U.S. patent application number 16/756696 was filed with the patent office on 2020-08-06 for portable, modular equipment for installation of a multi-sports and/or multi-use area and method of installing a multi-sports and.
This patent application is currently assigned to Soccer Grass Assessoria e Empreendimentos Esportivos Ltda.. The applicant listed for this patent is Soccer Grass Assessoria e Empreendimentos Esportivos Ltda.. Invention is credited to Alessandro da Silva OLIVEIRA.
Application Number | 20200246679 16/756696 |
Document ID | / |
Family ID | 1000004815531 |
Filed Date | 2020-08-06 |
![](/patent/app/20200246679/US20200246679A1-20200806-D00000.png)
![](/patent/app/20200246679/US20200246679A1-20200806-D00001.png)
![](/patent/app/20200246679/US20200246679A1-20200806-D00002.png)
![](/patent/app/20200246679/US20200246679A1-20200806-D00003.png)
![](/patent/app/20200246679/US20200246679A1-20200806-D00004.png)
![](/patent/app/20200246679/US20200246679A1-20200806-D00005.png)
![](/patent/app/20200246679/US20200246679A1-20200806-D00006.png)
![](/patent/app/20200246679/US20200246679A1-20200806-D00007.png)
![](/patent/app/20200246679/US20200246679A1-20200806-D00008.png)
United States Patent
Application |
20200246679 |
Kind Code |
A1 |
OLIVEIRA; Alessandro da
Silva |
August 6, 2020 |
PORTABLE, MODULAR EQUIPMENT FOR INSTALLATION OF A MULTI-SPORTS
AND/OR MULTI-USE AREA AND METHOD OF INSTALLING A MULTI-SPORTS
AND/OR MULTI-USE AREA
Abstract
This invention deals with portable modular equipment for area
assembly multisport and/or multipurpose and method of setting up
multisport area and/or multipurpose, ideal for sports such as
soccer, volleyball, basketball, handball or other sports, as well
as physical, educational and recreational activities that primarily
aim at the production of knowledge related to
teaching/learning/leisure; the modular equipment (10) is completely
portable and conformed by one, preferably, two modules (20), each
of them to the format preferential use of a container (21) and able
to pack a set of parts structural (CP) that correspond to half of a
multisport/multipurpose area (AP); said set of pieces (CP) is
basically composed of a fencing bottom link (30A), two side fences
(30B), at least four modular bleachers (40), at least one access
structure (30C), accessories goal posts (60), volleyball nets (61)
or others, at least one self-contained set for generating lighting
(70) and Wi-Fi signal, synthetic grass or modular floor coverings
(GS), as well as components of mounting type connectors, screws and
others.
Inventors: |
OLIVEIRA; Alessandro da Silva;
(Sao Paulo, BR) |
|
Applicant: |
Name |
City |
State |
Country |
Type |
Soccer Grass Assessoria e Empreendimentos Esportivos Ltda. |
Brooklin, Sao Paulo |
|
BR |
|
|
Assignee: |
Soccer Grass Assessoria e
Empreendimentos Esportivos Ltda.
Brooklin, Sao Paulo
BR
|
Family ID: |
1000004815531 |
Appl. No.: |
16/756696 |
Filed: |
October 16, 2018 |
PCT Filed: |
October 16, 2018 |
PCT NO: |
PCT/BR2018/000064 |
371 Date: |
April 16, 2020 |
Current U.S.
Class: |
1/1 |
Current CPC
Class: |
A63B 2210/50 20130101;
E04H 3/126 20130101; A63B 2243/0037 20130101; E04B 2001/34389
20130101; A63B 2243/0095 20130101; E01C 13/08 20130101; A63B
2243/0025 20130101; A63C 19/00 20130101; A63B 2243/0033 20130101;
E04B 1/3445 20130101; E04H 3/14 20130101 |
International
Class: |
A63C 19/00 20060101
A63C019/00; E04B 1/344 20060101 E04B001/344; E04H 3/12 20060101
E04H003/12; E04H 3/14 20060101 E04H003/14; E01C 13/08 20060101
E01C013/08 |
Foreign Application Data
Date |
Code |
Application Number |
Oct 17, 2017 |
BR |
1020170223752 |
Claims
1. Modular portable equipment for the composition of a multisport
area and/or multipurpose (AP) area for practicing soccer,
volleyball, handball, basketball, among others or as a multipurpose
event, fairs, presentations several, among others; comprising
portable modular equipment (10) and conformed by one, preferably,
two modules (20), each of them to the preferred format of a
container (21) and able to pack a set of structural pieces (CP)
that correspond to half of a multisport/multipurpose area (AP);
said set of pieces (CP) comprising a fencing bottom link (30A), two
side fences (30B), at least four modular bleachers (40), at least
one access structure (30C), accessories goal posts (60), volleyball
nets (61) or others, at least one self-contained set for generating
lighting (70) and Wi-Fi signal, synthetic grass or modular floor
coverings (GS), as well as components of mounting type connectors,
screws and others.
2. The modular portable equipment according to claim 1, comprising
two transport modules (20) containing, respectively, a set of parts
(CP), when properly fixed to each other and arranged on planned
land, form, in the end, a multisport/multipurpose area (AP).
3. The modular portable equipment according to claim 1, wherein the
sets of parts (CP) and the transport modules (20), containers (21)
or others to be mounted on the ground without the need for civil
works, foundations or drilling the same.
4. The modular portable equipment according to claim 1, wherein the
bottom (30A), side (30B) and access (30C) fences comprise frames
formed by vertical metal tubular profiles (33) and horizontal (34)
joined by screens (T1).
5. The modular portable equipment according to claim 1 wherein each
bottom fencing (32) comprising a set of modules mounted
superimposed on one of the larger side walls (RV) and an upper wall
(RV1) of the transport module or container (20); this set of
modules is formed by two side modules (32a) in length (x2) that
corresponds to half the side of the transport module (20); each
module (32a) is articulated on a vertical edge (21c) of the
transport module (20), as well as an upper and central module
(32b), of length (x) preferably equal to the length (x) of the
longest side (RV) of said transport module (20); referred upper
module (32b) is fixed and articulated on the upper edge (21d) of
the module (20), wherein in each end of the upper and central
module (32b) two panels of fenced (32c), each having a length (x2)
that corresponds to half of the length (x) of the longest side (RV)
of the module (32b), wherein as soon as the side modules lower
(32a) and upper side modules (32c) are articulated and aligned in a
single vertical plane with the wall (RV) and upper central module
(32b), they are fixed to each other by means of stainless steel
connectors; and wherein the articulations between the modules
(32a), (32b) and (32c) in relation to the edges (21c) and (21d) are
obtained by means of conventional or similar hinges.
6. The modular portable equipment according to claim 1, wherein the
modules (32a), (32b) and (32c) that make up the bottom fence (30A),
when armed in relation to the transport module (20), in the form of
container (21) or other ballast, form the bottom wall of the area
multisport/multipurpose (AP).
7. The modular portable equipment according to claim 1, wherein
each transport module (20) acting as a ballast for the entire
structure formed by the bottom fencing (30A), side fences (30B) and
assembly of grandstand modules (40).
8. The modular portable equipment according to claim 1, wherein the
length of each side fencing corresponds to half (x3) of the
multisport and/or multipurpose area (40) and also include, close to
the connection with the bottom fencing (30A), an extreme upper
sector (S1) that enlarges the height (H) of the fencing (30B) in
order to allow the sector (S1) to be fixed at 90.degree. with the
end of the upper module (32c), while the end of the side fence
(30B) attaches to the end of the lower module (32a) of the bottom
fence (30A).
9. The modular portable equipment according to claim 1 wherein a
distance between the side fences (30B) is maintained as a means of
access to the multisport and/or multipurpose (AP) area, means
passable access that is protected by at least one protection panel
(30C) where the vertical profiles (33) have angular projections
(35) that extend to be fixed on the side fences (30B).
10. The modular portable equipment according to claim 1 wherein
each grandstand (40) is comprised of support structure formed by
vertical profiles (50) joined inferiorly by a wire structure (51)
in steps, over which seat plates are distributed (52) made of wood
or other resistant material; vertical profiles (50) have superior
angular projections (51) for fixation on the external faces of the
side fences (30B).
11. The modular portable equipment according to claim 1, comprising
lighting poles (70), preferably made with a device for capturing
solar energy (71) and lamps (72); the lighting poles can be
arranged on ballast bases (74) or can alternatively, be provided
with an articulated base (75) for assembly next to the side fences
(30B) and/or bottom (30A).
12. A method of assembling a multisport and/or multipurpose area
(AP) comprising: a) arranging transport modules (20) in the form of
containers (21) or other adequate ballast close to the bottom lines
(L1) of demarcation of the lawn/covering (GS) of the multisport
and/or multipurpose area; b) framing, through articulation of the
articulating panels (32a)/(32b)/(32c) in relation to the module
(20), securely positioning the articulating rods (35) of bracing
(FIGS. 3 to 3D); c) assembling the side fences (30B) in the bottom
fences (30A); d) mounting the bleachers (40) and the access panels
(30C) on the side parts (32B); e) installing lighting poles (70)
next to the stands (40); and f) assembling synthetic grass or
modular covering (GS).
Description
TECHNICAL FIELD OF THE INVENTION
[0001] This invention deals with portable modular equipment for
mounting multisport and/or multipurpose area and method of setting
up multisport area and/or multipurpose, ideal for sports such as
soccer, volleyball, basketball, handball or other sports, as well
as physical, educational and recreational activities that primarily
aim at the production of knowledge related to
teaching/learning/leisure; notably, said modular system is
understood by a pair of transport modules, for example containers
or other suitable means, where components of modular equipment are
stored, such as bleachers, screens or fences and lampposts with a
means of capturing solar energy, various equipment such as soccer
goalposts, masts, volleyball, basketball goal or other components,
and modular floor multisport, synthetic grass with velcro splices,
which makes it easy and quick Assembly; said transport modules or
containers, in addition to storing the components of the modular
system, serve as ballast for the assembly of multiple screen
panels, wire mesh or similar to compose the sides and bottoms that
surround the whole multisport/multipurpose area; the modular system
and other equipment they are 100% portable, easy to assemble, safe
and durable.
HISTORY OF THE INVENTION
[0002] As you know, for the construction of areas
sports/multipurpose it is necessary to follow international and
national standards that establish safety and performance criteria
for absorption capacity shock, lateral sliding of the feet, level
of vertical deformation of the floor, level of brightness and
reflection of the floor, modulus of elasticity, deflection
patterns, energy of recovery and reflection of the ball, and even
mention some prohibited chemical substances, such as German
standard--DINV18032/2 and European Union standard--EN
14904/2006.
[0003] Likewise, procedures are provided for establishing
conditions techniques to be obeyed in the execution of the works
and services, setting parameters minimum requirements for
materials, services and equipment.
[0004] Then, it appears that the construction of a multisport area
requires considerable public resources for the purchase of various
materials and the hiring of specialized manpower, as well as the
provision of public space for the construction of the multisport
area, thus becoming a long-term project which depends a lot on the
climatic conditions for its conclusion, leaving, many sometimes to
be carried out mainly in peripheral areas far from the urban
centers. For all the reasons listed above, you can see how
difficult it is to assemble a sports court in a short time or for
certain events.
[0005] Some models of portable sports courts are already known,
however, are ideal only for children's entertainment and used in
events recreational activities such as parties, school recreation
and the like. These portable areas are formed by inflatable floors
and fences, in order to present a certain practicality of
assembly/disassembly, as well as, may present soccer goal post
formed by a pair of inflatable walls connected by a net.
[0006] This portable field model can be seen in the document no.
FR2885375 which reveals a structure formed by inflatable tubes
arranged horizontally and stacked parallel to each other. Each tube
has a tape self-adhesive buckle/hook that cooperates with the top
and/or bottom tape the tube. Sets of frames are alternatively
arranged at the level of the tubes and in two shoring units. A
connecting rod runs through each set of frames to ensure the
connection and fixation of the two units with the tubes.
ANALYSIS OF THE STATE OF THE TECHNIQUE
[0007] In research carried out in specialized databases, documents
referring to the modular soccer field, such as the document no.
RU2396400 comprising a mobile platform with support frame intended
for to receive a soccer field on it. The platform rests on the base
of concrete fixed through rollers, sliding bearings and rails.
Rails interact by with rolling surfaces. Each bearing is installed
on the foundation of concrete. The rails are inverted and are
attached to the bottom of the support structure the mobile
platform.
[0008] The document of no. US2014123566 deals with a sports field
and a bleachers for spectators around. The field comprises a
plurality of gram modules supported on a fixed support base. The
gram modules are movable on the fixed support base, thus being able
to be removed from the support base fixed. The fixed support base
has an opening that constitutes access to a storage under the fixed
support base. The storage room is adapted for the storage of gram
modules. An elevator is arranged to move the grass modules through
the opening.
[0009] The documents mentioned in the paragraphs above, despite
belonging to the same field of application, do not present any of
the characteristics of the object now improved, thus ensuring that
it meets the legal requirements of patentability.
OBJECTIVES OF THE INVENTION
[0010] In order to present improvements to the consumer market, the
applicant developed a modular system and assembly method for area
composition multisport/multipurpose, such as a field for sports
such as soccer, volleyball, basketball, handball or others, as well
as physical, educational activities recreational activities aimed
primarily at the production of knowledge related to
teaching/learning/leisure, contributing to social development in
content that is inserted.
[0011] In addition, an innovative assembly method was also
developed that makes it possible to obtain the
multisport/multipurpose area quickly, that is, due to the
portability conditions of the equipment, with only 02 (two)
assemblers, it is possible to obtain, in 2 to 3 days, the entire
frame of the fences and bleachers and 02 more days to assemble the
synthetic grass or suitable floor.
Thus, in a practical and methodological way, a
multisport/multipurpose area is obtained which avoids impacts
generated by civil construction such as noise, visual, various
construction wastes, etc., and, consequently, the contribution to
the environment. A fully green deployment solution, contributing
significantly with the environment.
[0012] As noted, versatility, portability and practicality are
attested to proof of the speed and efficiency that this innovation
provides, because in very short time the portable equipment is
manufactured, installed and released for use, removing and
dissociating this equipment from any relation to the work of
conventional civil construction, not to mention that the problems
related to the climate is totally removed since, even with rain it
is possible to give construction of the multisport/multipurpose
area in question.
[0013] A very significant advantage is that the portable equipment
innovated to present a high quality construction standard, since
all parts are industrially produced from galvanized metal parts,
"MIG" welds, stainless steel screws and connections and other
industrial characteristics. THE parts are manufactured in a closed,
safe and protected environment, different from of what happens in
civil works, where parts are kept outside and subjected to weather
variations. Once the pieces of equipment have been produced in
question, they are packed and stored, ready for assembly at the
final destination, without any delay, as already mentioned as it
happens in civil works.
[0014] Another advantage is that the portable and sustainable
equipment can be assembled, disassembled and reassembled several
times in various areas chosen by customers--city halls; event
sponsors and others--thus enabling adaptation to neighborhoods and
event plans over the years.
[0015] Another advantage is that 85% of the equipment, at the end
of its useful life, is recycled, thus avoiding disturbances such as
pollution to the environment and even visual (does not turn into
garbage), moving further away from the problems and inconveniences
resulting from construction waste or even when there is a need to
cut down a block in masonry for the construction of other
works.
[0016] Mentioned modular equipment, 100% portable, includes at
least two transport modules of the interconnectable elements for
shaping the court multisport/multipurpose. These transport modules,
in a preferred option, are comprised of 40-foot containers, or
chests or compartments equivalent, which can be transported in
carts, trucks, boats appropriate vehicles or vehicles, thus
allowing these transport modules, with the entire modular structure
for obtaining the multisport/multipurpose area can be delivered
anywhere in the world.
[0017] Each transport module, hereinafter referred to as container
only, accommodates a set of pieces that corresponds to half a block
or area multisport/multipurpose, set of pieces that is basically
formed by frames tubular where the mesh or wire panels are fixed;
all frames tubes include connectors, such as hinges, that allow
mounting and disassembly of a back wall showing each side end
suitable for assembly of another frame with a screen that
corresponds, respectively, to half of a side wall of the
multisport/multipurpose area.
[0018] The lateral side of the fence is fixed to the external
central part of the fence or screen container, corresponding, for
example, in the place where the goal post is positioned, if the
multisport area is set up for soccer practice. This container has
an important function in the structure, which is to act as ballast
for the entire bottom fencing and the respective side halves of the
multisport/multipurpose area.
[0019] To complete the anchoring of the bottom wall in each
container, structural angular profiles that are supported on the
wall top of the container setting braces resistant to the action of
the wind and, consequently, configuring greater constructive
resistance of the entire structure.
[0020] Mentioned containers, when used only in the form of
foundations, can be replaced by another module or ballast, provided
that it has dimensions considerable and that allow the support of
the structure of the bottom fence and respective side halves. As an
example, the modules can be configured by truck chests, trailers or
other products with large dimensions and portable water tanks,
fibreglass pools, etc.
[0021] Transport modules or containers, chests, etc., are given
preference, since they have the additional function of packing the
grandstand units and other equipment that configure the
multisport/multipurpose area such as soccer goalposts, masts and a
net for volleyball, basketball tables, towers of lighting,
accessories or other components.
[0022] In a constructive solution, bottom frames and articulated
frames are configured by tubular profiles with corrosion and paint
treatment galvanised where screens are installed.
[0023] The grandstands, in turn, are configured by banks formed by
metallic structure where at least two platforms are supported on
levels distinct, each obtained by a wooden plank or perforated
metal plate; The metallic structure provides for at least three
vertical rods that extend in towards the side fences to compose
means of fixing said bleachers multisport/multipurpose area.
[0024] The aforementioned assembly of the bleachers in the side
fences provides rigidity and structural stability to the
multisport/multipurpose area, avoiding the need to use any type of
means of fixing the bleachers to the at the time of assembly, as
well as said bleachers cooperate as ballast of the panels or side
fences.
[0025] The method of mounting multi-purpose/multi-purpose equipment
is practical and fast, simply placing the containers or other type
of weight structure close to the synthetic lawn bottom lines or
modular flooring suitable for obtaining of the desired multipurpose
or multipurpose area, in order to compose a foundation for the
frame of the panels or articulated fences that make up the bottom
of the area multisport/multipurpose.
[0026] After said fences at the bottom and sides of the
multisport/multipurpose area assembled and fixed together, the
assemblers simply have to distribute and fix the bleachers on the
outer lateral edges of said lateral fences, passing, then, to the
assembly of the synthetic lawn/modular coverings. That done,
lighting poles are continued, thus finalizing the delimitation of
the area for sports, physical activities, recreation, events and
laser.
[0027] In the case of setting up a multisport area for soccer
practice, the soccer beams are installed next to the container
walls. However, if the court idealised for the practice of other
modalities such as volleyball, basketball, tennis, etc. accessories
related to each chosen modality will be installed, thus completing
the assembly of the multisport/multipurpose area.
[0028] The great advantage of the innovative system consists in
obtaining a court multisport/multipurpose that dispenses any type
of civil construction, foundation or drilling work, etc., with the
provision of a flat area for the assembly of the components of the
system.
[0029] Another great advantage lies in the fact that the
articulated panels are assembled and peripherals dispense with any
type of specialized labor, therefore reducing contracting
costs.
[0030] Another advantage lies in the fact that the container or
other type of weight structure configure the foundation for the
assembly of the articulated fences, dispensing any type of
foundation for the formation of funds in the
multisport/multipurpose area.
[0031] Another advantage lies in the fact that the peripheral
panels are assembled close to the bleachers compose rigidity and
stability in the structure and, likewise, dispense with means of
attachment to the ground.
[0032] Another advantage lies in the fact that the modular
equipment includes lighting and WI-FI system powered by solar
energy, configuring total independence for the use of the
multisport/multipurpose area, even in deserted places, exempt from
lighting systems.
[0033] Another advantage lies in the fact that the side fences
present, at their center, specifically among the groups of stands,
a peripheral panel projecting outside the area that configures the
accessibility area of that area multisport/multipurpose.
[0034] Another advantage is the fact that the containers, after
being emptied of all structures, to be able to act as changing
rooms or even as a service point for the community, such as
cafeterias, clinics, shops, among other uses.
DESCRIPTION OF THE FIGURES
[0035] To complement the present description in order to obtain a
better understanding of the features of the present invention and
according to a preferential practical implementation of the same,
the description, attached, set of drawings, where, in an
exemplified way, although not limiting, represented its
operation:
[0036] FIG. 1 shows a perspective view of the modular system
revealing two transport modules, each containing half of all
components for assembling the equipment in question;
[0037] FIG. 1A represents one of the transport modules in
perspective and in open position, allowing to observe several
components in position blown, such as peripheral panels, bleachers,
floor covering (in the case of synthetic grass), lamp posts and
others that make up half components for assembling the equipment in
question;
[0038] FIG. 2 shows, through a block diagram, the modular system
and method assembly of a multisport area based on the equipment now
proposed;
[0039] FIGS. 3, 3A, 3B, 3C and 3D reveal views of the bottom panel
assembly in relation to the transport container that acts as
background and ballast for the area multisport;
[0040] FIG. 4 illustrates the method of assembling the components
that make up the equipment for multisport and/or multipurpose
areas;
[0041] FIG. 5 reveals a perspective view of an example area
multisport/multipurpose represented in the form of field for the
practice of soccer, illustrating the lamp posts with fixed
base;
[0042] FIG. 5A represents a perspective view of an example area
multisport/multipurpose represented in the form of field for the
practice of soccer, illustrating the lighting poles with an
articulable base;
[0043] FIG. 6 shows a view a perspective view of an example area
multisport/multipurpose represented in the form of court for the
practice of volleyball.
DESCRIPTION OF THE INVENTION
[0044] With reference to the illustrated drawings, the present
invention patent is refers to "MODULAR PORTABLE EQUIPMENT FOR
ASSEMBLY OF AREA POLYESPORTIVE AND/OR MULTIPURPOSE AND ASSEMBLY
METHOD OF POLYESPORTIVE AREA AND/OR MULTIPURPOSE", more precisely
it is modular equipment (10) (FIG. 1) and assembly method (10A)
(FIG. 2) for the composition of a multisport area and/or
multipurpose (AP) for practicing soccer, volleyball, handball,
basketball, among others or as a multipurpose event, fairs,
presentations diverse, among others.
[0045] According to the present invention, the modular equipment
(10) is totally portable and formed by one, preferably, two modules
(20), each of them the preferred format of a container (21) and
able to pack a set of structural parts (CP) (see FIG. 1A), which
correspond to half of an area multisport/multipurpose (AP). Said
set of parts (CP) is composed, basically, by a bottom articulated
fencing (30A), two lateral fencing (30B), at least four modular
bleachers (40), at least one structure access (30C), multisport
accessories like goalposts (60), volleyball nets (61) or others, at
least one self-sufficient set for generating lighting (70) and
Wi-Fi signal, synthetic grass modules or modular floor coverings
(GS), as well as mounting components such as connectors, screws and
others.
[0046] Thus, each two transport modules (20) containing,
respectively, one set of pieces (CP), when properly fixed to each
other and arranged on terrain planned location of the desired
location, form, at the end, an area secure and rigid
multisport/multipurpose (AP), ideal for various activities sports
and/or social.
[0047] Parts assemblies (CP) are mounted on the ground without the
need for fixing it, that is, it does not require foundations or
drilling in the ground, as well as civil works.
[0048] Each transport module (20), in addition to the transport
function of the set of pieces (CP), has the additional function of
remaining incorporated in the area multi-purpose/multipurpose, more
precisely acting as a ballast for the entire structure, being the
central and external element of the bottom fence (30A), allowing
the assembly and fixation of the side fences (30B) and assembly of
the bleachers (40).
[0049] The transport modules (20) are presented as containers (21)
of 20 or 40 feet and can be transported on trucks, trucks, boats or
equivalent (CN) (see FIG. 2). When installed and attached to the
external parts of bottom fences (30A), in addition to supporting
these structures, as already mentioned, can be used for other
activities, such as snack bars, changing rooms, dressing rooms,
ticket offices, among other services (see FIG. 6).
[0050] As alternatives of ballast function or foundations of the
bottom fences, the containers (21) can be replaced by chests of
trucks, trailers or other structures with dimensions and strengths
equivalent to containers, such as water tanks, fiberglass pools,
etc. (not shown).
[0051] The bottom (30A), side (30B) and access (30C) fences are
made from frames formed by vertical metal tubular profiles (33) and
horizontal (34) joined by screens (T1).
[0052] Each bottom fence (32), in a preferential option, when
industrial confection (see FIGS. 3 to 3D), comprises a set of
modules mounted superimposed on one of the larger side walls (RV)
and an upper wall (RV1) of the transport module or container (20).
This set of modules is formed two side modules (32a) in length (x2)
that correspond to half of the side of the transport module (20);
each module (32a) is hinged at one edge vertical (21c) of the
transport module (20), as well as providing an upper and (32b), of
length (x) preferably equal to the length (x) of the larger side
(RV) of said transport module (20); said upper module (32b) is
fixed and articulated on the top edge (21d) of the module (20). At
each end of the upper and central module (32b) two wire mesh panels
(32c) are articulated, each which having length (x2) corresponding
to half the length (x) of side (RV) of the module (32b). Once the
lower side modules (32a) and the upper side modules (32c) are
articulated and aligned in a single vertical plane with the wall
(RV) and central upper module (32b), they are fixed each other by
means of stainless steel connectors (not shown). The joints between
modules (32a), (32b) and (32c) in relation to the edges (21c) and
(21d) are obtained using conventional or similar hinges. Thus,
modules (32a), (32b) and (32c) that make up the bottom fence (30A),
when armed in relation to the transport module (20), in the form of
a container (21) or other ballast, form the background wall of the
multisport/multipurpose area (AP).
[0053] The articulated panels (32b), as a prevention of stability,
contemplate articulating rods (35) (see 3D figures) which, when
positioned on the wall or roof (RV1) of the container (21)
configure braces resistant to wind action.
[0054] Each side fence (30B) (See FIGS. 1A and 4) comprises a frame
formed by vertical (33) and horizontal (34) metal tubular profiles
joined by screens (T1). The length of each side fence corresponds
to half (x3) of the area multisport and/or multipurpose (40) and
also includes close to the connection with the fence bottom (30A),
an extreme upper sector (S1) that extends the height (H) of the
fence (30B) in order to allow the sector (S1) to be fixed at
90.degree. with the end of the upper module (32c), while the end of
the side fence (30B) is fixed at the end of the lower module (32a)
of the bottom fence (30A).
[0055] Between the side fences (30B), in a preferred option, a
distance (W) that acts as a means of access to the multisport
and/or multipurpose (AP) area, means of access that can be
protected by at least one protection panel (30C) formed by a frame
of horizontal tubular profiles (34) and vertical profiles (33)
joined by screen (T1). The vertical profiles (33) have angular
projections (35) that extend so that they are fixed to the side
fences (30B).
[0056] Each grandstand (40) (FIGS. 1A and 4), in a preferred
option, is comprised of a support structure formed by vertical
profiles (50) joined together inferiorly by a wire structure (51)
in steps, on which are seat plates (52) made of wood or other
material resistant. The vertical profiles (50) have angled
projections (51) superior for fixation on the external faces of the
lateral fencing (30B).
[0057] Lighting poles (70) are foreseen, preferably made with solar
energy capture device (71) and luminaries (72) to generate lighting
when necessary. The lamp posts can be arranged on bases ballast
(74) (FIG. 4) or alternatively (FIG. 5A), be provided with a
articulated base (75), facilitating transport and assembly close to
fences side (30B) and/or bottom (30A).
[0058] The method of assembly (10A) of the multisport and/or
multipurpose area (AP) (FIG. 2) comprises the following steps:
a) Arrangement of transport modules (20) in the form of containers
(21) or other suitable ballast close to the bottom lines (L1) of
demarcation of the lawn/covering (GS) of the multisport and/or
multipurpose area; b) Frame, through articulation of the
articulating panels (32a)/(32b)/(32c) in relation to the module
(20), securely positioning the articulating rods (35) of bracing
(FIGS. 3 to 3D); c) Assembly of the side fences (30B) in the bottom
fences (30A); d) Mount the bleachers (40) and the access panels
(30C) on the sides (32B); e) Installation of lighting poles (70)
next to the stands (40); and f) Assembly of synthetic grass or
modular covering (GS).
[0059] It is certain that when the present invention is put into
practice, it can be modifications have been made to certain details
of construction and shape, without implying a departure from the
fundamental principles that are clearly substantiated in the
claiming framework, it being understood that the terminology
employed did not have the purpose of limitation.
* * * * *