September 22, 2022 |
DATA CENTER CONTROL HIERARCHY FOR NEURAL NETWORKS INTEGRATION
Abstract
A data center system includes a load section having an array of
electronic racks, a thermal management system, and a power flow
optimizer. The power flow optimizer is configured to determine a
load power requirement of the load section based on workload data
of the electronic racks and thermal data of the thermal management
system. The data center system further includes a resource section
having a number of power sources to provide power to the load
section. The resource section includes a resource controller to
configure and select at least some of the power sources to provide
power to the load section based on the load power requirement
provided by the power flow optimizer. The power flow optimizer
includes a power flow neural network (NN) model to predict, based
on the thermal data and the load data, an amount of power that IT
clusters and the thermal management system need.
Inventors: |
GAO; Tianyi; (Sunnyvale,
CA) |
|
Applicant: |
Name |
City |
State |
Country |
Type |
BAIDU USA LLC |
Sunnyvale |
CA |
US |
|
|
Family ID: |
1000006575812 |
Appl. No.: |
17/205360 |
Filed: |
March 18, 2021 |
Current U.S.
Class: |
1/1 |
Current CPC
Class: |
G06F 1/206 20130101;
H05K 7/20836 20130101; G05B 13/027 20130101; G06F 1/26 20130101;
G01K 1/026 20130101 |
International
Class: |
G06F 1/26 20060101
G06F001/26; H05K 7/20 20060101 H05K007/20; G06F 1/20 20060101
G06F001/20; G05B 13/02 20060101 G05B013/02; G01K 1/02 20060101
G01K001/02 |
Claims
1. A data center system, comprising: a load section having a
plurality of electronic racks, a thermal management system, and a
power flow optimizer, wherein each of the electronic racks includes
a plurality of servers and each server containing one or more
electronic devices, wherein the thermal management system is
configured to provide cooling and/or heating to the electronic
devices, and wherein the power flow optimizer is configured to
determine a load power requirement of the load section based on
thermal data of the thermal management system and load data of the
electronic racks; and a resource section having a plurality of
power sources to provide power to the load section, wherein the
resource section includes a resource controller to configure and
select at least some of the power sources to provide power to the
load section based on the load power requirement provided by the
power flow optimizer, wherein the power flow optimizer includes a
power flow neural network (NN) model to predict, based on the
thermal data and the load data, an amount of power that the
electronic racks and the thermal management system need in order to
satisfy a thermal requirement and data processing load requirement
of the load section.
2. The data center system of claim 1, further comprising an
intermediate section coupled between the resource section and the
load section, wherein the intermediate section includes a power bus
to distribute power from the resource section to the load section
and other subsystems.
3. The data center system of claim 2, wherein the intermediate
section further comprises: a subsystem load detector coupled to the
other subsystems to determine a subsystem power requirement; and a
central controller coupled to the power flow optimizer of the load
section and the subsystem load detector to determine a total power
requirement based on the subsystem power requirement and the load
power requirement, wherein the total power requirement is utilized
by the resource controller to configure and select at least some of
the power sources.
4. The data center system of claim 3, wherein the load section
further comprises: one or more temperature sensors disposed within
each server to measure temperatures of the electronic devices; and
a workload detector configured to determine a workload of each of
the servers, wherein the power flow NN model is to infer the load
power requirement based on the temperatures and the workload of
each of the servers.
5. The data center system of claim 4, wherein the load section
further comprises a power dispatch controller coupled to a power
flow controller to proportionally distribute the power received
from the resource section to the thermal management system and the
servers based on the load power requirement received from the power
flow controller.
6. The data center system of claim 5, wherein the load power
requirement includes information regarding how to dispatch the
power to the thermal management system and the servers, and wherein
the power dispatch controller is configured to output total power
needed by the load section to the central controller.
7. The data center system of claim 3, wherein the resource section
comprises a resource optimizer to receive the total power
requirement from the central controller to generate power source
configuration information, wherein the resource controller is
configured to configure the power sources based on the power source
configuration information.
8. The data center system of claim 7, wherein the resource
optimizer comprises an NN model to determine the power source
configuration information based on total power needed.
9. The data center system of claim 7, wherein the power source
configuration information comprises information specifying an
amount of power to be provided by each of the plurality of power
sources.
10. The data center system of claim 7, wherein the plurality of
power sources comprises a utility power source, a photovoltaic (PV)
power source, and a battery power source.
11. The data center system of claim 3, wherein the central
controller comprises an NN model to infer total power needed based
on the load power requirement and the subsystem power
requirement.
12. The data center system of claim 2, wherein the data center
system is a first data center subsystem of a plurality of data
center subsystems, and wherein a power bus of the intermediate
section is coupled to a power bus of an intermediate section of a
second data center subsystem of the plurality of data center
subsystems.
13. The data center system of claim 12, wherein a central
controller is shared by the first data center subsystem and the
second data center subsystem.
14. The data center system of claim 12, wherein the plurality of
data center subsystems is a first data center cluster of a
plurality of data center clusters.
15. The data center system of claim 14, wherein each of the data
center clusters is controlled by a respective cluster controller,
and wherein a central controller is shared by the plurality of data
center clusters.
16. A method for managing a data center system, the method
comprising: determining, using a power flow optimizer, a load power
requirement of a load section having a plurality of electronic
racks, a thermal management system based on thermal data of the
thermal management system and load data of the electronic racks,
wherein each of the electronic racks includes a plurality of
servers and each server containing one or more electronic devices,
wherein the thermal management system is configured to provide
cooling and/or heating to the electronic devices; and configuring
and selecting, by a resource controller of a resource section
having a plurality of power sources to provide power to the load
section, at least some of the power sources to provide power to the
load section based on the load power requirement provided by the
power flow optimizer, wherein the power flow optimizer includes a
power flow neural network (NN) model to predict, based on the
thermal data and the load data, an amount of power that the
electronic racks and the thermal management system need in order to
satisfy a thermal requirement and data processing load requirement
of the load section.
17. The method of claim 16, wherein the data center system further
comprises an intermediate section coupled between the resource
section and the load section, wherein the intermediate section
includes a power bus to distribute power from the resource section
to the load section and other subsystems.
18. The method of claim 17, further comprising: determining a
subsystem power requirement using a subsystem load detector coupled
to the other subsystems; and determining a total power requirement
based on the subsystem power requirement and the load power
requirement using a central controller coupled to the power flow
optimizer of the load section and the subsystem load detector,
wherein the total power requirement is utilized by the resource
controller to configure and select at least some of the power
sources.
19. The method of claim 18, further comprising: measuring
temperatures of the electronic devices using one or more
temperature sensors disposed within each server; and determining a
workload of each of the servers using a workload detector, wherein
the power flow NN model is to infer the load power requirement
based on the temperatures and the workload of each of the
servers.
20. The method of claim 19, further comprising proportionally
distributing, using a power dispatch controller coupled to a power
flow controller, the power received from the resource section to
the thermal management system and the servers based on the load
power requirement received from the power flow controller.
Description
FIELD OF THE INVENTION
[0001] Embodiments of the present invention relate generally to
data center systems. More particularly, embodiments of the
invention relate to control architecture for data center
systems.
BACKGROUND
[0002] Given the fast development of AI (artificial intelligence),
big data, edge computing and so on, the requirement on data centers
and IT (information technology) clusters is becoming more and more
challenging. The challenge is not only the amount of the data
center and the servers need to be deployed are dramatically
increasing, but also the variations from different types of
workload requirements. These requirements are the main driver for
the data center fast development. However, the challenge requires
the data centers to be able to accommodate the workload variations.
Since the workload variations directly correlate to the IT server
diversities, what is more challenging is that energy efficiency is
always one of the requirements for data center and IT clusters.
Energy efficiency is not only correlated to the power consumption
and Opex, but more importantly fulfill environmental and power
usage regulations.
[0003] Another challenge is that the control design for the data
centers are complicated. Since there are completely different areas
of control technologies based for different systems, and they are
also closely coupled to each other during normal operations. It is
important to joint them together organically.
[0004] AI and ML (machine learning) technologies will sooner or
later become a key tool and technique for data centers and IT
clusters. It will bring full impact on data centers, including
design, building, deployment, and operation. It may bring multiple
benefits to the data center intelligence control. The current
challenge is that there is a tremendous amount of the data
generated by the data center. It is expensive and time consuming to
complete a model training and tuning for a cluster. Given the
nature of the data center system, a well-trained model based on one
cluster may work for this cluster well. However, it may not perform
well in another cluster, or significantly retraining may need. It
might be functioning for another cluster which are identical but
coupled in different systems (e.g., cooling and power).
[0005] The conventional solution for designing data center control
includes separate modules, such as control modules for cooling
systems, control modules for power systems, control modules for IT,
and maybe varies of modules for IT control. All these control
modules may not fully integrate to achieve a joint design. The
shortfall is that it is extremely complicated to integrated them
organically and operated them as one complete system. Overall, the
convention solution lacks scalability and technology
reusability.
BRIEF DESCRIPTION OF THE DRAWINGS
[0006] Embodiments of the invention are illustrated by way of
example and not limitation in the figures of the accompanying
drawings in which like references indicate similar elements.
[0007] FIG. 1 is a block diagram illustrating an overall
architecture of a data center system according to one
embodiment.
[0008] FIG. 2 is a flow diagram illustrating a process of a load
section of a data center system according to one embodiment.
[0009] FIG. 3 is a flow diagram illustrating a process of managing
power sources according to one embodiment.
[0010] FIG. 4 is a flow diagram illustrating a process of operating
an intermediate level according to one embodiment.
[0011] FIG. 5 shows the overall three levels control hierarchy
design and operation method according to one embodiment.
[0012] FIG. 6 shows a larger scale of the system with multiple
sub-systems interconnected with each other according to one
embodiment.
[0013] FIG. 7 is a block diagram illustrating a multi-cluster
design of the power system according to one embodiment.
[0014] FIG. 8 is a flow diagram illustrating a process of managing
power for a data center according to one embodiment.
DETAILED DESCRIPTION
[0015] Various embodiments and aspects of the inventions will be
described with reference to details discussed below, and the
accompanying drawings will illustrate the various embodiments. The
following description and drawings are illustrative of the
invention and are not to be construed as limiting the invention.
Numerous specific details are described to provide a thorough
understanding of various embodiments of the present invention.
However, in certain instances, well-known or conventional details
are not described in order to provide a concise discussion of
embodiments of the present inventions.
[0016] Reference in the specification to "one embodiment" or "an
embodiment" means that a particular feature, structure, or
characteristic described in conjunction with the embodiment can be
included in at least one embodiment of the invention. The
appearances of the phrase "in one embodiment" in various places in
the specification do not necessarily all refer to the same
embodiment.
[0017] Embodiments of the disclosure are related to a control
hierarchy design for data centers. First of all, the system design
is introduced as well as the control flow. In this part a
high-level description of the main components in the system is
provided, including the electrical, mechanical and IT components
and the interconnection and interconnection among them in the whole
system. Then the control flow is introduced to present the overall
system management. There are three levels in the system, which are
load level, source level, and intermediate level. In the second
part, the design and control flow of each level is introduced to
provide a detailed view of the levels. The input/output is given to
show the control logic in each level. This aims to provide
decoupled design on the control while still keeping the overall
system jointed as an organic one. An optimizer is used in
combination with each control for assisting implementing the AI/ML
models. Detailed control location and function, as well as
operation design for different levels are introduced.
[0018] According to some embodiments, a data center system includes
a load section having an array of electronic racks, a thermal
management system, and a power flow optimizer. Each of the
electronic racks includes a stack of servers and each server
contains one or more electronic devices. The thermal management
system is configured to provide cooling and/or heating to the
electronic devices. The power flow optimizer is configured to
determine a load power requirement of the load section based on
thermal data of the thermal management system and load data of the
electronic racks. The data center system further includes a
resource section having a number of power sources to provide power
to the load section. The resource section includes a resource
controller to configure and select at least some of the power
sources to provide power to the load section based on the load
power requirement provided by the power flow optimizer. The power
flow optimizer includes a power flow neural network (NN) model to
predict, based on the thermal data and the load data, an amount of
power that the electronic racks and the thermal management system
(the corresponding load side) need in order to satisfy a thermal
requirement and data processing load requirement of the load
section.
[0019] In one embodiment, the date center system further includes
an intermediate section coupled between the resource section and
the load section, where the intermediate section includes a power
bus to distribute power from the resource section to the load
section and other subsystems. The intermediate section further
includes a subsystem load detector coupled to the other subsystems
to determine a subsystem power requirement and a central controller
coupled to the power flow optimizer of the load section and the
subsystem load detector to determine a total power requirement
based on the subsystem power requirement and the load power
requirement. The total power requirement is utilized by the
resource controller to configure and select at least some of the
power sources.
[0020] In one embodiment, the load section further comprises one or
more temperature sensors disposed within each server to measure
temperatures of the electronic devices and a workload detector
configured to determine a workload of each of the servers. The
power flow NN model is to infer the load power requirement based on
the temperatures and the workload of each of the servers. The load
section further comprises a power dispatch controller coupled to
the power flow controller to proportionally distribute the power
received from the resource section to the thermal management system
and the servers based on the load power requirement received from
the power flow controller.
[0021] In one embodiment, the load power requirement includes
information regarding how to dispatch the power to the thermal
management system and the servers. The power dispatch controller is
configured to output total power needed by the load section to the
central controller. The resource section comprises a resource
optimizer to receive the power requirement from the central
controller to generate power source configuration information. The
resource controller is configured to configure the power sources
based on the power source configuration information. In one
embodiment, the power optimization on the load side, which includes
a NN model, may be developed to achieve an optimized computing
efficiency.
[0022] In one embodiment, the resource optimizer comprises an NN
model to determine the power source configuration information based
on the total power needed. The power source configuration
information includes information specifying an amount of power to
be provided by each of the plurality of power sources. The power
sources include a utility power source, a photovoltaic (PV) power
source, and a battery power source. The central controller includes
an NN model to infer the total power needed based on the load power
requirement and the subsystem power requirement. The data center
system of claim 1, wherein the data center system is a first data
center subsystem of a plurality of data center subsystems. The
power bus of the intermediate section is coupled to a power bus of
an intermediate section of a second data center subsystem of the
data center subsystems.
[0023] In one embodiment, the central controller is shared by the
first data center subsystem and the second data center subsystem.
The data center subsystems are part of a first data center cluster
of the data center clusters. Each of the data center clusters is
controlled by a respective cluster controller, and wherein the
central controller is shared by the plurality of data center
clusters.
[0024] FIG. 1 is a block diagram illustrating an overall
architecture of a data center system according to one embodiment.
Referring to FIG. 1, data center configuration or architecture 100
may represent any of data centers, where a data center may include
one or more arrays of electronic racks. Each electronic rack
include one or more server chassis arranged in a stack. Each server
chassis includes one or more servers operating therein. Each server
may include one or more processors, a memory, a storage device, and
a network interface, etc., collectively referred to as IT
components. In addition, a data center may further include a
thermal management system to provide cooling to the IT components
that generate heat during operations. Data center cooling may
include liquid cooling and/or air cooling.
[0025] In one embodiment, data center architecture 100 includes a
resource section or level 101, an intermediate section or level
102, and a load section or level 103. Load level 103 includes IT
load 112 and thermal management system 113. IT load 112 may
represent one or more electronic racks, each containing one or more
servers therein. Thermal management system 113 may provide liquid
cooling and/or air cooling to the IT components of the servers. In
one embodiment, some of the IT components (e.g., processors) may be
attached to a cold plate for liquid cooling and/or attached to a
heatsink for air cooling. In addition, load level 103 further
includes one or more temperature sensors 114 to measure the
temperatures at different locations within the load level (e.g.,
surface of IT components, cooling liquid temperature, ambient
temperature, etc.). Load level 103 further includes a load detector
115 to determine or detect the workload of load 112, which may be
proportional to the power consumption of the load 112.
[0026] The load level 103 includes the IT load 112 as well as all
levels of the thermal management 113 from internal of the servers
such as cold plates, TEC (thermoelectric cooling), to the full
system level. In this level, the key connection is the temperature,
which is measured by one or more temperature sensors 114. This
means the temperature is used for connecting the overall system
between the IT and cooling. However, another key input in this
level is the workload, which may be determined or detected by load
detector 115. Therefore, the workload is also used in designing
this level of control. The temperature is considered as a dependent
factor of the load however, it is also strongly correlated to the
thermal system. In one embodiment, the load detector 115 is
connected to switching logic disposed on servers and/or electronic
racks (e.g., motherboards) to determine the workload and traffic
through the network interface. In one embodiment, the load detector
115 is connected to the individual BMC (board management
controller) of the server chassis to determine the workload of
various components, such as processor usages, etc. In some
architectures, there is a load balancing server or resource manager
to dispatch workload to individual servers, then the load detector
115 can receive information concerning the distributed workload
from these components.
[0027] Furthermore, load level 103 includes a power flow optimizer
111, which may be implemented as a processor, a micro controller,
an FPGA (field programmable gate array), or an ASIC (application
specific integrated circuit). The power flow optimizer 111 is
configured to determine the load power requirement for the load
level 103 based on the thermal data (e.g., temperature) provided by
temperature sensors 114 and load data provided by load detector
115. In one embodiment, power flow optimizer 111 includes a
machine-learning model such as a neural network (NN) model to
predict or determine the load power requirement based on the
temperature data and the load data. The load power requirement
represents an amount of power that load 112 and the thermal
management system 113 need in order to satisfy the thermal
requirement (e.g., operating below a predetermined temperature) and
data processing load requirement of load 112. The NN model may be
trained using a large amount of thermal data and load data of a
variety of loads at different points in time. The NN model is
configured to infer the load power requirement based on the
temperature data and the workload of the servers. In one
embodiment, the optimized power requirement produced by power flow
optimizer 111 includes the optimized power requirement of each of
the individual server (i.e., at a server level) and/or the
associated thermal management system.
[0028] In one embodiment, load level 103 (also referred to as level
0) further includes dispatch controller 110 to receive the load
power requirement information from power flow optimizer 111. The
power requirement information may include information concerning
how to dispatch or distribute power to the load 112 and thermal
system 113, where power is received from resource level 101 via
intermediate level 102, which will be described in details further
below. Dispatch controller 110 may control or configure switching
logic (e.g., S4, S5), as indicated by the dash lines, to control
and distribute proper power to load 112 and thermal system 113
based on the load power requirement information provided by power
flow optimizer 111. Dispatch controller 110 further provide load
power requirement information to central controller 109 of
intermediate level 102.
[0029] In load level 103, the temperature is used as a key
parameter for the load and the thermal systems. The load detection
performed by load detector 115 plays a significantly role. Load
detector 115 (or power flow optimizer 111) intakes the actual
workload and translates it to the actual power needed for the
workload. In addition, in a more advanced architecture, the load
detection provides an optimized workload distribution strategy as
well. Since the load does not directly reflect the thermal system,
therefore, temperature is used for connecting the load and the
thermal systems. The temperature and load detection are used as
input for the power flow optimizer 111. The NN model of power flow
optimizer 111 only inputs these two parameters and generate an
output representing the load power requirement.
[0030] The NN model may be trained using a set of training data.
Once the training set of data are well converged such as
temperature ranges and the load power ranges, the optimizer 111 can
more accurately provide the power dispatch on this level such as
the cooling power to thermal system 113 and the load power to load
112. Note that the load power to load 112 is different from the
computing power, since the load power to the load 112 may be larger
than the computing power due to the power loss and power leakage.
The thermal management may impact on the difference, so that the
corresponding required power to the thermal management system 113
varies. All these complicated strategies are realized by the NN
model in the power flow optimizer 111. However, the only output for
the dispatch controller is the total load power needed.
[0031] FIG. 2 is a flow diagram illustrating a process of a load
section of a data center system according to one embodiment.
Process 200 may be performed by load level 103 of FIG. 1. Referring
to FIG. 2, at block 201, load detector 115 determine the workload
of load 112 and may convert the load data into power requirement.
In addition, temperature sensor 114 measure the temperature
associated with load 112. At block 202, the temperature data and
the load data are fed into an input of the NN model of power flow
optimizer 111, which results in the optimized power requirement
dispatch to the thermal system and the load. At block 203, in
response to the load power requirement, dispatch controller 110
controls the switching logic to provide proper power to the thermal
system and the load. Note that the term of "load power requirement"
refers to the power requirement of load section or load level 103,
including the power requirement of load 112 and thermal management
system 113. At block 204, the dispatch controller 110 outputs a
request the load power to central controller 109.
[0032] Referring back to FIG. 1, in one embodiment, resource
section or resource level 101 includes a variety of power or energy
sources, such as utility power source 104, photovoltaic (PV) power
source 105, storage energy 107 (e.g., batteries), and other energy
sources 106. Utility power source 104 provides alternating current
(AC) power from a utility power grid (e.g., provided by a public
utility company), which may be converted to direct current (DC)
power using an AC-to-DC (AC/DC) converter. PV power source 105 may
be a DC power source, which can be converted to a different DC
power voltage using a DC-to-DC (DC/DC) converter. Storage power
source 107 may be charged by any of power sources 104-106. When the
power provided by power sources 104-106 is insufficient, storage
power source 107 may be discharged to provide power to load section
103.
[0033] In one embodiment, resource level 101 includes resource
controller 116 to configure and select at least some of the power
sources 104-107 to provide power to the load level 103 based on at
least the lower power requirement. Resource controller 116 controls
the switching logic, as indicated by the dash lines, to configure
and select the power sources.
[0034] In one embodiment, resource level 101 further includes a
resource optimizer 108 to optimize and generate power source
configuration information. The power source configuration
information includes selection information for selecting at least
some of the power sources 104-107. The power source configuration
information is utilized by resource controller 116 to control the
power sources 104-107. In one embodiment, resource optimizer 108
includes an NN model to determine the power source configuration
information based on the total power required. The power source
configuration information may include information indicating an
amount of power to be provided by each of the power sources
104-107.
[0035] In the resource level 101, it is shown that this level
mainly designed for the energy sources. It can be seen that there
are several different types of sources including utility 104, PV
source 105 as well as other energy sources 106. In addition, backup
energy source or energy storage system 107 is used in this level.
The resource controller 116 is used for controlling the switching
logic (S1, S2, S3) for connecting the power to the main source bus.
The resource optimizer 108 is used to provide dispatch strategy and
communicated with the central controller 109. In one embodiment,
resource optimizer 108 includes an NN model for optimizing the
power source allocation based on the total power needed, as well as
the existing power conditions and availabilities from each power
sources. The only input fed to the resource optimizer 108 is the
total power needed. All the other variations, which are the
different power availabilities and conditions, are also input, but
may not need to considered as variables.
[0036] At this level the only input from external is the total
power needed. It can be an actual power in kW or kWh or a
nondimensional value representing the power need. The resource
optimizer 108 is integrated with AI/ML models to provide the most
efficient inference on detailed power dispatch. The dispatch
strategy is delivered to the resource controller 116 and the
resource controller 116 manages the power input from utility, PV
system, other renewable power source, battery and so on. Therefore,
it can be seen that this level is highly decoupled from the
others.
[0037] Since the total power is only input. This is a beneficial to
the NN model since the variations of inputs are only total power,
which can be easily covered by the training set of data. On the
source side, since the power architecture is fixed in modules. This
means even though there may be a power upgrade needed, the full
power architecture can be doubled or tripled by adding one or two
identical modules, respectively, which does not impact on the
physical behavior of the module. Therefore, the optimizer model
remains valid without too much NN training. On the hardware
portion, the power dispatch strategy provided by the resource
optimizer 108 is controlled by the resource controller 116 to
connect the power sources to the main source bus.
[0038] FIG. 3 is a flow diagram illustrating a process of managing
power sources according to one embodiment. Process 300 may be
performed by resource level 101 of FIG. 1. Referring to FIG. 3, at
block 301, resource optimizer 108 receives the total power needed
from central controller 109, where the total power needed
represents the total power that will be consumed by load 112,
thermal management system 113, and other subsystems 118.
[0039] Subsystems 118 can include another set of load similar to
load level 103, for example, as shown in FIG. 6. The intermediate
level 102 will manage the power distribution to other subsystems.
At block 302, the resource optimizer 108 determines the current
status of the power sources 104-107, including which of the power
sources are available and their respective capacity, etc. Note that
at block 302, these are also as inputs to the optimizer, but they
are not considered as the external variable inputs. Resource
optimizer 108 may invoke resource controller 116 to retrieve or
determine the status of the power sources. At block 303, resource
optimizer 108 calculates the optimized power needed from different
power sources 104-107. In one embodiment, resource optimizer 108
includes an NN model to determine the optimized power needed based
on the total power needed and the status of the power sources
104-107. At block 304, resource controller 116 receives the
optimized power needed from resource optimizer 108 and configures
and selects at least some of the power sources 104-107 accordingly,
which provides proper power to intermediate level 102 at block 305.
Resource level 101 is also referred to as level 1.
[0040] Referring back to FIG. 1, in one embodiment, intermediate
level 102 includes a power bus or interconnect 117 coupled between
an output of resource level 101 and an input of load level 103 to
transfer the power from resource level 101 to load level 103. In
addition, power bus 117 also provide power to other subsystems 118
other than load 112 and thermal management system 113. Intermediate
level 102 further includes a subsystem load detector 119 (also
referred to as an output load detector) and a central controller
109. Subsystem load detector 119 is configured to determine the
power consumption of the subsystem 118 based on their workload.
Central controller 109 is coupled to subsystem load detector and
dispatch controller 110 to receive the subsystem power requirement
and the load power requirement of load level 103. In one
embodiment, central controller 109 includes an NN model to infer
the total power needed based on the power requirements provided by
subsystem load detector 119 and dispatch controller 110.
[0041] The intermediate level 102 mainly includes the power bus
which connects the output of the resource level 101 with the input
of the load level 103. There is a load detector or inter-system
resource dispatch detector is implemented. This is mainly for
inter-system power dispatching requirement. The output load
detector 119 used for providing the energy delivering to the load
to the central controller 109. The central controller 109 is an
independent controller which takes input from both the load level
power requirement from dispatch controller 110 other
sub-system/intersystem power requirement from output load detector
119, and sends the total power requirement to the resource level
101 and monitors the output power from the resource level 101.
Central controller 109 is configured to determine the total power
needed by the intermediate level 102 and load level 103. The
intermediate level 102 is also referred to as level 2.
[0042] This level is above the resource and load levels which are
level 0 and level 1. The central controller 109 intakes two power
inputs from the intra-system controller (e.g., dispatch controller
and power flow optimizer) or the intersystem power controller.
There can be multiple of system 100 of FIG. 1 and they are
interconnected. For example, a first subsystem is level 101 plus
level 103, and a second subsystem is another set of level 101 plus
level 103. A combination of these two subsystems is considered as
an intersystem, and connected by the intermediate level 102. The
intersystem controller receives power need from its own load level
103 and other subsystem's load level 103. In addition, the
intersystem controller receives the power output from its resource
level 101, which is provided by the Output load detector. It
provides the total power needed to the level 1. This is under the
circumstances that the current central controller 109 does not
react to the power requirement from other subsystems 118. One key
design here is that the central controller 109 may add the load
requirement from the other subsystems 118 together and then
delivered to the level 1 with an updated total power needed.
Another NN model is integrated with central controller 119 since
for inter-system power dispatching such as under the circumstances
as power outage, power failure, or system service or
maintenance.
[0043] FIG. 4 is a flow diagram illustrating a process of operating
an intermediate level according to one embodiment. Process 400 may
be performed by intermediate level 102. Referring to FIG. 4, at
block 401, central controller 109 receives the load power
requirement from dispatch controller 110. At block 402, central
controller 109 receives power requirement by the other subsystems
from the output load detector 119. Output load detector 119
receives power requirement by the other subsystems, and output load
detector 119 provides how much power is provided by the resource
level 103. At block 403, the NN model of central controller 109
determines the total power needed and the inter-system level
dispatch strategy. At block 404, central controller 109 outputs the
total power needed to resource optimizer 108. For the intermediate
level 102, it connects with each own source and power, but also it
receives power needed from other subsystems.
[0044] FIG. 5 shows the overall three levels control hierarchy
design and operation method according to one embodiment. The key
connection is the power or energy. The controllers are integrated
with the optimizers, and the optimizers are embedded with NN
models. The input and output of each controller are data
representing power. The detailed power dispatch logic and principle
do not impact among different levels. It can be seen that the
variations of input in each layer is segregated among the layers
and taken care within each layer. This is how the decoupling is
being realized while the overall system is function as an organic
unity. Note that each of controllers 108-111 and 116 may be
implemented as a processor, microcontroller, an ASIC, or an FPGA,
and each of them may include an NN model embedded therein.
[0045] In one embodiment, the data center system as shown in FIG. 1
is one of the data center subsystems in a cluster. FIG. 6 shows a
larger scale of the system with multiple modules or it can be
understood as multiple sub-systems interconnected with each other
according to one embodiment. Referring to FIG. 6, the data center
system includes a subsystem 100A and a subsystem 100B. Although
there are only two subsystems shown, more subsystems may be
implemented. Each of the subsystems 100A-100B may represent data
center system 100 as shown in FIG. 1. Each of subsystems 100A-100B
includes their respective controllers (108A-B, 109A-B, 110A-B,
111A-B, and 116A-B) as described above with respect to FIG. 1.
[0046] Each of the subsystems 100A-100B is identical as shown in
FIG. 1. However, they are connected on the intermediate level 102
via an intersystem bus 150. This is why additional output power
controller and power detector are used for each of the central
controllers 109A-109B. In this example, central controllers
109A-109B are referred to as level 3 controllers. Even though there
are inter-system power dispatching needed and required. It does not
impact on the controllers or optimizers in level 0 (e.g., load
level 103) and, especially level 1 (e.g., resource level 101).
Since the only variation is the total power which already taken
into account in the NN models in the optimizers, this is the
benefit of the decoupling since there may be needed for future
upgrading by adding more and more sub-systems to the intersystem
bus 150. In some circumstances, each of the sub-systems may not be
identical. Even though the systems are in heterogeneous, the
individual optimizers still function properly. In one embodiment,
the central controller 1 and the central controller 2 are level 2
controllers at the intermediate level 102. The output power
controller 1 and output power controller 2 are level 3 controllers,
which are used for communicating and intersystem power dispatch.
This means that the output power controllers 1 and 2 only
communicate with the central controllers.
[0047] Note that output power controllers 1 and 2 each may
represent output load detector 119 of FIG. 1. Each power controller
is configured to receive power and/or load requirement from another
subsystem via intersystem bus 150. In addition, each power
controller can also provide the power and/or load requirement of
its own subsystem to another subsystem via intersystem bus 150.
Thus in this example, output power controllers 1 and 2 communicate
with each other within intermediate level 102. One subsystem may
provide power to another subsystem via intersystem bus 150.
[0048] FIG. 7 is a block diagram illustrating a multi-cluster
design of the power system according to one embodiment. Typically,
a data center may be hosted in one or more data center campuses.
Each campus may include one or more data center buildings. Each
building may host one or more clusters. Each cluster may include
one or more data center subsystems and each subsystem may include
various modules or units. In each model, there is one or more level
0 and level 1. Level 0 and level 1 are connected through the level
2. Level 2 is designed for connecting level 1 and level 2. A
cluster control is considered as a level 3 controller and the
higher tier one--central controller as shown is a level 4
controller.
[0049] In this example as shown in FIG. 7, there are two clusters
and each cluster includes two subsystems. As shown in each of the
modules, the numbers of load or numbers of resources can be
different and can be upgraded which does not impact on the any
other systems. Even though within each module, the upgrading or
variations in the level 1 and level 0 does not change the NN models
in each of the optimizers since it is upgrade by repeating the
identical infrastructures.
[0050] As an example, referring to FIG. 7, subsystem 1_1 maybe GPU
clusters and subsystem 1_2 maybe general computing clusters. Any
business model upgrading or business model variation will be only
responded by the dedicated modules. As another example, if there is
one more subsystem added to the cluster 1, even though a completely
new susystem 1_3 with new IT and power/cooling systems, it will
have its own level 0 and level 1 optimizers and control within its
module, and only connection is through the output controller 1_3.
At cluster level--level 3 as well as level 2, the impact is minimal
since they only communicate with the amount of power need and can
be dispatched.
[0051] Therefore, the corresponding NN models in these layers may
remain valid and no significant retraining needed. This design can
be understood as a container based solution, which means that the
corresponding control strategy and optimization NN are contained,
so they can be reuse for system expanding and upgrading through the
decoupling design. The control hierarchy enables the system variety
and diversity. In addition, it is benefit to optimize the power
efficiency, workload distribution design on different layers from
modules to the entire campus.
[0052] FIG. 8 is a flow diagram illustrating a process of managing
power for a data center according to one embodiment. Process 800
may be performed by processing logic which may include hardware,
software, or a combination thereof. Referring to FIG. 8, at block
801, a power flow optimizer determines a load power requirement of
a load section based on the thermal data of a thermal management
system and load data of electronic racks as a load. At block 802, a
subsystem load detector determines a subsystem power requirement of
one or more subsystems. At block 803, a central controller of an
intermediate section determines the total power needed based on the
load power requirement and subsystem power requirement. At block
804, a source controller configures and selects at least some of
the power sources based on the total power needed.
[0053] In the foregoing specification, embodiments of the invention
have been described with reference to specific exemplary
embodiments thereof. It will be evident that various modifications
may be made thereto without departing from the broader spirit and
scope of the invention as set forth in the following claims. The
specification and drawings are, accordingly, to be regarded in an
illustrative sense rather than a restrictive sense.
* * * * *