement of the platen P.
Thus, the coating chamber C is provided adjacent its entry end with
a limit switch 435 that is connected to the circuitry of the switch
236 in the rear end of the entrance chamber E. This ensures against
inadvertent closure of the sealing compartment V2 until the
trailing end of the platen has cleared the said compartment and
been completely received within the chamber C. A limit switch 436,
located in the rear end of chamber C, is adapted to coact with a
switch in the entry end of the discharge chamber D, for a purpose
to be later described.
Referring to FIGS. 6 and 18, the bottom wall 401 of housing 400 is
formed in its central area with a plenum chamber 437 having a
conduit 438 connected with the diffusion pump of the main vacuum
system. Near the entry end of coating chamber C, a conduit 440
(FIG. 3) is attached to the side wall 403 and connects into the
general conduit system 262 which provides communication between the
coating chamber C and discharge chamber D. To this end, a second
conduit 441 (FIG. 4) is provided adjacent the rear end of the
chamber C and communication with the discharge chamber D is
controlled by a valve 442. When the pressure in the entrance
chamber E is to be brought into equilibrium with that in coating
chamber C, the equalization valve 442 is closed and by valve 216
communication is established through conduit 440 to conduit 260 and
thence to chamber E.
Generally stated, the coating chamber C is equipped with means for
preheating and cleaning the glass substrates to properly condition
them for receiving the coating material as they pass through said
chamber. For this purpose, heating means comprising elongated
tubular radiation heaters 443 are mounted in the upper portion of
the chamber C adjacent the entry end thereof. The heaters are
preferably high-intensity radiation heaters and a reflector 444 is
mounted over each of the heaters to concentrate the heat on the
passing substrates S. The substrates are heated prior to coating to
promote outgassing and thereby attain additional surface cleaning
and improved adherence of the coating. In the coating of large
sheets of glass, thermal stresses which could crack the glass must
also be considered.
According to the present invention, the glass substrates will be
rapidly transported past a glow-discharge cleaning electrode 447.
During coating, the surface of the glass substrate is heated by the
electrode and the temperature in the glass drops off through the
thickness of the glass. This temperature gradient and the resulting
thermal stress can cause breakage of the glass unless the glass is
preheated prior to coating. It has been found that preheating the
substrates will have no deleterious effect on the quality of the
coating produced.
The electrode 447 is a glow-discharge cleaning electrode in the
form of a closed loop and is mounted in the top of the coating
chamber C adjacent the radiation heaters 443. The purpose of this
electrode is to remove any microscopical contaminants from the
surface of the substrate to maximize adherence of the coating.
Shields 448 are positioned below the electrode 447 and are just
large enough to prevent the substrates S from "seeing" the
electrode as they pass through the chamber. The electrode 447 is
operated as an ordinary sputtering electrode but the shields 448
prevent the electrode material from being deposited on the
substrates. The ionized ions of the gas will bombard the surfaces
of the substrates to clean them but no coating is deposited.
With reference to FIGS. 3, 4, 6 and 18, the top plate 409 of
coating chamber C is provided with four longitudinally spaced
rectangular openings 445 in which are mounted panels 446-1, 446-2,
446-3 and 446-4. The panel 446-1 supports the glow-discharge
cleaning electrode 447 described above, while the panels 446-2,
446-3 and 446-4 support sputter-coating cathodes 449, 450 and 451
respectively. The three sputter-coating cathodes are in the form of
elongated rectangular plates of the selected coating material. In
this embodiment, cathodes 449 and 450 are used to deposit a thim
film of a metal, such as nickel or a nickel alloy, while the
cathode 451 may be used to deposit a thin protective layer of a
siliceous material such a Pyrex glass by radio-frequency
sputtering.
In practice, one or more cathodes may be used during the coating
operation. Several coatings of different materials may be applied
consecutively as, for example, by making cathode 449 of one metal,
cathode 450 of a different metal and cathode 451 of a siliceous
material. Also, the coating chamber can be increased in length and
a greater number of cathodes of the same material used to increase
the deposition rate and therefore the production rate.
To guard against over-heating of the electrode 447 and the cathodes
449, 450 and 451, limit switches 454, 455, 456 and 457 are located
on the floor 401 of the coating chamber to be actuated by the
advancing platen as it approaches the cleaning and coating units.
Each of these switches controls a resistance to increase or
decrease the potential of the D.C. and radio-frequency power
sources (FIG. 23). These switches more particularly serve to
conserve the amount of electrical current consumed, to reduce
overheating of the coating chamber and to prevent unnecessary loss
of the coating materials.
As shown in FIGS. 3 and 4, the coating chamber is connected at its
entry and exit ends to suitable purge pumps or units to pump out
the argon gas that is leaked into the chamber to maintain a
constant pressure therein. The environment inside the chamber is
thereby kept clean by supplying new and fresh purified argon gas
while, at the same time, withdrawing the contaminated gas.
Accordingly, there will be at all times a continuous flow of argon
gas into and out of the coating chamber C when the apparatus is in
operation. This is without regard to the particular phase or stage
in which the apparatus is functioning during the coating operation.
For this purpose, as in FIG. 3, a conduit 458 is connected to the
chamber C adjacent the entry end thereof and is associated with a
first purge pump (not shown), while a conduit 459 (FIG. 4) is
connected to said chamber adjacent the exit end thereof and leads
to a second purge pump. Thus, there is a continuous circulation of
argon gas from the central region of the coating chamber toward the
opposite ends thereof.
The electrode 447 and cathodes 449, 450 and 451 (FIG. 6) are
mounted on their respective panels 446 by support units generally
designated by the numeral 460 (FIGS. 18, 19 and 20). Each of these
units includes a stainless steel ring 461 vertically aligned with
an opening 462 in the respective panel and sealed thereabout as by
welding. As soon in FIGS. 3 and 4, three units are aligned
transversely of each panel, with the oppositely disposed outer
units being connected to a rectangular, hollow boxlike cathode
chamber 463 for coolant purposes, while the center unit carries a
conductor rod connected to a power source, as will be later on
described. The chambers 463 constitute a component part of the
cathodes 449, 450 and 451, as the case may be, and are preferably
constructed of a metal having good conductivity, such as aluminum
or copper.
As viewed in FIGS. 19 and 20, the support units 460 comprise an
annular insulating chamber 465 having a depending collar 466
disposed above the ring 461, with a cover plate 467, having a
central aperature therein, positioned above said insulating member
465. The ring 461 has tapped holes for receiving bolts 468 passing
through openings in the insulating member 465 and cover plate 467.
An O-ring 469 is located between the ring 461 and insulating member
465 to provide a vacuum-tight seal, while an O-ring 470 between the
insulating member 465 and cover plate 467 serves the same
purpose.
The cathode chamber 463 has secured thereto, as by welding, an
annular sleeve 472 which is received in concentric relation within
the collar 466 depending from insulating member 465. This sleeve is
provided at its upper end with a centrally disposed aperature in an
inwardly directed rim 473 formed with tapped holes to receive bolts
474 passing through the cover plate 467. An O-ring 475 is located
around the bolts to afford an additional vacuum-tight seal.
A thin foil sheet 477 of a soft, thermally conductive material,
such as aluminum or indium, is positioned between the bottom of the
cathode chamber 463 and a support plate 478. The foil sheet 477
serves to increase the area of contact at the interface between the
bottom of said chamber and the support plate 478 to improve the
thermal conductivity across said interface. The support plate 478
is secured in place by bolts 479. Thus, a plurality of recessed
areas 480 are spaced along the sides of the chamber and are
provided with holes through which the bolts 479, secured to the
support plate, are passed and affixed by nuts 481.
The cathode or source sheet (target) to be sputtered is designated
by the numeral 478 and consists of a layer of the selected coating
material applied to the support plate 478 by electro-plating,
brazing or in some other suitable manner. The coating material may
be nickel or a nickelalloy, although other coating materials may be
used, with the thickness of the source sheet being varied as
desired. The cathodes are electrically insulated from the
supporting panels 446 by the insulating members 465 and depending
collars 466, with the cathodes being supported a sufficient
distance from the panels 446 to prevent electrical contact or
arcing during operation. Grounded shielding plates 483 are welded
to the panels 446 at a short distance from the edges of the
cathodes to prevent reverse sputtering of the material on the edges
of the cathodes.
An electrically conductive rod 484 (FIG. 3) for the glow-discharge
cleaning electrode 447 is connected to an individual power source,
while the conductor rod 485 for the cathode 449 and the conductor
rod 486 for the cathode 450 are connected to separate D.C. power
sources. In the case of the cathode 451, the conductor rod 487
thereof is connected to a radio-frequency power source and the
associated support plate 488 carries a sheet of siliceous material
or the like if it is desired to deposit a thin protective layer
over the previously deposited continuous film. With reference to
FIG. 19, each of the conductor rods 484, 485, 486 and 487 pass
upwardly through a sealed tube 490 in the respective cathode
chamber 463 and an opening in the cover plate 467.
As shown in FIGS. 18 and 20, the cathode chamber 463 of the
electrode 447 and the chambers of the cathodes 449, 450 and 451 are
maintained within a suitable temperature range by the circulation
of a coolant therethrough from pipes 492 and 493 respectively (FIG.
3). These pipes are secured as by welding to the upper wall of the
chamber and connected to a source of coolant and a sump.
THIRD SEALING COMPARTMENT
As illustrated in FIGS. 1, 4, 7 and 17, the sealing compartment V3
is constructed, as in the case of sealing compartments V1 and V2,
of a housing 500 supported on pedestals 501 and having a front wall
502, rear wall 503, side walls 504 and 505, a bottom wall 506 and a
top wall 513. The front wall 502 is secured by bolts 510 to the
rear wall 406 of the coating chamber C, while the rear wall 503 is
secured by bolts 511 to the front wall 602 of the discharge chamber
D. The front wall 502 is provided with an opening 517 which
registers with the opening 414 in the rear wall 406 of coating
chamber C and through which the platens P and substrates S pass
into the sealing compartment V4.
As previously described in connection with sealing compartments V1
and V2, the top wall 513 of sealing compartment V3 mounts a pair of
cylinders 527 and 528. The lower ends of the cylinders 527 and 528
are connected by pipes 538 and 539 respectively to a common
distributor pipe 557 leading to a source of hydraulic pressure,
while the upper ends of said cylinders 527 and 528 are connected by
pipes 540 and 541 respectively to independent sources of hydraulic
pressure through the distributor pipes 558 and 559.
The piston rod 543 having a piston loated in cylinder 527 carries a
control member 547 to actuate limit switches 545 and 546 mounted by
bracket 548 on cylinder 527, at the upper and lower limits of its
movement. Similarly, the piston rod 550 of piston 551 contained in
cylinder 528 has a control member 552 for actuating the upper and
lower limit switches 553 and 554 which are mounted by a bracket 555
on the cylinder 528.
The piston rods 543 and 550 pass through a gland 560 into the
housing 500 wherein they are attached to blocks 563 on the valve
member 568. Downward movement of the valve member 568 will bring
the same into sealing engagement with a fixed panel 579, cooled by
circulating fluid through the U-shaped element 585 by pipes 586 and
587. When this surface-to-surface contact of the valve member 568
with the panel 579 is effected, the sealing compartment V3 is
closed between the coating chamber C and discharge chamber D. At
this time the sealing compartment V4 should be open to permit
discharge of a platen P and previously coated substrate S. When the
sealing compartment V4 is again closed, the sealing compartment V3
can be opened to enable movement of a following platen and coated
substate into the discharge chamber D, after which the sealing
compartment V3 is closed.
DISCHARGE CHAMBER
As illustrated in FIGS. 1, 4, 7 and 21, the discharge chamber D is
substantially complementary in construction to that of the entrance
chamber E. Thus, this chamber is embodied in a horizontal,
elongated housing designated in its entirety by the numeral 600 and
comprises a bottom wall 601, top wall 602, side walls 603 and 604
and front and rear walls 605 and 606 respectively. The top wall 602
consists of a horizontal perimeter flange 607 that is hermetically
sealed to a top plate 609. The front wall is sealingly secured to
the rear wall 503 of the sealing compartment V3 by bolts 610. The
rear wall 606 is secured to the front wall 702 of the sealing
compartment V4 by bolts 611. The front wall 605 of discharge
chamber D is provided with an opening 613 is registry with the
opening 518 in the rear wall 503 of the sealing compartment V3,
while the rear wall 606 of discharge chamber D has a similar
opening 614 aligned with an opening 717 in the front wall 702 of
the sealing compartment V4.
Mounted in the housing 600 is a conveyor 615 for receiving the
platens P and coated substrates S from the conveyor 415 in the
coating chamber C through the sealing compartment V3. The conveyor
615 also includes a pair of transversely spaced, endless roller
type chains 616 and 617. At the entry end of the chamber D the
chains are trained about idler sprockets 618 fixed on a shaft 619
journaled in bearings 620, while the opposite looped ends of the
chains are trained about sprockets 622 fixed to a driven shaft 623
journaled in bearings 624. Between the pairs of sprockets the upper
flights of the chains are supported by tracks 625. The shaft 623
projects outwardly of the side wall 604 of discharge chamber D
through a gland 626 and is connected to an electrically energized
clutch 627 (FIG. 4) to join the shaft 623 to a drive shaft 628 of
the motor 630 having a brake 631. The motor 630 is variably
controlled by means of a resistance unit 632 to increase and/or
reduce the speed of the conveyor 615.
During movement of the platen P from the conveyor 415 in the
coating chamber C onto the conveyor 615 in the discharge chamber D,
both conveyors operate tandem-wise at the same speed as, for
example 8 FPM. When the trailing end of the platen leaves the
region of the last cathode, the speed of the conveyors 415 and 615
is increased to about 60 FPM to move the platen and coated sheet
out of the coating chamber C. However, when the platen is fully
received on the conveyor 615, the speed of the conveyor 415 is
substantially reduced to a relatively slow speed as, for example, 8
FPM. The resistance unit 632 is thus adjusted to maintain the speed
of the conveyor at 60 FPM until the leading end of the platen
approaches the rear end of the discharge chamber D. The resistance
unit then functions to stop the conveyor by deenergizing the clutch
627 and energizing the brake 631. After the discharge chamber D has
been vacuum broken, the sealing compartment V4 opened and sealing
compartment V3 closed, the conveyor 615 resumes operation at a
speed of 60 FPM until the platen P and coated substrate S are moved
out of the sealing compartment V4. The resistance unit 632 then
acts to cause the conveyor 615 to stop as the sealing compartment
V4 is again closed. After the platen has been moved from the
discharge chamber, the said chamber is dried with warm air until
sealing compartment V4 is closed.
A limit switch 635, located near the entry end of the discharge
chamber, is connected into the circuit of the switch 436 in the
rear end of the coating chamber to prevent inadvertent closing of
the sealing compartment V3 until the platen clears switch 635.
Located in the rear end of the discharge chamber is a limit switch
636 which cooperates with the switch 725 on the unloading platform
720 to prevent closing of the sealing compartment V4 until the
platen has been completely removed therefrom.
The discharge chamber D is connected to the main vacuum system by a
conduit 645 through a valve 646 to a backfill unit by conduit 649
via a valve 650 and to a vacuum "break" unit by conduit 653 and
valve 654. To enable equalization of the vacuum in coating chamber
C and discharge chamber D, a conduit 660 (FIG. 4) enters the side
wall 603 of the discharge chamber and, through an equalization
valve 442, can be opened to the conduit 262 leading to the coating
chamber C. The discharge chamber D is also adapted to be connected
to a warm-air blower system (not shown) to dry the interior of said
chamber, as explained above in connection with the entrance chamber
E. This system may include a blower unit, a heater and an air-purge
unit. Between the heater and the air-purge unit the system is
connected to a by-pass valve that is adapted to "shunt" to warm air
into the atmosphere while the discharge chamber D is closed an
under vacuum.
FOURTH SEALING COMPARTMENT
The sealing compartment V4 (FIGS. 1, 4, 7 and 21) is substantially
the same as sealing compartments V1, V2 and V3 and comprises a
housing 700 supported by pedestals 701. The housing has a front
wall 702 secured to the rear wall 606 of the discharge chamber D by
bolts or the like 611 and is provided with an opening 717 which
registers with the opening 614 in the wall 606 of the discharge
chamber. The rear wall 703 of the housing is provided with an
opening 718 aligned with the opening 717 in the front wall. An
unloading platform 720 is secured by bolts 723 to said rear wall
703. The platform is provided with roller devices 724 over which
the platen and coated substrate are moved as they are advanced from
the conveyor 615 in the discharge chamber to a cart or other
conveyor apparatus. A limit switch 725 is mounted on the platform
to coact with limit switch 636 in the discharge chamber to prevent
inadvertent closing of the sealing compartment V4 until the platen
has passed beyond said switch 725.
A hood H is mounted on the rear wall 703 of the housing 700 and is
connected to an exhaust system to draw off heated air that is
introduced into the discharge chamber D for the purpose of warming
and drying the interior of said chamber to prevent moisture of
ambient air from condensing on the chamber walls.
The top wall 713 of the housing 700 supports a pair of transversely
spaced and aligned hydraulically operated cylinders 727 and 728.
The lower ends of these cylinders are connected by pipes 738 and
739 to a common distributor pipe 757 leading to a suitable source
of pressure, while the upper ends of the cylinders 727 and 728 are
connected by pipes 740 and 741 respectively to separate distributor
pipes 758 and 759 leading to individual sources of pressure.
The piston rod 743 of piston located in cylinder 727 carries a
control member 747 which is adapted to actuate limit switches 745
and 746 at the upper and lower limits of its movements. These
switches are mounted by a bracket 748 on the cylinder 727.
Likewise, the piston rod 750 of piston contained in cylinder 728 is
provided with a control member 752 for actuating the upper and
lower limit switches 753 and 754 which are mounted by a bracket 755
on the cylinder 728.
The piston rods 743 and 750 pass through a gland 760 into the
housing 700 wherein they are connected to blocks 766 on the valve
member 768. Upon downward movement of the valve member, it will
sealingly engage the fixed panel 779 which is cooled by circulating
a cooling fluid through a U-shaped element similar to element 385
in FIG. 16, pipes 786 and 787 (FIG. 21). When the valve member is
closed, the discharge chamber D is sealed from the ambient
atmosphere. When the sealing compartment V4 is subsequently opened
after the vacuum has been relieved in the discharge chamber and the
sealing compartment is closed, the platen P and coated substrate S
can be removed from the apparatus.
SUMMARY OF OPERATION
The following is a summary of the operation of the coating
apparatus of this invention in which the sequence of operations is
initiated and controlled by movement of the platens, carrying the
glass sheets, or other substrates, through the apparatus.
At the beginning of the coating cycle, the sealing compartment V1
is open, sealing compartment V2 closed, sealing compartment V3 open
and sealing compartment V4 closed.
The purpose of the diffusion pump referred to above is to pump down
the chambers E, C and D initially to a pressure in the neighborhood
of about 2 .times. 10.sup.-.sup.6 torr to clean up any contaminants
present in the chambers and to accelerate outgassing from the walls
of said chambers which is a source of contamination. This
pre-conditioning of the chambers can usually be done overnight or
week ends when the apparatus is not in use.
The platen P, carrying the substrate S to be coated, is removed
from the cart T onto the loading platform 120 where the leading end
thereof engages and closes a limit switch 125 and, upon continued
movement into the entrance chamber E, closes limit switch 235. As
long as these switches are closed by the platen, accidental closing
of the sealing compartment V1 is prevented.
As the platen moves further into the entrance chamber E, it is
received on the conveyor 215 which is being driven to advance the
platen at a relatively high speed, for example 60 FPM. The platen
continues forwardly at this speed until the leading end thereof
closes switch 236 at the exit end of the entrance chamber E which
brings the conveyor 215 to a stop. Also, through a timer, the
closing of switch 236 causes the closing of sealing compartment V1
and substantially simultaneously, warm air previously introduced
into the entrance chamber E is vented to the atmosphere. The
entrance chamber is connected with the main vacuum pumping system
and after being pumped down to the desired pressure it is
backfilled with an inert gas, preferably argon, until the pressure
in this chamber is substantially the same as the pressure in the
coating chamber C and then is equalized with that in the coating
chamber C through the conduit 262; said coating chamber being under
continual pressure. When pressure equalization between chambers E
and C has been attained, the sealing compartment V2 is opened by a
timer to place the coating member C in communication with the
entrance chamber E. The opening of sealing compartment V2 initiates
the operation of the conveyor 215 in entrance chamber E to advance
the platen at high speed onto the conveyor 415 in coating chamber
C, which is also operating at the same high speed.
When the platen and sheet have been received in the entrance
chamber E and sealing compartment V1 closed, the entrance chamber
is pumped down from atmosphere to a pressure in the range of 1 to 8
.times. 10.sup.-.sup.3 torr. It is then backfilled with an inert
gas, such as argon, to the pressure which is maintained in the
coating chamber C and which is in the range of 2 to 6 .times.
10.sup.-.sup.2 torr. The equalization valve 261 is then opened to
insure that the pressure in entrance chamber E will be the same as
the pressure in coating chamber C.
Upon continued forward movement of the platen through the coating
chamber C, the leading end of the platen will actuate switch 435 to
prevent closing of sealing compartment V2 until the platen is
completely within chamber C and to slow down the speed of the
conveyors 215 and 415 to around 8 FPM. When the platen is received
in chamber C and the trailing end of said platen passes switch 435,
the sealing compartment V2 is closed, the entrance chamber E is
vacuum broken and the conveyor is said chamber continued at its low
speed until the trailing end of the platen passes beyond the switch
436. The sealing compartment V1 is also reopened and the entrance
chamber purged with warm air to keep the walls thereof dry until
another platen and sheet are introduced.
The coating chamber C is maintained at a constant pressure of about
4 .times. 10.sup.-.sup.2 torr. On the other hand, the entrance
chamber E and discharge chamber D are alternately open to the
atmosphere during the time the platens are introduced into the
entrance chamber and discharged from the dischargd chamber and
evacuated to a desired vacuum andn backfilled to a pressure equal
to that in the coating chamber C when the platen is moved into and
out of the coating chamber.
As the platen moves through the coating chamber at low speed, it
carries the substrate first beneath the radiation heaters 443 which
concentrate heat on the passing substrate to promote outgassing and
thereby attain additional surface cleaning and improved adherence
of the coating. For example, the substrate can be heated to a
temperature within the range of 100.degree.C. to 250.degree.C.
The substrate then passes beneath the glow-discharge cleaning
electrode 447 which is operated as an ordinary sputtering electrode
but which is so constructed that the ionized ions of the gas will
bombard the surface of the substrate to clean them but no coating
will be deposited. Upon continued movement, the substrate is
carried successively beneath the sputter-coating electrodes 449,
450 and 451. In this embodiment of the invention, the cathodes 449
and 450 are used to deposit a thin film of a metal, such as nickel
or a nickel-alloy, on the substrate, while cathode 451 may be used
to deposit a thin protective layer of a siliceous material, such as
Pyrex glass, by radio-frequency sputtering.
In practice, one or more cathodes may be used in the coating
chamber. Several coatings of different materials may be applied
consecutively as, for example, by making cathode 449 of one metal,
cathode 450 of a different metal and cathode 451 of a siliceous
material. Or, only one or two of the cathodes may be employed
depending upon the type of coating desired. As stated above, the
coating chamber C is under controlled pressure at all times, with
the entrance chamber E and discharge chamber D being alternately
under the same vacuum as the coating chamber and then open to the
atmosphere.
When the trailing end of the platen clears the sealing compartment
V3, the conveyor 415 in coating chamber C is moving at its low
speed and when the platen reaches the exit end of the coating
chamber, the leading end thereof closes switch 436 (FIG. 23) to
start a timer which, when the trailing end of the platen clears the
last cathode 451, acts to increase the speed of the conveyor 415 to
quickly move the platen into the discharge chamber D, where it is
received on conveyor 615 also traveling at the same speed. When the
trailing end of the platen clears the sealing compartment V3, the
conveyor 415 in coating chamber C slows down and when the leading
end of the platen reaches the discharge end of chamber D, it closes
switch 636 (FIG. 4) to close the sealing compartment V3, while the
discharge chamber reamins under vacuum. The closing of switch 636
also causes the conveyor 615 to stop. At the same time, closing of
the sealing compartment V3 breaks the vacuum in discharge chamber
D, opens the sealing compartment V4 and cuases the introduction of
warm air into the discharge chamber.
Prior to opening of the sealing compartment V3 to permit passage of
the platen into the discharge chamber D, the said discharge chamber
has been pumped down to a pressure of about 1 to 8 .times.
10.sup.-.sup.3 Torr and then backfilled with Argon to the pressure
in the coating chamber. To compensate for any slight difference
that may exist between the pressure in discharge chamber and that
in the coating chamber, the equalization valve 442 is opened to
insure equalization of the pressure in said chambers C and D.
The conveyor 615 then travels at high speed until the platen is
removed from the discharge chamber D onto a cart T or suitable
conveyor after which the conveyor 615 resumes its slower speed. The
sealing compartment V4 is then closed when the trailing end of the
platen passes and energizes switch 725, the warm air purge in the
discharge chamber vented to the atmosphere and the said chamber
again put under vacuum and backfilled to a pressure which is
equalized with that in the coating chamber C. The sealing
compartment V3 is then opened by a timer actuated by the switch 725
to pump down the discharge chamber D and to equalize the pressure
therein with the pressure in coating chamber C. The apparatus is
now set-up to receive another platen and substrate to be coated and
the above cycle is repeated.
HYDRAULIC PRESSURE SYSTEM AND ELECTRICAL CONTROLS
An exemplary embodiment of a hydraulic pressure system and
associated electrical controls for the coating apparatus described
above are illustrated in FIGS. 22 and 23. With reference to the
first sealing compartment V1, a plurality of electrically
controlled valves 801, 802 and 803 are connected to a hydraulic
pump 805 through a supply conduit 806, with branches to the said
valves. These valves are also connected to a suitable sump through
an exhaust conduit 807 and branch conduits. The valve 801 is
connected to the lower end of the cylinder 127 by the conduit 138,
while the lower end of the cylinder 128 is connected through the
conduit 139 to the common distributor pipe 157. The valve 802 is
connected to the upper end of cylinder 127 through the conduit 140
and distributor 158, while the upper end of the cylinder 128 is
connected to the vlave 803 by conduit 141 and distributor pipe
159.
The motors 230, 430 and 630 normally operate continuously to drive
the respective conveyors 215, 415 and 615 in tandem (FIG. 1).
Operative connections between the motors and conveyors are
controlled by the travel of the platens and substrates to be coated
through the apparatus, with the speed of the conveyors being
automatically varied, halted and then restarted when and as
required during performance of the successive operations. This,
when the platen P and substrate or substrates positoned thereon,
are moved over the rollers 124 on the loading platform, the leading
end of the platen closes the switch 125 to start the conveyor 215
in the entrance chamber E. Advancing through the compartment V1 and
into the conveyor 215, the platen then closes the switch 235. These
switches 125 and 235 are connected to a service line 810 and are
joined by a common line 809 to complete a circuit through a
solenoid 812 of a spring-biased relay switch 813 to the service
line 814.
The disengaged pair of contacts 815 of relay switch 813 thereby
open a circuit between lines 816 and 817 to the valves 802 and 803.
While contacts 815 are separated, it will be impossible to operate
the pistons 144 and 151 in cylinders 127 and 128 to move the valve
member 168 downwardly against the valve seat 170 to effect closing
of the sealing compartment V1. When the trailing end of the platen
has been carried into the entrance chamber E, the switches 125 and
235 drop open to deenergize the solenoid 812. A circuit by lines
816 and 817 is then completed through the reenergized contacts 815.
As the leading end of the platen approaches the rear end of the
entrance chamber, it closes the switch 236.
Initially, the switch 236 completes a circuit from service line 810
through lines 816 and 817 to the valves 802 and 803 to service line
814. At this time, upper limit switches 145 and 153 are already
closed by control members 147 and 152 to complete line 818 to the
exhaust side of valve 801 to open the same to the sump through
conduit 807. Substantially simultaneously, the switch 236 completes
circuits by lines 819, 820 and 821 to a pair of timing relays 822
and 823. The line 821 activates the timing relay 823 which monitors
a short interval of time and then deenergizes the clutch 227 and
energizes the brake 231 to bring the conveyor to a stop. The relay
822 is adjusted to monitor several phases of activity of the
resistance unit 232 which initially reduces the speed of the
conveyor 215 from a relatively high speed to a relatively low speed
(as described above) and then, after a predetermined interval of
time, returns to conveyor to its high speed.
When hydraulic pressure is introduced from the supply conduit 806
through valves 802 and 803 and distributor pipes 158 and 159 to
conduits 140 and 141, pressure is applied to the upper ends of
cylinders 127 and 128 to move the pistons 144 and 151 downwardly to
bring the valve member 168 into engagement with the valve seat 179
and thereby close the passageway 188 therein. As the pistons 144
and 151 move downwardly, fluid in the lower ends of cylinders 127
and 128 will be exhausted through conduits 138 and 139 and
distributor pipe 157 to the sump conduit 807 via the valve 801.
When contact of the valve member 168 with the valve seat 170 has
been made, the control members 147 and 152 close the lower limit
switches 146 and 154 which completes a common line 825 from service
line 810 to open the exhaust sides of valves 802 and 803.
By branch line 827 from line 819, a circuit is completed from line
810 to a timing relay 828 which is connected by line 829 to the
valve 266 in the conduit 265 and close communication of the
warm-air purge system to the interior of the entrance chamber E.
The timing relay 828 is preferably adjusted to monitor an interval
of time during which the valve 266 is closed. When the sealing
compartment V2 is closed, said relay 828 "times" out after the
sealing compartment V1 has been reopened to the atmosphere.
Substantially simultaneously, line 830 energizes a timing relay 831
to initially create a circuit by line 832 to open the valve 246 in
the conduit 245 which connects the entrance chamber E to the main
vacuum system until the desired pressure therein has been attained.
The vacuous condition in the entrance chamber increases the
effectiveness of the seal between the valve members 168 and 368 and
the valve seats 179 and 379.
When the required pressure has been reaches in entrance chamber E,
the relry 831 completes a line 834 and opens line 832 closing valve
246 to stop the pump down. This relay also opens the valve 250 in
the conduit 249 of a backfill unit to discharge a small quantity of
an inert gas into said entrance chamber. Raising of the pressure to
around 10 microns is followed by the creation of the line 836 from
the relay 831 to open the valve 261 in the conduit 260 to put the
entrance chamber in communication with the coating chamber C by way
of conduits 262, 440 and 441, the oppositely disposed valve 442
then being closed. This places the chambers E and C in an equalized
vacuous condition preparatory to opening of the sealing compartment
V2.
Then, from line 819, branch line 838 energizes a timing relay 839
to, in a first phase, complete the circuit of line 842 through the
valve 843 to connect the supply conduit 806 to the distributor pipe
357 and conduits 338 and 339 to the lower ends of cylinders 327 and
328. When hydraulic pressure is applied to the lower ends of the
cylinders 327 and 328, the pistons 344 and 351 will effect
separation of the valve member 368 from the valve seat 379 in the
sealing compartment V1 to open the passageway 388. When the piston
rods 343 and 350 of pistons 344 and 351 respectively reach the
upper limit of their movement the control members 347 and 352
carried thereby close the switches 345 and 353 so that the circuit
of line 847 will be completed to open the exhaust side of valve 843
to the sump pipe 807.
When the sealing compartment V2 is fully open, the relay 823
"times" out to deenergize the brake 231 and permit the clutch 227
to restart the conveyor 215 to advance the platen through the
sealing compartment V2 onto the conveyor 415 in the coating chamber
C and release switch 236. During transfer of the platen from the
conveyor 215 onto the conveyor 415, the resistance 232 maintains
the conveyor 215 at its high speed, at which speed the conveyor 415
is also moving. When the platen is partially within the coating
chamber, the resistence 232 "times" out to resume movement of the
conveyor 215 at its low speed.
The platen then closes switch 435 (FIGS. 5 and 15) which is
connected to service line 810 to complete a circuit by line 850
through the solenoid 851 of a spring-biased relay switch 852 to
service line 814. The disengaged pair of contacts 853 of said relay
switch open a circuit between lines 854 and 855 to the valves 844
and 845. While the contacts 853 are separated, inadvertent downward
movement of the pistons in cylinders 327 and 328 to close the valve
member 368 of sealing compartment V2 will be prevented.
After the trailing end of the platen has passed completely through
the sealing compartment V2, releasing switch 435, the timing relay
839 opens line 842 and completes the circuit of lines 854 and 855
through the valves 844 and 845 to service line 814. Pressure is
thus applied from supply conduit 806 to distributor pipes 358 and
359 to the upper ends of cylinders 327 and 328. As the pistons are
moved downwardly in cylinders 327 and 328, hydraulic pressure in
the lower ends of said cylinders is exhausted via conduits 338, 339
and 357 and the valve 843 to the sump through discharge conduit
807. The control members 347 and 352 carried by the piston rods 343
and 350 of pistons 344 and 351 close switches 346 and 354 when the
piston rods reach the lower end of their stroke, the valve member
368 is in contact with the valve seat 379. Switches 346 and 354 are
then closed to establish the circuit of line 848 to the exhaust
sides of valves 844 and 845.
When the sealing compartment V2 is closed, the relay 839 activates
a line 856 to the valve 254 which opens the conduit 253 to relieve
the vacuum in the entrance chamber E through the baffling unit 255.
Line 857 then completes a circuit through the valve 801 to service
line 814. This will connect supply conduit 806 to the distributor
pipe 157 and conduits 138 and 139 to the lower ends of cylinders
127 and 128. As the piston rods 143 and 150 move upwardly, the
upper ends of these cylinders are connected through conduits 140
and 141 and 158 and 159 and valves 802 and 803 to the sump pipe
807. When the piston rods reach the upper limit of their movement
and the sealing compartment V1 fully open, the control members 147
and 162 again close switches 145 and 153 to complete line 818 to
the exhaust side of valve 801. The relay 828 then times out so that
the valve 266 reopens conduit 265 to connect the warm-air purge
unit to the entrance chamber E.
As heretofore described, radiation heaters 443 are located in the
entry end of the coating chamber C to heat the glass substrate to
the desired temperature. In FIG. 22, a circuit is illustrated
between a D.C. power source 860 and the heaters which is completed
by line 861 through the contacts 862 of a switch 863 and line 864.
If desired, a rheostat 866 can be interposed in line 864 and
regulated by closing of switch 453 and line 867 to adjust the
temperature of the heaters.
To conserve the current output from the D.C. and R.F. power
sources, to also reduce over-heating of the coating chamber C and
to conserve the coating materials on the source sheets of the
chatodes 449, 450 and 451, means is provided to reduce the power
output to said cathodes. Thus, as shown in FIG. 23, the D.C. power
source 869 is connected by a manula switch 870 and line 871 to the
rod 487 of the glowdischarge unit 447 through a rheostat 872. Said
rheostat is controlled by switch 454 through line 873 from line
810. Similarly, the rod 488 of the cathode 449 is connected by line
875 via a switch 876 to the D.C. power source 877 through a
rheostat 878 which is controlled by the switch 455 by line 879. The
rod 489 of the cathode 450 is connected to the D.C. power source
880 through a manual switch 881 and rheostat 882 by line 883. The
amount of current output through the rheostat 882 is controlled by
the switch 456 via line 884. The rod 490 of the cathod 451, which
may be employed to apply a thin protective coating PL on the base
coating L on the substrate S, is connected to the radio-frequency
power source 886 through a manual switch 887 and line 888. A
rheostat 889 is interposed in the lower source and controlled by
the switch 457 by way of line 890.
At this point in the continuing operation of the coating apparatus,
the sealing compartment V4 at the exit end of the discharge chamber
D has reclosed and said chamber put under vacuum which is equalized
with the vacuum in the coating chamber C. In consequence, the
sealing compartment V3 is open and the platen is moved continuously
into the discharge chamber. As the platen enters the coating
chamber, it itially closes switch 454 to release the rheostat 872
and increase the power output by line 871 to the rod 487 and the
glow-discharge electrode 447. The platen in sequence then closes
switch 455 and switch 456 to release rheostats 878 and 882 thereby
increasing the output of power from D.C. sources 877 and 880. The
rods 488 and 489 of catodes 449 and 450 thus conduct sufficient
current to effect the sputtering of thin films of the selected
metal or metals on the upper surface of the glass substrate. In the
event it is desired not to use both cathodes 449 and 450 in the
same operation, switches 892 and 893 can be interposed in the lines
879 and 884 to render one or the other of the cathodes inoperable.
A thin protective film of a siliceous material may be sputtered
upon the base coating on the substrate by cathode 451 as the platen
closes switch 457 to release the rheostat 889 and allow current
from the radio-frequency power source 886 to flow by line 888 to
the rod 490 of the cathode 451.
As the trailing end of the platen passes through and beyond the
areas of the radiant heaters 443, glow-discharge electrode 447 and
sputtering cathodes 449, 450 and 451, it successively releases
switches 453, 454, 455, 456 and 457 to reduce the output of power
to the said heaters, electrode and cathodes by the respective
rheostats 866, 872, 878, 882 and 888. When the coating operation
has been completed and the trailing end of th platen approaches the
rear area of the coating chamber C, the switch 436 is closed. This
switch is connected by line 895 to a timing relay 896 which
monitors and controls the resistance 432 and activates the same to
increase the speed of the conveyor 415. This more rapid speed is
commensurate with the speed at which the conveyor 615 is operating
so that the platen is quickly removed from the coating chamber C
into the discharge chamber D. The relay 896 before timing out
causes the conveyor 415 to revert to its high speed after sealing
compartment V3 closes.
As the platen is carried through the open sealing compartment V3
and while switch 436 is closed, switch 635 is also closed. These
switches are interlocked by line 897 to complete a circuit from
service line 810 through the solenoid 898 of a spring-biased relay
switch 899 to service line 814. This disengages the contacts 900
and breaks the continuity of line 901 to the valves 903 and 904
with line 905. Inadvertent closing of the sealing compartment V3 is
thereby prevented. As the platen approaches the rear area of the
discharge chamber, it releases switches 436 and 635 to enable
reengagement of the contacts 900 of the relay switch 899.
The plante then closes switch 636 to complete the circuit of line
905 from service line 810 and line 901 to the valves 903 and 904
and stops conveyor 615. These valves connect supply conduit 806 to
distributor pipes 558 and 559 and conduits 540 and 541 to apply
hydraulic pressure to the upper ends of the cylinders 527 and 528.
This moves the pistons 544 and 551 to project the piston rods 543
and 550 downwardly to bring the valve member 568 into sealing
engagement with the valve seat 579 to close the passageway therein.
As the pistons move downwardly, fluid in the lower ends of the
cylinders 527 and 528 is exhausted through conduits 538 and 539 and
distributor pipe 557 to the sump pipe 557 via valve 902. When
contact of the valve member 568 with the valve seat 579 has been
made and the piston rods have reached the lower limit of their
stroke, control members 547 and 552 carried by said piston rods act
to close switches 546 and 554 carried by cylinders 527 and 528,
which complete a common line 907 from service line 810 to open the
exhaust sides of the valves 903 and 904.
The switch 636 also completes a circuit by line 910 to the timing
relay 911 which controls the resistance unit 632 to change conveyor
615 to its high speed. The relay 911 monitors an interval of time
during which the platen is carried outwardly through the sealing
compartment V4 at high speed and removed from the apparatus. Branch
line 912 activates a timing relay 913 to monitor a short interval
of time after which it deenergizes the clutch 627 and enengizes the
brake 631 to halt operation of the conveyot 615.
With the sealing compartment V3 being closed, a circuit by line 915
energizes a timing relay 916 to create a line 918 to the valve 654
in the conduit 653 to the baffling chamber 655 that acts to relieve
the vacuum in the discharge chamber D preparatory to opening of the
sealing compartment V4. The relay 916 then completes the circuit of
line 920 to a valve 922 for operation of the cylinders 727 and 728,
valve 923 and 924 also cooperating to produce operation of said
cylinders. Presently closed switches 746 and 754 have made the
circuit of line 925 to the exhaust sides of valves 923 and 924 for
exhaust of hydraulic fluid from the upper ends of the cylinders 727
and 728.
When hydraulic pressure from supply conduit 806 is connected
through the valve 922 to the distributor pipe 757 and conduit 738
and 739, pressure will be introduced into the lower ends of the
cylinders 727 and 728. The pistons 744 and 751 are forced upwardly
by said pressure to open the valve 768 in the sealing compartment
V4. Hydraulic fluid is released from the upper ends of the
cylinders through conduits 740 and 741 and the exhaust sides of
valves 923 and 924 to the sump pipe 807. Also, when the sealing
compartment V4 is fully open and the piston rods 743 and 750 reach
the upper limit of their stroke, switches 745 and 753 are closed to
complete line 926 to the exhaust side of the valve 922.
By lines 915 and 927 from switch 636, a circuit is completed to a
timing relay 928 which is connected by line 929 to the valve 666 in
the conduit 665 of the warm-air purge system. The relay acts to
open the valve 666, while the sealing compartment V4 is open for
removal of the platen. When the relay times out after subsequent
closing of the sealing compartment, the valve 66 is again
closed.
When the platen and coated substrate are to be removed from the
discharge chamber D, the relay 912 times out to deenergize the
resistance unit 632 and brake 631 while reenergizing the clutch
627. The conveyor 615 is thus restarted to move the platen onto and
over the unloading platform 720 on the roller devices to a suitable
receiving apparatus or conveyor. The switch 725 is then closed to
complete a circuit by line 930 through the solenoid 931 of a
spring-biased relay switch 932 to service line 814. Before the
switch 636 is released by the platen, a branch line 935 from line
915 energizes a timing relay 936. While the solenoid 931 is
energized, the pair of contacts 940 are disengaged to break the
circuit of lines 941 and 942 to the valves 923 and 924. The relay
936 monitors a period of time for the platen to clear the platform
and then activates line 941. At this time, the switch 725 has
dropped open and the circuit of line 930 is broken. The contacts
940 again engage to connect line 941 to lines 942 and 943. Valves
923 and 924 transmit hydraulic fluid from supply conduit 806 to
distributor pipes 758 and 759 and conduits 740 and 741 to the upper
ends of the cylinders 727 and 728. The piston rods 743 and 750 now
move downwardly to bring the valve member 768 into sealing
engagement with the valve seat 779 of the sealing compartment V4.
When the valve has been closed and the piston rods reach the lower
limit of their movement, the control members 747 and 752 carried
thereby close switches 746 and 754 on cylinders 727 and 728 which
completes the common line 925 to the exhaust side of the valve 923
and 924.
When the sealing compartment V4 is closed, the timing relay 936
initially creates a circuit by line 945 to open the valve 646 in
the conduit 645 and connect the discharge chamber D to the main
vacuum system unil the desired pressure has been attained in said
chamber. The vacuous condition in the discharge chamber increases
the effectiveness of the sealing engagement between the valve
members 568 and 768 and valve seats 579 and 779. When the required
pressure in the discharge chamber is reached, the relay 936
completes line 946 to open valve 650 in the conduit 649 of the
backfill unit 648 to discharge a relatively small quantity of an
inert gas into the said chamber. Raising of the pressure in the
discharge chamber is followed by creation of a line 947 to open the
valve 442 to place the discharge chamber in communication with the
coating chamber by way of conduits 660, 262, 440 and 441, the
oppositely disposed valve 261 being closed. This places chambers C
and D in an equalized vacuous condition preparatory to reopening of
the sealing compartment V3.
The timing relay 916 then completes the circuit of line 950 through
valve 902 to connect the supply conduit 806 to the distributor pipe
557 and conduits 538 and 539 to the lower ends of the cylinders 527
and 528. At this time, switches 546 and 554 are closed to complete
the line 907 to open the exhaust sides of the valve 903 and 904.
Hydraulic pressure in the upper ends of the cylinders is relieved
through conduits 558 and 559, conduits 540 and 541 and the exhaust
sides of the valve 903 and 904 to the sump pipe 807. When the
sealing compartment V3 is fully open and the piston rods 543 and
550 of the pistons in said cylinders reach the upper limit of their
stroke, the switches 545 and 553 are closed to complete the circuit
of line 906 to the exhaust side of the valve 902.
The above detailed description covers one complete cycle of
operations of the apparatus beginning with the introduction of the
platen P and substrate S to be coated into the first sealing
compartment V1 and discharge of the platen and coated substrate
from the fourth sealing compartment V4. When the cycle of
operations has been completed the sealing compartments are in the
same relative positions as they were at the beginning of the cycle.
Thus, the sealing compartment V1 is open, sealing compartment V2
closed, sealing compartment V3 open and sealing compartment V4
closed.
It will be understood, of course, that while the form of the
invention herein shown and described constitutes a preferred
embodiment of the invention, it is not intended to illustrate all
possible form of the invention. It will also be understood that the
words used are words of description rather than of limitation and
that various changes may be made without departing from the spirit
and scope of the invention herein disclosed.
* * * * *