U.S. patent application number 15/850464 was filed with the patent office on 2018-06-14 for data centre cooling systems.
The applicant listed for this patent is BRIPCO BVBA. Invention is credited to Simon Britton, Tom Kingham, Nick Vaney.
Application Number | 20180168073 15/850464 |
Document ID | / |
Family ID | 42371045 |
Filed Date | 2018-06-14 |
United States Patent
Application |
20180168073 |
Kind Code |
A1 |
Vaney; Nick ; et
al. |
June 14, 2018 |
Data Centre Cooling Systems
Abstract
A method of cooling a data centre having at least one hot aisle
(145) and at least one cold aisle (144), including the steps of
producing cooling air having controlled to have temperature and
relative humidity within certain pre-defined limits; supplying the
cooling air to a plurality of items of IT equipment (143) located
in the data centre between the cold aisle and the hot aisle;
measuring the velocity of air flowing from the hot aisle to the
cold aisle through an opening (150) between the hot aisle and the
cold aisle; and controlling the rate of supply of cooling air to
the items of IT equipment in dependence on the velocity of air so
measured.
Inventors: |
Vaney; Nick; (Witney Oxon,
GB) ; Kingham; Tom; (Oxford, GB) ; Britton;
Simon; (Bedminster, GB) |
|
Applicant: |
Name |
City |
State |
Country |
Type |
BRIPCO BVBA |
Antwerp |
|
BE |
|
|
Family ID: |
42371045 |
Appl. No.: |
15/850464 |
Filed: |
December 21, 2017 |
Related U.S. Patent Documents
|
|
|
|
|
|
Application
Number |
Filing Date |
Patent Number |
|
|
13699350 |
Nov 21, 2012 |
9930812 |
|
|
PCT/GB2011/050987 |
May 25, 2011 |
|
|
|
15850464 |
|
|
|
|
61410762 |
Nov 5, 2010 |
|
|
|
Current U.S.
Class: |
1/1 |
Current CPC
Class: |
H05K 7/20745 20130101;
H05K 7/20836 20130101 |
International
Class: |
H05K 7/20 20060101
H05K007/20 |
Foreign Application Data
Date |
Code |
Application Number |
May 26, 2010 |
GB |
1008825.0 |
Aug 11, 2010 |
GB |
1013506.9 |
Claims
1-41. (canceled)
42. A method of cooling a data centre having at least one hot
region and at least one cold region, wherein the method comprises
the steps of: producing cooling air controlled to have temperature
and relative humidity within certain pre-defined limits; supplying
the cooling air, by means of an over-floor air duct, to a plurality
of items of IT equipment located between the cold region and the
hot region; measuring the air flow rate from the cold region to the
hot region through an opening between the hot region and the cold
region, and controlling the rate of supply of cooling air to the
items of IT equipment in dependence on the air flow rate so
measured.
43. A method according to claim 42, wherein the method further
comprises the steps of producing cooling air at a first rate and
subsequently producing cooling air at a second rate.
44. A method according to claim 42, wherein the cooling air is
produced by one or more fans, including at least one variable speed
fan.
45. A method according to claim 42, wherein the method further
comprises the step of passing cooling air through an aperture of a
first effective size, adjusting the size of the aperture to a
second effective size, and subsequently passing the cooling air
through the aperture of the second effective size.
46. A method according to claim 45, wherein the aperture is located
upstream of the IT equipment and downstream of the apparatus used
to produce the cooling air.
47. A method according to claim 45, wherein the step of controlling
the rate of supply of cooling air includes varying the size of the
aperture in dependence on the air flow rate through the
opening.
48. A method according to claim 42, wherein the step of controlling
the rate of supply of cooling air includes varying the rate of
production of cooling air in dependence on the size of the aperture
and on the air flow rate through the opening.
49. A method according to claim 42, wherein the method includes the
step of controlling the rate of supply of cooling air to the IT
equipment in dependence on at least one criterion concerning the
air flow rate through the opening.
50. A method according to claim 49, wherein the method is performed
such that if the air flow rate through the opening is below a first
pre-set level, the size of the aperture is increased.
51. A method according to claim 49, wherein the method is performed
such that if the air flow rate through the opening is below the
first pre-set level and the size of the aperture has been increased
to its operational maximum size, the rate at which cooling air is
produced is increased.
52. A method according to claim 49, wherein the method is performed
such that if the air flow rate through the opening is above a
second pre-set level, the rate at which cooling air is produced is
reduced.
53. A method according to claim 49, wherein the method is performed
such that if the air flow rate through the opening is above the
second pre-set level, and the rate at which cooling air is produced
has been reduced to its operational minimum, the size of the
aperture is reduced.
54. A method according to claim 49, wherein the IT equipment is
arranged so that substantially all of the cooling air passes
through the IT equipment along air flow paths internal to the items
of IT equipment.
55. A method according to claim 49, wherein the data centre has a
plurality of hot regions and cold regions, each of the plurality of
cold regions being fed with cooling air via a dedicated variably
sized aperture, and wherein the method comprises the steps of:
measuring a first air flow rate through a first opening between a
first hot region and a first cold region; measuring a second air
flow rate through a second opening between a second hot region and
a second cold region; and supplying cooling air to IT equipment, on
the one hand, between the first hot region and the first cold
region and, on the other hand, between the second hot region and
the second cold region, in dependence on the first and second
measured air flow rates.
56. A method according to claim 55, wherein the method is performed
such that if the air flow rate through the first opening or the
second opening is below the first pre-set level, the size of the
aperture associated with the cold region connected to that opening
is increased; and if the air flow rate through the first opening or
the second opening is below the first pre-set level and the size of
the aperture associated with the cold region connected to that
opening has been increased to its operational maximum size, the
rate at which cooling air is produced is increased.
57. A method according to claim 55, wherein the method is performed
such that if the air flow rate through one of the first opening and
the second opening is above the second pre-set level and the size
of the aperture associated with the cold region connected to the
other of the first opening and the second opening is not at its
operational maximum size, the rate at which cooling air is produced
is decreased.
58. A method according to any of claim 55, wherein the method is
performed such that if the air flow rate through one of the first
opening and the second opening is above the second pre-set level
and the size of the aperture associated with the cold region
connected to the other of the first opening and the second opening
is at its operational maximum size, the size of the aperture
associated with the cold region connected to the opening through
which the air flow rate is above the second pre-set level is
reduced.
59. A method according to claim 55, wherein the method is performed
such that if the air flow rate through the first opening and the
second opening is above the second pre-set level, the rate at which
cooling air is produced is decreased.
60. A method according to claim 42, wherein the method includes a
step of defining a maximum rate of production of cooling air in
dependence on one or more characteristics of the IT equipment, and
wherein cooling air is produced at a rate less than or equal to
this maximum rate.
61. A method according to claim 42, wherein the cooling air is
produced from supply air, the supply air comprising: ambient air
from outside the data centre, or air exhausted by the IT equipment
in the data centre, or a mixture of ambient air and exhaust air;
and wherein how much, if any, ambient air and how much, if any,
exhaust air the supply air comprises is controlled in dependence on
the temperature and relative humidity of the ambient air.
62. A method according to claim 61, wherein cooling air is produced
by adjusting the temperature and relative humidity of the supply
air to be within the pre-defined limits by any one of mechanical
cooling, adiabatic cooling, or a combination of mechanical and
adiabatic cooling.
63. A method according to claim 62, wherein how much, if any,
mechanical cooling, and how much, if any, adiabatic cooling is used
to adjust the temperature and relative humidity of the supply air
to within the pre-defined limits is controlled in dependence on the
temperature and relative humidity of the outside air.
64. Apparatus for supplying cooling air to a plurality of items of
IT equipment in a data centre having at least one hot region and at
least one cold region, wherein the apparatus comprises an opening
between the hot region and the cold region; an air flow sensor
located in said opening for measuring the rate at which air passes
through the opening; a source of cooling air, the cooling air
having temperature and relative humidity within certain pre-defined
limits, and an adjustably sized aperture located upstream of the IT
equipment and downstream of the source of cooling air; wherein the
apparatus is arranged such that the rate at which the cooling air
is supplied to the IT equipment depends on the velocity measured by
the sensor.
65. Apparatus according to claim 64, wherein the opening is a
one-way duct.
66. A computer program comprising computer program code means
adapted to perform the method of claim 42 when said program is run
on a programmable controller.
Description
BACKGROUND OF THE INVENTION
[0001] The present invention concerns data centres and a method of
cooling equipment in a data centre. The invention also concerns
apparatus for cooling a data centre.
[0002] A data centre is a late 20.sup.th Century development that
has grown as a response to the increasing demand for computer
processing capability and a recognition of the importance of
information technology (IT) in the place of every business and
organisation today. Whereas smaller organisations have sufficient
processing power with laptops, PCs and occasionally servers, larger
organisations require higher capacity centralised processing to
serve a wide range of needs and applications. A few years ago this
capacity was supplied by large mainframe computers, but more
recently the method used has been to provide data centres
comprising many networked computer servers known as "blades"
installed in racks enabling controlled and modular expansion of
capacity. The racks also typically house storage systems and/or
telecommunications equipment such as routers to handle data flow
between the computer servers and data flow between the data centre
and the outside world.
[0003] One key problem faced is how to cool a data centre
effectively and efficiently. In a traditional data centre
arrangement the racks are laid out in rows. Cooling is provided by
direct expansion (DX) or chilled water cooling plants. The cool air
produced by these units is entrained through an underfloor plenum
and exits through floor grilles at the front of the IT rack rows.
The IT products installed in the racks contain integral fans which
draw the cooled air from the front across the circuitry and heat is
exhausted via vents in the products to the rear. In certain
arrangements of the prior art, the separation between these IT
racks creates a `hot aisle` into which air is expelled by the IT
products in the racks and a `cold aisle` from which cooler air is
drawn into and through the IT products by their integral fans.
[0004] A typical arrangement of the prior art is shown
schematically in FIG. 1 of the attached drawings. Thus, the data
centre includes a rack room 1 defined by walls 2 in which two sets
of racks 4 for IT equipment are accommodated. The IT equipment in
the racks 4 generate heat, represented by arrows 6. The cooling of
the IT equipment is achieved by introducing cold air, via a floor
void, into the room by means of air conditioning units, the cold
air being represented by arrows 8.
[0005] In certain data centre arrangements it is important that the
volume of cold air supplied is equal to or greater than that drawn
through the servers by their internal fans. If the volume is not
sufficient, then the servers can draw in warm air from other areas
of the data centre, possibly resulting in the IT equipment
overheating. In a traditional data centre this is generally avoided
by supplying significantly more cold air than the servers actually
need at any given time. It will be seen that this typical data
centre arrangement is not particularly energy efficient.
[0006] The drive for more efficient use of power has given rise to
a need to make the cooling regimes used in data centres more
efficient, as cooling of equipment typically contributes
significantly to the power used by a data centre. For example, the
power usage in certain data centres may require between 1 kW and 2
kW of power for every 1 kW of power used to power the IT equipment,
a significant proportion of which would be related to cooling.
[0007] In recent years, data centre designers have sought to
improve energy efficiency with cooling systems that attempt to
tailor the amount of cooling air delivered to the actual
requirements of the servers at any given time. U.S. Pat. No.
6,283,380 (IBM), for example, describes a system for automatically
controlling the volume and distribution of cooling air supplied to
IT equipment in a data centre based on the data provided by a
network of temperature sensors deployed at various positions around
the rack room. The temperature data is input into a computer
simulation of the rack room and the predictions of this simulation
are used to adjust the speed of the fans supplying the cooling air.
This system has the disadvantages that it requires a significant
number of both fans and temperature sensors to be distributed
around the data centre in order to achieve effective airflow
control, and the simulation uses significant computing power.
[0008] An alternative method is to measure the pressure in the
"cold aisle" area at the front of the racks and to adjust the
amount of cold air supplied from the CRAC unit so as to maintain a
constant pressure. The pressure at the front of the racks will vary
according to whether the amount of cold air being supplied is too
much or too little to meet the demand of the servers. If too much
cold air is supplied, the pressure will increase, whereas if too
little is supplied it will decrease. Keeping the pressure constant
therefore means that the amount of cold air supplied by the CRAC
unit is appropriate to the demand of the servers at a given
time.
[0009] U.S. Pat. No. 6,694,759 (Hewlett Packard) provides an
example of this method in which pressure measurements are also used
to adjust the vents through which the cold air exits a cold air
plenum, providing an extra level of control over the airflow. As
this document explains, however, the pressure within the rack room
and within the plenum is highly non-uniform, and fluctuates
unpredictably. As such, a complex network of sensors and vents is
required in order to provide adequate airflow control.
[0010] Efforts to improve energy efficiency by separating the flows
of hot and cold air in a data centre have also become popular
recently. This may be done by, for example, adding baffles across
the top of the hot and/or cold aisles, with doors or further panels
across the end of the aisle. A baffle arrangement is for example
proposed in WO 2006/124240 (APC). In data centres where the hot
aisles and/or the cold aisles are enclosed, the pressure
differential between the front and rear of the racks can be larger
than the situation where the hot and cold aisles are not sealed off
from one another. In such data centres if the pressure in the cold
aisle becomes lower than the pressure in the hot aisle, warm air
from the hot aisle can be drawn back through the servers since all
other air paths are blocked. This situation is likely to lead to
the servers overheating. In data centres with encapsulated hot
and/or cold aisles, it is therefore even more important to ensure
that the pressure in the cold aisle is always greater than that in
the hot aisle. GB2466178 (Hewlett Packard) (filed earlier but
published later than the earliest claimed priority date of the
present application) describes a method of monitoring this pressure
differential in a data centre where the cold aisles are supplied
with cooling air from an underfloor plenum, which involves
measuring the air flow velocity through a small opening between a
hot aisle and a neighbouring cold aisle.
[0011] A further way of improving the energy efficiency of a data
centre is to use cool air from outside the data centre for cooling
the IT equipment (known in the art as free cooling) whenever the
ambient conditions allow, and/or using adiabatic cooling instead of
mechanical cooling. WO2010/075358 (Amazon Technologies) (filed
earlier but published later than the earliest claimed priority date
of the present application), for example, describes a data centre
cooling system having both mechanical and adiabatic cooling
apparatus, which can be operated in various modes utilising
combinations of adiabatic, mechanical and free cooling depending. A
disadvantage of prior art combined systems such as that of
WO2010/075358 is that although they control what type of cooling
apparatus is used depending on ambient air conditions, they are not
sophisticated enough to be able to tailor the interaction of the
various types of cooling apparatus so as to achieve optimum, or
close to optimum, efficiency.
[0012] The present invention seeks to provide an improved method
and apparatus for cooling a data centre. Alternatively or
additionally, the present invention seeks to provide a system for
cooling a data centre that mitigates one or more of the above
mentioned disadvantages.
SUMMARY OF THE INVENTION
[0013] The present invention relates to various aspects of a method
of cooling IT equipment and/or aspects of a data centre for housing
such IT equipment. The invention also relates to a control
apparatus for controlling the performance of such methods.
Embodiments of at least some of the aspects of the invention
described below relate to data centres in which IT equipment is, or
may be, arranged, for example in racks, between a cold region and a
hot region. Cooling air may thus be arranged to pass from the cold
region to the hot region over and/or through the IT equipment to
thereby cool the IT equipment. Some aspects of the present
invention relate to the way in which the cooling of the IT
equipment is controlled. There are therefore several aspects of the
invention which are independent from one another, but which share
common features. Some aspects of the invention require the
provision of a source of cooling air, for example including one or
more fans. Some aspects of the invention require the provision of
an adjustably sized aperture arranged to control the rate of flow
of cooling air to the IT equipment. In some cases, there is
provided an adiabatic cooler. In some embodiments, there is
provided an air flow sensor. In some embodiments, there is provided
a control system, for example a control unit, for performing
control processes. In some embodiments, there are provided means
for determining the psychrometric characteristics, for example the
relative humidity and temperature, of air, for example air from
outside the data centre. Various aspects of the invention will now
be described in further detail.
[0014] The present invention provides, according to a first aspect,
a method of cooling a data centre having at least one hot region
and at least one cold region, wherein the method comprises the
steps of:
[0015] producing cooling air, preferably controlled to have
temperature and relative humidity within certain pre-defined
limits;
[0016] supplying the cooling air to a plurality of items of IT
equipment located between the cold region and the hot region;
[0017] measuring the rate of air flow from the cold region to the
hot region through an opening between the hot region and the cold
region, and
[0018] controlling the rate of supply of cooling air to the items
of IT equipment in dependence on the air flow rate so measured.
[0019] The rate of air flow from the cold region to the hot region
may be measured by measuring the velocity of air flowing through an
opening between the hot region and the cold region. There may be
more than one opening between the cold region and the hot region.
Where there is more than one opening, the openings need not connect
the cold region to the same hot region. The openings may connect
the cold region to two or more different hot regions. Where there
is more than one opening, the rate of air flow from the cold region
to the hot region through each opening may be measured. In such a
case, the rate of supply of cooling air may be controlled in
dependence on the average of the air flow rates so measured or in
dependence on the highest of the air flow rates so measured, or in
dependence on some other calculation using one or more of the
combination of the air flow rates so measured.
[0020] The IT equipment may be arranged in racks. The hot region
may be in the form of a substantially enclosed region. It may be in
the form of a duct. It may be in the form of a space bound by a
floor, a ceiling and one or more walls. The floor may be level with
the bottom of the racks. The hot region may be in the form of an
over-floor air duct. The ceiling may be level with the top of the
racks. The hot region may be a hot aisle, for example a hot aisle
that acts as an over-floor air duct. The cold region may have
similar such characteristics as the hot region. For example, the
cold region may be in the form of a substantially enclosed region.
The cold region may be in the form of a duct. The cold region may
be in the form of a space bound by a floor, a ceiling and one or
more walls. The cold region may be in the form of an over-floor air
duct. The cold region may be a cold aisle, for example a cold aisle
that acts as an over-floor air duct. The step of supplying the
cooling air to the plurality of items of IT equipment may be
conducted by means of an over-floor air duct, for example defined
in part by the cold region. The over-floor air duct supplying
cooling air may extend all the way from the source of the cooling
air to the plurality of items of IT equipment. The over-floor air
duct may include one or more adjustably sized apertures arranged to
control the rate of flow of cooling air to the IT equipment. The
over-floor air duct may be in the form of a corridor, for example a
personnel corridor. Thus, the cooling of the items of IT equipment
may be achieved by introducing cooling air, via a route not being
via a floor void, into the cold region.
[0021] The hot region may be a hot aisle, and/or the cold region
may be a cold aisle. Advantageously, the step of controlling the
rate of supply of cooling air in dependence on the air flow rate so
measured enables arrangements in which only the amount of cooling
air actually needed by the IT equipment is supplied at any given
time. In an embodiment of the invention, this allows an arrangement
in which the energy efficiency of the data centre may be improved
by the equipment used to produce cooling air always operating at as
low a level as possible. Furthermore, the cooling air requirements
of each cold region are preferably determined based on a single air
flow rate parameter (based on, say, measurements from one or two
velocity sensors, for example). A complex network of sensors and
simulations may not therefore be needed.
[0022] The method may further comprise the steps of producing
cooling air at a first rate and subsequently producing cooling air
at a second rate (i.e. different from the first rate). The cooling
air may be produced by one or more fans including at least one
variable speed fan. The method may include varying the rate at
which cooling air is produced, for example varying it according to
the cooling requirements of the IT equipment at any given time,
which may be achieved by means of the measured rate of air flow
through the opening.
[0023] The method may further comprise the step of passing cooling
air through an aperture of a first effective size, adjusting the
size of the aperture to a second effective size (i.e. different
from the first effective size), and subsequently passing cooling
air through the aperture of the second effective size. The aperture
may be an adjustably sized aperture. It may include, or be defined
by, a damper. The aperture may include several damper blades, in
which case the area defined between a pair of blades or between a
blade and the edge of the aperture may be adjustable. In such a
case, the aperture may be considered as extending to cover the
space defined by the blades and the area between adjacent blades.
The effective size of the aperture may be adjusted by rotating the
damper blade(s) along their axes. The aperture may be located
upstream of the IT equipment and downstream of the apparatus used
to produce the cooling air. Advantageously, the provision of an
adjustably sized aperture allows a further level of control over
the amount of cooling air supplied to the IT equipment.
[0024] The step of controlling the rate of supply of cooling air
may include varying the size of the aperture in dependence on the
air flow rate through the opening. The step of controlling the rate
of supply of cooling air may also include varying the rate of
production of cooling air in dependence on the size of the aperture
and on the air flow rate through the opening.
[0025] The method may include the step of controlling the rate of
supply of cooling air to the IT equipment in dependence on at least
one criterion concerning the air flow rate through the opening.
Preferably the criterion is defined such that the air pressure in
the cold region will always be slightly higher than the air
pressure in the hot region. Preferably the criterion is defined
such that the air pressure in the cold region will never be
significantly higher than necessary to generate the cooling air
flows necessary to meet the cooling demand of the IT equipment. The
criterion may be defined such that the air pressure in the cold
region will never be considerably higher than the air pressure in
the hot region. Maintaining at least some air flow from the cold
region to the hot region through the opening indicates that the
cold region is at an appropriate pressure to meet the cooling
demand of the IT equipment.
[0026] In the case where an adjustable aperture is provided, the
method may be performed such that if the air flow rate through the
opening is below a first pre-set level, the size of the aperture is
increased. This increases the amount of cooling air supplied to the
IT equipment downstream of the aperture. The size of the aperture
at any given time is preferably such that the rate at which cooling
air is produced is relatively low (preferably as low as possible)
while still being sufficient to meet the demand of the IT equipment
at that time. The method may be performed such that if the air flow
rate through the opening is below the first pre-set level and the
size of the aperture has been increased to its operational maximum
size, the rate at which cooling air is produced is increased.
[0027] The method may be performed such that if the air flow rate
through the opening is above a second pre-set level, the rate at
which cooling air is produced is reduced. This may be done by
decreasing the speed of the variable speed fan, which reduces the
energy usage of the data centre. The method may be performed such
that if the air flow rate through the opening is above the second
pre-set level, the size of the aperture is reduced. The size of the
aperture may be so reduced in the case where the rate at which
cooling air is produced has already been reduced to a relatively
low level, for example to a level deemed to be the operational
minimum. The first and second pre-set levels may be different. In
the embodiment described below the first and second pre-set levels
are equal. The first and second pre-set levels need not represent
large air flow rates. The first and second pre-set levels may be
low air flow rates, for example an air flow rate where the speed of
the air flowing is less than 1 ms.sup.-1.
[0028] The IT equipment may be arranged so that substantially all
of the cooling air passes through the IT equipment along air flow
paths internal to the items of IT equipment. Ensuring that cooling
air only passes through the inside of each item of IT equipment and
does not pass in between the items of IT equipment may improve the
cooling effect of the air on the IT equipment. Blanking panels may
be used to prevent air flowing between individual items of IT
equipment. Blanking panels may be used to prevent air flowing
between the IT equipment and the floor of the cold region. Blanking
panels may be used to prevent air flowing between the IT equipment
and the ceiling of the cold region. Blanking panels may be used to
prevent air flowing between the IT equipment and the walls of the
cold region.
[0029] The data centre may have a plurality of hot regions and cold
regions. Each of the plurality of cold regions may be fed with
cooling air via a dedicated variably sized aperture. This allows a
different amount of cooling air to be supplied to each cold region,
which is advantageous since the demand of the IT equipment cooled
with air from each cold region may be different. In this case the
method may comprise the steps of measuring the air flow rate
through a first opening between a first hot region and a first cold
region and measuring the air flow rate through a second opening
between a second hot region and a second cold region, and supplying
cooling air to IT equipment, on the one hand, between the first hot
region and the first cold region and, on the other hand, between
the second hot region and the second cold region, in dependence on
the first and second measured air flow rates. It will be
appreciated of course that there may be more than one opening
between each pair of hot and cold regions, such that the measured
air flow rate through the first opening is combined with, or
otherwise used in conjunction with, a measured air flow rate
through one or more further openings between the first cold region
and the first hot region.
[0030] The method may be performed such that if the air flow rate
through the first opening or the second opening is below the first
pre-set level, the size of the aperture associated with the cold
region connected to that opening is increased. The method may be
performed such that if the air flow rate through the first opening
or the second opening is below the first pre-set level and the size
of the aperture associated with the cold region connected to that
opening has been increased to its operational maximum size, the
rate at which cooling air is produced is increased.
[0031] The method may be performed such that if the air flow rate
through one of the first opening and the second opening is above
the second pre-set level and the size of the aperture associated
with the cold region connected to the other of the first opening
and the second opening is not at its operational maximum size, the
rate at which cooling air is produced is decreased. The method may
be performed such that if the air flow rate through one of the
first opening and the second opening is above the second pre-set
level and the size of the aperture associated with the cold region
connected to the other of the first opening and the second opening
is at its operational maximum size, the size of the aperture in the
cold region connected to the opening through which the air flow
rate is above the second pre-set level is reduced. The method may
be performed such that if the air flow rate through the first
opening is above the second pre-set level and the air flow rate
through the second opening is above the second pre-set level, the
rate at which cooling air is produced is decreased. Thus the amount
of cooling air supplied to each cold region may be tailored to
meet, with great accuracy, the cooling demand of the IT equipment
drawing air from that cold region at any given time. The speed of
the variable speed fan may therefore be able to be reduced to be as
low as possible while still being sufficient to meet the cooling
demand of the region with the highest cooling requirements. In such
a case, the aperture (or apertures) associated with the region
having the highest cooling requirement id advantageously controlled
to be at its operational maximum size.
[0032] The method may be performed such that it includes the step
of defining a maximum rate of production of cooling air in
dependence on one or more characteristics of the IT equipment, and
cooling air is produced at a rate less than or equal to this
maximum rate. The maximum rate of production of cooling air may be
defined in dependence on the power usage of the IT equipment. It
may be defined in dependence on the theoretical maximum requirement
of the IT equipment for cooling air. It may be greater than 120% of
the maximum requirement of the IT equipment for cooling air. It may
be greater than twice the maximum requirement of the IT equipment
for cooling air. Providing such a maximum limit for the rate of
production of cooling air improves the energy efficiency of a data
centre in which the method is performed. This is because in
situations where the rate of production of cooling air otherwise
might temporarily increase by a significant amount unnecessarily,
for example if the removal of baffles in the cold aisle during
maintenance allowed some cooling air to pass directly from the cold
aisle to the hot aisle without passing through the IT equipment,
the provision of a maximum rate will prevent the apparatus
producing the cooling air from operating at too high a level and
using an excessive amount of energy.
[0033] The cooling air may be produced from supply air, the supply
air comprising ambient air from outside the data centre, or air
exhausted by the IT equipment in the data centre, or a mixture of
air from outside the data centre and exhaust air. How much, if any,
ambient air and how much, if any, exhaust air the supply air
comprises may be controlled in dependence on the temperature and
relative humidity of the outside air.
[0034] Preferably, production of cooling air is controlled to have
temperature and relative humidity within certain pre-defined
limits. The control of the cooling air to have temperature and
relative humidity within certain pre-defined limits may consist of
ensuring that the air has the ability to cool the IT equipment. The
cooling air may be produced by adjusting the temperature and
relative humidity of the supply air to be within the pre-defined
limits by any one of mechanical cooling, adiabatic cooling, or a
combination of mechanical and adiabatic cooling. How much, if any,
mechanical cooling, and how much, if any, adiabatic cooling is used
to adjust the temperature and relative humidity of the supply air
to within the pre-defined limits may be controlled in dependence on
the temperature and relative humidity of the outside air.
Preferably no mechanical cooling is used for the majority of the
time, which means that the energy usage of the data centre is very
low.
[0035] According to a second aspect of the invention there is also
provided a method of cooling a data centre with cooling air,
wherein the method comprises the following steps:
[0036] (a) defining criteria for the temperature and relative
humidity of the cooling air, wherein the criteria are a range of
temperatures and a range of humidities;
[0037] (b) determining the temperature and relative humidity of
ambient air from outside the data centre;
[0038] (c) determining a set point for each of the temperature and
relative humidity of cooling air, the set point satisfying the
criteria defined in step (a) and being chosen in dependence on the
temperature and relative humidity of the ambient air;
[0039] (d) producing cooling air having temperature and relative
humidity substantially equal to those set points; and
[0040] (e) delivering the cooling air to a region in the data
centre to be cooled.
[0041] The range of humidities at which the cooling air is deemed
to be substantially equal to the set point for relative humidity
may be wider than the range of temperatures at which the cooling
air is deemed to be substantially equal to the set point for
temperature. For example in some embodiments a .+-.2% tolerance on
temperature may be too great, whereas a .+-.2% tolerance on
relative humidity would be acceptable. In certain embodiments, a
.+-.5% tolerance (or even a .+-.10% tolerance) on relative humidity
may be acceptable.
[0042] The method may further comprise the following steps:
[0043] (f) removing exhaust air from the region of the building to
be cooled, the exhaust air including air heated as a result of heat
exchange between the cooling air and the region in the building to
be cooled; and
[0044] (g) choosing how much, if any, of the exhaust air and how
much, if any, of the ambient air are used during step (d) to
produce the cooling air in dependence on the temperature and
relative humidity of the ambient air.
[0045] The criteria defined in step (a) may be such that they may
be represented on a psychrometric chart by a single point. The
criteria defined in step (a) may be such that they may be
represented on a psychrometric chart by a single line. This line is
preferably a line of finite length; however it may be a closed
loop. Conditions corresponding to any of the points on the line
will satisfy the criteria defined in step (a); however producing
cooling air having characteristics represented by some points on
the line will require more energy than producing cooling air having
characteristics represented by certain other points on the
line.
[0046] Preferably the step of choosing a set point, for example on
such a line, for the temperature and relative humidity of cooling
air in dependence on the temperature and relative humidity of the
ambient air at a given time is carried out such that producing
cooling air with temperature and relative humidity at the chosen
set point requires no more cooling energy than producing cooling
air with temperature and relative humidity represented by any of
the other points on the line. This means that the most efficient
possible process for producing cooling air is always used.
[0047] Step (d) of the method may include a first stage of
producing cooling air having relative humidity higher than the set
point for the relative humidity of cooling air and temperature
lower than the set point for the temperature of cooling air, and a
second stage of raising the temperature and lowering the relative
humidity of the cooling air so produced, by passing it through a
fan, so that the temperature and relative humidity of the air are
substantially equal to the set points for the temperature and
relative humidity of cooling air. The method may therefore include
compensating for the temperature rise and humidity drop produced
when the air is passed through the fan (or fans). It will be
appreciated that the relative humidity may need to be only slightly
higher than the set point for the relative humidity of cooling air
and that the temperature may need to be set only slightly lower
than the set point for the temperature of cooling air, in order to
reach the desired set points because the temperature rise (and
consequential relative humidity drop) caused by passing the cooling
air through the fan(s) will typically be relatively low. The
temperature rise caused by passing the cooling air through the
fan(s) may be of the order of one or two degrees Centigrade.
According to a third aspect of the invention there is also provided
apparatus for supplying cooling air to a plurality of items of IT
equipment in a data centre having at least one hot region and at
least one cold region. The apparatus may comprise
[0048] an opening between the hot region and the cold region;
[0049] an air flow sensor located in said opening for measuring the
rate at which air passes through the opening;
[0050] a source of cooling air, the cooling air having temperature
and relative humidity within certain pre-defined limits, and
[0051] an adjustably sized aperture located upstream of the IT
equipment and downstream of the source of cooling air.
[0052] The apparatus may be arranged such that the rate at which
the cooling air is supplied to the IT equipment depends on the air
flow rate measured by the sensor. For example, the effective size
of the adjustably sized aperture may be adjusted in dependence on
an output of the air flow sensor. The opening may be a one-way
duct. For example, the duct may define the opening. Other physical
structure, separate from the IT equipment, may define the opening.
The end of the duct that joins the hot aisle may be covered by a
hinged flap, or the duct may include some other form of non-return
valve. This prevents hot air from flowing back into the cold aisle,
and means that a simple non-directional velocity sensor may be
used. Alternatively the duct may be a two-way duct, in which case a
directional air flow sensor may be preferred. The air flow sensor
may be in the form of an air velocity sensor. The air flow sensor
may be arranged to provide an output in dependence on the volume of
air that passes through the opening per unit time. The air flow
sensor may be arranged to provide an output in dependence on the
speed at which air passes through the opening. Of course, the
measure of volume of air passing through the opening per unit time
may be directly proportional to the speed at which air passes
through the opening. The air flow sensor may be in the form of a
differential pressure sensor. The opening may be in the form of a
simple orifice, across which a differential pressure is
measured.
[0053] According to a fourth aspect of the invention there is also
provided a control system for controlling the cooling of IT
equipment in a data centre. The control system may include
[0054] an input for receiving information about the temperature and
relative humidity of ambient air outside the data centre;
[0055] memory for storing pre-loaded criteria for the relative
humidity and temperature of the cooling air, said criteria covering
a range of temperatures and a range of humidities, and
[0056] a processor for:
[0057] (a) determining a set point for each of the temperature and
relative humidity of the cooling air in view of the pre-loaded
criteria and the information received about the temperature and
relative humidity of the ambient air;
[0058] (b) determining how much, if any, of the exhaust air and how
much, if any, of the ambient air are used by the source of cooling
air to produce cooling air having temperature and relative humidity
substantially equal to the set points, in view of the information
received about the temperature and relative humidity of the ambient
air; and
[0059] (c) determining how much, if any, mechanical cooling and how
much, if any, adiabatic cooling is used by the source of cooling
air to produce cooling air having temperature and relative humidity
substantially equal to the set points.
[0060] The processor may perform operations (a), (b) and (c) in
view of the information received about the temperature and relative
humidity of the ambient air.
[0061] Operations (a), (b) and (c) may be carried out by software
installed onto the memory of the control system. The control system
may be programmed with different pre-loaded criteria according to
the type of IT equipment in the data centre at any given time. The
control system may be arranged for connection to, and control of, a
source of cooling air. The control system may be arranged for
connection to, and control of, physical means for varying the
amounts of exhaust air and ambient air used in generating the
cooling air. For example, the control system may be arranged for
connection to, and control of, one or more dampers, valves or the
like.
[0062] The present invention also provides, according to a fifth
aspect, apparatus for cooling air, preferably for adiabatically
cooling air. In the context of the present invention a cooling
process may be considered as an "adiabatic" process if there is no
change, or very little change, in enthalpy. It will be appreciated
that a cooling process in which there is some, for example
negligible, heat exchange with the external environment may still
be considered, in a practical sense, as an adiabatic cooling
process. This apparatus may comprise a cooler having at least a
first section and a second section, wherein the first and second
sections are individually selectively operable. Air may for example
be cooled by means of passing over or through the one or more
sections of the cooler. Each section may itself have a limited,
finite, number of settings (for example operating states) for
varying the amount of cooling provided by an individual section.
The number of settings may be fewer than five. The number of
settings may be two, in that each section may itself only be
controlled by selectively operating the section or not operating
the section (i.e. simple "on/off" control). The cooler may have
three or more individually operable sections. Preferably the cooler
has ten or fewer such sections. Preferably all sections of the one
cooler are arranged in parallel (for example, not arranged in
series). For example, an array of such sections may be provided in
a single plane. Sections of the cooler may be arranged adjacent to
each other. The cooler may be in the form of an evaporative cooling
apparatus. The cooler may be in the form of adiabatic cooler. The
apparatus for cooling air may comprise an adjustably sized
aperture, for example a bypass damper (i.e. a damper which allows
air to bypass the sections of the cooler). Preferably the
adjustably sized aperture is arranged in parallel with the cooler.
Preferably, the adjustably sized aperture and the cooler are
accommodated in the same airflow channel. Preferably, the apparatus
is so arranged that air flowing along the channel from a position
upstream of the apparatus to a position downstream of the apparatus
must pass via either one or more sections of the cooler or the
adjustable aperture. The apparatus may be arranged such that in use
air is permitted to pass through a non-operating section of the
cooler. Operation of a section of the cooler may comprise
introducing moisture, for example a flow of water, into the
section. The apparatus is preferably so arranged that the amount of
cooling provided by the apparatus depends on both how many sections
of the cooler are in operation and the size of the adjustably sized
aperture. Advantageously, this arrangement allows for a much finer
degree of control over the amount of cooling (for example the
amount of adiabatic or evaporative cooling) provided by the
apparatus than could be achieved without using an adjustably sized
aperture. It will be appreciated that this advantage is more
pronounced the lower the number of sections and the lower the
number of operating states (or cooling settings) that each section
has. Having such a fine degree of control available may allow the
amount of cooling provided to be closely matched to the cooling
demand at any given time. Having such a fine degree of control
available may allow the operation of a control regime in which set
points for the temperature and relative humidity of cooling air can
be reached and maintained with a high degree of accuracy.
[0063] For example, a method of cooling, for example IT equipment
in a data centre, may utilise the aforesaid apparatus by operating
at least one but not all of the sections, and then increasing the
amount of cooling (for example providing the same rate of flow of
air but at a lower temperature) by means of reducing the size of
the adjustable aperture, thereby forcing more air through the
sections of the cooler. The method may include a step (as cooling
demand increases still further) of then closing the aperture
completely such that substantially all air passes through the
sections of the cooler. The method may include a step of then
causing a further single section of the cooler to become
operational.
[0064] The method may include a step of performing the cooling
method for a set time (thereby introducing a delay) with the
adjustable aperture at a pre-set position (for example, fully
closed) before changing the number of sections of the cooler which
are operational. Introducing such a delay can be useful in
maintaining a smooth and/or efficient cooling regime. At
substantially the same time (just before, just after, or at exactly
the same time) as a new section of the cooler is made operational,
the adjustable aperture may start moving to a pre-set position. For
example, the adjustable aperture may move to be a position (i.e.
size of aperture) at which the amount of cooling provided by the
apparatus, once the extra section is fully operational, is
substantially the same as the amount of cooling provided by the
apparatus immediately before both the extra section was made
operational and the position of the aperture was so moved. In this
manner, the amount of cooling provided by the apparatus can, in
effect, be smoothly varied as extra cooling sections are made
operational. The preset position to which the aperture moves may
depend on the number of sections which are operational.
[0065] It will be appreciated that order of the steps of the method
just described (in the context of the cooling demand being greater
than the cooling provided--i.e. a condition where more cooling is
needed) is important but that not all steps need be performed. For
example, the aperture need not be closed completely before causing
an extra cooling section to become operational.
[0066] A method of cooling may similarly include steps which are
performed when the cooling demand is less than the cooling provided
(i.e. a condition where less cooling is needed). For example, a
method of cooling may utilise the aforesaid apparatus by operating
at least two of the sections, and then decreasing the amount of
cooling by means of increasing the size of the adjustable aperture,
thereby passing less air through the sections of the cooler and
more through the aperture. The method may include a step (as
cooling demand decreases still further) of then opening the
aperture completely. The method may include a step of then causing
a further single section of the cooler to become
non-operational.
[0067] The method may include a step of performing the cooling
method for a set time (thereby introducing a delay) with the
adjustable aperture at a pre-set position (for example, fully open)
before changing the number of sections of the cooler which are
operational.
[0068] At substantially the same time (just before, just after, or
at exactly the same time) as an operational section of the cooler
is made non-operational, the adjustable aperture may start moving
to a pre-set position.
[0069] The preset position to which the aperture moves may depend
on (a) whether cooling demand is not being met or cooling demand is
being more than met and (b) the number of sections which are
operational.
[0070] A sixth aspect of the invention provides apparatus for
controlling the rate of flow of air into, from, or within a data
centre (for example to control exhaust of air from a data centre),
the apparatus comprising at least a first adjustably sized aperture
and a second adjustably sized aperture, wherein each adjustably
sized aperture is arranged to be individually controlled.
Advantageously, this arrangement allows a better degree of control
over flow rates, for example the rate at which air is exhausted
from the data centre, than can be achieved with an arrangement in
which all of the adjustably sized apertures are controlled together
(so that each aperture is opened or closed by the same amount in
parallel, in contrast to the present aspect of the invention where
the apertures may be opened and closed in sequence). Each
adjustably sized aperture may comprise a set of damper blades. Each
adjustably sized aperture may be located at or near the point of
exhaust from the data centre. The adjustably sized apertures are
preferably arranged in parallel with each other (as opposed to
arranging apertures in series in which arrangement air would pass
thorough each of the apertures in turn).
[0071] A method of controlling the rate of air exiting a data
centre according to this sixth aspect is also provided. Such a
method may comprise the steps of providing a data centre having one
or more fans generating an air flow and a plurality of adjustably
sized apertures arranged to control the rate of air flow, for
example from inside the data centre to outside the data centre.
There may be steps of causing air to exhaust from the data centre
at a first rate during which one or more of the adjustably sized
apertures are at least partially open, and then moving one but not
all of the adjustably sized apertures to cause air to exhaust from
the data centre at a second, different, rate. The method may
include having one or more apertures in a fully closed position and
one aperture partially open, then fully opening that aperture
before starting to open one of the fully closed apertures. The
method may include having one or more apertures in a fully open
position and one aperture partially open, then fully closing that
aperture before starting to close one of the fully open
apertures.
[0072] The method may include moving the adjustably sized apertures
in sequence as the flow rate (for example exhaust rate) is varied
from a lower rate to a higher rate such that the adjustment in flow
rate is effected at lower flow rates by moving a first set of one
or more apertures whereas the adjustment in flow rate is effected
at higher flow rates by moving a second different set of one or
more apertures. The method may include varying the sequence. For
example, the method may include using at least one adjustably sized
aperture to enable variation of the air flow rate across a range of
lower rates at one instant and then at another instant using that
same adjustably sized aperture to enable variation of the air flow
rate across a higher range of rates not including the lower range.
The method may alternatively or additionally be used to control the
rate of air entering a data centre. The method may be used to
control the rate of air moving from one part of a data centre to
another part of that data centre.
[0073] A seventh aspect of the present invention provides a method
of accessing a first space in a data centre, the first space having
a high airflow due to the operation of at least one variable speed
fan, from a second space, the second space having a low or zero
airflow. There may for example be a door between the first space
and the second space. There may be a relatively large differential
pressure across the door as a result of the airflows in the first
space making it difficult and/or dangerous to open the door
manually.
[0074] The method according to this seventh aspect of the present
invention may include the steps of:
[0075] operating the at least one variable speed fan at a first
(for example relatively high) speed;
[0076] operating the at least one variable speed fan at a second,
pre-determined (for example relatively low), speed for a first
pre-determined time period; and
[0077] operating the at least one variable speed fan at the first
speed for a second pre-determined time period after the first time
period has elapsed.
[0078] The door may be opened during the period when the at least
one variable speed fan is operating at the second speed. This
method may thus allow easy and safe access to areas housing the air
treatment apparatus for a data centre while the apparatus is in
operation. The second speed is preferably sufficiently low to
enable the door to be opened and closed safely. The method is
preferably controlled by a control unit. The method may be used to
enable access to the first space by a person to engage in
maintenance work. The method may include operating the at least one
variable speed fan at the second speed for a first pre-determined
time period in response to a manually made request, for example to
open the door. For example the request may be provided by pressing
a door-release button, lever, or the like.
[0079] The present invention also provides, according to an eighth
aspect, a method of operating a data centre in a first mode in
which substantially all of the cooling done is mechanical cooling,
and subsequently operating the data centre in a second mode in
which a significant proportion of the cooling done is adiabatic
cooling. The method may include a step of providing adiabatic
cooling apparatus in an offline state and then operating the
adiabatic cooling apparatus simultaneously with the mechanical
cooling apparatus for a pre-set time period. The adiabatic cooling
apparatus may be operated at a level dependent on the temperature
and relative humidity of ambient air outside the data centre. The
method may be performed such that the adiabatic cooling apparatus
is initially operated at a level which represents a significant
proportion of the operational maximum of the apparatus (for example
at least 40%, and preferably at least 50%). The method may include
a step of reducing the level of operation of the mechanical cooling
apparatus to a level dependent on the temperature and relative
humidity of the ambient air, when the pre-set time period has
elapsed. When the adiabatic cooling apparatus is in an offline
state for any significant length of time, the moisture retaining
parts of the apparatus have a tendency to dry out. When initiated
there can therefore be a significant time-lag before the adiabatic
cooling apparatus reaches its steady state cooling levels, at any
given level of desired cooling capacity.
[0080] Advantageously, this method ensures that the adiabatic
cooling apparatus is sufficiently wet to be able to provide the
level of cooling required (i.e. to convert ambient air into cooling
air of the required characteristics) immediately after the
mechanical cooling apparatus is turned off, despite the time it
might take for the adiabatic cooling apparatus to reach its steady
state cooling rate when it is brought online. The method may
therefore, for a short-time, cause the cooling air to be cooler
than required as the adiabatic cooling apparatus is operated in
parallel with the mechanical cooling apparatus during pre-set time
period. The pre-set time period may be considered as a transition
period between the first and second modes of operation. The first
mode of operation (in which substantially all of the cooling done
is mechanical cooling) may be such that the data centre
re-circulates fully the exhaust air and draws little or no ambient
air during operation. Such a (fully re-circulating) mode may be
engaged when the outside air is very warm or when a fire alarm or
VESDA alarm is triggered. The second mode of operation (in which a
significant proportion of the cooling done is adiabatic cooling)
may be such that the cooling air is composed substantially entirely
of ambient air from outside the data centre (a "fresh air" mode).
This method may be used when the data centre is changed from a
fully re-circulating mode to a fresh air mode because the fire
alarm or VESDA alarm has been triggered when there is, in fact, not
a fire.
[0081] The adiabatic cooling mentioned above may be in the form of
evaporative cooling. The eighth aspect of the invention also has
application in the case where heat is exchanged, for example extra
cooling is performed, alongside or in combination with the
adiabatic cooling. For example, an evaporative cooler may reduce
the temperature of the air in a manner that is effectively a
combination of perfect adiabatic cooling and heat exchange, whether
positive or negative. The second mode of cooling may therefore be
one in which a significant proportion of the cooling done is
evaporative cooling, whether or not adiabatic.
[0082] According to a ninth aspect, the present invention provides
a method of operating a data centre in a first mode in which most
or all of the cooling is not provided by mechanical cooling and
subsequently operating the data centre in a second mode in which
substantially all of the cooling is provided by mechanical cooling,
the method including the following steps:
[0083] defining a target value for cooling air produced by the
mechanical cooling apparatus, wherein this target value is
significantly lower than the temperature of cooling air produced
when the data centre is operating in the first mode;
[0084] increasing the target value by a pre-set amount over a
pre-set period of time; and
[0085] operating the mechanical cooling apparatus at a level
dependent on the target value.
[0086] The target value may be gradually increased over time to a
final steady-state target value. By initially setting the target
value to a value that is significantly lower than the final
steady-state target value, the mechanical cooling system may
effectively be run at a level significantly higher than the level
that would be necessary to achieve the final steady-state target
value in the most energy efficient manner possible. However, by
over-driving the mechanical cooling system initially, there is less
of a risk of an unintentional increase in temperature as a result
of lag in the system. The mechanical cooling system may be run at a
relatively high level temporarily in order to achieve the final
steady-state target value in a timely manner.
[0087] This method has the advantage that it may act to force the
mechanical cooling apparatus to operate at its maximum level as
soon as the data centre is switched into a mode in which all of the
cooling demand must be met by the mechanical cooling apparatus.
There is therefore a reduced risk of the mechanical cooling
apparatus not being able to meet this cooling demand because the DX
system is operating at too low a level. If the mechanical cooling
apparatus were allowed to adjust to the change in mode
automatically, the delay in bringing additional DX cooling coils
online could mean that the temperature of the cooling air supplied
to the servers would rise to unacceptable levels for a period of
time.
[0088] The second mode of operation in this aspect of the invention
(in which substantially all of the cooling done is mechanical
cooling) may be such that the data centre re-circulates fully the
exhaust air and draws little or no ambient air during operation.
The first mode of operation in this aspect of the invention may be
such that a significant proportion of the cooling is not provided
by mechanical cooling. It may be that none of the cooling is
provided by mechanical cooling during the first mode.
[0089] According to a tenth aspect, the present invention provides
a method of operating a data centre having a smoke detection system
and mechanical cooling apparatus, wherein the smoke detection
system has detected smoke and a significant proportion of the
mechanical cooling apparatus has become inoperable. The method may
include a step of operating the data centre in a mode in which the
cooling air is composed substantially entirely of ambient air from
outside the data centre and in which substantially none of the
cooling is provided by mechanical cooling (for example, a "fresh
air cooling" mode). Whilst on detection of smoke it may be
preferable to operate in a mode in which mechanical cooling is used
and in which exhaust air is re-circulated, if sufficient mechanical
cooling is unavailable and there is no fire alarm activated it may
be preferable to utilise a fresh air cooling mode instead. (It may
be better, in the case of a combination of a mechanical cooling
fault and smoke alarm situation, to keep the IT equipment cool if
the risk of fire is still judged as low, than to over-react to a
fire-risk and prejudice the proper function of the IT equipment.)
Apparatus suitable for detecting a fire within the data centre may
be provided, for example in the form of a fire alarm system. In the
case where a fire is subsequently detected within the data centre,
the method preferably includes a step of operating the data centre
in a mode in which the cooling air is composed substantially
entirely of exhaust air and in which substantially all of the
cooling is provided by mechanical cooling (for example, a fully
re-circulating mode).
[0090] Advantageously, this method ensures that the electronic
equipment in the data centre is kept cool enough in the event that
smoke is detected in the data centre and the mechanical cooling
apparatus experiences a partial failure. If, as would be the usual
response to detecting smoke, the data centre was switched into full
re-circulation mode, the mechanical cooling apparatus that was
still operational would not be able to meet the demand for cooling
air and the electronic equipment could overheat. However, if an
actual fire is detected within the data centre, it is more
important to control the fire risk than to keep the servers cool so
the data centre is switched into full-recirculation mode,
notwithstanding the reduced mechanical cooling capacity, so that
fire suppressant gas can be deployed.
[0091] A final aspect of the present invention provides a method of
monitoring the status of a network of controllers suitable for
controlling components of a data centre cooling system. The method
may include the steps of:
[0092] providing a primary controller arranged to be able to send
signals to at least one secondary controller and to receive signals
from said secondary controller;
[0093] providing at least one secondary controller arranged to be
able to receive signals from the primary controller and to send
signals to the primary controller;
[0094] the primary controller sending a first signal to the
secondary controller; and
[0095] the secondary controller sending a second signal to the
primary controller.
[0096] The method may be performed such that in the case that
either (a) the primary controller does not receive a second signal
from the secondary controller during a first pre-set time period or
(b) the secondary controller does not receive a first signal from
the primary controller during a second pre-set time period (which
need not necessarily be different from the first pre-set time
period), at least one component of the cooling system is instructed
by one of the controllers to enter a failsafe mode.
[0097] The method may be performed such that in the case that the
primary controller does not receive a second signal from the
secondary controller during the first pre-set time period, the
primary controller instructs at least a first component of the
cooling system to enter a failsafe mode. The method may be
performed such that in the case that the secondary controller does
not receive a first signal from the primary controller during a
second pre-set time period, the secondary controller instructs at
least a second component (which may or may not be different from
the first component) of the cooling system to enter a failsafe
mode.
[0098] The method may be performed such that the primary controller
sends the first signal to the secondary controller in response to
the second signal received from the secondary controller. It will
be appreciated therefore that the second signal may be sent before
the first signal is sent. The primary controller is preferably
arranged to receive signals from a plurality of secondary
controllers.
[0099] The fail safe mode may include operating one or more fans at
or near their operational maximum. The fail safe mode may include
moving one or more adjustable apertures to their fully open state.
In an embodiment of the invention, the secondary controllers are
each associated with a cold region. In that embodiment, adjustable
apertures are associated with each cold region. The primary and
secondary controllers are preferably linked to each other via a
computer network arrangement, such as an Ethernet network. Checking
the health of the network in the manner suggested above may be of
particular benefit in that a further supervisory control panel or
interface need not be required for the purpose of checking the
health of the network or for the purpose of reacting to a detected
fault.
[0100] The method of the invention, according to any of the above
aspects, may be implemented by a suitably arranged control
apparatus. For example, the control apparatus may be arranged to
receive inputs, from which measures of outside air temperature and
relative humidity may be ascertained. The control apparatus may be
arranged to receive at least one input from an air flow sensor
located in an opening, for example in a rack of IT equipment,
between a hot region and a cold region. It will be appreciated that
other aspects of the invention may require a control unit, or
multiple control units, requiring further inputs. The control
apparatus may control fan speed. The control apparatus may control
the adjustment of adjustable apertures. The control apparatus may
control the use of the cooling apparatus mentioned above (for
example the apparatus for adiabatic cooling and/or evaporative
cooling). The control apparatus may control the use of mechanical
cooling. It will be appreciated that other aspects of the invention
may require a control unit, or multiple control units, controlling
other parts of the data centre.
[0101] The control apparatus may comprise one or more programmable
control units. The method of the invention may be implemented by
means of suitably programmed control units. The invention may
therefore extend to the programming of a control apparatus, and for
example to programming of one or more control units to perform the
methods of the invention. The present invention thus further
provides a computer program comprising computer program code means
adapted to perform any of the methods of the invention, according
to any of the aspects described herein, when said program is run on
a programmable controller.
[0102] It will of course be appreciated that features described in
relation to one aspect of the present invention may be incorporated
into other aspects of the present invention. For example, the
method of the invention may incorporate any of the features
described with reference to the apparatus of the invention and vice
versa.
DESCRIPTION OF THE DRAWINGS
[0103] Embodiments of the present invention will now be described
by way of example only with reference to the accompanying schematic
drawings of which:
[0104] FIG. 1 shows a prior art rack room;
[0105] FIG. 2 shows a data centre building according to a first
embodiment of the invention;
[0106] FIG. 3 is a partial plan view of a data centre building
according to a second embodiment of the present invention;
[0107] FIG. 4 shows a rack room door with variable air flow intake
according to a second embodiment of the invention;
[0108] FIG. 5 shows a first example psychrometric chart including a
control line and zones;
[0109] FIG. 6 shows a second example psychrometric chart including
a control line and zones;
[0110] FIG. 7 is a plan view of the air optimisation module of a
data centre building according to a second embodiment of the
invention;
[0111] FIG. 8 is an end view of two adjacent rack storage areas
according to a second embodiment of the invention; and
[0112] FIG. 9 is a partial plan view of a data centre according to
a third embodiment of the invention.
DETAILED DESCRIPTION
[0113] FIG. 2 shows a data centre building 10 according to a first
embodiment of the invention.
[0114] The building 10 is rectangular with external walls 12. The
building is divided into front and rear sections by an internal
dividing wall 12a, located approximately one third of the length of
the building from the rear external wall.
[0115] The rear section (on the left in FIG. 2) defines an air
optimisation room 11, which provides a system of circulating
cooling air in the building 10. Ambient air 18 can enter the air
optimisation room 11 through an ambient air intake 13 in the rear
external wall. Exhaust air 16, which has been heated by IT
equipment in the data centre, can enter the air optimisation room
through two exhaust air intakes 20a and 20b in the internal
dividing wall 12a. The ambient air intake 13 and the exhaust air
intakes 20a and 20b are fitted with dampers so that the amount of
ambient air and the amount of exhaust air entering the air
optimisation room may be controlled. When the ambient air intake
damper is shut, no ambient air may enter the air optimisation room.
Likewise, when the exhaust air intake dampers are shut, no exhaust
air may enter the air optimisation room.
[0116] Ambient air 18, exhaust air 16 or a mixture of ambient and
exhaust air can be treated/cooled in the air optimisation room and
this air 18a is then used for cooling. If the ambient air outside
the building 10 is sufficiently cool, the ambient air may be used
as cooling air, without requiring any active cooling by the air
optimisation room 11. Cooling air 18a passes into the front section
of the building 10 through two air passages 17 in the internal
dividing wall 12a.
[0117] The front section (on the right in FIG. 2) of the building
10 defines a rack room 19. The rack room 19 houses two rows of
racks 14; one on either side of the air passages 17. The racks 14
extend away from the internal dividing wall 12a, towards the front
of the building. Although only shown schematically in FIG. 2, there
are 20 racks in each row, each rack housing up to 40 items of IT
equipment (typically server blades). There may therefore be a many
as 1,600 items of IT equipment in the racks. A blanking panel 14a
extends between the front ends of the two racks, thereby defining a
cold region 19a between the internal dividing wall 12a, the two
racks 14 and the blanking panel 14a.
[0118] A hot region 19b is defined on the other side of the racks
14 and the blanking panel 14a. Air can escape from the hot region
19b though a hot air exit 15 in the front external wall of the
building. The hot region and the cold region are made largely air
tight through the use of further blanking panels in empty racks and
between the top of the racks and the ceiling of the rack room, so
that air may only move from the cold region to the hot region
through the servers, or through a duct 21.
[0119] The duct 21 is located between the top of one of the rows of
racks 14 and the ceiling. The duct 21 extends from the cold region
to the hot region. The end of the duct that meets the hot region is
covered by a hinged flap (not shown), meaning that air may only
enter the duct from the cold region and exit it into the hot
region, and not vice versa. The duct 21 contains an airflow
velocity sensor (not shown).
[0120] In use, ambient air 18 enters the air optimisation room 11
through the ambient air intake 13 and/or exhaust air enters the air
optimisation room through exhaust air intakes 20a and 20b. The air
that enters the air optimisation room will from here on be referred
to as supply air. The supply air can consist of just ambient air,
just exhaust air, or a mixture of ambient and exhaust air depending
on the position of the ambient air intake damper and the position
of the exhaust air intake dampers. The supply air is cooled/treated
as necessary in the air optimisation room 11 and leaves through air
passages 17 as cooling air 18a. The treatment and/or cooling of the
supply air may be effected in accordance with the second embodiment
described below. The volume of cooling air leaving the air
optimisation room is controlled by a variable speed fan (not shown)
in the air optimisation room.
[0121] The cooling air 18a enters the rack room 19 into the cold
region 19a. The cooling air 18a moves over the racks 14 in the rack
room 19 to reach the hot region 19b and in the process cools the
racks 14. The resulting hot air 16 coming off the racks 14 then
leaves the rack room through the hot air exit 15. If the exhaust
air intake dampers 20a and 20b are open then some of the hot air 16
will re-circulate back into the air optimisation room 11.
[0122] The volume of air flow through the building is at least 12
m.sup.3s.sup.-1. Such a high rate of supply of air is sufficient to
cool the IT equipment in the room via ambient air cooling alone for
ambient air temperatures of up to 24 degrees Celsius. The volume of
air supplied to the cold region is adjusted according to the demand
of the servers at any given time. How this adjustment is achieved
will now be described.
[0123] If too much cooling air is being supplied to the cold
region--i.e. the volume of air flowing through passages 17 is
greater than the volume of air being drawn through the servers--the
air pressure in the cold region will increase. As a result, the
velocity of the air flowing through duct 21 will increase. The
velocity sensor in duct 21 provides velocity information to a
control system that controls the speed of the variable speed fan in
the air optimisation room 11. When the velocity measured by the
velocity sensor is greater than 0.35 m/s, the control system
reduces the speed of the fan so that less air is supplied to the
cold region.
[0124] If too little cooling air is being supplied to the cold
region--i.e. the volume of air flowing through passages 17 is less
than the volume of air being drawn through the servers--the air
pressure in the cold region will decrease. As a result, the
velocity of the air flowing through duct 21 will decrease. When the
velocity measured by the velocity sensor in duct 21 falls below
0.35 m/s, the control system increases the speed of the variable
speed fan so that more air is supplied to the cold region.
[0125] FIG. 3 shows a second embodiment of the invention. In the
embodiment shown in FIG. 3, there is an air optimisation room 120
located at the rear of the building 100, a plant room 130 located
in front of the air optimisation room 120, a rack room 140 located
in front of the plant room 130, an above-floor hot air corridor 132
and an above-floor air supply corridor 123.
[0126] The air optimisation room 120 contains an air optimisation
unit 122, the layout of which is shown in FIG. 6. The air
optimisation unit 122 is located adjacent the external right side
wall of the data centre building 100 so that an ambient air intake
grille 121 on one end of the unit 122 lines up with an ambient air
intake hole 113 in the external wall of the data centre. The
ambient air intake grille 121 includes a damper that is
controllable so that the amount of air entering the air
optimisation unit 122 through grille 121 can be controlled.
[0127] The air optimisation unit 122 also has a second air intake
in the form of a return air grille 125. The return air grille 125
is located at the right, front end of the optimisation unit 122,
near the end wall including the ambient air intake grille 121. The
return air grille 125 includes a damper that is controllable so
that the amount of air entering the air optimisation unit 122
through grille 125 can be controlled.
[0128] The air optimisation unit 122 (shown in detail in FIG. 7)
contains various air treatment apparatus, including a bank of
variable speed fans 700, air filters 710, an adiabatic cooler 720
and six DX cooling coils 730. The air optimisation unit 122 also
contains an air mixing box 740 for mixing the air from return air
grille 125 and ambient air intake grille 121. The unit 122 also
contains sound attenuation apparatus.
[0129] The wall between the plant room 130 and the air optimisation
room 120 includes several doors (not shown), through which the air
treatment apparatus may be accessed for maintenance. When the fans
700 are operating at more than 35% of their maximum speed, the
pressure differential between the air optimisation unit 122 and the
plant room 130 is such that it is very difficult to open these
access doors. So that the air treatment apparatus may be inspected
and maintained while the cooling system is in operation, there is a
switch in the plant room and switches next to each of the access
doors on the air optimiser unit side.
[0130] When any of these switches is activated, the normal control
process for the fans 700 is overridden and their speed drops to a
low level for 8 seconds. This allows the door to be opened safely.
After the 8 seconds has elapsed, the fans 700 then operate at the
speed at which they were operating when the switch was pressed for
2 minutes, after which normal control is resumed.
[0131] To the left side of the air optimisation unit 122 is an air
supply corridor 123. The air supply corridor 123 runs above-floor
from the rear external wall, and along and in between the left side
of the air optimisation unit 122 and the left external side
wall.
[0132] To the right side of the plant room 130 is a hot air
corridor 132 running above-floor along the width of the plant room
130 and along the external side wall of the building. The hot air
corridor 132 also extends around the front of the plant room 130,
in between the front plant room wall and the rear side of the
left-most row of racks. This corridor also extends into the spaces
145 between the rear sides of the other rows of racks. This allows
air from the rack room 140 to enter the hot air corridor 132.
[0133] On the left end wall of the plant room 130 is a plant room
access door 131. The door 131 allows access to the plant room 130
from the hot air corridor 132.
[0134] The plant room 130 contains an air optimiser control panel
137, mounted on an internal side of the plant room walls. The air
optimiser control panel 137 receives data from various sensors
inside the building 100 and an outside ambient air temperature and
relative humidity sensor TH.sub.0. This outside ambient air
temperature sensor TH.sub.0 is placed outside the building 100 near
the ambient air intake grille 121. Sensor TH.sub.0 actually
comprises two separate temperature and humidity sensors, and the
temperature and humidity values provided to the air optimiser
control panel 137 are averages of the values measured by the two
sensors.
[0135] The air optimiser control panel 137 also receives data from
three rack room control panels (not shown), each of which is
located at the end one of the cold aisles 144.
[0136] The air optimiser control panel includes processors and
memory for storing pre-programmed instructions and control
software. The air optimiser control panel uses the information
received from the sensors and the rack room control panels together
with the pre-programmed instructions to control the fans,
humidification apparatus, cooling system and the ambient air
intake, exhaust and return dampers in order to achieve effective
cooling of the racks in the rack room 140.
[0137] The plant room 130 also contains fire suppression apparatus
and a VESDA (Very Early Warning Smoke Detection Apparatus) fire
detection monitoring panel, mounted on an internal side of the
plant room walls 134. Fire suppression gas discharge cylinders are
connected to the air optimisation unit 122 so that in the event of
a fire (when the VESDA monitoring panel is triggered), gas from the
cylinders can be discharged through the air optimisation unit 122
into air supply corridor 123.
[0138] The rack room 140 contains six elongate rectangular rack
storage areas, the areas being parallel to each other. Hence, a
passageway running along and in between the rear external wall of
the building and the rear internal wall 141 of the rack room 140 is
defined. This passageway runs along the width of the rack room 140
and is closed off from the rack room area by the internal wall 141.
The passageway forms part of the air supply corridor 123.
[0139] Each rack storage area is effectively defined by a single
row of racks 143 running lengthways along the rack room 140, i.e.
widthways across the building, from the internal wall 141 to the
rear end of the rack room area. The rack storage areas are arranged
in three pairs such that when racks have been installed in the rack
storage areas and the racks have been filled with servers, each
pair of rack storage areas includes two rows of racks 143 arranged
face-to-face. Between the front faces of the rows of racks making
up each pair is a cold region in the form of an above-floor cold
aisle 144.
[0140] At the rear end of the rack room area, spanning across the
ends of the two rack rows making up each pair, is a cold aisle
blanking panel 147 designed to close off the cold aisle 144 at the
rear end. As shown by FIG. 8, above the front face of each row of
racks 143 there are over-rack blanking plates 800 between the top
of the racks and the ceiling 810 of the rack room 140, which are
designed to stop cold air travelling over the racks 143. Blanking
plates are also used to prevent air flow through any other spaces
between the racks and the floor, ceiling or ends of the cold aisle,
as well as through spaces in the racks where there is no IT
equipment. Above each row of racks there is also a duct 150, 160,
170 joining each cold aisle 144 to each hot region 145 between the
back of the racks. These ducts 150, 160, 170 pass through holes in
the over-rack blanking plates 800. The end of each duct 150, 160,
170 that joins the hot region 145 is covered by a hinged flap (not
shown). Ducts 150, 160 and 170 are of rectangular cross-section
measuring approximately 110 mm.times.54 mm. Each duct 150, 160, 170
contains an air flow velocity sensor (not shown), which provides
air flow velocity information to a rack room control panel (not
shown). Hence, air can only leave the cold aisles 144 through the
racks 143 and through the ducts 150, 160 and 170. Each cold aisle
has its own rack room control panel, located on the cold aisle
blanking panels 147.
[0141] Air from the supply air corridor 123 can enter the cold
aisles 144 through cooling air intake grilles 142, located on the
internal wall 141 (i.e. above-floor) in between the rows of racks
143. The grilles 142 include dampers 182. Each damper 182 is
controlled by the rack room control panel for its respective aisle
so that a desired air flow regime can be achieved.
[0142] The rack room control panels use proportional-integral (PI)
controllers to control the dampers 182. A PI controller uses two
separate parameters which may be thought of as the reaction to the
current error, and the reaction to the accumulation of past errors.
A weighted sum of these two parameters is used to determine the
actual reaction, for example how the dampers 182 move in response
to a change in the airflow velocity measured by the sensors. The PI
algorithm used by the controller is tuned to provide optimal
control of the dampers, such that the position quickly stabilises
at the optimal value and does not oscillate around it for very
long.
[0143] As shown by FIG. 4, each cooling air intake grille 142 is
part of a securable door 180 that can be opened and closed to allow
personnel access from the air supply corridor 123 to the cold aisle
144 of the rack room 140. Each cooling air intake grille door 180
is made from aluminium and/or steel. Each door 180 opens by way of
a hinge 184. Each set of dampers 182 is connected to the rack room
control panel for its aisle by wiring which runs through a flexible
tube 183.
[0144] On the front wall of the rack room 140, which is also the
front external wall of the building, is a hot air outlet grille
146. The grille 146 is divided into four equally sized sections.
Each of these sections has a damper that is individually
controllable by the air optimiser control panel 137 so that the
amount of hot air 16 that is exhausted from the building 100
through hot air outlet grill 146 can be controlled.
[0145] The ambient air intake grille 113 is also divided into four
equally sized sections, each of which has its own individually
controllable damper controlled by the air optimiser control panel
137. The air optimiser control panel is programmed such that the
dampers in the air intake grille 113 and the dampers in the exhaust
grilles 146 move in tandem and are always in the same position.
[0146] The air optimiser control panel 137 is programmed to open
and shut the air intake and exhaust dampers in such a way that the
finest possible degree of control over the amount of air exiting
and entering the data centre is achieved. This means that, for
example, if the ambient air intake dampers and the exhaust dampers
are required to be 25% open, for each grille one of the four
sections will be fully open and the other three will be fully
closed. If the cooling load increases from this situation so that
more airflow is needed, a second section will start to open until
the demand for cooling air is met. If the cooling load increases
further, the second section will open more. If it reaches the fully
open and the demand is still not met, a third section will start to
open, and so on.
[0147] The air optimiser control panel 137 is programmed so that it
instructs the sections to open in a different order each week,
cycling through all possible orders. This evens out the wear on the
actuators that move the dampers. The air optimiser control panel
137 uses PI controllers to control the air intake and exhaust
dampers.
[0148] In use, the data centre building 100 of FIG. 3 operates to
cool the racks 143 in the rack room 140 by generating a sufficient
quantity, velocity and pressure of cooling air 18a in the air
optimisation unit 122. The operation of the air optimisation unit
will now be described in detail, with reference to FIG. 7.
[0149] When the data centre is started up for the first time, the
air optimisation unit 122 must be turned on by activating a switch.
This causes the fans 700 to begin operating at a preset speed,
without activating any of the other air optimisation equipment. The
fans 700 operate at this preset speed for a preset time period of
two minutes. During this period the air pressure across the fans is
measured by pressure sensors upstream and downstream of the fans,
and monitored by the air optimiser control panel 137. If at the end
of the two minute period the pressure differential is greater or
equal to 5 Pa, and has been for at least 15 seconds, the rest of
the air optimisation equipment is activated and normal control as
described below is established. If the pressure differential
condition is not met, then the rest of the air optimisation
equipment is not allowed to begin operation. Once normal operation
is established, the air optimisation unit functions as follows.
[0150] Air entering the air optimisation unit may be ambient air
18, which enters through ambient air intake grille 121, exhaust air
16, which enters through return air intake grille 125, or a
combination of ambient air 18 and exhaust air 16, depending on the
positions of the ambient air intake damper and the return air
intake damper (as explained above, the position of the exhaust air
dampers is always the same as the position of the ambient air
intake damper). The position of these dampers is controlled by the
air optimiser control panel 137. The air optimiser control panel is
connected to the outside ambient air temperature and relative
humidity sensor TH.sub.0, which is located outside the building
100, near the ambient air intake hole.
[0151] Sensor TH.sub.0 measures the temperature and relative
humidity of the ambient air outside the building. The air optimiser
control panel 137 uses these measured values to determine which one
of seven pre-defined zones on a psychrometric chart 600 the ambient
air falls within. These zones are shown by FIG. 5. There are seven
zones, referred to as zone 1, zone 2 and so on, up to zone 7. In
FIG. 5, zone 1 represents a relatively cold and dry zone, whereas
zone 7 represents a relatively hot and humid zone. Further
explanation concerning these seven zones and their function is
provided later on. Which zone the measured values fall within
determines whether the ambient air intake damper and the return air
intake damper are open or closed, and hence whether the supply air
consists of just ambient air 18, just exhaust air 16, or a mixture
of ambient air 18 and exhaust air 16. The exact position of each
damper is controllable by the air optimiser control panel 137 using
a PI controller.
[0152] If both the return air damper and the ambient air intake
damper are open, ambient air 18 and exhaust air 16 are mixed
together in mixing box 740 to create supply air.
[0153] From the mixing box, the supply air then passes through
filters 710, which remove dust and other particles from the supply
air. Once it has passed through the filters 710, the supply air
passes through a DX cooling system 730, which comprises six DX
cooling coils and six condenser units. The DX cooling system 730 is
controlled by the air optimiser control panel 137 using a PI
controller. Whether the DX cooling system is on or off, and if on,
at what level it is operating, is determined by which zone the
ambient air characteristics measured by sensor TH.sub.0 fall
within. The air optimiser control panel is programmed to only allow
operation of the DX system 730 when there is positive airflow
across the fans 700.
[0154] Once the supply air has passed through the DX cooling system
730 it passes through the adiabatic cooler 720 and/or the bypass
damper 750. When the bypass damper 750 is closed all of the supply
air will pass through the adiabatic cooler 720. When the bypass
damper 750 is partially open, some of the supply air will pass
through the adiabatic cooler 720 and some will pass through the
bypass damper 750. If the adiabatic cooler is operating at the same
level in both scenarios, the air downstream of the adiabatic cooler
720 will be colder and more humid if the bypass damper is shut than
if it is open.
[0155] The adiabatic cooler 720 consists of a matrix made of
corrugated sheets of glass fibre material. Water is supplied to the
top of the matrix and flows down its corrugated surface. The supply
air passes through air gaps between the sheets of moist material,
picking up water vapour as it does so. This increases the relative
humidity and lowers the temperature of the supply air. The water
that does not evaporate flows into a stainless steel tank at the
base of the unit before being re-circulated up on to the matrix
again. The matrix has four sections, each of which has a separate
water supply that is individually controlled by the air optimiser
control panel. This allows the level of humidification and cooling
provided by the adiabatic cooler to be varied between four
different states. The amount of cooling can be further varied by
altering how much air passes through the bypass damper and
therefore is not cooled at all.
[0156] The amount of cooling done by the adiabatic cooler 720 is
determined by which zone the temperature and relative humidity
values measured by sensor TH.sub.0 fall within. When the adiabatic
cooler is on, the level at which it is operating at any given time
is controlled in dependence on the temperature and relative
humidity measured by sensor TH.sub.2. (Like sensor TH.sub.0, sensor
TH.sub.2 actually comprises two separate temperature and humidity
sensors, and the temperature and humidity values provided to the
air optimiser control panel 137 are averages of the values measured
by the two sensors.) When the adiabatic cooler 720 is completely
off (for example when the ambient air is in zone 7) the bypass
damper 750 is fully open. When the adiabatic cooler 720 is on, the
level at which it operates and the exact position of the bypass
damper 750 (which together determine the amount of cooling) are
controlled by the air optimiser control panel 137 using a PI
controller.
[0157] The bypass damper allows a much finer degree of control over
the amount of cooling provided by the adiabatic cooler 720 than
would be possible without such a damper. When the adiabatic cooler
is on, which (if any) of the water supplies for the adiabatic
cooler 720 are on, and the position of the bypass damper 750, at
any given time is determined by the air optimiser control panel
based on the temperature and relative humidity of the air
immediately downstream of the adiabatic cooler as measured by
sensor TH.sub.2.
[0158] The control process for the adiabatic cooler 720 and the
bypass damper 750 will now be described. When no adiabatic cooling
is required, all four sections of the adiabatic cooler are off
(i.e. no water is flowing through them) and the bypass damper 750
is fully open. If the cooling demand increases, one section of the
adiabatic cooler is brought online using the following procedure,
which is programmed in to the air optimiser control panel 137.
[0159] When a new section is about to be brought online, the bypass
damper is always instructed to move to the fully closed position.
When the bypass damper has been fully closed for 30 seconds, the
new section is activated by turning on the water supply to that
section. Once the water supply has been switched on, the bypass
damper is moved to a pre-set position corresponding to
approximately two-thirds open. Once this activation sequence has
been completed, the amount of cooling is then adjusted to exactly
meet the demand at any given time by adjusting the position of the
damper. If the cooling demand increases to the point where it is
not met even with the damper fully closed, an additional section of
the adiabatic cooler must be brought online.
[0160] The air optimiser control panel is programmed such that
there is always a delay of 30 seconds between the bypass damper 750
closing and an additional section of the adiabatic cooler 720
switching on. This is because the inactive sections of the cooler
may still be wet from previous use, in which case more cooling than
expected would result when the damper was fully closed. If the
cooling demand is still not met after the 30 seconds has passed, a
second section of the adiabatic cooler 720 is switched on and the
damper is moved to the pre-set position. As cooling demand
increases, this process will be repeated until all four sections of
the adiabatic cooler are switched on and the bypass damper 750 is
fully closed, at which point the adiabatic cooler 720 is providing
its maximum amount of cooling.
[0161] As the cooling load decreases, the bypass damper 750 is
opened. If the damper reaches the fully open position and there is
still too much cooling being done, a section of the adiabatic
cooler is switched off (by shutting off its water supply) and at
the same time the bypass damper 750 is instructed to start closing.
The bypass damper takes approximately 2.5 minutes to move from
fully open to fully closed. A section of the cooler will become
completely dry approximately 5-10 minutes after it has been
switched off if there is airflow through it.
[0162] As the recently switched off section dries, the amount of
cooling provided by the adiabatic cooler drops. The bypass damper
is instructed to close to compensate for this drop. The bypass
damper 750 will not usually reach the fully closed position,
instead it will stop closing once the data from sensor TH.sub.2
show that the amount of cooling being provided meets the cooling
demand and hence the cooling air meets the pre-defined criteria for
cooling air programmed into the memory of the air optimiser control
panel 137.
[0163] If the cooling demand drops further, the bypass damper 750
will open. If it reaches fully open and the amount of cooling being
done is still too high, another section of the cooler will be
switched off using the process described above. The degree of
control provided by the combination of the four-sectional adiabatic
cooler 720 and the bypass damper 750 is such that the amount of
adiabatic cooling being done can be tailored to closely match the
cooling demand at any given time.
[0164] Once the supply air has passed through the adiabatic cooler
720 or the bypass damper 750, its relative humidity will meet
pre-defined criteria for cooling air programmed into the memory of
the air optimiser control panel 137 but its temperature will be
approximately 1.degree. C. too low to meet the pre-defined criteria
for cooling air. This is because the temperature of the supply air
increases by approximately 1.degree. C. as it passes through the
fans 700.
[0165] The temperature and relative humidity of the cooling air
supplied to the IT equipment is measured by sensor TH.sub.2. If the
temperature measured by TH.sub.2 deviates from the pre-defined
criteria for cooling air by more than 5.degree. C. then an alarm is
raised.
[0166] The pre-defined criteria for cooling air are represented by
a single control line 610 on psychrometric chart 600 (see FIG. 5),
which in accordance with convention, has a horizontal axis
measuring dry-bulb temperature and a vertical axis measuring
moisture content. The user can select an appropriate control line
based on the characteristics of the IT equipment installed in the
data centre. In the current example the control line joins point
620 (representing a temperature of 18.degree. C. and a relative
relative humidity of 45%), point 630 (representing a temperature of
24.degree. C. and a relative humidity of 65%) and point 640
(representing a temperature of 24.degree. C. and a relative
humidity of 80%). The cooling air supplied to the IT equipment may
have temperature and relative humidity substantially equal to any
point on this line. Each section of the control line 610 is defined
by the equation of a straight line having terms for enthalpy,
moisture content and dry bulb temperature.
[0167] The psychrometric chart 600 is divided into a plurality of
different zones around the control line. The zones are bounded by
the control line 610, lines of constant enthalpy, lines of constant
temperature and/or lines of constant moisture content. The
boundaries of the zones are calculated by the control process panel
137 when the user defines the control line that is to be used. In
the current example the control line 610 has two straight line
sections, which leads to seven zones. FIG. 6 shows an alternative
control line 680 which has three straight line sections. The
control line 680 in FIG. 6 results in nine separate zones, since
zone 1 has been split into three separate zones 1a, 1b and 1c. The
control line 680 of FIG. 6 has the effect of reducing the water
consumption of the data centre as compared with control line 610 of
FIG. 5, since it allows the supply air provided to the IT equipment
to be less humid. The control line can be altered while the data
centre is in operation, in which case the control process panel 137
will automatically recalculate the number, size and position of the
zones.
[0168] The sensor TH.sub.0 measures the temperature and relative
humidity of the ambient air 18, and the moisture content and
enthalpy of the ambient air (hereafter "measured moisture content"
and "measured enthalpy") are calculated from these values as
measured. A processor in control process panel 137 uses the
measured moisture content and measured enthalpy and/or the measured
temperature and measured relative humidity to determine which zone
the ambient air falls within. If the ambient air 18 falls within
zones 1, 3, 5, 6 or 7 then the control process panel 137 can
determine the zone by comparing the measured temperature, measured
moisture content and/or measured enthalpy values with the constant
values of temperature, moisture content and/or enthalpy that
represent the zone boundaries. For example, if the measured
temperature is greater than 24.degree. C. and the measured enthalpy
lies between the values represented by the upper and lower lines of
constant enthalpy that bound zone 5, the outside air will have
characteristics that fall within zone 5 (there will be no need for
comparison of other values). If the ambient air 18 falls within
zone 2 or zone 4, the control process panel 137 must additionally
determine which side of the control line the ambient air 18 lies by
substituting the measured temperature into the equation of the
control line. If the resulting value for moisture content is
greater than the measured moisture content then the ambient air is
in zone 4. If the resulting value is less than the measured value,
then the ambient air 18 is in zone 2.
[0169] The psychrometric characteristics of humid air vary with air
pressure. As such, the control process panel 137 is able to
compensate (or recalibrate) to account for atmospheric air
pressure. Whilst day-to-day variations need not be accounted for,
the average atmospheric air pressure of ambient air at a given
location, dictated for example by altitude, may usefully be taken
into account. The control process panel 137 is pre-programmed with
the altitude at which the data centre is located and thus adjusts
its calculations accordingly.
[0170] Once it has been determined which zone the ambient air falls
into, the processor in control process panel 137 calculates the
most efficient way to adjust the temperature and relative humidity
of the ambient air 18 (i.e. using the most amount of free cooling
and/or the least amount of mechanical cooling possible) until it is
somewhere on the control line 610, and selects a target point on
the control line accordingly. Thus a target point (or set point) is
calculated on the basis of the psychrometric characteristics of the
outside air, such that the target point lies at a position on a
control line so that the target point can be reached in an energy
efficient manner.
[0171] Table 1 shows how the air optimisation unit 122 adjusts the
temperature and relative humidity of the ambient air 18 to be on
the control line depending on which zone the ambient air 18 falls
into.
[0172] When the ambient air 18 is in zone 1, which will be a
significant amount of the time in the UK, it will be adjusted so
that its temperature and relative humidity are substantially equal
to a point on the control line 610 by mixing it with exhaust air
16, adiabatically cooling the resulting supply air, and then
passing it through fans 700. For example, for ambient air having
temperature and relative humidity represented by point 650 on the
psychrometric chart 600, the air optimiser control panel 137
calculates a first target temperature and relative humidity for the
mixed supply air, this first target being represented by point 660
on chart 600. The first target point 660 is on the boundary line
between zones 1 and 4, since this is the first line of constant
enthalpy (the diagonal lines on the chart 600) to intersect the
control line 610.
[0173] The air optimiser control panel 137 then modulates the
position of the intake, exhaust and return dampers (the position of
the intake and exhaust dampers is always the same), based on the
temperature and relative humidity measured by a sensor TH.sub.1
located between the DX cooling coils 730 and the adiabatic cooler
720, until the values measured by sensor TH.sub.1 are equal to the
first target values 660 for the mixed supply air. The air optimiser
control panel also receives information about the temperature and
relative humidity of the exhaust air 16 from sensor TH.sub.3, which
is located near return air intake grille 125.
[0174] The temperature and relative humidity of air can be adjusted
along the lines of constant enthalpy without any energy needing to
be input into the system. The temperature and relative humidity of
the mixed supply air can therefore be adjusted from point 660 to a
point approximately 1.degree. C. colder than the final target point
670 on the control line by adiabatic cooling (since this does not
change the enthalpy of the air), which uses very little energy.
Passing the air through fans 700 then raises its temperature by
approximately 1.degree. C., so its characteristics are then equal
to the final target point 670.
[0175] The air optimiser control panel 137 modulates the level at
which the adiabatic cooler 720 is operating and the position of the
bypass damper 750, using PI controllers, until the values measured
by sensor TH.sub.2 are substantially equal to the final target
values 670. Supply air 18a downstream of fans 700 therefore meets
the pre-defined criteria for cooling air to be supplied to the IT
equipment. The air optimiser control panel 137 is programmed to
accept a greater tolerance in the relative humidity of the cooling
air than in the temperature of the cooling air. For example if the
relative humidity measured by sensor TH.sub.2 is up to 10% higher
or lower than the final target value represented by point 670, it
will be deemed to be at this target value. On the other hand, the
temperature measured by sensor TH.sub.2 will be deemed to be at the
final target value for cooling air if it is up to 0.5% higher or
lower than the target value.
[0176] The same control principles apply when the ambient air is in
the other zones, so these will be discussed more briefly.
[0177] When the ambient air 18 is in zone 2, it can be adjusted to
a state where its temperature and relative humidity lie on the
control line 610 purely by mixing with exhaust air 16, without any
adiabatic cooling. The target value for temperature is calculated
by substituting the measured moisture content of the ambient air 18
into the equation of the control line between points 670 and 630
and solving this equation to give the required temperature for the
supply air (i.e. the cooling air that is supplied to the IT
equipment to be cooled). The moisture content of the ambient air 18
and exhaust air 16 will usually be approximately the same when the
ambient air is in zone 2, so the relative humidity is not changed
by the mixing process. Whilst in theory the target temperature can
be achieved solely by mixing exhaust and ambient air, in practice
when the ambient air characteristics are very close to the boundary
with zone 4, some adiabatic cooling is often required, and this is
allowed by the programming of the control process panel 137.
[0178] When the temperature and relative humidity of the ambient
air are such that it falls into zone 3, the ambient air 18 can be
adjusted to a state where its temperature and relative humidity lie
on the control line 610 purely by mixing with exhaust air 16. Where
the control line bounds zone 3 it is a line of constant
temperature, so there is no need for the control process panel 137
to calculate a target temperature (because the target temperature
is that represented by the control line dividing zones 3 and 5). As
with zone 2, the moisture content of the ambient air will be
substantially unchanged.
[0179] When the temperature and relative humidity of the ambient
air 18 are such that it falls into zone 4, the ambient air may be
adjusted to a state where its temperature and relative humidity lie
on the control line 610 purely through adiabatic cooling. The
target value for temperature is calculated by substituting the
measured enthalpy of the ambient air 18 into the equation of the
control line between points 670 and 630 and solving this equation
to give the required temperature for the supply air. The relative
humidity of the supply air will be greater than the relative
humidity of the ambient air as a consequence of using adiabatic
cooling, which conserves the enthalpy of the air.
[0180] When the ambient air falls into zone 5, the ambient air can
be adjusted to a state where its temperature and relative humidity
lie on the control line 610 using just adiabatic cooling. Where the
control line bounds zone 5 it is a line of constant temperature, so
the control process panel 137 simply sets the target temperature at
this constant temperature. As with zone 4, the relative humidity of
the ambient air will be increased by the adiabatic cooling
process.
[0181] When the ambient air is in zones 4 or 5 there is no
advantage gained by mixing the ambient air 18 with exhaust air 16,
so the air optimiser control panel 137 closes the return air damper
and fully opens the ambient air intake damper (and the exhaust
damper).
[0182] When the temperature and relative humidity of the ambient
air are such that it falls into zone 6, there is also no advantage
to mixing the ambient air 18 with exhaust air 16. In this situation
the supply air, which consists entirely of ambient air 18, must be
cooled using DX cooling coils 730 until its temperature and
relative humidity are at a point on a line of constant enthalpy
that intersects the control line 610 (i.e. a line of constant
enthalpy that intersects the line at or near point 640). The DX
cooling system 730 includes condensers as well as cooling coils,
and can operate in either a pure cooling mode or in a combined
cooling and dehumidification mode. Once the supply air is at such a
point it is cooled adiabatically until its characteristics are
substantially equal to point 640 on the control line 610 (taking
into account the heating caused by the fans).
TABLE-US-00001 TABLE 1 Types of cooling according to zone
Composition DX Adiabatic Bypass Zone of supply air cooling cooler
damper TH1 controls TH.sub.2 controls 1 Mixture Off On Modulating
Intake and Adiabatic return damper cooler and positions bypass
damper 2 Mixture Off Off Open -- Intake and return damper positions
3 Mixture Off Off Open -- Intake and return damper positions 4 100%
Off On Modulating -- Adiabatic ambient air cooler and bypass damper
5 100% Off On Modulating -- Adiabatic ambient air cooler and bypass
damper 6 100% On On Modulating Rate of DX Adiabatic ambient air
cooling cooler and bypass damper 7 100% On Off Open Rate of DX Rate
of DX exhaust air cooling cooling
[0183] When the temperature and relative humidity of the ambient
air are such that it falls into zone 7, the conditions of the
ambient air 18 are such that it requires more energy to adjust them
to lie on control line 610 than the amount of energy required to
adjust the characteristics of exhaust air 16 to lie on the control
line. As such, the air optimiser control panel 137 instructs the
data centre to operate in a full recirculation mode in which the
ambient air intake damper and the exhaust damper are closed and the
return air damper and the adiabatic cooler bypass damper 750 are
fully open, meaning that the supply air consists entirely of
exhaust air 16. In this situation the supply air must be adjusted
so that its temperature and relative humidity are on the control
line 610 (taking into account the heating caused by the fans) using
only DX cooling and dehumidification.
[0184] When the characteristics of the ambient air 18 change such
that it moves from one zone to another, the control process panel
137 determines which zone the air has passed from and which zone it
has passed into and uses this information to determine what the air
optimiser needs to do to ensure that the temperature and relative
humidity of the supply air remain on the control line 610.
[0185] When the zone changes into zone 1 from zone 2 or zone 4, the
control process panel performs a proportional calculation based on
enthalpy. The enthalpy of the exhaust air 16, the enthalpy of the
ambient air 18 and the enthalpy of the required set point (point
620) are used to calculate the proportions of exhaust and ambient
air that must be combined to achieve the set point enthalpy. This
in turn determines the position of the intake, exhaust and return
air dampers and the control process panel 137 moves the dampers to
the positions so calculated and keeps them there for a pre-set
period of three minutes. After this period has elapsed, the
position of the dampers is once again allowed to vary along with
the characteristics of the ambient air 18.
[0186] When the zone changes into zone 2 or zone 3 from any other
zone, the control process panel 137 performs a proportional
calculation based on temperature. The temperature of the exhaust
air 16, the temperature of the ambient air 18, and the temperature
of the required set point are used to calculate the proportions of
exhaust and ambient air that must be combined to achieve the set
point temperature. The positions of the intake, exhaust and return
air dampers are adjusted accordingly and held in the calculated
positions for three minutes.
[0187] When the zone changes into zones 4 to 7 there is no mixing
of ambient and exhaust air so the damper positions do not need to
be calculated.
[0188] The bank of variable speed fans 700 delivers cooling air 18a
into the cold air corridor 123 at a rate determined by the air
optimiser control panel 137 based on information on the air flow
velocities measured by the velocity sensors 150, 160 and 170 and
the position of the dampers in the cooling air intake grilles 142a,
142b and 142c communicated to it by each of the rack room control
panels.
[0189] The speed at which the fans can operate is limited by a
maximum speed calculated by the air optimiser control panel 137
every 10 seconds. This maximum speed is twice the speed necessary
to deliver the theoretical maximum amount of cooling air required
by the IT equipment installed in the data centre at a particular
time, as calculated based on the actual power consumption of the IT
equipment at that time. The air optimiser control panel 137
receives values for current power usage of the IT equipment at one
minute intervals. In the event that one or more of the velocity
sensors 150, 160 and 170 provides an artificially low reading to
the air optimiser control panel 137, for example because baffles
have been removed in a cold aisle for maintenance purposes, then
the pre-set maximum fan speed prevents the variable speed fans 700
from operating at an unnecessarily high level. This consequently
improves the energy efficiency of the data centre. However, during
normal operation of the data centre the fan speed should always be
significantly lower than this maximum limit.
[0190] The cooling air 18a is pushed out of the air optimisation
unit 122 and moves above-floor along the air supply corridor 123.
The dampers in the cooling air intake grille(s) 142 are controlled
in combination with the speed of the variable speed fans 700 so as
to ensure that exactly the right amount of cooling air 18a is
supplied to each cold aisle 144 to meet the demand of the servers
facing into that aisle at any given time. The cooling air 18a is
drawn through the servers by their integral fans, and cools them as
it goes through.
[0191] The resulting hot air 16 moves above-floor through the hot
aisles 145 in the rack room 140 to the hot air corridor 132. The
pressure differential between the cooling air 18a and the hot air
16 is maintained at a sufficient level to ensure there is no return
of hot air 16 through the racks. This is done by monitoring the
amount of air flowing through ducts 150, 160 and 170 using the air
flow velocity sensors located in these ducts. The air flow velocity
information for each cold aisle is fed to the rack room control
panel for that aisle. The rack room control panel continuously
passes this information to the air optimiser control panel 137 in
the plant room 133, together with information about the position of
the cooling air intake damper for the aisle in question.
[0192] The air optimiser control panel 137 and the rack room
control panels are pre-programmed with a set point for the velocity
of air flowing through ducts 150, 160 and 170. In the present
example the set point is 0.35 m/s. If the velocity measured by any
of the velocity sensors drops below this set point, the rack room
control panel for the cold aisle supplying the duct in which that
sensor is located will increase the amount of air being delivered
to that aisle by opening the cooling air intake damper of that
aisle further. If the damper reaches the fully open position and
the airflow velocity measured by the sensor is still below the set
point, the rack room control panel for that cold aisle will send a
request to the air optimiser control panel 137 to increase the
speed of the variable speed fans 700 until the velocity measured by
the sensor is at the set point.
[0193] If this increase in the speed of the fans 700 causes the
airflow velocity measured by any of the other sensors to rise above
the set point, the rack room control panels for the aisles
supplying the affected sensors will reduce the degree of openness
of the cooling air intake dampers for those aisles until the
airflow velocity measured by each sensor is at the set point. If
the point is reached where one or more of the aisles has a fully
closed damper and the air flow velocity measured by the sensor for
that aisle is still measuring a velocity greater than the set
point, the rack room control panel for the cold aisle supplying the
duct in which that sensor is located will send a request to the air
optimiser control panel 137 to reduce the speed of the variable
speed fans 700 until the airflow velocity measured by that sensor
is at the set point.
[0194] If at any time the airflow velocity measured by all of the
velocity sensors is above the set point, the control process panel
137 will reduce the speed of the fans 700 until the airflow
velocity measured by at least one of the sensors is at the set
point.
[0195] The control system just described is designed so that the
variable speed fans 700 are always operating at the minimum speed
at which it is possible to meet the demand of the aisle having the
largest cooling load at any given time. This significantly reduces
the energy used by the data centre.
[0196] The air optimiser control panel 137 and the rack room
control panels are all programmed with a watchdog routine to
automatically monitor the health of the communications network
linking the panels. Every 10 seconds, each of the rack room control
panels sends a value of 100 to the air optimiser control panel 137,
which returns a value of 0 to the rack room control panels 10
seconds later. This means that when the communications network is
operating correctly, the values registered by each of the panels
will oscillate between 100 and 0 every 10 seconds.
[0197] If a link between one of the rack room control panels and
the air optimiser control panel is broken, that rack room control
panel will register a constant value of 0 or 100. If the value does
not change for 90 seconds the rack room control panel will go into
a failsafe mode in which it fully opens the cooling air intake
dampers for its aisle. If there is a fault with the rack room
control panel itself, the cooling air intake dampers for that aisle
are set up to move to a default position of fully open.
[0198] In this situation the air optimiser control panel will also
register a constant value for the rack room control panel in
question. If this value does not change for 90 seconds the air
optimiser control panel will go into a fault mode in which the data
centre operates in full recirculation mode using only the DX
cooling system, with the fans 700 running at the calculated maximum
speed limit based on the IT equipment power consumption and all of
the cooling air intake dampers for the cold aisles fully open. In
the fault mode the temperature of the supply air is controlled to a
fixed pre-set temperature of 22.degree. C. This fault mode ensures
that sufficient cooling air is provided to all the servers if the
air optimiser control panel is unable to determine the cooling load
being experienced by one or more of the aisles because of a failure
of the communications network or a fault with one or more of the
rack room control panels. There is a backup air optimiser control
panel which takes over in the case of a fault with the main air
optimiser control panel. The data centre can only operate in the
fault mode described above if it is being controlled by the backup
air optimiser control panel.
[0199] In the event of the VESDA (Very Early Warning Smoke
Detection Apparatus) system detecting smoke, as an initial step,
the air optimisation control panel 137 causes air flow into and/or
out of the building to cease by instructing the air optimisation
control panel to close the dampers in the hot air outlet grille 146
and the ambient air intake grille 121. The building is therefore
operating in full re-circulation mode, in which all of the cooling
is done by the DX system 730.
[0200] If smoke is no longer detected then it is likely that any
fire is outside the building and so there is no need to release the
fire suppression gas. If, on the other hand, smoke is detected by
two different types of smoke detector, it is likely that there is a
fire within the building and fire suppression gas will be
released.
[0201] As the fire suppression gas rapidly expands, release vents
(not shown) in the building 100 are activated to maintain the
building integrity.
[0202] When the building is in recirculation mode because the VESDA
system has been activated, all of the cooling for the servers is
provided by DX cooling coils 730. Since it is likely that the DX
coils will have been off at the time of the alarm, as soon as the
building goes into recirculation mode the air optimiser control
panel 137 reduces the target temperature for the cooling air to
12.degree. C. so that the cooling coils 730 will start up quickly.
The air optimisation control panel 137 then increases the target
temperature by 1.degree. C. every minute until it reaches
22.degree. C. This ensures that the temperature of the cooling air
does not become too high whilst the building management system is
adjusting to the new mode of operation.
[0203] If it turns out that the activation of the VESDA system was
a false alarm, the air optimiser control panel 137 will switch the
building from full re-circulation mode to the standard mode of
operation based on the conditions of the ambient air. When the
ambient air falls into zones 4, 5 and 6 this means that the
building goes into a mode where it uses 100% ambient air for
cooling. The ambient air may require a significant amount of
adiabatic cooling in order to adjust its temperature and relative
humidity to meet the criteria for cooling air. During the time the
building was in re-circulation mode the adiabatic cooler 720 will
have been offline and its matrix will have completely dried out. It
takes approximately 10 minutes to bring the adiabatic cooler online
to full capacity from this situation.
[0204] Clearly, if the switch from re-circulation mode into the
normal control mode for zones 4, 5 or 6 was made without allowing
for this, the adiabatic cooler would not at first be able to
provide the amount of cooling required and the temperature of the
supply air would become too high. To avoid this scenario, the air
optimiser control panel is programmed to switch on the adiabatic
cooler (all four sections if the ambient air is in zone 4 or 5, two
sections if the ambient air is in zone 6) and operate at this fixed
level for two minutes before the level of operation of the DX coils
is reduced. This allows the matrix of the adiabatic cooler 720 to
become sufficiently wet to cope with the cooling requirements of
the ambient air. The level of operation of the adiabatic cooler is
then fixed for a further minute before automatic control is
restored.
[0205] As part of the procedure for returning to normal operation,
a damper position calculation is carried out using the calculated
supply temperature setpoint, outside air temperature and return air
temperature to determine what position the exhaust, intake and
return air dampers should be in to maintain the current calculated
setpoint. If the ambient air is in zones 2 or 3, then the
temperature based calculated damper position is used for 3 minutes
with the dampers held at a position 5% lower than the actual
calculated demand. The same procedure is used if the ambient air is
in zone 1, but the damper position is calculated based on enthalpy
instead of temperature. This offset encourages the automatic demand
to wind up to the correct level so that after 3 minutes when the
artificial signal is removed the dampers will automatically control
to the right position.
[0206] The air optimiser control panel 137 will also switch the
data centre into the full recirculation mode where all cooling is
provided by the DX system 730 if it detects a fault with the
adiabatic cooler 720. The same control processes for entering and
leaving the full recirculation mode are used as described
above.
[0207] In the event that, while the building is in full
re-circulation mode because the VESDA system has detected smoke,
but not an actual fire, two or more of the DX cooling coils 730
fail and the temperature of the cooling air measured by sensor
TH.sub.2 becomes too hot to meet the pre-defined criteria for
cooling air, the air optimiser control panel 137 will switch the
building into a mode where the cooling air comprises 100% ambient
air to ensure that the cooling demand of the servers is met. If a
fire inside the building is subsequently detected, the air
optimiser control panel 137 will switch the building back into full
re-circulation mode in spite of the failed DX coils, and will
release the fire suppression gas. At this point it is more
important to extinguish the fire than to meet the cooling demand of
the servers.
[0208] FIG. 9 shows a data centre according to a third embodiment
of the invention. This data centre is the same as the data centre
of the second embodiment with an above-floor air supply corridor
923 and a hot air corridor 932; however, it has a second air
optimisation unit 920 located at the opposite end of the rack room
to the first air optimisation unit 910. The contents and operation
of the second air optimisation unit 920 are identical to that of
the first air optimisation unit 910, which are described above in
relation to the second embodiment. There is also an additional
plant room 940 between the second air optimisation unit 920 and the
rack room.
[0209] Each air optimisation unit is controlled by its own
dedicated air optimiser control panel. The first air optimiser
control panel 937 is located in the first plant room 930 and the
second air optimiser control panel 938 is located in the second
plant room 940. Each control panel has its own backup control panel
(not shown). Aspects of the operation of the data centre of the
third embodiment which differ from the data centre of the second
embodiment will now be described. Any aspects not mentioned may be
assumed to be in accordance, mutatis mutandis, with the description
provided above in relation to the second embodiment.
[0210] The two air optimiser control panels 937, 938 are connected
via a communications link and each is programmed to recognise and
monitor the presence and activity of the other. Each air optimiser
control panel receives data from its own set of temperature and
humidity sensors (only TH.sub.2 a and b are shown) since the
temperature and humidity conditions may be different between the
two ends of the data centre. Each control panel 937, 938 therefore
calculates a set point for the temperature and humidity of the
cooling air independently, and may perform different cooling
processes to achieve the set points.
[0211] By contrast, both air optimiser control panels 937, 938
receive air flow velocity data from all of the velocity sensors in
the rack room, and so cooling air is always supplied at the same
rate from each air optimisation unit 910, 920 and both air
optimiser control panels always send the same control signals to
the aisle control panels (not shown) which control the degree of
openness of the vents between the air supply corridor 923 and the
cold aisles 944.
[0212] If one of the air optimiser control panels fails, its
associated backup control panel will start up. The other air
optimiser control panel will register the fault and will also hand
over control to its backup control panel. This ensures that both
air optimisation units 910, 920 are running in fault mode. Clearly
if one unit was operating in fault mode (where all air is
recirculated, a fixed set point is used and all the cooling is
provided by the DX system) and the other unit was operating
normally, the two units could end up operating in conflict with
each other. Like the main air optimiser control panels, the backup
panels are connected via a communications link and each is
programmed to recognise and monitor the presence and activity of
the other. The back up panels are programmed so that if one is
activated, it instructs the other to activate as well.
[0213] If the adiabatic cooler in either of the air optimisation
units 910, 920 fails, this will be registered by both air optimiser
control panels 937, 938 and both of the air optimisation units will
be switched into fault mode.
[0214] Whilst the present invention has been described and
illustrated with reference to particular embodiments, it will be
appreciated by those of ordinary skill in the art that the
invention lends itself to many different variations not
specifically illustrated herein. By way of example only, certain
possible variations will now be described.
[0215] It will be seen that in the above embodiments, the air is
supplied to the cold region/cold aisle by means of an over-floor
passageway, for example the personnel corridor (air supply corridor
123) from the source of cooling air (the air optimisation unit 122)
to the rack room 140. As an alternative, the air supply corridor
from the air optimisation unit 122 to the rack room 140 may be
independent of the personnel passageway leading to the rack room
module(s) 140. Instead of supplying air above the floor as in the
illustrated embodiments, the air may be supplied at least partially
via an under-floor duct.
[0216] Cooling air could be transported into the cold aisles
through a wall of the rack room via one or more apertures or
passageways in the wall that are not arranged to permit personnel
access. There may be an access door to the rack room that is not
part of the intended path for cooling air.
[0217] The ducts 150, 160 and 170 need not be located above the
rows of racks, instead they may be located between adjacent racks,
below the rows of racks, or within a rack or racks. The ducts may
not have a hinged flap preventing air entering from the hot end,
instead the velocity sensors in the ducts may be directional
velocity sensors which provide information about the direction of
the air flow.
[0218] There may be more than one duct connecting each cold aisle
144 to an adjacent hot aisle 145. In this case each duct would
contain a velocity sensor that provides a velocity reading to the
air optimiser control panel, but only the reading from one of the
sensors would be used by the air optimiser control panel 137. The
air optimiser control panel would use only the lowest of the two
velocity readings. The other sensor would serve as a backup in case
the first sensor failed.
[0219] The arrangement of the air optimisation unit 122 may be
different from that described above. For example the DX cooling
coils 730 may be downstream of the humidifier 720.
[0220] The control line 610 may be in the form of a closed loop or
a point. The number and shape of the zones will vary according to
the length and configuration of the control line.
[0221] Individual aspects of one embodiment may have application in
other embodiments of the invention. For example, the use of a
velocity sensor may have independent application of the method of
controlling cooling air to meeting pre-set criteria. The treatment
and/or cooling of the supply air to supply cooling air mentioned in
the first embodiment need not therefore be effected in accordance
with the method set out in the second embodiment. For example, the
controlling of the temperature and humidity of the cooling air
produced from the supply air may consist of ensuring that the
cooling air is between relative wide acceptable limits of
temperature and/or humidity.
[0222] The rack room control panels could instead use
proportional-integral-derivative (PID) controllers to control the
dampers 182. A PID controller uses three separate parameters which
may be thought of as the reaction to the current error, the
reaction to the accumulation of past errors, and the reaction based
on a prediction of future errors. A weighted sum of these three
parameters is used to determine the actual reaction, for example
how the dampers 182 move in response to a change in the airflow
velocity measured by the sensors. The PID algorithm used by the
controller is tuned to provide optimal control of the dampers, such
that the position quickly stabilises at the optimal value and does
not oscillate around it for very long.
[0223] Where in the foregoing description, integers or elements are
mentioned which have known, obvious or foreseeable equivalents,
then such equivalents are herein incorporated as if individually
set forth. Reference should be made to the claims for determining
the true scope of the present invention, which should be construed
so as to encompass any such equivalents. It will also be
appreciated by the reader that integers or features of the
invention that are described as preferable, advantageous,
convenient or the like are optional and do not limit the scope of
the independent claims. Moreover, it is to be understood that such
optional integers or features, whilst of possible benefit in some
embodiments of the invention, may not be desirable, and may
therefore be absent, in other embodiments.
* * * * *