U.S. patent application number 12/121113 was filed with the patent office on 2009-05-28 for methods and systems for managing facility power and cooling.
This patent application is currently assigned to American Power Conversion Corporation. Invention is credited to Morten Bock, Mikkel Dalgas, Ted Ives, Jane E. Morgan, Neil Rasmussen, James W. VanGilder.
Application Number | 20090138313 12/121113 |
Document ID | / |
Family ID | 39874103 |
Filed Date | 2009-05-28 |
United States Patent
Application |
20090138313 |
Kind Code |
A1 |
Morgan; Jane E. ; et
al. |
May 28, 2009 |
METHODS AND SYSTEMS FOR MANAGING FACILITY POWER AND COOLING
Abstract
Systems and methods are provided for determining data center
resource requirements, such as cooling and power requirements, and
for monitoring performance of data center resource systems, such as
cooling and power systems, in data centers. At least one aspect
provides a system and method that enables a data center operator to
determine available data center resources, such as power and
cooling, at specific areas and enclosures in a data center to
assist in locating new equipment in the data center.
Inventors: |
Morgan; Jane E.; (Cranston,
RI) ; Rasmussen; Neil; (Concord, MA) ;
VanGilder; James W.; (Pepperell, MA) ; Dalgas;
Mikkel; (Sjoelund, DK) ; Ives; Ted; (Exeter,
RI) ; Bock; Morten; (Broager, DK) |
Correspondence
Address: |
LOWRIE, LANDO & ANASTASI, LLP;A2000
One Main Street, Suite 1100
Cambridge
MA
02142
US
|
Assignee: |
American Power Conversion
Corporation
West Kingston
RI
|
Family ID: |
39874103 |
Appl. No.: |
12/121113 |
Filed: |
May 15, 2008 |
Related U.S. Patent Documents
|
|
|
|
|
|
Application
Number |
Filing Date |
Patent Number |
|
|
60938034 |
May 15, 2007 |
|
|
|
Current U.S.
Class: |
705/7.23 |
Current CPC
Class: |
G06Q 10/06313 20130101;
G06Q 10/06 20130101; H01H 21/24 20130101; Y02P 90/82 20151101; H05K
7/2079 20130101; H05K 7/20836 20130101 |
Class at
Publication: |
705/8 ; 705/7;
705/10 |
International
Class: |
G06Q 10/00 20060101
G06Q010/00 |
Claims
1. A computer-implemented method for providing a representation of
capacity of a data center resource, the method comprising acts of:
determining an first indication of excess capacity of a first data
center resource that is unusable due to insufficient capacity of at
least one other data center resource associated with the first data
center resource; and providing the first indication of excess
capacity of the first data center resource to an external
entity.
2. The method according to claim 1, wherein the act of determining
the first indication of excess capacity includes an act of
determining an amount of excess capacity of the first data center
resource that is unusable due to insufficient capacity of the at
least one other data center resource associated with the first data
center resource.
3. The method according to claim 1, wherein the act of determining
the first indication of excess capacity includes an act of
determining an indication of excess capacity at a location in a
rack.
4. The method according to claim 3, wherein the act of determining
the first indication of excess capacity at the location in the rack
includes an act of determining an indication of excess capacity at
a U space position.
5. The method according to claim 1, wherein the act of determining
the first indication of excess capacity includes an act of
determining an indication of excess capacity of rack space that is
unusable due to insufficient capacity of power.
6. The method according to claim 1, wherein the act of determining
the first indication of excess capacity includes an act of
determining an indication of excess capacity of power that is
unusable due to insufficient capacity of cooling.
7. The method according to claim 1, wherein the act of determining
the first indication of excess capacity includes an act of
determining an indication of excess capacity of power distribution
that is unusable due to insufficient capacity of power available
for distribution.
8. The method according to claim 1, wherein the act of determining
the first indication of excess capacity includes an act of
determining an indication of excess capacity of physical space that
is unusable due to insufficient capacity of cooling.
9. The method according to claim 1, wherein the act of determining
the first indication of excess capacity includes an act of
determining an indication of excess capacity of power distribution
that is unusable due to insufficient capacity of network
connectivity.
10. The method according to claim 1, wherein the act of determining
the first indication of excess capacity includes an act of
determining an indication of excess capacity of U space that is
unusable due to insufficient capacity of weight support.
11. The method according to claim 1, wherein the act of providing
the first indication of excess capacity includes an act of
providing the indication to another system element.
12. The method according to claim 1, wherein the act of providing
the first indication of excess capacity includes an act of
presenting the first indication to a user of a computer system.
13. The method according to claim 12, wherein the act of presenting
the first indication to the user of the computer system includes an
act of presenting, to the user of the computer system, an amount of
excess capacity of the first data center resource that is unusable
due to insufficient capacity of the at least one other data center
resource associated with the first data center resource.
14. The method according to claim 13, wherein the act of
presenting, to the user of the computer system, the amount of
excess capacity includes acts of: presenting, to the user of the
computer system, an identifier that identifies the first data
center resource; and presenting, to the user of the computer
system, an identifier that identifies the at least one other data
center resource.
15. The method according to claim 1, further comprising:
determining a configuration of data center equipment that
minimizes, relative to at least one other configuration, the excess
capacity of the first data center resource; and providing the
configuration of data center equipment to an external entity.
16. The method according to claim 15, wherein determining the
configuration of data center equipment includes determining a
location for at least one element of data center equipment.
17. The method according to claim 1, further comprising:
determining a second indication of excess capacity of a second data
center resource that is unusable due to insufficient capacity of at
least one other data center resource associated with the second
data center resource; determining a configuration of data center
equipment that minimizes, relative to at least one other
configuration, an aggregate of the first indication and the second
indication; and providing the configuration of data center
equipment to an external entity.
18. A computer-implemented method for providing a representation of
a data center resource, the method comprising acts of: determining
a status of capacity for the data center resource provided to
either a rack or a location in a rack; and providing the status to
an external entity.
19. The method according to claim 18, wherein determining the
status of capacity for the data center resource includes
determining a status for the data center resource provided to a U
space position.
20. The method according to claim 18, wherein the act of
determining the status of capacity for the data center resource
includes an act of determining a status of capacity of power.
21. The method according to claim 18, wherein the act of
determining the status of capacity for the data center resource
includes an act of determining a status of capacity of cooling.
22. The method according to claim 18, wherein the act of
determining the status of capacity for the data center resource
includes an act of determining a status of capacity of physical
space.
23. The method according to claim 18, wherein the act of
determining the status of capacity for the data center resource
includes an act of determining a status of capacity of weight
support.
24. The method according to claim 18, wherein the act of
determining the status of capacity for the data center resource
includes an act of determining a status of available capacity.
25. The method according to claim 18, wherein the act of
determining the status of capacity for the data center resource
includes an act of determining a status of utilized capacity.
26. A computer-implemented method for providing a representation of
a data center resource, the method comprising the acts of:
determining a rate of change of a utilized capacity of the data
center resource based at least in part on changes to a data center
configuration; and providing a predicted utilization of the data
center resource based at least in part on the rate of change.
27. The method according to claim 26, wherein determining the rate
of change of utilized capacity of the data center resource includes
determining the rate of change using linear regression.
28. The method according to claim 26, wherein the data center
resource includes power.
29. The method according to claim 26, wherein the data center
resource includes cooling.
30. A system for providing a representation of a capacity of data
center resource, the system comprising: an input configured to
receive a capacity of a first data center resource and a capacity
of at least one other data center resource; an output configured to
provide an amount of excess capacity of the first data center
resource; and a controller coupled to the input and the output and
configured to determine an amount of excess capacity of the first
data center resource that is unusable due to insufficient capacity
of the at least one other data center resource.
31. A system for providing a representation of a data center
resource, the system comprising: an input configured to receive
capacity information for a data center resource; an output
configured to provide a status of capacity for the data center
resource; and a controller coupled to the input and the output and
configured to determine the status of capacity for the data center
resource at either a rack or a location in a rack.
32. A system for providing an evaluation of a data center resource,
the system comprising: an input configured to receive changes in a
data center configuration; an output configured to provide a
predicted utilization of the data center resource based on a rate
of change of utilized capacity of the data center resource; and a
controller configured to determine the rate of change of the
utilized capacity of the data center resource based on the changes
in a data center configuration.
Description
RELATED APPLICATIONS
[0001] This application claims priority under 35 U.S.C. .sctn.
119(e) to U.S. Provisional Application Ser. No. 60/938,034,
entitled "METHODS AND SYSTEMS FOR MANAGING FACILITY POWER AND
COOLING," filed on May 15, 2007, which is herein incorporated by
reference in its entirety.
BACKGROUND OF INVENTION
[0002] 1. Field of Invention
[0003] Embodiments of the invention relate generally to entity
management, and more specifically to methods and systems for
managing facility power and cooling.
[0004] 2. Discussion of Related Art
[0005] Centralized data centers for computer, communications and
other electronic equipment have been in use for a number of years,
and more recently with the increasing use of the Internet, large
scale data centers that provide hosting services for Internet
Service Providers (ISPs), Application Service Providers (ASPs) and
Internet content providers are becoming more prevalent. Typical
centralized data centers contain numerous racks of equipment that
require power, cooling and connections to external communications
facilities. In modern data centers and network rooms, the increased
density of computing equipment used in these facilities has put
strains on the cooling and power systems of the facilities. In the
past, typical power consumption for each equipment enclosure in a
data facility was on the order of 1 kW. With the use of server
blades and other high power density equipment in equipment racks,
it is not uncommon for an equipment rack to have a power draw of 10
kW or even as high as 25 kW.
[0006] Typically, the power consumed by computer equipment is
converted to heat and typically, the cooling requirements of a
facility are determined based on the power requirements of the
facility. Typical data centers utilize air plenums under raised
floors to distribute cooling air through a data center. One or more
computer room air conditioners (CRACs) or computer room air
handlers (CRAHs) are typically distributed along the periphery of
the data room, and these units draw return air from the room or a
ceiling plenum and distribute cooling air beneath the raised floor.
Perforated tiles may be placed in front or beneath racks of
equipment to be cooled to allow the cooling air from beneath the
floor to cool equipment within the racks.
[0007] Several tools are available to assist a data center designer
in configuring a layout of a data center to provide necessary power
and cooling to equipment to be located in the data center. These
tools typically assist a designer in determining total power
requirements and accordingly overall cooling requirements for a
data center. In addition, these tools may assist a designer in
determining optimum equipment layout and proper sizing of power
cabling and circuit breakers.
[0008] While existing tools provide a designer with detailed layout
information regarding power distribution, these tools typically
provide far less help in determining cooling needs for a facility.
Advanced programs that use computational fluid dynamics (CFD) may
be used to model the cooling design of a facility, but the use of
such programs is extremely limited due to the complexity of the
programs, which results in their use being prohibitively expensive
and time consuming. U.S. Patent Application US2003/0158718 A1 to
Nakagawa et al describes an automated system for designing a
cooling system for a facility. In the system of Nakagawa, the
facility is divided into a number of pre-characterized cells (such
as a cluster of racks) over which the response of various
parameters, such as maximum temperature, are known based on key
parameters. The system uses built-in cell to cell interaction rules
to predict overall thermal performance and to optimize equipment
layout. While this system may offer some improvements in speed over
a full CFD analysis, it is limited to the use of pre-characterized
cells, and does not provide analysis below the cell level. Also,
the cells must be characterized using, for example, a CFD analysis
or physical testing.
[0009] Programs and systems such as those described above provide
idealized results for the cooling performance of a facility and
often fail to account for situations which often occur in real life
installations, which can dramatically affect the cooling
performance of a data center. For example, in a facility using a
raised floor, the absence of one or more floor panels, or the
misplacement of one or more perforated floor panels can greatly
affect the cooling performance of the data center and cause the
actual performance to vary greatly from a calculated idealized
performance. Further, the degradation in performance of one or more
air conditioning units can drastically change airflow and cooling
characteristics of a facility.
[0010] The inability to properly analyze the cooling performance of
a facility typically causes a data center designer to over design
the facility from a cooling perspective, which results in the
facility to be more expensive and less efficient.
[0011] In existing data centers, it is often desirable to replace
equipment with upgraded equipment and/or add new equipment to
existing enclosures in the facility. Several tools exist which
enable a manager of a data center to monitor power usage in a
facility. These tools include the InfrastruXure.RTM. Manager and/or
InfrastruXure.RTM. Central product available from American Power
Conversion Corporation of West Kingston, R.I.
[0012] With the increasing cooling and power requirements of
computer equipment, it is desirable for a data center manager to
determine if there is adequate power and cooling available in the
facility before new or replacement equipment may be added.
Typically, a data center manager may know, or can determine, if the
total cooling capacity of the data center is sufficient for the
total power draw. However, hot spots in a facility may develop,
particularly where high power density equipment is used, and it may
not be enough to merely analyze cooling capacity at the facility
level. To attempt to identify hot spots, a data center manager may
resort to manual temperature measurements throughout a facility and
try to implement fixes to correct the hot spots. Such fixes may
involve a rearrangement or replacement of perforated floor panels,
a rearrangement of enclosures, and/or adding additional cooling
capacity. In any case, these fixes are typically done on a trial
and error basis, and while some hot spots may be eliminated, the
fixes may cause other hot spots to arise due to a redirection of
the cooling air in the facility. This trial and error approach can
lead to unexpected failures of equipment, which is unacceptable in
critical data centers. To avoid such failures, data center managers
typically over design facilities and fail to use facilities to
their full capacity.
SUMMARY OF INVENTION
[0013] Aspects of the present invention relate generally to
management of data center entities and their associated resources.
Embodiments of the invention provide systems and methods for
determining data center cooling and power requirements and for
monitoring performance of cooling and power systems in data
centers. At least one embodiment provides a system and method that
enables a data center operator to determine available power and
cooling at specific areas and enclosures in a data center to assist
in locating new equipment in the data center.
[0014] One aspect is directed to a method that includes determining
cooling capacity of a number of equipment enclosures in a data
center, determining cooling requirements of each of the number of
equipment enclosures, and providing an indication of remaining
cooling capacity for each of the number of equipment
enclosures.
[0015] The method may further include developing a floor plan model
of the data center, wherein the floor plan model includes a floor
plan that indicates location of each of the number of equipment
enclosures in the data center, and for each of the number of
equipment enclosures, displaying on the floor plan, the indication
of remaining cooling capacity. The indication of remaining cooling
capacity may include an indication of additional power that can be
drawn by each of the number of equipment enclosures based on the
remaining cooling capacity. Determining cooling capacity may
include calculating a predicted cooling capacity based on the floor
plan model. Determining cooling capacity may include measuring
airflow at a first plurality of locations in the facility to obtain
a measured cooling capacity. Determining cooling capacity may
include measuring air temperature at a second plurality of
locations in the facility. At least one of the first plurality of
locations and the second plurality of locations includes at least
one air vent of a raised floor. The method may further include
comparing predicted cooling capacity with measured cooling capacity
to obtain a comparison result and providing an indication when the
comparison result is greater than a threshold. The method may
further include adjusting the predicted cooling capacity based on
measured airflow. The method may further include determining
placement of new equipment in an equipment enclosure in the data
center by comparing power ratings of the new equipment with cooling
capacity of the equipment enclosure. The method may further
include, for each of the number of equipment enclosures,
determining electrical power capacity and remaining electrical
power availability, and displaying on the floor plan remaining
electrical power availability. In the method, determining remaining
electrical power availability may include measuring at least one
parameter of electrical power provided to at least one of the
number of equipment enclosures. In the method, determining cooling
capacity of an equipment enclosure may include estimating available
cooling air at the equipment enclosure using a weighted summation
of available airflows from a plurality of airflow sources, the
weights used in the weighted summation may decrease with distance
from the equipment enclosure to each of the airflow sources, and
the weights may be based on mechanical characteristics of the
plurality of airflow sources. The method may further include
determining available airflow of at least one of the plurality of
airflow devices using at least one of specifications of the at
least one of the plurality of airflow devices and measured data for
the at least one of the plurality of airflow devices in the data
center. The method may further include determining available
airflow of at least a second one of the plurality of airflow
devices based on the measured data for the at least one of the
plurality of airflow devices. In the method, determining cooling
capacity may include using superposition to combine airflows. In
the method, determining airflow into and out of each of a plurality
of sides of each control volume may include computing airflows
using equations based on at least one of conservation of mass and
conservation of momentum. Further, determining airflow into and out
of each of a plurality of sides of each control volume may include
determining airflows using empirical rules derived from CFD,
physical measurement, or any other means.
[0016] Another aspect of the invention is directed to a system for
managing a data center. The system includes at least one input to
receive data related to equipment and equipment enclosures and to
receive data related to cooling characteristics of the data center,
a controller operatively coupled to the input and configured to
determine cooling capacity of each equipment enclosure, and at
least one output operatively coupled to the controller that
provides an indication of remaining cooling capacity for each of
the equipment enclosures.
[0017] The system may further include an output device coupled to
the at least one output, wherein the system is configured to
display a floor plan of at least a portion of the data center
indicating location of at least one of the equipment enclosures in
the data center and indicating the remaining cooling capacity for
the at least one of the equipment enclosures. The output device may
be configured to include an indication of additional power that can
be drawn by the at least one of the equipment enclosures. The
system may further include at least one airflow monitor operatively
coupled to the controller to provide data related to at least one
airflow in the data center. The system may further include at least
one air monitor operatively coupled to the controller to provide
data related to air temperature at a location in the data center.
The controller may be configured to compare a predicted cooling
capacity with a measured cooling capacity to obtain a comparison
result and to provide an indication when the comparison result is
greater than a threshold. The system may further include at least
one power monitor operatively coupled to the controller, and at
least one airflow controller operatively coupled to the controller
and responsive to signals from the controller to alter cooling
airflow in the data center. The system may further include at least
one power controller operatively coupled to the controller and
responsive to signals from the controller to alter at least one
characteristic of power in the data center.
[0018] Another aspect of the invention is directed to a system for
managing a data center. The system includes at least one input to
receive data related to equipment and equipment enclosures and to
receive data related to cooling characteristics of the data center,
and means, coupled to the at least one input, for determining
remaining cooling capacity for each of the number of equipment
enclosures and providing an indication of remaining cooling
capacity.
[0019] The system may further include means for providing an
indication of additional power that can be drawn by each of the
equipment enclosures and means for updating the indication of
remaining cooling capacity based on measured airflows in the data
center. The system may still further include means for determining
placement of equipment in the data center based on remaining
cooling capacity, and means for estimating available cooling air of
at least one of the equipment enclosures using a weighted summation
of available airflows from a plurality of airflow sources.
[0020] Another aspect of the invention is directed to a
computer-implemented method of managing power and cooling capacity
of a data center. The method includes receiving data center
parameters, determining an equipment layout in the data center, the
equipment layout identifying a location of each of a plurality of
devices in the data center, based on the location, determining
available power and available cooling in the data center for each
of the plurality of devices, comparing the available power and
available cooling with power requirements and cooling requirements
of each of the plurality of devices to obtain a cooling comparison
result and a power comparison result for each of the plurality of
devices.
[0021] The method may further include comparing each of the
comparison cooling results and the power cooling results with
thresholds and providing at least one recommendation for correcting
an out of tolerance condition. The at least one recommendation may
include adding an in-row cooling unit in a row of equipment of the
data center along with a proposed location for the in-row cooling
unit. The method may further include determining at least one of
stranded cooling capacity and stranded power capacity in the data
center and providing recommendations for reducing at least one of
the stranded power capacity and the stranded cooling capacity in
the data center. The method may further include displaying a floor
plan model of the data center, wherein the floor plan model
includes a floor plan that indicates a location of each of the
plurality of devices in the data center, and for each of the
plurality of devices, displaying on the floor plan an indication of
remaining cooling capacity. The method may include displaying on
the floor plan an indication of remaining power capacity for each
of the plurality of devices. The method may still further include
setting a redundancy level for at least some of the plurality of
devices, and wherein the available power and available cooling are
determined to meet the redundancy level. In the method, the act of
determining the equipment layout may include arranging the
plurality of devices in at least two substantially parallel rows
with a hot aisle formed between the two rows, and the method may
further include conducting a cooling analysis by analyzing airflows
in the hot aisle. The method may include selecting at least one
in-row cooling unit to be placed in the layout in one of the at
least two substantially parallel rows. At least one of the
plurality of devices is an equipment rack, and the method may
include determining a capture index for the at least one in-row
cooling unit and the equipment rack. The method may further include
on a display screen, simultaneously displaying a first floor plan
model of the data center and a second floor plan model of the data
center, wherein the first floor plan model includes at least a
partial view of the data center and the second floor plan model
includes a full view of the data center. The second floor plan
model may include an indication of a portion of the data center
that is shown in the first floor plan model. The method may further
include displaying a three dimensional view of at least a portion
of the data center. The method may include selecting a camera
location for use in the data center and displaying a three
dimensional view of a viewing area of the camera. The method may
further include selecting a subset of the plurality of devices and
defining a power zone for each device of the subset of the
plurality of devices, wherein each power zone includes at least one
UPS. In the method, each of the plurality of devices may be an
equipment rack, and the method may further include selecting
components for each of the plurality of devices from a displayed
list of components. The method may further include determining
operational power costs and operational cooling costs for a subset
of the plurality of devices, and the operational power costs and
operational cooling costs may be determined in terms of kilowatts.
The method may further include transferring an electronic file
containing data for the equipment layout from a design system to a
management system. The method may also include displaying measured
data for the data center on a display of a layout of the data
center.
[0022] Another aspect of the invention is directed to a
computer-implemented method for designing a layout of a data
center. The method includes receiving information from a user
regarding parameters of the data center, determining an equipment
layout for the data center, the equipment layout identifying a
location of each of a plurality of devices in the data center, and
on a display screen, simultaneously displaying a first floor plan
model of the data center and a second floor plan model of the data
center, wherein the first floor plan model includes at least a
partial view of the data center and the second floor plan model
includes a full view of the data center.
[0023] In the method, the second floor plan model may include an
indication of a portion of the data center that is shown in the
first floor plan model. The method may further include determining
available power and available cooling in the data center for each
of the plurality of devices, and comparing the available power and
available cooling with power requirements and cooling requirements
of each of the plurality of devices to obtain a cooling comparison
result and a power comparison result for each of the plurality of
devices. The method may include, for each of the plurality of
devices, displaying on the first floor plan model an indication of
remaining cooling capacity, and displaying on the first floor plan
model an indication of remaining power capacity for each of the
plurality of devices.
[0024] Another aspect of the invention is directed to a system for
use with a data center. The system includes an input to receive
instructions from a user, an output to provide output data to a
display device, and a controller coupled to the input and to the
output and configured to determine an equipment layout of a data
center, the equipment layout identifying a location of each of a
plurality of devices in the data center. The controller is further
configured to, based on the location, determine available power and
available cooling in the data center for each of the plurality of
devices, and compare the available power and available cooling with
power requirements and cooling requirements of each of the
plurality of devices to obtain a cooling comparison result and a
power comparison result for each of the plurality of devices.
[0025] In the system, the controller may be configured to compare
each of the comparison cooling results and the power cooling
results with thresholds, and based on at least one of the cooling
comparison result and the power comparison result, provide at least
one recommendation for correcting an out of tolerance condition.
The at least one recommendation may include adding an in-row
cooling unit in a row of equipment of the data center, and the at
least one recommendation may include a proposed location for the
in-row cooling unit. The controller may be configured to determine
at least one of stranded cooling capacity and stranded power
capacity in the data center, and to provide recommendations for
reducing at least one of the stranded power capacity and the
stranded cooling capacity in the data center. The controller may be
further configured to provide data to the output for displaying a
floor plan model of the data center, wherein the floor plan model
includes a floor plan that indicates a location of each of the
plurality of devices in the data center, and provide data to the
output for displaying on the floor plan an indication of remaining
cooling capacity. The controller may be further configured to
provide data to the output for displaying on the floor plan an
indication of remaining power capacity for each of the plurality of
devices, and the controller may be configured to determine the
available power and available cooling based on a user-selected
redundancy level. The controller may be configured to arrange the
plurality of devices in at least two substantially parallel rows
with a hot aisle formed between the two rows, and to conduct a
cooling analysis by analyzing airflows in the hot aisle. The
controller may be configured to select at least one in-row cooling
unit to be placed in the layout in one of the at least two
substantially parallel rows. At least one of the plurality of
devices may be an equipment rack, and the controller may be
configured to determine a capture index for the at least one in-row
cooling unit and the equipment rack. The controller may be
configured to provide data to the output to simultaneously display
a first floor plan model of the data center and a second floor plan
model of the data center, wherein the first floor plan model
includes at least a partial view of the data center and the second
floor plan model includes a full view of the data center. The
second floor plan model may also include an indication of a portion
of the data center that is shown in the first floor plan model. The
controller may be configured to provide data to the output to
display a three dimensional view of at least a portion of the data
center, and to provide data to the output to display a three
dimensional view of a viewing area of a camera to be located in the
data center. The controller may be further configured to select a
subset of the plurality of devices and define a power zone for each
device of the subset of the plurality of devices, wherein each
power zone includes at least one UPS. The system may further
include a database module containing data for components to be
loaded into the plurality of devices, and the controller may be
configured to provide data to the output for displaying a list of
the components. The controller may be configured to determine
operational power costs and operational cooling costs for a subset
of the plurality of devices, and the operational power costs and
operational cooling costs may be determined in terms of kilowatts.
The controller may also be configured to provide an output
electronic file containing data for the equipment layout. The
controller may also be configured to, based on at least one of the
cooling comparison result and the power comparison result, provide
at least one recommendation for placement of rack mount
equipment.
[0026] Another aspect of the invention is directed to a
computer-implemented method for designing a layout of a data
center. The method includes receiving information from a user
regarding parameters of the data center, determining an equipment
layout for the data center, the equipment layout identifying a
location of each of a plurality of devices in the data center,
including identifying a row location for each of a plurality of
equipment racks with a first subset of the plurality of equipment
racks being included in a first row; and on a display screen,
displaying a rack view of the data center showing a front view of
each of the plurality of equipment racks of the first subset in the
first row.
[0027] In the method, displaying a rack view may include displaying
a front view of a second subset of the plurality of equipment racks
of a second row along with the front view of the first subset of
the plurality of equipment racks. In the method, displaying a rack
view may include displaying a front view of a second subset of the
plurality of equipment racks of a second row along with the front
view of the first subset of the plurality of equipment racks. The
first row may include additional equipment, with the additional
equipment not included in the rack view. The method may further
include simultaneously displaying on the display screen the rack
view and a full room view of the equipment layout for the data
center. The method may also include, in response to selection of a
selected equipment rack in the full room view by a user, displaying
the selected equipment rack in the rack view, and displaying the
selected equipment rack in the rack view may include displaying a
front view of the selected equipment rack.
[0028] Another aspect of the invention is directed to a
computer-implemented method for evaluating the cooling performance
of a cluster of equipment racks in a data center, wherein the
cluster of equipment racks includes at least a first row of racks
and a second row of racks separated by a cool aisle, with each of
the equipment racks being configured to draw cooling air from the
cool aisle. The method includes obtaining at least one of power
data and airflow data for each of the equipment racks, obtaining
cool airflow data for cool air supplied to the cool aisle from a
source of cool air, and conducting an analysis of airflows in the
cool aisle to determine a recirculation index for at least one of
the equipment racks, wherein the recirculation index is indicative
of a quantity of recirculated air included in an input airflow of
the at least one equipment rack.
[0029] In the method, the recirculation index may be equal to a
ratio of recirculated air to total air in the input airflow of the
at least one equipment rack, and the method may further include
determining a recirculation index for each of the equipment racks.
In the method, the act of obtaining cool airflow data may include
obtaining cool airflow data for an in-row cooling unit included in
the cluster of racks. In the method, the act of obtaining cool
airflow data may include obtaining cool airflow data of at least
one perforated tile included in the cool aisle. In the method, the
act of conducting an analysis may include defining a plurality of
control volumes in the cool aisle, and the method may further
include determining airflows in the cool aisle by determining
airflow into and out of at least one of the control volumes. The
method may further include comparing the recirculation index for
each of the plurality of equipment enclosures with a threshold. The
method may further include determining a cooling capacity for each
of the equipment enclosures based on the recirculation index for
each of the equipment enclosures, and displaying the cooling
capacity for each of the equipment enclosures along with a
representation of a data center containing the cluster. In the
method, the act of conducting an analysis may include assigning
different chemical concentration identifiers to the airflows for at
least two of the plurality of equipment racks. In the method, the
act of conducting an analysis may include importing empirical data
and determining end of aisle airflows using the empirical data. In
the method, the act of conducting an analysis may include
determining cool aisle airflows in isolation from the data center
to obtain isolated results, and combining the isolated results with
the empirical data.
[0030] Another aspect of the invention is directed to a
computer-implemented method for evaluating the cooling performance
of a cluster of equipment racks in a data center, wherein the
cluster of equipment racks includes at least a first row of racks
and a second row of racks separated by a hot aisle, with each of
the equipment racks being configured to exhaust air into the hot
aisle. The method includes obtaining at least one of power data and
airflow data for each of the equipment racks, obtaining airflow
data for at least one air removal unit contained in one of the
first row of equipment racks and the second row of equipment racks,
and conducting an analysis of airflows in the hot aisle to
determine a capture index for at least one of the equipment racks,
wherein the capture index is indicative of a fraction of air that
is exhausted by the at least one of the equipment racks and
captured by the at least one air removal unit.
[0031] In the method, the at least one air removal unit may include
an in-row cooling unit, and the capture index may be equal to a
ratio of captured air to total air exhausted by the at least one
equipment rack. The method may further include determining a
capture index for each of the equipment racks. In the method, the
act of conducting an analysis may include defining a plurality of
control volumes in the hot aisle, and the method may further
include determining airflows in the hot aisle by determining
airflow into and out of at least one of the control volumes. The
method may further include comparing the capture index for each of
the plurality of equipment enclosures with a threshold. The method
may include determining a cooling capacity for each of the
equipment enclosures based on the capture index for each of the
equipment enclosures, and displaying the cooling capacity for each
of the equipment enclosures along with a representation of a data
center containing the cluster. In the method, the act of conducting
an analysis may include assigning different chemical concentration
identifiers to the airflows for at least two of the plurality of
equipment racks. In the method, the act of conducting an analysis
may include importing empirical data and determining end of aisle
airflows using the empirical data. The act of conducting an
analysis may include determining hot aisle airflows in isolation
from the data center to obtain isolated results, and combining the
isolated results with the empirical data. In the method, the act of
conducting an analysis may include importing empirical rules, and
determining the capture index using the empirical rules, and the
empirical rules may include coefficients for use in determining at
least one capture index.
[0032] Another aspect of the invention is directed to a
computer-readable medium encoded with instructions for execution on
a computer system. The instructions, when executed, perform a
method comprising acts of obtaining at least one of power data and
airflow data for a plurality of equipment racks arranged in a
cluster, wherein the cluster of equipment racks includes at least a
first row of racks and a second row of racks separated by a cool
aisle, with each of the equipment racks being configured to draw
cooling air from the cool aisle, obtaining cool airflow data for
cool air supplied to the cool aisle from a source of cool air, and
conducting an analysis of airflows in the cool aisle to determine a
recirculation index for at least one of the equipment racks,
wherein the recirculation index is indicative of a quantity of
recirculated air included in an input airflow of the at least one
equipment rack.
[0033] The recirculation index may equal to a ratio of recirculated
air to total air in the input airflow of the at least one equipment
rack, and the acts may further include determining a recirculation
index for each of the equipment racks. The act of obtaining cool
airflow data may include obtaining cool airflow data for an in-row
cooling unit included in the cluster of racks. The act of obtaining
cool airflow data may include obtaining cool airflow data of at
least one perforated tile included in the cool aisle. The act of
conducting an analysis ma include defining a plurality of control
volumes in the cool aisle, and wherein the method further includes
determining airflows in the cool aisle by determining airflow into
and out of at least one of the control volumes. The acts may
further include comparing the recirculation index for each of the
plurality of equipment enclosures with a threshold, and determining
a cooling capacity for each of the equipment enclosures based on
the recirculation index for each of the equipment enclosures. The
acts may further include displaying the cooling capacity for each
of the equipment enclosures along with a representation of a data
center containing the cluster. The act of conducting an analysis
may include assigning different chemical concentration identifiers
to the airflows for at least two of the plurality of equipment
racks. The act of conducting an analysis may include importing
empirical data and determining end of aisle airflows using the
empirical data. The act of conducting an analysis may include
determining cool aisle airflows in isolation from the data center
to obtain isolated results, and combining the isolated results with
the empirical data.
[0034] Another aspect of the invention is directed to a
computer-readable medium encoded with instructions for execution on
a computer system. The instructions when executed, perform a method
comprising acts of obtaining at least one of power data and airflow
data for a plurality of equipment racks arranged in a cluster,
wherein the cluster of equipment racks includes at least a first
row of racks and a second row of racks separated by a hot aisle,
with each of the equipment racks being configured to exhaust air
into the hot aisle, obtaining airflow data for at least one air
removal unit contained in one of the first row of equipment racks
and the second row of equipment racks, and conducting an analysis
of airflows in the hot aisle to determine a capture index for at
least one of the equipment racks, wherein the capture index is
indicative of a fraction of air that is exhausted by the at least
one of the equipment racks and captured by the at least one air
removal unit.
[0035] In the method, the at least one air removal unit may be an
in-row cooling unit, and the capture index may be equal to a ratio
of captured air to total air exhausted by the at least one
equipment rack. The acts may further include determining a capture
index for each of the equipment racks. The act of conducting an
analysis may include defining a plurality of control volumes, and
wherein the method further includes determining airflows in the hot
aisle by determining airflow into and out of at least one of the
control volumes. The acts may further include comparing the capture
index for each of the plurality of equipment enclosures with a
threshold. The acts may further include determining a cooling
capacity for each of the equipment enclosures based on the capture
index for each of the equipment enclosures, and displaying the
cooling capacity for each of the equipment enclosures along with a
representation of a data center containing the cluster. The act of
conducting an analysis may include assigning different chemical
concentration identifiers to the airflows for at least two of the
plurality of equipment racks. The act of conducting an analysis may
include importing empirical data and determining end of aisle
airflows using the empirical data. The act of conducting an
analysis may include determining hot aisle airflows in isolation
from the data center to obtain isolated results, and combining the
isolated results with the empirical data. The act of conducting an
analysis may include importing empirical rules, and determining the
capture index using the empirical rules. The empirical rules
include coefficients for use in determining at least one capture
index.
[0036] According to one aspect of the present invention, a
computer-implemented method for providing a representation of
capacity of a data center resource is provided. The method
comprises acts of determining a first indication of excess capacity
of a first data center resource that is unusable due to
insufficient capacity of at least one other data center resource
associated with the first data center resource, and providing the
first indication of excess capacity of the first data center
resource to an external entity. According to one embodiment of the
present invention, the act of determining the first indication of
excess capacity includes an act of determining an amount of excess
capacity of the first data center resource that is unusable due to
insufficient capacity of the at least one other data center
resource associated with the first data center resource. According
to another embodiment of the invention, the act of determining the
first indication of excess capacity includes an act of determining
an indication of excess capacity at a location in a rack. According
to another embodiment of the invention, the act of determining the
first indication of excess capacity at the location in the rack
includes an act of determining an indication of excess capacity at
a U space position. According to another embodiment of the
invention, the act of determining the first indication of excess
capacity includes an act of determining an indication of excess
capacity of rack space that is unusable due to insufficient
capacity of power.
[0037] According to one embodiment of the present invention, the
act of determining the first indication of excess capacity includes
an act of determining an indication of excess capacity of power
that is unusable due to insufficient capacity of cooling. According
to another embodiment of the invention, the act of determining the
first indication of excess capacity includes an act of determining
an indication of excess capacity of power distribution that is
unusable due to insufficient capacity of power available for
distribution. According to another embodiment of the invention, the
act of determining the first indication of excess capacity includes
an act of determining an indication of excess capacity of physical
space that is unusable due to insufficient capacity of cooling.
According to another embodiment of the invention, the act of
determining the first indication of excess capacity includes an act
of determining an indication of excess capacity of power
distribution that is unusable due to insufficient capacity of
network connectivity. According to another embodiment of the
invention, the act of determining the first indication of excess
capacity includes an act of determining an indication of excess
capacity of U space that is unusable due to insufficient capacity
of weight support.
[0038] According to one embodiment of the present invention, the
act of providing the first indication of excess capacity includes
an act of providing the indication to another system element.
According to another embodiment of the invention, the act of
providing the first indication of excess capacity includes an act
of presenting the first indication to a user of a computer system.
According to another embodiment of the invention, the act of
presenting the first indication to the user of the computer system
includes an act of presenting, to the user of the computer system,
an amount of excess capacity of the first data center resource that
is unusable due to insufficient capacity of the at least one other
data center resource associated with the first data center
resource. According to another embodiment of the invention, the act
of presenting, to the user of the computer system, the amount of
excess capacity includes acts of presenting, to the user of the
computer system, an identifier that identifies the first data
center resource and presenting, to the user of the computer system,
an identifier that identifies the at least one other data center
resource. According to another embodiment of the invention, the
method further comprises determining a configuration of data center
equipment that minimizes, relative to at least one other
configuration, the excess capacity of the first data center
resource, and providing the configuration of data center equipment
to an external entity.
[0039] According to one embodiment of the present invention,
determining the configuration of data center equipment includes
determining a location for at least one element of data center
equipment. According to another embodiment of the invention, the
method further comprises determining a second indication of excess
capacity of a second data center resource that is unusable due to
insufficient capacity of at least one other data center resource
associated with the second data center resource determining a
configuration of data center equipment that minimizes, relative to
at least one other configuration, an aggregate of the first
indication and the second indication, and providing the
configuration of data center equipment to an external entity.
[0040] According to one aspect of the present invention, a
computer-implemented method for providing a representation of a
data center resource is provided. The method comprises acts of
determining a status of capacity for the data center resource
provided to either a rack or a location in a rack, and providing
the status to an external entity. According to another embodiment
of the invention, determining the status of capacity for the data
center resource includes determining a status for the data center
resource provided to a U space position. According to one
embodiment of the present invention, the act of determining the
status of capacity for the data center resource includes an act of
determining a status of capacity of power. According to another
embodiment of the invention, the act of determining the status of
capacity for the data center resource includes an act of
determining a status of capacity of cooling. According to another
embodiment of the invention, the act of determining the status of
capacity for the data center resource includes an act of
determining a status of capacity of physical space. According to
another embodiment of the invention, the act of determining the
status of capacity for the data center resource includes an act of
determining a status of capacity of weight support. According to
another embodiment of the invention, the act of determining the
status of capacity for the data center resource includes an act of
determining a status of available capacity. According to another
embodiment of the invention, the act of determining the status of
capacity for the data center resource includes an act of
determining a status of utilized capacity.
[0041] According to one aspect of the present invention, a
computer-implemented method for providing a representation of a
data center resource is provided. The method comprises acts of
determining a rate of change of a utilized capacity of the data
center resource based at least in part on changes to a data center
configuration, and providing a predicted utilization of the data
center resource based at least in part on the rate of change.
According to another embodiment of the invention, determining the
rate of change of utilized capacity of the data center resource
includes determining the rate of change using linear regression.
According to another embodiment of the invention, the data center
resource includes power. According to another embodiment of the
invention, the data center resource includes cooling.
[0042] According to one aspect of the present invention, a system
for providing a representation of a capacity of data center
resource is provided. The system comprises an input configured to
receive a capacity of a first data center resource and a capacity
of at least one other data center resource, an output configured to
provide an amount of excess capacity of the first data center
resource, and a controller coupled to the input and the output and
configured to determine an amount of excess capacity of the first
data center resource that is unusable due to insufficient capacity
of the at least one other data center resource.
[0043] According to one aspect of the present invention, a system
for providing a representation of a data center resource is
provided. The system comprises an input configured to receive
capacity information for a data center resource, an output
configured to provide a status of capacity for the data center
resource, and a controller coupled to the input and the output and
configured to determine the status of capacity for the data center
resource at either a rack or a location in a rack.
[0044] According to one aspect of the present invention, a system
for providing an evaluation of a data center resource is provided.
The system comprises an input configured to receive changes in a
data center configuration, an output configured to provide a
predicted utilization of the data center resource based on a rate
of change of utilized capacity of the data center resource, and a
controller configured to determine the rate of change of the
utilized capacity of the data center resource based on the changes
in a data center configuration.
[0045] According to one aspect of the present invention, a
computer-implemented method for distributing data describing models
of data center equipment is provided. The method comprises acts of
indicating a first group of the data describing models of data
center equipment, the first group identifying standard models of
data center equipment, indicating a second group of the data
describing models of data center equipment, the second group
identifying models approved for use in a first data center,
indicating a third group of the data describing models of data
center equipment, the third group identifying models preferred for
use in the first data center, providing the second group to a first
remote computing device located in the first data center, and
providing the third group to the first remote computing device
located in the first data center. According to one embodiment of
the present invention, the act of providing the second group
comprises an act of providing data including at least one of the
group comprising data center equipment manufacturer, data center
equipment model, data center equipment power plug type, data center
equipment number of plugs required, data center equipment power
required, data center equipment airflow required, data center
equipment network connectivity required, data center equipment
weight support required, data center equipment cooling required,
and data center equipment physical space required. According to
another embodiment of the invention, the method further comprises
an act of providing the third group from the first remote computing
device to a second remote computing device.
[0046] According to one embodiment of the present invention, the
act of providing the third group from the first remote computing
device includes an act of providing the third group to a mobile
computing device. According to another embodiment of the invention,
the act of indicating a first group includes storing an indicator
of the first group in a database hosted by a system provider.
According to another embodiment of the invention, the method
further comprises an act of receiving first non-standard data
describing models of data center equipment from the first remote
computing device. According to another embodiment of the invention,
the method further comprises an act of receiving non-standard data
describing models of data center equipment from an external entity.
According to another embodiment of the invention, the act of
receiving non-standard data includes receiving additional data from
a data center equipment manufacturer. According to another
embodiment of the invention, the method further comprises acts of
indicating a fourth group of the data describing models of data
center equipment, the fourth group identifying models approved for
use in a second data center, indicating a fifth group of the data
describing models of data center equipment, the fifth group
identifying models preferred for use in the second data center,
providing the fourth group to a third remote computing device
located in the second data center, and providing the fifth group to
the third remote computing device located in the second data
center. According to another embodiment of the invention, the
method further comprises an act of receiving second non-standard
data describing models of data center equipment from the third
remote computing device.
[0047] According to one aspect of the present invention, a
computer-implemented method for maintaining a data center equipment
database is provided. The method comprises acts of receiving a set
of configuration management data from each of a plurality of data
centers, each set of configuration management data identifying one
of the plurality data centers, a capacity for power of the
identified data center, a capacity for cooling of the identified
data center and at least one element of data center equipment
disposed within the identified data center. According to one
embodiment of the present invention, the acts of receiving include
acts of receiving configuration management data including at least
one of the group comprising data center physical dimensions, data
center equipment location within the data center physical
dimensions, data center power distribution provided to the data
center equipment location, data center cooling distribution
provided to the data center equipment location, data center network
connectivity provided to the data center equipment location, data
center equipment manufacturer, and data center equipment model.
According to another embodiment of the invention, the method
further comprises acts of receiving a set of data center resource
consumption and production data from each of the plurality of data
centers, each set of data center resource consumption and
production data identifying one of the plurality of data centers
and being associated with at least one element of data center
equipment disposed within the identified data center.
[0048] According to one embodiment of the present invention, the
acts of receiving a set of data center resource consumption and
production data from each of the plurality of data centers include
acts of receiving data center resource consumption and production
data including at least one from the group comprising data center
equipment identity, data center equipment manufacturer, data center
equipment model, data center equipment power plug type used, data
center equipment number of plugs used, data center equipment power
used, data center equipment airflow used, data center equipment
network connectivity used, data center equipment weight support
used, data center equipment cooling used, and data center equipment
physical space used. According to another embodiment of the
invention, the acts of receiving a set of data center resource
consumption and production data from each of the plurality of data
centers include acts of receiving data center resource consumption
and production data including at least one from the group
comprising data center equipment identity, data center equipment
manufacturer, data center equipment model, data center equipment
power plug type provided, data center equipment number of plugs
provided, data center equipment power provided, data center
equipment airflow provided, data center equipment network
connectivity provided, data center equipment weight support
provided, data center equipment cooling provided, and data center
equipment physical space provided.
[0049] According to one aspect of the present invention, a
computer-implemented method for distributing data describing models
of data center equipment is provided. The method comprises acts of
receiving, from a first remote computing device, a first group of
the data describing models of data center equipment, the first
group identifying models approved for use in a data center,
receiving, from the first remote computing device, a second group
of the data describing models of data center equipment, the second
group identifying models preferred for use in the data center, and
providing the second group to a second remote computing device.
According to one embodiment of the present invention, the method
further comprises acts of receiving, from an external entity,
non-standard data describing models of data center equipment that
are not approved for use in the data center, and providing the
non-standard data to the first remote computing device.
[0050] According to one aspect of the present invention, a system
for managing equipment data describing models of data center
equipment is provided. The system comprises an input configured to
receive data associated with the equipment data, an output
configured to provide data associated with the equipment data, and
a controller coupled to the input and the output and configured to
allow an external entity to indicate that a first group of the
equipment data describes standard models of data center equipment;
to indicate that a second group of the equipment data describes
models of data center equipment approved for use in a data center,
to indicate that a third group of the equipment data describes
models of data center equipment preferred for use in the data
center and further configured to provide, via the output, the
second group to a remote computing device located in the data
center and to provide, via the output, the third group to the
remote computing device located in the data center.
[0051] According to one aspect of the present invention, a system
for managing equipment data describing models of data center
equipment is provided. The system comprises a computer readable
medium, an input configured to receive data associated with the
equipment data, an output configured to provide data associated
with the equipment data, and a controller coupled to the input, the
output and the computer readable medium and configured to store, in
the computer readable medium, an first indication that a first
group of the equipment data describes models of data center
equipment approved for use in a data center and to store a second
indication that a second group of equipment data describes models
of data center equipment preferred for use in the data center and
further configured to provide, via the output, the second group to
a remote computing device located in the data center.
[0052] According to one aspect of the present invention, a system
for maintaining a data center equipment database is provided. The
system comprises an input configured to receive a set of
configuration management data from each of a plurality of data
centers, each set of configuration management data identifying one
of the plurality data centers, a capacity for power of the
identified data center, a capacity for cooling of the identified
data center and at least one element of data center equipment
disposed within the identified data center, and a controller
coupled to the input and configured to store, in the data center
equipment database, each set of configuration management data.
[0053] According to one aspect of the present invention, a
computer-implemented method for managing a data center
configuration is provided. The method comprises acts of receiving,
from a user, a proposed change to the data center configuration
though an interactive representation of a layout of an identified
space in a data center, the proposed change including data
identifying at least one element of data center equipment to be
provisioned in the data center, the at least one element of data
center equipment having a plurality of data center resource
requirements, determining at least one location in the data center
having a plurality of data center resources that satisfy the
plurality of data center resource requirements of the at least one
element of data center equipment, and storing the at least one
location on a computer readable medium. According to one embodiment
of the present invention, the act of receiving, from the user, the
proposed change to the data center configuration includes an act of
receiving data identifying at least one element of floor mounted
data center equipment to be provisioned in the data center.
According to another embodiment of the invention, the act of
receiving, from the user, the proposed change includes an act of
receiving, from the user, the proposed change to the data center
configuration though an interactive representation of a layout of a
data center room. According to another embodiment of the invention,
the act of receiving, from the user, the proposed change includes
an act of receiving, from the user, the proposed change to the data
center configuration though an interactive representation of a
layout of a rack. According to another embodiment of the invention,
the act of receiving, from the user, the proposed change to the
data center configuration includes an act of receiving information
regarding at least one element of data center equipment represented
in the interactive representation.
[0054] According to one embodiment of the present invention, the
act of receiving, from the user, the proposed change to the data
center configuration includes an act of scanning a barcode.
According to another embodiment of the invention, the act of
determining the at least one location includes an act of
determining at least one location in near real-time. According to
another embodiment of the invention, the act of determining the at
least one location includes an act of receiving, from an external
entity, data identifying at least one location in the data center
for the at least one element of data center equipment having a
plurality of data center resources. According to another embodiment
of the invention, the act of determining the at least one location
includes an act of determining a location that minimizes, relative
to at least one other location, an amount of excess data center
resource capacity that is unusable due to insufficient associated
capacity of at least one other data center resource, and the method
further comprises providing the at least one location to an
external entity. According to another embodiment of the invention,
the act of providing the at least one location further includes an
act of presenting the at least one location to a user of a computer
system. According to another embodiment of the invention, the act
of determining the at least one location includes an act of
determining a series of locations arranged consecutively according
to an amount of excess data center resource capacity that is
unusable due to insufficient associated capacity of at least one
other data center resource and the method further comprises
providing the series of locations to an external entity.
[0055] According to one embodiment of the present invention, the
act of providing the at least one location includes an act of
presenting the series to a user of a computer system. According to
another embodiment of the invention, the method further comprises
an act of presenting, to the user, information regarding the
proposed change to the data center configuration, the information
including a representation of at least one element of data center
equipment that is disposed in a rack. According to another
embodiment of the invention, the act of presenting, to the user,
the information regarding the proposed change to the data center
configuration includes an act of presenting, to the user, a
representation of the at least one element of data center equipment
as placed in inactive storage, and the method further includes an
act of recording the at least one element of data center equipment
as placed in inactive storage. According to another embodiment of
the invention, the act of presenting, to the user, the information
regarding the proposed change to the data center configuration
includes an act of presenting, to the user, an interactive
representation that is updated based on the proposed change.
According to another embodiment of the invention, the act of
presenting, to the user, the interactive representation that is
updated based on the proposed change includes an act of presenting,
to the user, the interactive representation updated in near
real-time. According to another embodiment of the invention, the
method further comprises generating a work order identifying a set
of tasks required to complete the proposed change, and presenting
the set of tasks via an output of a computer system. According to
another embodiment of the invention, the method further comprises
acts of detecting a change in the power demanded at power
distribution device associated with the work order, and recording
the work order as completed based on the change in power demanded.
According to another embodiment of the invention, the method is
performed using a remote computing device.
[0056] According to one aspect of the present invention, a
computer-implemented method for managing a data center
configuration is provided. The method comprises acts of receiving
at least one policy identifying at least one characteristic of a
data center resource as provided to at least one element of data
center equipment, receiving a proposed change to the data center
configuration, and determining a compliance result that indicates
whether the data center configuration, including the proposed
change, complies with the at least one policy. According to one
embodiment of the present invention, the act of receiving the at
least one policy includes an act of receiving at least one policy
identifying a redundancy level. According to another embodiment of
the invention, the act of receiving the at least one policy
includes an act of receiving at least one policy identifying a
runtime requirement. According to another embodiment of the
invention, the act of receiving the at least one policy includes an
act of receiving at least one policy identifying a security
requirement. According to another embodiment of the invention, the
act of receiving the at least one policy includes an act of
receiving at least one policy identifying a requirement of cooling.
According to another embodiment of the invention, the act of
receiving the at least one policy includes an act of receiving at
least one policy identifying a requirement of network connectivity.
According to another embodiment of the invention, the act of
receiving the at least one policy includes an act of receiving at
least one policy identifying a requirement of power. According to
another embodiment of the invention, the act of receiving the at
least one policy identifying a requirement of power includes an act
of receiving at least one policy identifying a requirement of power
distribution.
[0057] According to one aspect of the present invention, a
computer-implemented method for designing a data center is
provided. The method comprises acts of receiving at least one
policy identifying at least one characteristic of a data center
resource as provided to at least one element of data center
equipment, receiving data identifying at least one location in the
data center for at least one element of data center equipment, the
at least one location having a plurality of data center resources
and the at least one element of data center equipment having a
plurality of data center resource requirements, and determining at
least one element of data center equipment that satisfies the
policy when located at the at least one location, wherein the
plurality of data center resources of the at least one location
satisfy the plurality of data center resource requirements of the
at least one element of data center equipment.
[0058] According to one aspect of the present invention, a system
for managing a data center configuration comprising an input
configured to receive, from a user, a proposed change to the data
center configuration though an interactive representation of a
layout of an identified space in a data center, an output
configured to provide a set of tasks to a user, and a controller
coupled to the input and the output and configured to generate a
work order identifying the set of tasks required to complete the
proposed change and to provide the set of tasks to the output.
According to one embodiment of the present invention, the system
further comprises a computer readable medium coupled to the
controller and wherein the input is further configured to receive
status information associated with the work order and the
controller is further configured to record the status information
in the computer readable medium. According to another embodiment of
the invention, the system further comprises an input configured to
receive, from a user, status information associated with the work
order and wherein the controller is further configured to provide
the status information to the output.
[0059] According to one aspect of the present invention, a system
for managing a data center configuration comprises a first input
configured to receive at least one policy identifying at least one
characteristic of a data center resource as provided to at least
one element of data center equipment, a second input configured to
receive a proposed change to the data center configuration, and a
controller coupled to the first and second inputs and configured to
determine a compliance result that indicates whether the data
center configuration, including the proposed change, complies with
the at least one policy.
[0060] According to one aspect of the present invention, a system
for designing a data center is provided. The system comprises an
first input configured to receive at least one policy identifying
at least one characteristic of a data center resource as provided
to at least one element of data center equipment, a second input
configured to receive data identifying at least one location in the
data center for at least one element of data center equipment, the
at least one location having a plurality of data center resources
and the at least one element of data center equipment having a
plurality of data center resource requirements, and a controller
coupled to the first and second inputs and configured to determine
at least one element of data center equipment that satisfies the
policy when located at the at least one location, wherein the
plurality of data center resources of the at least one location
satisfy the plurality of data center resource requirements of the
at least one element of data center equipment.
[0061] According to one aspect of the present invention, a remote
computing device for navigating a representation of a data center
is provided. The remote computing device comprises an interface
configured to present, to a user, an interactive representation of
a layout of an identified space in a data center and to receive,
from the user, an identifier of at least one element of data center
equipment located in the data center, a memory configured to store
information regarding data center equipment represented by the
interface, and a controller coupled to the interface and memory and
configured to retrieve information regarding the identified at
least one element of data center equipment from the memory and
provide the information to the interface.
[0062] According to one aspect of the present invention, a
computer-implemented method for managing data center resource
redundancy is provided. The method comprises acts of determining a
redundancy level of a data center resource at a location in a rack,
and providing the redundancy level of the data center resource.
According to one embodiment of the present invention, the act of
determining the redundancy level of the data center resource
includes an act of determining a redundancy level of cooling.
According to another embodiment of the invention, the act of
determining the redundancy level of the data center resource
includes an act of determining a redundancy level of network
connectivity. According to another embodiment of the invention, the
act of determining the redundancy level of the data center resource
includes an act of determining a redundancy level of power.
According to another embodiment of the invention, the act of
determining the redundancy level of the data center resource
includes an act of determining a redundancy level of power
distribution. According to another embodiment of the invention, the
act of determining the redundancy level of the data center resource
at a location in a rack includes an act of determining a redundancy
level of a data center resource at a U space position. According to
another embodiment of the invention, the act of providing the
redundancy level includes an act of presenting, to a user of a
computer system, a representation of the at least one location in a
rack. According to another embodiment of the invention, the act of
presenting, to the user of the computer system, the representation
of the at least one location in the rack includes an act of
presenting, to a user of a computer system, a representation at
least one U space position in a rack. According to another
embodiment of the invention, the act of presenting, to the user of
the computer system, the representation of the at least one
location in the rack includes an act of presenting, to a user of a
computer system, a representation of a redundancy relationship
between elements disposed in a data center. According to another
embodiment of the invention, the act of presenting, to the user of
the computer system, a representation of a redundancy relationship
between elements disposed in a data center includes an act of
presenting, to a user of a computer system, a redundancy
relationship between elements disposed in a rack.
[0063] According to one aspect of the present invention, a system
for managing data center resource redundancy is provided. The
system comprises a controller configured to determine the
redundancy level of a data center resource at a location in a rack,
and an output coupled to the controller and configured to provide a
representation of the redundancy level of the data center resource.
According to one embodiment of the present invention, the location
in the rack includes a U space position in a rack. According to
another embodiment of the invention, the system includes a remote
computing device.
[0064] Further features and advantages of the present invention as
well as the structure and operation of various embodiments of the
present invention are described in detail below with reference to
the accompanying drawings. In the drawings, like reference numerals
indicate like or functionally similar elements. Additionally, the
left-most one or two digits of a reference numeral identifies the
drawing in which the reference numeral first appears.
BRIEF DESCRIPTION OF DRAWINGS
[0065] The accompanying drawings, are not intended to be drawn to
scale. In the drawings, each identical or nearly identical
component that is illustrated in various figures is represented by
a like numeral. For purposes of clarity, not every component may be
labeled in every drawing. In the drawings:
BRIEF DESCRIPTION OF DRAWINGS
[0066] The accompanying drawings are not intended to be drawn to
scale. In the drawings, each identical or nearly identical
component that is illustrated in various figures is represented by
a like numeral. For purposes of clarity, not every component may be
labeled in every drawing. In the drawings:
[0067] FIG. 1 is a top view of a data center of the type with which
embodiments of the present invention may be used;
[0068] FIG. 2 is a side view of the data center of FIG. 1.
[0069] FIG. 3 is a functional block diagram of a system in
accordance with one embodiment of the present invention;
[0070] FIG. 4 is a flowchart of a process that may be implemented
using the system of FIG. 3 in accordance with one embodiment of the
invention;
[0071] FIG. 5 is a diagram showing facility information that can be
displayed using at least one embodiment of the invention;
[0072] FIGS. 5A and 5B are diagrams showing additional information
that can be displayed using embodiments of the invention;
[0073] FIGS. 5C and 5D show graphical user interface screens that
exhibit various aspects of the present invention;
[0074] FIG. 6 is a functional block diagram of a management system
in accordance with one embodiment of the invention;
[0075] FIG. 7 is a flow chart of a management process in accordance
with one embodiment of the invention;
[0076] FIG. 8 shows a perspective view of a cluster of racks whose
cooling performance can be analyzed using embodiments of the
invention;
[0077] FIG. 9 shows a top view of a cluster of racks whose cooling
performance can be analyzed using a control volume analysis
technique of at least one embodiment;
[0078] FIG. 9A shows the cluster of racks of FIG. 9 along with
staggered control volumes that may be used in the control volume
analysis technique;
[0079] FIG. 10 is a flow chart of a control volume analysis
technique in accordance with one embodiment of the invention;
[0080] FIG. 11 is a diagram demonstrating a principle of
superposition used in one embodiment;
[0081] FIG. 12 is a graph used in determining airflows in one
embodiment;
[0082] FIG. 13 is a diagram identifying airflows used with one
analysis method of one embodiment;
[0083] FIG. 14 is a flow chart of a process for determining a
recirculation index in one embodiment;
[0084] FIG. 15 is a schematic diagram showing a layout of equipment
racks used in an analysis in one embodiment to determine a capture
index;
[0085] FIG. 16 is a flowchart of a process for determining a
capture index in accordance with one embodiment;
[0086] FIG. 17 is a functional block diagram of a computer system
that may be used in embodiments of the invention;
[0087] FIG. 18 is a functional block diagram of a storage system
that may be used with the computer system of FIG. 17;
[0088] FIG. 19 is a flowchart of a process that may be implemented
using the system of FIG. 3 in accordance with one embodiment of the
invention;
[0089] FIG. 20 shows graphical user interface screen that exhibits
various aspects of the present invention;
[0090] FIG. 21 depicts another graphical user interface screens
that exhibits various aspects of the present invention;
[0091] FIG. 22 illustrates another graphical user interface screen
that exhibits various aspects of the present invention; and
[0092] FIG. 23 shows a representation used to analyze stranded
capacity according to an aspect of the present invention.
DETAILED DESCRIPTION
[0093] This invention is not limited in its application to the
details of construction and the arrangement of components set forth
in the following description or illustrated in the drawings. The
invention is capable of other embodiments and of being practiced or
of being carried out in various ways. Also, the phraseology and
terminology used herein is for the purpose of description and
should not be regarded as limiting. The use of "including,"
"comprising," or "having," "containing," "involving," and
variations thereof herein, is meant to encompass the items listed
thereafter and equivalents thereof as well as additional items.
[0094] Embodiments of the present invention may be used to design,
manage and retrofit a data center, such as data center 100 which is
shown in FIGS. 1 and 2 with FIG. 1 showing a top view of the data
center 100, and FIG. 2 showing a side view of the data center 100.
As discussed further below, the design of the layout of the data
center 100, including various data center resources such as power
and cooling considerations may be performed using systems and
processes of embodiments of the present invention. A data center
resource may include, for example, any characteristic of a data
center that supports and/or ensures data center equipment
functionality. Examples of data center resources include power,
cooling, physical space, weight support, remote equipment control
capability, physical and logical security and physical and logical
network connectivity. Power data center resources may include power
distribution resources, such as transformers, PDUs and outlets, and
power available for distribution, such as utility power supplied to
the data center, power generated by an onsite generator and power
supplied by UPSs. Physical space resources in a data center may
include data center floor space and rack U space. Cooling resources
in a data center may include cooling distribution capacity and
cooling generation capacity. Physical security resources in a data
center may include security cameras and door locks. Logical network
connectivity resources in a data center may include Virtual Local
Area Networks, Domain Name Services, and Dynamic Host Configuration
Protocol Services. Physical network connectivity resources may
include network cabling and patch panels. Remote equipment control
capability resources in a data center may include Keyboard Video
Mouse services.
[0095] Embodiments of the invention, however, are not limited for
use with data centers like that shown in FIGS. 1 and 2 and may be
used with other facilities that do not include raised floors and
may be used with facilities that house equipment other than
computing equipment, including telecommunications facilities and
other facilities. Further, embodiments of the invention may be used
with raised floor and equipment layouts that are not neatly
arranged in the manner shown in FIGS. 1 and 2. Embodiments of the
present invention may use systems, devices and methods described in
U.S. patent application Ser. No. 10/038,106, filed Jan. 2, 2002,
titled "Rack Power System and Method," incorporated herein in its
entirety by reference.
[0096] The data center 100 includes rows of racks 102A, 102B, 102C
and 102D, cooling units 104A and 104B, and a raised floor 106. Each
of the rows includes racks 108, at least a number of which draw
cool air from the front of the rack and return warm air to the rear
or top or rear and top of the rack. Each rack may contain U space
positions designed to house rack mounted data center equipment,
such as, for example, servers, cooling equipment and network
connectivity equipment.
[0097] As understood by those skilled in the art, to optimize
cooling performance in a data center, rows of racks are often
positioned to create alternating cold aisles and hot aisles. In the
configuration shown in FIGS. 1 and 2, aisles 110A, 110B and 110C
are hot aisles and aisles 112A and 112B are cold aisles. To provide
cooling to the racks, in front of each of the racks in the cold
aisle, perforated floor tiles 114 are used to provide cooling air
from under the raised floor. In the data center 100, in addition to
the perforated floor tiles shown, the raised floor may include
solid floor tiles. The cooling units 104A and 104B are designed to
provide cool air to the area under the raised floor and to receive
return warm air from the space adjacent the ceiling of the data
center. In other embodiments, in addition to or in place of the
cooling units 104A and 104B, in-row cooling units, such as those
available from American Power Conversion Corporation, may be used.
Further, in at least one embodiment, half-rack in-row cooling units
may be used, as described in co-pending U.S. patent application
Ser. No. 11/335,901, entitled COOLING SYSTEM AND METHOD, Attorney
Docket No. A2000-704819, by Neil Rasmussen et al., filed on Jan.
19, 2006, and incorporated herein by reference. As described in the
referenced application, the half-rack, in-row units have a width of
twelve inches, which is approximately half of that of a standard
data center rack.
[0098] One embodiment of the invention, directed to a system and a
method for designing, monitoring, and upgrading the equipment
installed in a data center, such as data center 100, will now be
described with reference to FIG. 3. This equipment may include rack
mounted equipment, such as servers, storage devices, and network
connectivity equipment, and floor mounted equipment, such as three
phase power distribution units and CRACs. FIG. 3 shows a functional
block diagram of a design and management system 200. Embodiments of
the invention are not limited to the functions provided by the
functional blocks or the particular arrangement of the blocks. In
addition, the functions provided by the system 200 need not be
implemented on one computer system, but rather may be implemented
using a number of networked devices as described further below that
provide the functions described. Further, particular embodiments
may have more or less functions and functional modules than those
described below with reference to FIG. 3. In different embodiments,
the functions described with reference to FIG. 3 may be performed
on one processor or controller or may be distributed across a
number of different devices.
[0099] The system 200 includes an input module 202, a display
module 204, a builder module 206, a facility management module 208,
an integration module 210, a database module 212, and a work order
module 214. The input module 202 provides an interface to allow
users to enter data into the system 200. The input module may
include, for example, one of a number of known user input devices
for computer systems, and in addition, in at least one embodiment,
electronic data regarding a facility and/or equipment to be loaded
into a facility may be entered into the system through a network
interface or using an electronic media storage reader. Information
may flow between these modules using any technique known in the
art. Such techniques include passing the information over the
network via TCP/IP, passing the information between modules in
memory and passing the information by writing to a file, database,
or other storage entity, such as a storage device, disk or other
type of storage entity.
[0100] The display module includes a display interface and may
include a graphical display to display output data to a user. In
addition, the display module may include an interface for one or
more printers that provide a hard copy of output data.
[0101] The builder module 206 includes routines for designing
optimal layout of equipment in a facility, determining data center
resource requirements, such as power requirements and cooling
requirements, for electronic enclosures and/or equipment racks,
ensuring that the placement of equipment, cooling units and power
distribution branches in the facility allow the data center
resource requirements, such as power and cooling requirements, to
be met, and calculating for each electronic enclosure, and/or
equipment rack, the remaining data center resource capacity, such
as power capacity and cooling capacity, available based on the
layout of equipment in the facility.
[0102] In another embodiment, builder module 206 exposes interfaces
that allow for entry of data center resource supply policies. These
policies may detail additional desired characteristics of the data
center resources as provided to data center equipment. For example,
data center resource supply policies may specify desired data
center resource redundancy levels and runtime requirements.
Additionally, data center resource supply policies may specify
security needs for data center equipment, such as, for example, the
need to locate servers with financial data in racks that made be
locked and/or under surveillance. As is discussed further below,
both system and method embodiments may compare particular data
center configurations to data center supply polices to determine
whether the particular data center configuration complies with the
data center policies. The result of this comparison may be stored
on a computer readable medium for later use.
[0103] The facility management module 208 is used by the system 200
after equipment is installed in the facility. The management module
includes routines to monitor data center resource characteristics,
such as power and cooling characteristics, of equipment in a
facility. The management module may be coupled, either directly or
through one or more networks, to measurement devices and control
devices throughout the facility and may record their history for
analysis, summarization and exportation. Based at least in part on
methods discussed further below, the facility management module 208
may ascertain data center resources provided to a particular space
or location in the data center.
[0104] According to one embodiment, the integration module 210 is
the main module in the system and coordinates flow of data in the
system to perform methods of embodiments of the present
invention.
[0105] The database module is used to store data regarding various
devices that may be used in a data center, such as servers,
uninterruptible power supplies, power strips, network connectivity
equipment (such as network cabling, hubs, routers, wireless
routers, switches, patch panels, etc.), automatic transfer
switches, power distribution units, air conditioning units, racks
and any other data center equipment. The data stored may include
data center resource supply policies for data center equipment. The
data stored may also include data center resource consumption and
production benchmarks for data center equipment such as physical
parameters (e.g., dimensions/rack space requirements, power plug
types, network cabling specifications, etc.) as well as power and
cooling consumption data. In the case of data center equipment that
provide data center resources such as network connectivity
equipment, power supplies and air conditioning units, data center
resource production benchmarks may include network connectivity,
cooling and power output characteristics (e.g. total output
capacity, number and type of connections/plugs available, etc.). It
should be appreciated that benchmarks may indicate that certain
data center equipment produce, and/or consume, data center
resources. Examples of data center resource providing equipment
include electrical generators and CRACs, among others. As described
below, the database module may be used in embodiments of the
invention to provide a complete bill of materials (BOM) for a
completed design. In one embodiment, a centralized web-accessible
database server may be used to store equipment information and
warnings and error messages, allowing easy access to the
information for editing.
[0106] In another embodiment, a user may maintain data center
equipment information, such as the information handled by database
module 212, with the assistance of system 300. System 300 is also
depicted in functional block diagram FIG. 3. System 300, which may
be hosted by the system provider, includes data center equipment
database 304 and data center equipment database interface 302. In
general, interface 302 may be an interface to database 304 that may
receive or provide any data appropriate for storage in database 304
including data center configuration, equipment or resource
information. Database 304, in turn, may receive and store from
interface 302 or retrieve and provide to interface 302 data center
information including data center equipment resource requirements,
data center configurations and data center resource redundancy and
runtime requirements.
[0107] Database 304 may serve as a master database for the system
provider and thus may include several types of information related
to data centers. In one embodiment, database 304 includes a data
center configuration management database (CMDB), which may
encompass various configuration management data including one or
more specific data center physical and logical configurations, and
a data center equipment characteristics database, which may include
theoretical and actual data center resource production and
consumption information for data center equipment. More
particularly, database 304 may accept and store specific CMDB
information for the system provider's installed base of data
centers or a subset thereof. This information may include the
entire physical layout of a data center, e.g. its physical
dimensions, the location and identity of data center equipment, and
data center resource capacity, redundancy and runtime requirements,
among other information that may have relevance to the design and
performance of a data center. The source of this information may
include the initial design on the data center as discussed with
regard to method 300 below.
[0108] The type of information stored by database 304 for data
center equipment characteristics may include the information
discussed above with regard to database module 212, e.g. nameplate
values as referred to in the art. Additionally, database 304 may
also store data center resource consumption and production history
for data center equipment and may use this information to maintain
a set of benchmarks that are specific to the manufacturer and model
of data center equipment. These specific historical measurements
may be summarized into various forms to establish a benchmark that
is specific to the manufacturer and model of data center equipment
and that is based on actual, practical usage of the data center
equipment rather than theoretical values (e.g. nameplate values).
These data center resource consumption and production summaries may
include, among others, minimum, maximum and average data center
resource consumption or production, data center resource
consumption or production as a function of time, e.g. power or
cooling consumption or production by day of week, week of year,
etc., actual data center resource consumption or production when a
change in either is requested, and data center resource consumption
or production as a function of data center equipment utilization.
The source of this information may include the initial design on
the data center, including customer or system provider entered
benchmarks, and ongoing parameter measurement as discussed with
regard to method 300 below. According to one aspect, it is
appreciated that these benchmarks, in turn, may be more accurate
than the nameplate values and may be used for simulation purposes
during the design and retrofitting processes discussed below.
[0109] Interface 302 may expose both user interfaces (UIs) and
system interfaces to exchange database 304 information with
external entities. These external entities may include systems
and/or users. Interface 302 may both restrict input to a predefined
information domain and validate any information entered prior to
using the information or supplying the information to other
modules. For instance, in one embodiment, interface 302 may include
a Structured Query Language (SQL) interface to enable a user or
application program to interrogate database 304. This SQL interface
may include graphical elements that a user may actuate to build SQL
statements and may also include elements that enable a user to
simply input SQL statement directly.
[0110] In other embodiments, interface 302 may include more complex
grouping, translation, validation and/or restriction logic. For
instance, interface 302 may validate that a SQL statement entered
by a user conforms to proper SQL syntax prior to executing it
against database 304. In one embodiment, interface 302 may expose a
UI with characteristics similar to those of builder module 206 to
enable users to create database information representing various
data center configurations. In another example, interface 302 may
expose a user interface allowing a user to enter new data center
equipment resource information, including manufacturer, model and
data center resource consumption and production benchmarks.
Interface 302 may restrict entry of resource consumption and
production benchmarks to predefined data center resources, such as
power, cooling, physical space, etc. In still another embodiment, a
user may establish groups of data center equipment through
interface 302 and approve these equipment groups for use within a
set of data centers or upon certain types of computing devices,
such as remote or mobile computing devices. Furthermore, interface
302 may enable a user to designate a hierarchical relationship
between groups of equipment. As discussed further in regard to
method 300 below, arrangement of this information into a hierarchy
of groups may ease database maintenance and distribution.
[0111] In one embodiment, interface 302 may expose a system
interface that imports data center configuration and measured
parameter information from a system provider's installed base of
data centers or data center equipment providers. Interface 302 may
utilize a standard protocol, such as, for example, SQL or SQL
wrapped in SOAP, to implement such a system interface and may
include non-standard protocol elements that are parsed and resolved
to commands to be executed by database 304. Interface 302 may
validate database commands prior to execution on database 304. Any
customer specific data center equipment, e.g. data center equipment
entered by a customer that is not present in the database 304, may
be imported into database 304 by interface 302 if any applicable
validation is successful. Similarly, equipment not present in
database 304 that is made available by data center equipment
providers may be imported into database 304 by interface 302 if any
applicable validation is successful. These features enable system
300 to easily add new data center equipment to its set of managed
elements.
[0112] Furthermore, importation of measure parameters may trigger a
parameter summarization process that updates data center equipment
resource consumption and production benchmarks to reflect actual
usage history. The summarization process may include updating,
among others, minimum, maximum and average power consumed or
produced benchmarks, benchmarks for power consumption or production
as a function of time, e.g. power consumed or produced by day of
week, week of year, etc., benchmarks for power actually consumed or
produced when a change in either is requested, and/or benchmarks
for power consumed or produced as a function of data center
equipment utilization.
[0113] In still another embodiment, interface 302 may expose a
system interface that exports data center equipment information, or
catalogs, to external storage. This external storage may reside at
various locations on various computing devices. Furthermore, as
discussed below, the particular information that is exported to
these locations and computing devices may be relegated to specific
groups of data center equipment.
[0114] It should be appreciated that in at least one embodiment,
the functionality of system 300 may be included in database module
212 of system 200.
[0115] In yet another embodiment, the work order module 214 may
enable management of changes to the configuration of the data
center, such as those resulting from a data center retrofit process
as discussed below with regard to process 600. In general, work
order module 214 analyzes any changes made to the data center
configuration by the other modules in system 200. Then work order
module 214 generates a set of tasks that, once complete, will
implement those changes. Next, work order module 214 translates the
set of tasks to a set of work orders in human-readable form.
Lastly, work order module 214 facilitates tracking of those work
orders to completion. To accomplish these objectives, work order
module 214 may expose various UIs and system interfaces to enable
communication and interoperation with external entities.
[0116] In one embodiment, work order module 214 exposes a system
interface through which integration module 210 may supply any
changes made to the data center configuration. Work order module
214 may also expose a user interface including elements that enable
a user, such as a data center manager, to modify and dispatch work
orders to other users, such as technicians, for implementation.
Work order module 214 may also expose a user interface to enable a
user to configure a set of automatic dispatching rules. Further,
work order module 214 may expose other user interfaces that enable
users, such as technicians, to modify the details, including status
information, of work orders. These user interfaces may reside on
various computing devices, including remote or mobile computing
devices.
[0117] Implementing such a user interface on a remote or mobile
computing device may allow users, such as technicians, to update
the CMDB of the data center as configuration changes are made. This
may produce several benefits including increased accuracy of the
CMDB, due to the increased compliance with, and promptness of,
configuration change updates. Another benefit may be increased
productivity for users, such as technicians, because configuration
changes may be entered while working on data center equipment,
rather than entering changes at a workstation as a separate
activity.
[0118] Work order module 214 may also implement modification and
assignment system interfaces to interoperate with other systems.
For example, work order module 214 may, through a system interface,
utilize an external email system to notify users of a work order
assignments. Lastly, work order module 214 may utilize a system
interface that enables it to detect changes in data center resource
demands and may use this information, when appropriate, to modify
the status information of a work order.
[0119] A flow chart of a method 300 in accordance with one
embodiment that may be performed using the system 200 will now be
described with reference to FIG. 4. Initially, and optionally, at
stage 301 of the method 300, a user may create groups of data
describing data center equipment. These groups may enable
management of multiple types and/or models of data center equipment
as a single collective entity. For example, inclusion of data
describing data center equipment in a group may designate such
equipment as approved for use within all of the data centers owned
by a customer or specific subsets thereof. Any data center
equipment approved for use within a data center may be used during
the design or retrofit of the data center.
[0120] Moreover, the user may arrange these groups in a
hierarchical fashion. In one embodiment, a first group is created
that includes all of the data center equipment supported by the
system, a second group is created that is a subset of the first
group and that designates equipment that is approved for use within
the data centers of a particular customer, and a third group is
created that is a subset of the second group and that designates
equipment that is preferred for use within a particular customer
data center. In one embodiment, a user may target specific groups
for exportation to specific customers, customer data centers or
specific computing devices within a customer data center, such as
remote or mobile computing devices.
[0121] Fashioning groups of equipment data may ease maintenance and
distribution of electronic data center equipment catalogs, which
may include data describing characteristics of data center
equipment. For example, specific inclusion of data center equipment
data in a group that is lower in the hierarchy, e.g. a group
designated for distribution to a remote or mobile computing device
within a specific data center, may require that the data be present
in ancestor groups. This inclusion may be performed automatically
by the system. These groups may also be employed to enforce
standardization of data center equipment within the customer
organizational hierarchy by requiring that equipment be approved
for use by the customer before it is allowed to be used to retrofit
a specific customer data center.
[0122] In another embodiment, the system provider may create a
group of data describing standard data center equipment. A group of
the standard data center equipment data may be approved for use in
customer data centers. An equipment catalog including data
associated with the standard and/or approved data center equipment
may be delivered with the initial system installation in a data
center. The standard and/or approved equipment data may then be
supplemented with customer specific, non-standard equipment data
used in a customer data center, as discussed with regard to stage
304 below.
[0123] Approved equipment may be further grouped into a preferred
set for use with one or more customer data centers. The creation of
these preferred groups may be explicitly performed by the user or
may be implicitly performed by the system based on usage of
specific equipment by a customer or within a customer data center
during data center design or retrofit.
[0124] In stage 302 of the method 300, information regarding the
facility is loaded into the system. The information includes, for
example, dimensions of the facility, number of rooms, locations of
doors, support columns, other obstructions, parameters of data
center resource capabilities, such as available power, cooling
capabilities of the facility, whether a raised floor or drop
ceiling is in use, and characteristics of any such floor and roof.
Data center resource supply policies may also be entered in this
stage. For data center resource providing equipment, such as
electrical generators or CRACs, capability information may be
loaded by receiving data center equipment information from
interface 302 of system 300. Thus, this stage of method 300
collects information helpful in determining the data center
resources provided to particular data center locations and spaces.
In at least one embodiment, as discussed further below with regard
to cooling, this information may be further processed to determine
the data center resources provided to particular data center
locations and spaces.
[0125] In stage 304 of the method, information regarding equipment
to be installed in the facility is entered. The information
includes, for example, the number of racks of equipment, maximum
power draw for each of the racks, dimensions of the racks, and
cooling requirements for the racks. The need for backup power
sources and multiple power sources for equipment and or racks may
also be entered at stage 304. In one embodiment, data center
resource consumption and production characteristics of individual
pieces of equipment that are to be loaded into racks may also be
entered. Also, the weight of equipment (including equipment loaded
into racks) may be used to ensure that the weight of the installed
equipment is within any facility constraints. These characteristics
may include, in addition to network connectivity, power and cooling
requirements, the amount of rack space that the equipment needs to
occupy and the type and/or number of electrical plugs that the
equipment requires. In one embodiment, the database module 212
contains information regarding a number of devices, such as
uninterruptible power supplies, equipment racks, cooling units,
generator systems, power distribution units, automatic transfer
switches, electrical routing devices, including cables, and servers
and other computer equipment. In this embodiment, when a particular
model number of a device is entered, characteristics of the device
are retrieved from the database module. In one embodiment,
interface 302 of system 300 provides these device/equipment
characteristics to database module 212. Equipment related to fire
protection and security may also be included in the design.
Further, in at least one version, all equipment and components
within equipment racks may include RFID tags, which can be used by
systems of the invention to track location of equipment and racks.
In another embodiment, any data center equipment characteristics
that are added or changed by a user at this or the previous stage
may be transmitted to interface 302 of system 300 for importation
into database 304.
[0126] Once all of the information is entered into the system, at
stage 306, the system in one embodiment determines a layout for the
equipment in the facility, taking into account the data center
resource requirements, such as power and cooling requirements, of
the equipment as well as other characteristics of the equipment
that were entered at stage 304 or retrieved from the database
module. In another embodiment, the user may create the layout
graphically, adding racks and other equipment where desired, and in
this embodiment, the system will provide feedback during the layout
process, disallowing some choices and making intelligent
suggestions. These rules may include, for example: a standard
alternating hot aisle/cold aisle layout must be specified, the
plenum must be greater than some minimum value, the total room
cooling capacity must exceed total room cooling load, aisles must
be wide enough for access purposes and to meet building codes,
distance between PDU and IT racks served by the PDU must not exceed
some maximum value, PDU must be located immediately adjacent to a
UPS, where a cable ladder spans an aisle, the aisle cannot exceed a
maximum width, one or more data center resource capacities must be
at a level sufficient to support target data center resource
redundancy and/or runtime requirements, etc.
[0127] Next, at stage 308, a cooling analysis is conducted to
determine if the design provides adequate cooling for each of the
racks and the equipment installed in the racks. As described
further below, in different embodiments of the present invention
one of a number of different methods may be used to conduct the
cooling analysis. In one embodiment, if the results of the cooling
analysis indicate that one or more devices and/or racks are not
receiving adequate cool air, then the procedure may return to stage
306 to change the layout of the equipment based on feedback
provided from the analysis conducted at stage 308.
[0128] At the completion of the cooling analysis, at stage 310, a
room model is displayed showing the locations of the equipment in
one or more rooms of the facility. The room model may include, for
each equipment rack, or for individual data center equipment,
information regarding the total data center resources, such as
power and cooling, being consumed or produced as well as an
indication of total available data center resources, such as power
and cooling, to the rack or data center equipment. In one
embodiment actual data center resource data, such as power and
cooling data, may be displayed, while in other embodiments colors
may be used, either alone or in combination with data, to display
different levels of data center resource availability, such as
power and cooling availability. For example, if a rack is operating
with sufficient cooling air with a margin above a threshold, the
rack may be indicated in green on the display, if the cooling air
availability is closer to the threshold, the rack may be indicated
in yellow, and if the rack does not have sufficient cooling air it
may be indicated in red. Still further, the results of the analysis
may indicate that adequate data center resources, such as power
and/or cooling, are being provided for equipment, but that
specified redundancy levels and/or runtime margins are not being
met, either at the room level, a row level, a rack level, or at a
specific piece/element of data center equipment.
[0129] In one embodiment, the system may display multiple room
models and may allow the user to find one or a series of alternate
satisfactory locations for the equipment based on the data center
resource requirements of the equipment and any applicable
redundancy and/or runtime requirements. Another embodiment may
allow the user to find an optimum location followed by a series of
alternate satisfactory locations for the equipment. Each series of
locations may be arranged consecutively according to an order of
preference, such as in order of decreasing excess or stranded
capacity. As discussed further below, stranded capacity includes
excess capacity that is nominally available, but unusable, due to
insufficient associated capacity of another data center resource
required by data center equipment.
[0130] Yet another embodiment may allow the user to specify both
the data center equipment and location and may validate whether the
location provides sufficient data center resources to satisfy the
requirements of the equipment and any applicable data center supply
policies. This validation may be performed by comparing the data
center resources provided to the location, the data center
requirements of the equipment and any applicable data center
resource supply policies. The result of this comparison, a
compliance result, may be stored for later use. In still another
embodiment, the system may suggest data center equipment to be
placed at a user specified location. In this case, the system may
ensure that applicable data center resource supply policies, and
data center resource requirements of the suggested equipment, are
met by comparing the polices, the data center resources provided to
the location and the data center resource requirements of the
equipment prior to suggesting the equipment based on a compliance
result. Specific example details regarding the room model are
described further below with reference to FIGS. 5 through 5D.
[0131] At decision block 312, a determination may be made by, for
example, a facility designer as to whether the layout generated in
stage 310 is satisfactory. The determination may be based on
additional criteria of importance to the designer that was not
included during the design of the original layout. For example, it
may be desirable to have certain racks near each other or to have
certain racks isolated from one another. At stage 314, additional
criteria or other feedback can be provided and the process then
returns to stages 306 and 308 where the room model can be refined.
Stages 306 to 312 may be repeated until a satisfactory model is
achieved at stage 312. In at least one embodiment, at the
completion of the design stage, a bill of materials is generated
and may be used to provide the cost of the equipment to be
installed in the facility and may also be used to generate a sales
order for the equipment, providing a simple solution for ordering
all equipment associated with a new data center. Further, CAD
drawings and electronic files that capture the designed layout may
also be generated. In another embodiment, this data center
configuration is transmitted to interface 302 of system 300 for
storage in database 304 in the form of a CMDB for the installed
data center.
[0132] At stage 316, the equipment is installed in the facility
according to the layout generated at stages 306 to 314. In one
embodiment, measurement equipment to measure cooling
characteristics and power characteristics, may be installed with
the equipment. The measurement equipment is described further
below, and may include, for example, devices for measuring power,
airflow, humidity and temperature at various locations in the
facility and within equipment racks located in the facility.
[0133] At stage 318 of the process 300, power and cooling
parameters are measured using the measurement equipment. Additional
temperature measurements may also be provided by devices, such as
servers, that have the capability to detect internal temperatures.
The parameters measured may be used continuously by the management
module of the system 200 to detect error conditions and to monitor
trends that may lead to an error condition. Further, in the process
300, the measured parameters can be compared with predicted
parameters calculated during the design process in stages 306 and
308. For example, in one embodiment, the airflow through a
perforated floor tile of a raised floor is used to determine the
available cooling air of a rack located adjacent the floor tile.
The airflow through the perforated tile may be determined in stage
308 using one of a number of computational methods that are
described further below, or the airflow may be determined using
data from related physical measurements or simulations. Once the
equipment is installed in the facility, the perforated floor tile
may be instrumented to measure the actual airflow through the tile.
The actual measured value may then be compared with the calculated
value at stage 320. If the two differ by more than a predetermined
threshold, then an indication or warning may be provided and the
calculations conducted in stage 308 may be conducted once again at
stage 322 using measured values in place of calculated values as
appropriate to obtain updated parameters. In another embodiment,
measured parameters are transmitted to interface 302 of system 300
for storage in database 304. As discussed above, the storage of
these measure parameters by interface 302 may trigger further
analysis and summarization of the measure parameters into data
center equipment consumption and production benchmarks.
[0134] After stage 322, the model of the facility described above
with reference to stage 310 may be displayed with values of power
and cooling availability and consumption updated to reflect any
differences between measured parameters and calculated parameters.
Any out of tolerance conditions (for either cooling or power) may
be indicated on the display using, for example, a color coded
scheme as described above. In one embodiment, a user may be
provided with a number of available options to correct an out of
tolerance condition. The options may include upgrading or adding
facility equipment (i.e., an air conditioning unit or an
uninterruptible power supply) or may include moving equipment
and/or racks. Stages 318 to 322 of the process may be performed
continuously as part of a management system of the data
facility.
[0135] In one embodiment of the invention, stages 302 to 314 of the
process 300 are implemented using a build-out system accessible by
a user over the Internet. In this embodiment, the user provides the
requested information, and the build-out system provides the
processing described above, provides outputs to the user over the
Internet, and stores results locally. After the equipment has been
installed in the facility, the management system 500 (described
below) may access the build-out system to download information
related to the equipment. In addition, when a retrofit of the
facility is to occur, the management system may contact the
build-out system to coordinate the design of the retrofit. In at
least one embodiment, electronic files may be imported/exported
between the systems to provide a complete transfer of all
information related to a data center's design.
[0136] FIG. 5 shows an example of a display of a room model that
may be generated using the system 200 and the process 300 and shown
on a computer display. It should be appreciated that this computer
display may be any be coupled to, or included in, any sort of
computing device including a remote or mobile computing device. The
room model shown in FIG. 5 is essentially the data center 100
previously discussed above with reference to FIGS. 1 and 2.
However, in FIG. 5, additional data related to the power and
cooling consumption and capacity of each rack, U space positions,
and/or elements of data center equipment housed within each rack
may be included in an informational block, such as informational
blocks 120A and 120B shown on two of the racks 108A and 108B in
FIG. 5. Informational blocks may be included on data center
equipment, each rack, or on less than all racks, for example, by
row, zone, or cluster.
[0137] FIGS. 5A and 5B show enlarged views of respectively racks
108A and 108B that may also be shown on a computer display of
systems of embodiments of the invention. In the views of FIGS. 5A
and 5B, specific information regarding the racks and U space
positions is included in the informational block. In the embodiment
shown, the information in the block includes a rack identifier 122,
a rack type 124, power capacity 126, power usage 128, cooling
capacity 130, cooling usage 132, contents of the rack 134, power
redundancy 136, cooling redundancy 138, and UPS runtime 140. In
other embodiments, such as the embodiment depicted in FIG. 20
discussed below, information for each rack may be included in
tabular form, or in the form of columnar bars, on a graphical
display showing the room layout. Data center information that may
be displayed includes runtime measurements, data center resource
redundancy measurements, including relationships between data
center equipment working in combination to providing redundancy,
and capacity measurements, such as available capacity, utilized
capacity, and stranded capacity.
[0138] The rack identifier 122 includes a row number and a rack
number, however, in other embodiments, the rack identifier may also
include an indicator of the type of rack, membership of the rack to
a particular row, zone, group, or cluster, manufacturer of the
rack, as well as other information. The rack type 124 identifies
the particular type of rack, i.e., server rack, router rack or
telecommunications rack. The power capacity 126 indicates the
maximum power capacity of the rack, and the power usage indicator
128 indicates the percentage of maximum capacity at which the rack
is expected to operate. In different embodiments, the power usage
indicator may be calculated based on manufacturer supplied data for
equipment contained in the rack and/or based on actual power
measurements of equipment. The power capacity for a rack, in at
least one embodiment, is determined based on limitations of devices
and/or power cables that supply power to the rack, such as circuit
breakers, UPSs or any other devices. The contents of the rack 134
includes a list of the equipment contained in the rack and may
include an indication of remaining space in the rack displayed, for
example, in terms of rack units, which are typically referred to as
"U" with 1 U equal to 1.75 inches. Details regarding the equipment
in the rack, including operational status and network addresses,
such as an IP address for a device may also be included.
[0139] The cooling capacity indicator 130 and cooling usage
indicator 132 identify respectively the quantity of cooling air
available to the rack and the percentage of that cooling air that
is being used by equipment in the rack. In other embodiments power
and cooling usage may be indicated using various types of graphical
gauges, such as a bar graph, that indicates power and cooling usage
and capacity. In the embodiment shown in FIGS. 5A and 5B, the
cooling capacity is shown in terms of kilowatts (kW). As known to
those skilled in the art, for typical data center applications,
many equipment racks typically require approximately 160 cfm (cubic
feet per minute) of cooling air per kilowatt of power used by the
rack. All the power consumed by computing type devices is typically
converted to heat, such that the required cooling (in terms of kW)
for a rack can be assumed to be equal to the power consumption of
the rack. Accordingly, in one embodiment, the cooling usage
indicator is equal to the power consumed by the rack. In other
embodiments, depending on the type of equipment that is installed
in the racks, the cooling required by a rack may not be equal to
that consumed by the rack and may be calculated based on
manufacturer's data for the equipment, based on test results, or in
any other manner.
[0140] The cooling capacity of an equipment rack is determined
based on a number of different factors. For example, for a
raised-floor environment, these factors may include: location of
the rack in the facility, proximity of perforated tiles to the
rack, the amount and temperature of cooling air provided through
any such perforated tile, the physical or geometric layout of the
racks and building, and the cooling requirements of other equipment
in the facility located near the rack. The cooling capacity of one
rack in a facility may be affected by the cooling usage of nearby
racks, and accordingly, in one embodiment, the cooling capacity of
a rack is adjusted when the cooling usage of a nearby rack is
changed. In at least one embodiment of the present invention,
calculations for determining cooling capacity of a rack are based
in part on the ability of one rack to borrow cooling air available
to adjacent racks. Particular methods for determining cooling
capacity for racks in embodiments of the present invention are
described further below. In one embodiment, when the cooling usage
of one rack is changed, the cooling capacity of that rack, and all
racks located near the changed rack is recalculated.
[0141] In embodiments of the present invention, during the design
as well as during the management of a data center, the true
available capacity of a data center can be determined at U space
position level, the rack level, at the row level and at the room
level. In determining available capacity (including unused
capacity), data center resources including both cooling and power
capacity are used, and the true available capacity can be
determined using the lowest data center resource capacity. In
situations where data center resource capacities are not equal, the
excess capacity can be considered wasted or stranded capacity that
can not be used in the present design. In other words, while
stranded capacity is nominally available, it is unusable due to
insufficient associated capacity. In embodiments of the present
invention, the stranded capacity can be determined at the U space
position level or rack level and can be totaled to determine
stranded capacity at the row level and at the room level.
[0142] In one embodiment, as depicted in FIG. 21, this data
resource information may be displayed to the user in the form of
graphs. For example, FIG. 21 depicts total capacity 2102, space
capacity 2104, cooling capacity 2106 and power capacity 2108, each
as a function of time. Each of these representations may include
total data center capacity specific to the data center resource
shown. In addition, the representations may include data center
capacity specific to a specific location in the data center, e.g.
high density or medium density racks. Still further, these
capacities may be projected into the future to enable a user, such
as a data center manager, to predict when capacity may need
expansion.
[0143] FIG. 23 illustrates an embodiment that a user, such as a
data center manager, may reference to assess stranded data center
capacity and ascertain the root cause of the stranded capacity.
More specifically, FIG. 23 depicts report 2302 which includes rows
and columns under various data center resource headings. The
intersection of these rows and columns may indicate how much excess
capacity of the data resource listed in column 2304 is unusable due
to insufficient capacity of the data resource listed in row 2306.
For example, intersection 2308 may indicate that 20% of the weight
support capacity of the data center is unusable due to insufficient
power capacity. In another embodiment, the actual amount of
stranded capacity may be used to articulate these relationships and
the meaning ascribed to the rows and columns may be transposed. As
will be apparent to one of ordinary skill in the art, other
embodiments illustrating this relationship are possible without
departing from the present invention.
[0144] Recommendations are provided for reducing stranded capacity
during the design phase as well as during the management phase. The
recommendations may include reducing capacity of data center
resources, such as power and cooling resources, (thereby reducing
operational costs) or adding data center resource capacity, such as
cooling capacity or power capacity, appropriately to reduce the
stranded capacity. Warnings may be generated when the stranded
capacity is greater than preset thresholds, and in addition,
recommendations for more optimal locations of equipment, including
power and cooling equipment, may also be provided to minimize the
amount of stranded capacity. Further, costs of the stranded
capacity may be calculated.
[0145] In management systems and methods of embodiments of the
invention, as described above, data center resource capacity and
availability, such as power and cooling capacity and availability,
may be monitored in real time. In one version, changes to the
availability rate (or the utilization rate) are monitored and based
on these changes, the growth rate of a data center may be
determined, and predictions of dates when additional capacity will
be required can be provided. In one embodiment the forecasting
method used to make these determinations is linear regression.
Other forecasting methods are possible without departing from the
scope of the present invention. The ability to monitor capacity and
predict future capacity needs allows data center operators to
control costs and plan for upcoming expenses. Further,
determinations may be made as to the additional expenses that will
be incurred if new equipment is added. The total cost (for example
per kilowatt) can also be determined during the design phase or
during operation.
[0146] In embodiments of the invention described herein, data
center layouts may be designed to provide specific redundancy
levels (i.e., n, n+1 or 2 n) for data center resource design, such
as both the power design and the cooling design. In data centers in
the past, additional room cooling units are typically provided to
include some redundancy in a data center, such that an overall
cooling capacity of the data center can be maintained, even when
one or more of the room cooling units fails or must be powered down
to conduct maintenance. One problem with these past solutions is
that the cooling redundancy is designed at the room level and not
the rack level, and while overall cooling capacity may meet
redundancy requirements, cooling at the rack level may not meet the
desired redundancy requirements. In embodiments described herein,
the ability to provide accurate airflow data at the rack level and
U space position level allows true cooling redundancy to be
designed into a solution.
[0147] As discussed above, graphical user interfaces may be used
with embodiments of the present invention to assist in the design
and management of data centers. In one embodiment, these graphical
user interfaces may be used to present an interactive
representation of a layout of a various spaces in the data center.
In another embodiment, interactive representations may be tailored
to particular spaces within the data center, such as the entire
data center, data center floors, rooms, racks and U spaces. Further
these interfaces may be displayed on a local or remote computing
device. Remote computing devices may include general computer
systems, mobile computing devices and computing devices that are
included with, embedded in, or affixed to, another physical
structure or device, such as a wall, ceiling, another computer
system or an enclosure, e.g. a rack enclosure, etc.
[0148] For example, particular user interface screens used in one
embodiment to design a layout in a data center will now be
described further with reference to FIGS. 5C and 5D. FIG. 5C shows
a floor editor interface 402 used in one embodiment to layout
equipment in a data center, while FIG. 5D shows a rack editor
interface 404 used in one embodiment to provide further details of
the contents of equipment in the data center. In one embodiment of
a data center design system, tutorials are provided for a user to
assist the user by providing best practice design guidelines. The
tutorials may be accessed by a user as desired or may be configured
to be displayed as a user is taking a particular action.
[0149] The floor editor interface includes a main menu 403, a tool
bar 406, a configuration box 408, a generic components box 410, a
floor layout box 412, a status box 414 a full-image viewing box
416, and an unplaced equipment box 418. The main menu 403 provides
a drop-down menu in a format known to those skilled in the art, and
allows a user to perform various functions, including the ability
to "undo" and/or "redo" changes that are made to the layout. The
tool bar 406 provides short hand access to functions of the design
system, and in one embodiment includes a floor editor button 406A
and a rack editor button 406B. Activation of the floor editor
button results in the display of the screen shown in FIG. 5C, while
activation of the rack editor button results in display of the
screen shown in FIG. 5D.
[0150] The floor editor box 412 shows the layout of equipment in a
data center being designed and provides text that identifies the
equipment contained in the layout. A room perimeter 412A shows the
exterior walls of the room along with dimensions of the room that
can be set by a user. In one embodiment, when a new design is
started, the user is presented with a screen showing a number of
basic room configurations that can be selected. Further, the walls
of the room can be moved by a user by selecting one of buttons
412B, and additional buttons can be added where needed to expand or
shrink an area of the room. In one embodiment, the room size may be
changed as equipment is added to the layout. Three rows 412C, 412D
and 412E are outlined in the room shown in FIG. 5C. In other
embodiments, more or less rows may be included. As shown in FIG.
5C, the rows are configured in a manner to provide alternating hot
and cold aisles. Row 412D includes three equipment racks
(identified by "R"), two half-rack cooling units (identified by
"C") a UPS ("U") and a power distribution unit ("P"). Row 412E
includes one rack, and row 412C as presently configured does not
include any equipment. During the design phase additional equipment
may be added to each of the rows. The room also includes an
automatic transfer switch (ATS) 412G and a cooling distribution
unit (CDU) 412F. Hatched areas are shown on the display around the
ATS and CDU to indicate that these areas should be kept clear of
equipment. Each piece of equipment in the room may include
identifiers that indicate the type of rack as well as the rack's
location in the room and the power source for the rack. Further, as
discussed above, each rack may include information regarding data
center resource use and availability, such as power and cooling use
and availability. Still further, text may be provided on each row
to indicate total data center resource information, such as power
and cooling information for each row.
[0151] The configuration box 408 includes eight configuration
options for designing a data center. A room properties
configuration option, when selected, allows a user to identify data
center resource values, such as physical, power, and cooling
values, that affect the data center design as a whole including
dimensions of the room, aisle widths and total anticipated power
density for the data center. Data center resource redundancy and/or
runtime requirements, such as power redundancy requirements (i.e.
N, N+1, 2N), cooling redundancy requirements and runtime
requirements for UPS systems may also be set. The number of data
troughs that will be used and location of power distribution and
cooling line distribution (i.e. overhead or under a raised floor)
can also be configured. In one embodiment, only in-row cooling is
provided, however, in other embodiments other types of cooling
solutions may be used as well. In at least one embodiment,
individual rows may be rotated to different angles in the data
center. Further, while only one room is shown in FIG. 5C, at least
one embodiment allows a data center to include multiple rooms.
These rooms may be active rooms, which hold active data center
equipment, and inactive rooms for storage of spare or
decommissioned equipment.
[0152] An add rack configuration option in the configurations box
408 is used to add equipment racks to the data center design. When
this option is selected, a user is presented with choices of
various types of racks to add to the data center. When racks are
selected, an indicator is provided in the unplaced equipment box
418, indicating that the racks still need to be placed into the
room layout.
[0153] An add in-row cooling option in the configuration box is
used to add in-row cooling units to the data center design. When
this option is selected, a user is presented with various types of
cooling units that can be added in the rows. As with equipment
racks, when a cooling unit is selected, an indicator is provided in
the unplaced equipment box 418, indicating that the cooling unit
still needs to be placed in the room layout.
[0154] A power zone option in the configuration box is used to
identify and select PDUs and UPSs and to indicate which equipment
will be powered from the UPSs and PDUs. Characteristics of the PDUs
and UPSs may also be selected. Once selected, an indicator is
provided in the unplaced equipment box 418 for the UPSs and PDUs.
In one embodiment, multiple racks may be included in a selection on
the layout to identify the equipment that belongs to a particular
power group, also known as power zone. In still another embodiment,
after selection of equipment and UPSs and PDUs, an automatic power
zone option may be implemented in which the system matches
equipment power requirements (i.e., redundancy levels, runtime
durations, voltages, phasing) to those of the UPSs and PDUs and
assigns power zones automatically and determines lengths of power
cables that are needed to power equipment from the assigned PDU. In
automatically determining power zones, the system may also identify
the need for additional UPSs and PDUs.
[0155] A power generation option in the configuration box 408 is
used to identify and select an automatic transfer switch (ATS) and
generator. Again, once these are selected, an indicator is provided
in the unplaced equipment box 418.
[0156] An emergency power off option in the configuration box is
used to select an emergency power off (EPO) solution for the data
center design, and once selected, an indicator for the EPO solution
will be added in the unplaced equipment box.
[0157] A management option in the configuration box 408 allows a
data center manager, such as the InfrastruXure.RTM. Manager and/or
InfrastruXure.RTM. Central discussed above, to be added. In one
embodiment, when selecting the manager, a rack location for the
manager is also selected.
[0158] A service option in the configuration box 408 allows a user
to select a level of service to be provided to the data center by a
data center services organization.
[0159] Other configuration options may include a row planning
configurator that allows a user to plan how many racks a row can
support by defining the power and cooling settings for the row,
prior to placing equipment in a row. In one embodiment, the row
planning configurator may provide an estimate on the number of
racks that can be supported based on the power components and
in-row cooling units contained in the row. In one embodiment, the
row planning configurator may provide a complete layout based on
design best practices.
[0160] The generic components box 410 includes a number of icons to
designate pre-existing equipment in a data center. The components
may be selected and "dragged" into position in the layout. In one
embodiment, the generic components include blocks and gaps. The
gaps can be used to identify areas over which cables and conduits
can be routed (i.e. a walkway), while the blocks are used to
identify areas over which cables and conduits can not be routed
(i.e. a column). Once dragged onto the layout, the blocks and gaps
can be sized appropriately.
[0161] As discussed above, when equipment is selected for use in
the data center, an icon appears in the unplaced equipment box 418.
To place the equipment in the layout, the icon is selected and
dragged into the appropriate location in the layout. Existing
equipment may be repositioned using this same method. For example,
existing equipment may be dragged from an active room and dropped
in an inactive storage room, thus enabling the system to track
unutilized equipment available for provisioning elsewhere. In one
embodiment, when adding an in-row cooling unit, the icon for the
cooling unit can be placed between two adjacent racks and released,
and the racks will then move in the row to allow the cooling unit
to be inserted between the racks. Further, in one embodiment, a
snap-to feature is employed to align equipment properly in rows and
along walls, and in addition, rows and equipment may be aligned
along and "snapped to" floor tiles when, for example, a raised
floor is in use. Using this feature, a user does not need to
precisely align objects.
[0162] The full-image viewing box 416 provides a "bird's eye" view
of the layout contained in the floor layout box 412. In one
embodiment, the zoom button on the tool bar can be used to enlarge
the view of the data center layout in the floor layout box 412.
When the view is enlarged, the entire layout may not appear in the
floor layout box. The full-image box 416 still displays the full
image of the layout for the user. In one embodiment, when the full
layout does not appear in the floor layout box, an overlay is used
in the full-image box to indicate on the full-image, the portion of
the layout that is displayed in the floor layout box. In one
embodiment, when the full image is not displayed in the floor
layout box 412, the overlay may be selected and dragged within the
full-image viewing box to select which part of the layout is
displayed in the floor layout box.
[0163] The status box 414 is used to display warnings, errors and
other conditions to the user. The warnings may vary in severity and
may include indications that design guidelines are being violated
and may also include more severe warnings indicating that data
center resource capacities, such as power and cooling capacities,
have been exceeded, or that redundancy and/or runtime requirements
are no longer met. In one embodiment, when the status box indicates
that there is an error or warning associated with a particular
piece of equipment in the layout, the piece of equipment may be
highlighted with a color such as red or yellow. In at least one
embodiment, when an error or warning occurs, guidelines for
correcting the error or warning are provided by either selecting a
highlighted piece of equipment or the error or warning message
directly.
[0164] The rack editor interface 404 will now be described further
with reference to FIG. 5D. The rack editor interface includes the
tool bar 406, the status box 414 and the full-image viewing box 416
discussed above. Further, the rack editor interface 404 also
includes a rack editor box, a product catalog box 422 and a rack
content section 424.
[0165] The rack editor box 420 shows the front face of each of the
equipment racks in the data center layout with the racks being
arranged by row. In FIG. 5, two rows of racks 420A and 420B are
shown. As shown in FIG. 5, in one embodiment, only the equipment
racks are shown in the rack editor box. When a particular rack is
selected in the rack editor box, then the contents of the rack
appear in the rack content box 424, and components may be added to
the selected rack. Racks may be selected in the rack editor box or
may also be selected in the full-image view box 416. When a rack is
selected in the full-image view box, then the image in the rack
editor box will shift, if necessary, to provide a view that
includes the selected rack.
[0166] The product catalog box 422 provides a comprehensive listing
of components that may be used in equipment racks in data centers.
The user may select equipment to be included in each rack, and as
equipment is selected, it is included in the rack content box 424.
The list may include only equipment of a particular manufacturer or
may include equipment from several manufacturers. In one
embodiment, all necessary hardware and cabling associated with rack
equipment may be selected from the product catalog box.
[0167] In one embodiment depicted in FIG. 20, a user may review and
manage data center resource capacity and available supplied to data
center equipment. Many of the features of this embodiment are
similar to those described in reference to FIG. 5C above. In
addition, FIG. 20 includes capacity group explorer 2002, which
presents a logical grouping of data center equipment, such as
racks, based on common capacity requirements. This grouping enables
a user, such as a data center designer, to manage sets of data
center equipment as one collective entity for capacity planning
purposes. Representations of individual elements of data center
equipment, such as UPS 2004, Rack 2006, and PDU 2008 may present
the user with columnar bars depicting various data center resource
redundancy and/or runtime measurements and capacity measurements,
such as available capacity, utilized capacity, stranded capacity.
For example, Rack 2006 has an as-configured potential power and
cooling demand of 28.8 kW and a current actual power and cooling
demand of 7.92 kW. In other embodiments, these demand or
consumption measurements may be matched against as-configured
potential power and cooling supply capacity and actual power and
cooling capacity to ensure all capacity, consumption, redundancy
and runtime requirements are met.
[0168] In another embodiment depicted in FIG. 22, rack editor
interface 404 may be displayed on a remote or mobile computing
device. Rack editor interface 404 includes user interface elements
that allow for adding equipment 2202, deleting equipment 2204,
editing equipment 2206 and moving equipment 2208. This embodiment
further includes data center explorer 2210 and rack editor box
2212. Because rack editor interface 404 may be provided on a remote
or mobile computing device, users, such as technicians, may
document as-built conditions, verify rack installations,
troubleshoot installation in a more efficient manner and perform
other rack-oriented activities.
[0169] In the depicted embodiment, equipment racks are shown in
data center explorer 2210. The rack editor box 2212 shows the front
face of the equipment rack currently selected in data center
explorer 2210. In another embodiment, rack editor box 2212 may
display the rear face of the rack and/or the front face of the
rack. In FIG. 22, rack Front is selected in data center explorer
2210 and houses data center equipment sss, PowerEdge 2650,
PowerEdge 6650, etc. When a particular rack is selected in data
center explorer 2210, the equipment it houses may be modified using
user interface elements 2202 through 2208.
[0170] The user may add data center equipment to the currently
selected rack by actuating user element 2202 and selecting the
desired equipment and position with the rack. The user may delete
or edit data center equipment associated with the currently
selected rack by selecting the desired equipment from data center
explorer 2210 and actuating user element 2204 or 2206,
respectively. The user may move data center equipment associated
with the currently selected rack by selecting the desired equipment
from data center explorer 2210, actuating user element 2208 and
selecting the desired position within the rack. In another
embodiment, the system may recommend a satisfactory or optimum
position. It should be appreciated that the user may select
particular data center equipment by drilling down in data center
explorer 2210 or by searching the data center using a unique
identifier, such as a barcode scanned by the remote or mobile
computing device. These methods of searching may allow a user, such
as a technician, to quickly obtain information concerning specific
data center equipment or modify the CMDB while physically located
near the equipment.
[0171] According to other embodiments, an interactive
representation of an identified space within a data center may be
implemented using other interface technology. For example, in
another embodiment, in addition to the graphical user interface
screens shown above, a three-dimensional option is available
allowing a user to view the design of a data center in 3D. In one
embodiment, a design system includes software code programmed in
Java that is used to generate 3D models that are rendered via
OpenGL to allow for hardware acceleration. Further, 3D models may
be exported from the design system to CAD tools such as AutoCAD,
available from AutoDesk of San Rafael, Calif. As described above,
security cameras can be implemented into data centers designed
using embodiments of the present invention. In one version that has
3D viewing capabilities, security cameras may be included in the
design and the 3D view may be used to view a simulation of a
camera's view after installation. In one embodiment, networked
cameras and other security monitoring devices available from
Netbotz Corporation of Austin, Tex. may be used.
[0172] As discussed above, with reference to the process shown in
FIG. 4, the system 200, and other systems of the present invention,
may be used as part of a data center management system. The
management system may include the system 200 described above with
the management module containing routines to perform management
functions, or in other embodiments, the management functions may be
performed by a designated manager controller contained in the data
center and implemented, for example, in a computer server located
in one of the racks of equipment and accessible by a user using a
management console.
[0173] FIG. 6 shows a block diagram of a management system 500 that
may be used in embodiments of the present invention. The management
system includes the manager controller 502, the manager console
504, power measurement devices 506, and airflow, humidity and
temperature measurement devices 508. It should be appreciated that
manager console 504 may be implemented as any computing device,
including a remote or mobile computing device. Implementing manager
console 504 on a remote or mobile computing device may allow a
user, such as a data center manager, to, for example, dispatch work
orders to technicians while physically inspecting, installing,
moving, and/or changing data center equipment. In addition, in one
embodiment, the management system may include power control devices
520 to control application of power to one or more individual
devices or racks contained within a data center, and the system may
include airflow controllers 521 to control the airflow or supply
temperature of an air conditioning unit or to control, for example,
perforated tile dampers. As discussed above, the management system
may also include one or more security devices 523, including
security cameras. The devices of the management system 500 may be
directly coupled to the manager controller or may be coupled to the
manager controller using a network 522 that may be a dedicated
network, may include the Internet, or may include a LAN or WAN
contained in the data center. The manager controller may
communicate with one or more servers 524 to obtain information from
and control operation of the servers.
[0174] In one embodiment, the management controller 502 may be
implemented at least in part using an InfrastruXure.RTM. Manager
and/or InfrastruXure.RTM. Central available from American Power
Conversion Corporation (APC) of West Kingston, R.I., and devices
may be coupled to the manager using, for example a controller area
network (CAN) bus or an Ethernet network. The power controllers and
airflow controllers may be implemented using available known
devices that monitor and/or control power and airflow in
facilities. Further, in at least one embodiment, the management
system 500 may include systems and methods for monitoring and
controlling power as described in U.S. Pat. No. 6,721,672 to
Spitaels et al, which is incorporated by reference herein. Further,
in at least one embodiment that uses in-row cooling devices, the
management controller may communicate with the cooling units to
control the units to ensure that adequate cooling at specified
redundancy levels is being met. Further details regarding the
control of in-row cooling units that can be used with embodiments
of the invention are discussed in copending U.S. patent application
Ser. No. 11/335,901, discussed above and filed on Jan. 19,
2006.
[0175] One aspect of the present invention, which will now be
described, is directed to a retrofit system and method that is
particularly useful for adding new equipment to a facility. The
addition of new equipment may include adding equipment to existing
racks or may include adding other data center equipment, such as
racks or other floor mounted equipment, to a facility. The retrofit
system may be a standalone computer system configured to perform
processes described herein, or in one embodiment, the retrofit
system is implemented using the system 200 described above.
Specifically, the builder module 206 of the system 200 may include
routines to assist in retrofitting a data center. A process 600 for
using the system 200 (or some other system) to retrofit or upgrade
a data center will now be described with reference to FIG. 7, which
shows a flow chart of the process 600.
[0176] In a first stage 602 of the process 600, data related to a
present configuration of a data center to be retrofitted is
provided to the builder module. The data related to the present
configuration may include the data displayed in the room model of
FIG. 5 along with additional data that was generated during design
of the data center. Further, in one embodiment, the data related to
the present configuration may include data generated during an
initial design as updated by actual measurements conducted in a
facility. For example, the cooling capacity of individual racks may
be calculated in an initial design and then updated by the
management module once the system is installed and operating.
Cooling capacity data may be updated based on actual measurements
of airflow from, for example, perforated floor tiles, while the
original data may have been calculated based on predicted airflows.
In one embodiment, interface 302 of system 300 provides this data
center configuration and measured parameter information from
database 304.
[0177] Information related to the retrofit is then provided in
stage 604. The information related to the retrofit may include
information similar to that input at stage 304 of process 300
described above, such as type of equipment, characteristics of
equipment, number of racks, as well as other information. In
addition, a user may designate one or more desired locations in the
data center for the installation of new equipment. For example, a
user may desire to add five additional servers to the data center,
where the servers are similar to and have a related function to
existing servers in the data center. The user may choose one or
more preferred locations based on power specifications, cooling
specifications and physical dimensions of the servers, and based on
power capacity, power plug type and/or number, cooling capacity and
contents of existing racks displayed on a floor model of the data
center. In addition, the user may indicate whether it is acceptable
to move existing equipment to accommodate the installation of new
equipment. In another example, a user may desire to replace three
servers in the data center. The user may choose the servers
targeted for replacement and may make other data center
modifications with these replacement servers in mind. In addition,
the user may indicate whether the replaced equipment should be
removed from the data center or moved into an inactive storage
room. Tracking inactive equipment may allow a user, such as a data
center manager, to quickly ascertain equipment available for
provisioning within the data center.
[0178] At stage 606, an updated layout for the data center is
generated and cooling and power calculations are performed at stage
608 on the updated layout in the manner discussed above at stage
308 of process 300. If the user has designated specific locations
for equipment in the data center, the layout may first be
determined using these locations, and if problems arise as a result
of the desired layout (i.e., lack of cooling for a rack based on
equipment or supply policy requirements), then the user will be
able to note any such problems once the layout is displayed and can
then choose to change the layout. In one embodiment, the system may
suggest one or more elements of data center equipment to be placed
at one or more locations. In this case, the system may ensure that
applicable data center resource supply policies, and data center
resource requirements of the suggested equipment, are met. In
another embodiment, the system may provide the user with one or a
series of satisfactory locations for the equipment based on the
data center resource requirements of the equipment and any
applicable data center resource redundancy and/or runtime
requirements. In another embodiment, the system may provide the
user with an optimum location, followed by other satisfactory
locations in a decreasing order of preference, for the new
equipment based on the data center resource requirements of the
equipment and any applicable data center resource redundancy and/or
runtime requirements. If a particular layout is not designated by a
user, then the system 200 will determine the layout in the manner
discussed above with respect to stage 306 of process 300.
[0179] At stage 610, an updated floor model is displayed (for
example, in the manner shown in FIGS. 5C and 5D), and at stage 612,
a user can review the model and either provide feedback (stage 614)
or indicate that the design is satisfactory. Once the floor model
has been approved by a user, the retrofit design process is
complete, and the equipment may be installed, relocated, or removed
and parameters of the data center may be measured and updated in
the manner described above in stages 318 to 322 of process 300
using for example a data center management system.
[0180] In one embodiment, changes to the configuration of the data
center such as those designed by retrofit process 600 may be
implemented by work order process 1900 as illustrated by the
flowchart in FIG. 19. Initially, at stage 1900, a data center
configuration change may be made using a graphical user interface
such as those discussed with regard to FIGS. 5C and 5D above.
Details of the change may be used to construct a set of tasks to
carry out the change. These tasks may be grouped together into work
orders. Work orders may be human-readable and may include textual
instructions as well as pictorial representations. It should be
appreciated that a single configuration change, initiated using a
visual editor, may be translated into multiple work orders.
[0181] At stage 1902, a work order is dispatched to a user for
implementation. In one embodiment, this dispatching may be
automatic or manual. Automatic dispatching may occur based on a set
of preconfigured rules. These rules may consider characteristics of
both the work to be performed and the user to whom the work order
may be dispatched. Characteristics of the user that may be
considered include the user's physical location, physical area of
responsibility, recent and current work load, remaining schedule
availability and area of expertise. Alternatively, a work order may
be automatically dispatched to one or more users in a "round robin"
fashion. In another embodiment, a user, such as a data center
manager, may access the dispatch UI exposed by work order module
214, discussed in relation to FIG. 3 above, to modify and/or
dispatch work orders to users. In still another embodiment, a user,
such as a technician, may access the dispatch UI exposed by work
order module 214 to modify and/or dispatch work orders to
himself.
[0182] At stage 1904, a user performs the work dictated by the work
order and modifies the work order appropriately. Modification of
the work order may include, for example, changing the details of
the work performed such as recording installation of an alternative
model of equipment, rearrangement of the order of equipment within
the rack, reconfiguration of the flow of a data center's resources,
such as power, to the equipment, etc. Modification may also include
changing the status of the work order. When a user modifies a work
order using a remote or mobile computing device, certain
information required to complete the modification may be entered
using any interface supported by the remote or mobile computing
device, including barcode scanning.
[0183] In one embodiment, work order module 214 may monitor a data
center resource provider, such as power outlet, that is targeted as
part of the work order for a change in demand. When a change in
demand is detected, such as an increase in the power demanded at a
power outlet, the work order may be marked as complete. In another
embodiment, the work order is not marked as complete until the data
center resource consumption or production benchmark, such as the
power consumption benchmark, of the data center equipment specified
on the work order is recognized. For example, if a work order calls
for the installation of a particular model of blade server, the
system may not mark the work order as complete after initial
activation of the blade server, but instead may wait until the
power consumption history of the blade server matches a known power
consumption benchmark for the model of blade server called for in
the work order.
[0184] In the processes 300 and 600 described above, design and
analysis stages are performed after all data is entered as part of
an initial design or a retrofit of a facility. In another
embodiment, analysis is performed real-time, and user displays are
updated as the user enters data into the system.
[0185] In embodiments of the present invention, using the processes
described above, data center operators are able to determine, in
essentially real-time, whether additional equipment may be added to
a data center and may also determine locations for the equipment,
where data center resource requirements, such as both power and
cooling requirements, of the equipment may be met. Further, reports
may be generated that indicate to a user or data center manager how
much capacity, redundancy and/or runtime is available for each row,
for each rack, for each U space position, for each piece of data
center equipment and for the facility in its entirety. Still
further, as discussed above, in determining overall capacity,
systems and methods are able to identify and display stranded
capacity, and provide suggestions for reducing the stranded
capacity.
[0186] In the processes and systems described above, cooling
calculations for a data center and for equipment in the data center
are performed as part of the design process for the data center,
during operation of the data center, and during an upgrade or
retrofit of the data center. In embodiments of the present
invention, in determining equipment layout and performing cooling
calculations, initial information on characteristics of the
facility itself are identified to determine if there is sufficient
cooling at the facility level. These characteristics include, for
example, whether a raised floor or drop ceiling is used as an air
plenum, the location and characteristics of air conditioning units
(including in-row cooling units), dimensions of the room that are
to house the data center, and total power draw of the data center.
Based on this information, an initial determination may be made as
to whether there is sufficient cooling provided by the air
conditioning units for the expected power draw in the room, and if
not, a recommendation may be made for additional air conditioning
units. For some facilities, desired redundancy and operating
margins may be included in this determination.
[0187] Once the determination has been made that there is
sufficient cooling at the facility level, an analysis is conducted
to determine if there is adequate cooling at each rack in the
facility and/or at individual pieces of equipment. In at least one
embodiment, the cooling capacity of a rack may be determined by
increasing the power level of the rack to determine at what
additional power level the airflow to the rack becomes inadequate.
This can be performed individually for each of the racks in a data
center. In different embodiments of the present invention, one or
more of a number of different methods may be used to perform the
cooling calculations. These methods include, but are not limited
to, a computational fluid dynamics (CFD) analysis, a Coarse-Grid
CFD analysis (designated as CGCFD), a control volume analysis
(designated as CVA), and an analysis based on empirical rules
and/or borrowing concepts. Further, in some embodiments, a
combination of two or more of the above methods may be used to
conduct portions of an overall analysis. In one embodiment, the
principle of superposition is used to combine results of portions
of an analysis. In particular, in many applications the airflows
may be considered to be ideal, where an ideal airflow is inviscid,
incompressible, irrotational without any other forces, such as
buoyancy. With such an ideal airflow, a complex application can be
reduced to a number of less complex applications, analysis of the
less complex applications can be performed using one of the methods
described herein, and superposition can be used to combine the
results of each of the less complex applications to obtain analysis
results for the complex application.
[0188] A computational fluid dynamics analysis can be used in one
embodiment in association with the design and retrofit of a data
center to provide detailed results of the cooling performance of a
facility, including determining the availability of adequate
cooling air at racks and individual pieces of equipment in the
facility and determining cooling capacity for each rack. The
techniques for implementing a CFD analysis of a data center are
known. A CFD analysis must typically be performed by someone
particularly skilled in the art, typically requires detailed
information regarding the facility and the layout of equipment in
the facility, and depending on the complexity of the analysis
conducted, and the computing equipment used to conduct the
analysis, may take hours or days to run one iteration of the
analysis.
[0189] In another embodiment, an improved technique for conducting
the cooling analysis is used. The improved technique has been
developed based on computational fluid dynamics techniques. The
improved technique is referred to herein as a Coarse-Grid CFD or
simply CGCFD. In a typical CFD analysis, a data center to be
analyzed is typically divided into non-uniform cells in the range
of one to eight inches on a side. In at least one embodiment, in
the CGCFD analysis, a Cartesian grid system of cells that are one
foot cubes are used. The use of uniform one foot cells typically
reduces the number of cells used in the calculations from a
traditional CFD analysis by at least an order of magnitude.
Further, uniform grid cells generally make the CFD analysis faster
and more reliable relative to a comparable non-uniform cell
analysis. Further, other techniques are employed in the CGCFD
analysis to improve the computational efficiency of the analysis.
These techniques include: the use of simple turbulence models,
initializing the analysis with data obtained from the results from
a prior similar solution, using two dimensional or partial two
dimensional representations when possible to simplify calculations,
and tailoring a CGCFD routine for a specific application. The use
of two dimensional representations may be used, for example, in a
raised floor or ceiling plenum, where pressure gradients in the
depth direction can be neglected in the computations.
[0190] The tailoring of a CGCFD routine can be used in embodiments
of the present invention to significantly improve computational
efficiency and improve robustness (for example, so the tool can be
made to work reliably in an autonomous way) of the total analysis,
and multiple tailored routines may be used in combination to
produce a complete analysis. For example, a first CGCFD routine may
be tailored for use with different raised floor configurations to
determine the output airflow at each perforated floor tile of a
raised floor in a data center, and a second CGCFD routine may be
tailored for use with a cluster of racks that include two rows of
racks with a cold aisle between the rows. The first CGCFD routine
may be run to determine the output air at perforated tiles in the
cold aisle of the rack cluster, and the second CGCFD routine may
use the results of the first routine to determine the airflows and
temperatures at inlets and outlets of the racks. The second routine
may be run a number of times to account for all of the clusters of
racks located in a data center. As equipment is moved, and as
different configurations are established within a cluster to
optimize cooling performance, the second routine may be run to
obtain new cooling data without the need to repeat the first
routine, as the airflows from the perforated tiles generally would
not change. In some cases, for perforated floor tiles having a
large percentage of open area (for example, greater than 50%), it
may be desirable to repeat the first routine as air flows may
change based on room configuration.
[0191] Embodiments of the invention that utilize the CGCFD approach
to conduct the analyses of a data center provide advantages over
embodiments that utilize a traditional CFD approach. These
advantages include computational efficiency and simplification of
use. Iterations of cooling calculations using the CGCFD approach
may be conducted in a matter of seconds or minutes versus hours or
days with a full CFD analysis. Further, the CGCFD routines may be
designed to operate with a limited set of input variables, allowing
a less-skilled user to conduct analyses using the CGCFD approach.
For example, for a CGCFD routine that is tailored to analyze only
the raised floor plenum, the input variables may be limited to the
height of the floor, location and type of perforated tiles, length
and width of the floor, and the locations and characteristics of
air conditioning units that provide cooling air to the raised
floor. For a CGCFD routine that is tailored to conduct an analysis
on a cluster of racks, the input data may be limited to airflow per
tile (could be obtained automatically from the output of a separate
CGCFD routine or using other methods), the number of racks in the
cluster, the power draw of each of the racks, and room
environmental details including the temperature of the surrounding
environment, ceiling height, the presence of nearby walls, etc. The
output data for a cluster of racks may include the input
temperature at each server, or other piece of equipment in a rack.
In other embodiments, the output data may simply be a measure of
the amount of warm recirculated air drawn into each rack. The data
may be expressed as an absolute number (e.g. in terms of cfm) or
expressed as a fraction of the total air consumed by the rack. A
system, such as system 200 described above, may use the output data
to determine if the cooling performance of the cluster is
satisfactory.
[0192] In another embodiment, another improved technique for
conducting the cooling analysis is used. The improved technique is
referred to herein as a control volume analysis or simply CVA. The
control volume analysis may be used in conjunction with a CFD
analysis and/or a CGCFD analysis, or may be used as a stand alone
process. The CVA technique is similar in some aspects to the CGCFD
technique described above, however, further simplification of the
analysis process is provided. As will be discussed below, the CVA
technique is a computationally efficient technique that is
particularly effective for computing the three-dimensional airflow,
pressure and temperature distributions in the cold aisle of a
raised floor data center. However, the CVA technique is not limited
in its use to this application and may be used for other
applications as well. The CVA technique can provide output data in
essentially real-time, allowing a user to try various locations for
equipment as part of an initial design or a retrofit and obtain
cooling data for the different locations in real-time.
[0193] The CVA technique will be described with reference to FIG.
8, which shows a subsection 700 of a data center. The subsection of
the data center includes a cluster of racks that includes a first
row of racks 702, and a second row of racks 704, which are located
on a raised floor and separated by two rows of perforated tiles
706, 708.
[0194] In data centers that have clusters of racks arranged like
those in FIG. 8, it is not uncommon for undesirable hot spots to
develop even though the total supply of cool air to the cluster
should be sufficient to meet the needs of the racks. For example,
if the airflow rate through one or more perforated tiles is too
great, a rack may be unable to capture all of the tile airflow and
some of the cooling air may escape the cold aisle. Racks will
generally draw their required air, and in this situation, if a rack
can not capture cool air, it may draw hot exhaust air over the top
of the rack creating a hot spot. Further, due to widely varying
cooling airflow requirements, racks may compete with one another
for cooling airflow. In particular, a high-power rack may borrow
underutilized air from an adjacent rack, or in some cases from a
rack separated by several tiles. With several racks contained in a
cluster, with each having different cooling needs, the airflow
patterns and temperature distribution in the cold aisle are complex
functions. The CVA technique can be used to simplify the solutions
to these complex functions.
[0195] In the CVA analysis for the rack cluster of FIG. 8, the
airflow and temperature analysis is conducted on the volume of air
contained in the cold aisle, between the racks, from the perforated
tiles up to a height equal to the top height of the racks. The
volume of air is divided into a number of control volumes equal to
the number of racks in the cluster. Each control volume is defined
as the volume above one of the perforated tiles extending from the
perforated tile to the top of the racks. The control volume
analysis includes determining for each control volume, the airflow
through each of the six faces of the control volume. Once the
airflows are known, temperatures and mass species concentrations
can be determined for each of the control volumes. In the CVA
technique, the temperature analysis can be decoupled from the
airflow analysis because, as discussed above, buoyancy forces in
the control volumes can be ignored. Similarly, mass species
concentrations are not coupled to the airflow solution and may also
be computed separately if desired in order to compute the fraction
of recirculated air ingested by each rack.
[0196] In conducting a CVA analysis in the embodiment described
herein, there are several initial assumptions made to simplify the
analysis. In other embodiments, the analysis could be changed if
these assumptions would not apply. The first assumption is that
airflow across each face of a control volume (and therefore into
the front face of a rack) is considered uniform. Resulting airflow
and temperature values effectively represent an average of the
airflow and temperature at each face.
[0197] The second assumption is that buoyancy forces within each
control volume are negligible. Unless a significant hot spot
develops, then there is insufficient heating of the air in a cold
aisle to substantially affect airflow patterns, and even if some
heating occurs, any buoyancy effects are small compared to the
momentum of the airflow from typical perforated tiles.
[0198] The third initial assumption is that viscosity and
turbulence within each control volume are negligible. In the
control volumes, air is introduced through the perforated tiles and
is pulled into the racks. The air is not required to change
direction rapidly and there is no flow of air parallel to solid
objects. Accordingly, viscosity and turbulence may be ignored and
the competition of forces driving the airflow reduces to an
interplay between pressure and momentum.
[0199] The CVA analysis may be further simplified by dividing a
cluster of racks into slices of two racks separated by two
perforated tiles 718A, 718B. FIG. 9 shows a cluster of six racks
710 that can be divided into three two-rack slices 712, 714, 716.
The nomenclature used for identifying racks, and airflows in FIG. 9
is defined in Table 1 below, along with other variables that will
be used herein in the description of the CVA technique.
TABLE-US-00001 TABLE 1 A.sub.s, A.sub.t Control volume side and
perforated tile area C.sub.1, C.sub.2 Dimensionless empirical
constants in the y and x- momentum equations C Species
Concentration CV Control volume N Number of 2-rack slices in
cluster {circumflex over (n)} Outward unit normal vector PA.sub.i,
PB.sub.i Pressure in control volume above perforated tiles A.sub.i
and B.sub.i P.sub.amb Ambient reference pressure M.sub.L, M.sub.R,
M.sub.T z-direction momentum flux terms through left, right, and
top surfaces of staggered CV at slice i TA.sub.i, TB.sub.i
Temperature in control volume above perforated tiles A.sub.i and
B.sub.i Q.sub.t Airflow rate through each perforated tile QA.sub.i,
QB.sub.i Airflow rate through racks A.sub.i and B.sub.i QAx.sub.i,
QBx.sub.i Airflow rates in the x-direction above perforated tiles
A.sub.i and B.sub.i Qz.sub.i Airflow rates in the z-direction above
perforated tiles between tiles A.sub.i and B.sub.i QAtop.sub.i,
Airflow rates in the y-direction above perforated tiles A.sub.i
QBtop.sub.i and B.sub.i at top-of-rack height {right arrow over
(V)} Velocity Vector .alpha. Linear relaxation factor .rho. Density
of air
[0200] At the start of the CVA analysis, the rack airflows
QA.sub.i, QB.sub.i and the tile airflows are known. The tile
airflows can be estimated based on the mean perforated tile airflow
for the entire facility or determined using a CFD analysis, a CGCFD
analysis, physical measurement, or using one of a number of known
programs. The rack airflows can be determined based on
characteristics of equipment installed in the rack. In one
embodiment, each rack airflow is determined on the basis of the
power usage of the rack and using the relationship of 160 cfm per
kilowatt of power as discussed above. To determine the airflow
patterns, all airflows QAx.sub.i, QBx.sub.i, Qz.sub.i, QAtop.sub.i,
and QBtop.sub.i, and pressures PA.sub.i, and PB.sub.i are computed
based on the principle of conservation of mass and momentum. To
perform this computation, a total of 7 n-2 unknowns (5 n-2 internal
airflows plus 2 n pressures) may be determined using a total of 7
n-2 equations, where n is the number of 2-rack slices (or length of
cluster expressed in tile or rack widths). Optionally, an energy
balance or mass species balance can then be used to compute the 2 n
temperatures or 2 n species concentrations based on the
airflows.
[0201] In one embodiment, rather than solve all equations
simultaneously, a semi-simultaneous approach is taken. In this
embodiment, the five unknowns for each two-rack slices of a rack
cluster, airflows Qz.sub.i, QAtop.sub.i, and QBtop.sub.i, and
pressures PA.sub.i, and PB.sub.i, are first determined
simultaneously. During these initial computations, each two-rack
slice is considered in isolation, which is the equivalent of having
the ends of the slices blocked, such that QAx.sub.i and QBx.sub.i
are equal to zero. After an initial sweep through each two-rack
slice is complete, the side-to-side airflows (QAx.sub.i,
QBx.sub.i,) can be computed based on the calculated pressures
within each control volume. The side-to-side airflows affect the
pressures, and after computing the side to side airflows, a second
computation of the airflows and pressures is conducted for each of
the two-rack slices. This process is repeated until there are no
significant changes in the computed variables. Once all airflows
are known, all temperatures or mass species concentrations can be
computed directly without the need to do multiple iterations.
[0202] The fundamental equations used to compute the unknowns
described above, assuming steady state, incompressible and inviscid
fluid flow rely on conservation of mass (m), conservation of
momentum (M) conservation of energy (e) and conservation of species
concentration (C), and can be written as follows:
.intg. A ( V -> n ^ ) A = 0 ( m ) .intg. A ( .rho. V -> n ^ )
V -> A = - .intg. A p n ^ A ( M ) .intg. A T ( V -> n ^ ) A =
0 ( e ) .intg. A C ( V -> n ^ ) A = 0 ( C ) ##EQU00001##
[0203] Applying the conservation of mass equation (m) to the
two-rack slices for the conditions described above results in the
following equations:
Q.sub.t+QA.sub.i+QAx.sub.i-1=Qz.sub.i+QAx.sub.i+QAtop.sub.i (1)
Q.sub.t+Qz.sub.i+QBx.sub.i-1=QB.sub.i+QBx.sub.i+QBtop.sub.i (2)
[0204] Where QA.sub.i is always negative based on the sign
convention of FIG. 9.
[0205] As will now be described, staggered control volumes are used
to formulate the z-momentum equations. Three staggered control
volumes 730A, 730B and 730C are shown in FIG. 9A. The number of
staggered control volumes is equal to the number of 2-rack slices.
The staggered control volumes are the same size as the main control
volumes, but are shifted so that they are located midway between
opposing racks. The staggered control volumes allow pressure to be
considered more easily for each face which is normal to the
z-direction. If the original control volumes are used, then each
control volume would have one face coplanar with a rack inlet,
which is a face over which the pressure is not known and need not
be known in the calculations. Applying the conservation of momentum
equation (M) in the z-direction to the staggered control volume in
slice i results in the following equation:
PA.sub.i-PB.sub.i=(.rho./(4A.sub.s.sup.2)){(Qz.sub.i+QB.sub.i).sup.2-(QA-
.sub.i+Qz.sub.i).sup.2}+M.sub.L+M.sub.R+M.sub.T (3)
[0206] In equation (3), the first term on the right hand side of
equation (3) is generally dominant, as it accounts for the effect
of rack airflow rates on control volume pressures. M.sub.L, M.sub.R
and M.sub.T account for losses or gains in z-momentum through the
sides and the top of the control volume.
[0207] Using an "upwind" estimate for incoming/outgoing z-momentum
and assuming that the velocity of the air in the z-direction is
negligible above the racks, M.sub.L, M.sub.R and M.sub.T are
determined using the equations of Table 2 below
TABLE-US-00002 TABLE 2 IF THEN ELSE QAx.sub.i-1 + QBx.sub.i-1
.gtoreq. 0 M.sub.L = -(.rho./(2 A.sub.s.sup.2)) (QAx.sub.i-1 +
QBx.sub.i-1) Qz.sub.i-1 M.sub.L = -(.rho./(2 A.sub.s.sup.2))
(QAx.sub.i-1 + QBx.sub.i-1) Qz.sub.i QAx.sub.i + QBx.sub.i .gtoreq.
0 M.sub.R = (.rho./(2 A.sub.s.sup.2)) (QAx.sub.i + QBx.sub.i)
Qz.sub.i M.sub.R = (.rho./(2 A.sub.s.sup.2)) (QAx.sub.i +
QBx.sub.i) Qz.sub.i+1 QAtop.sub.i + QBtop.sub.i .gtoreq. 0 M.sub.T
= (.rho./(4 A.sub.s.sup.2)) (QAtop.sub.i + QBtop.sub.i) Qz.sub.i
M.sub.T = 0
[0208] The relationship between Y-momentum and pressure may be
written using equations (4) and (5) as follows:
PA.sub.i-P.sub.amb==(.rho./A.sub.t.sup.2){C1[Q.sub.t+1/2(QAi+QAx.sub.i-1-
-QAx.sub.i-Qz.sub.i)].sup.2-1/2QAtop.sub.i.sup.2} (4)
PB.sub.i-P.sub.amb==(.rho./A.sub.t.sup.2){C1[Q.sub.t+1/2(Qzi+QBx.sub.i-1-
-QBx.sub.i-QB.sub.i)].sup.2-1/2QBtop.sub.i.sup.2} (5)
[0209] In one embodiment, equations (1) through (5) are solved
simultaneously for each 2-rack slice of a cluster sequentially
using the process 800 shown in FIG. 10. In the first stage 802 of
process 800, the user defines Q.sub.T (the airflow through the
perforated tiles), the number of 2-rack slices in the cluster, and
the power draw of each of the racks. As discussed above, Q.sub.T
may be estimated as the mean perforated tile airflow rate for the
entire facility or determined separately using, for example, a CFD
or CGCFD analysis or other analysis or physical measurement. At
stage 804, all airflow variables (except Q.sub.T and the rack inlet
airflows) are initialized to zero. At stage 806, equations (1)
through (5) are solved simultaneously for each slice. At decision
block 808 a determination is made as to whether the equations have
been solved for all slices, and if not, stage 806 is repeated. Once
the equations have been solved for all slices, then at stage 810,
the x-direction airflow variables are updated based on the computed
pressures in the control volumes, PA.sub.i and PB.sub.i as
discussed below. At stage 812, a determination is made as to
whether the computed pressures have changed by more than a
predetermined threshold since the previous iteration and if so,
stages 806 to 812 are repeated. Once there is no significant change
in the computed variables, the process 800 stops at stage 814, at
which point the pressures and airflows for all of the control
spaces have been determined.
[0210] In the process 800, at stage 810, new x-direction airflow
values (QA.sub.xi and QB.sub.xi) are determined based on the
assumption that the pressure drop between adjacent cells is
proportional to the square of the airflow rate using the equations
in Table 3.
TABLE-US-00003 TABLE 3 IF THEN ELSE PA.sub.i .gtoreq. PA.sub.i+1
QAx.sub.i = A.sub.s{(PA.sub.i - PA.sub.i+1)/(.rho.
C.sub.2)}.sup.1/2 QAx.sub.i = -A.sub.s{(PA.sub.i+1 -
PA.sub.i)/(.rho. C.sub.2)}.sup.1/2 PB.sub.i .gtoreq. PB.sub.i+1
QBx.sub.i = A.sub.s{(PB.sub.i - PB.sub.i+1)/(.rho.
C.sub.2)}.sup.1/2 QBx.sub.i = -A.sub.s{(PB.sub.i+1 -
PB.sub.i)/(.rho. C.sub.2)}.sup.1/2
[0211] In one embodiment, because of non-linearities of the
equations, adjustments to the x-direction airflow values at stage
810 are achieved gradually by introducing damping into the
iterative process and updating the values of QA.sub.xi and
QB.sub.xi using the following equations (6) and (7).
QAx.sub.i=.alpha.QAx.sub.i.sup.new+(1-.alpha.)QAx.sub.i.sup.old
(6)
QBx.sub.i=.alpha.QBx.sub.i.sup.new+(1-.alpha.)QBx.sub.i.sup.old
(7)
[0212] In equations (6) and (7), .alpha. is a linear relaxation
factor. If .alpha. is set to zero, then no changes will occur from
iteration to iteration. If .alpha. is set to 1, then there will be
no damping introduced. For smaller values of .alpha., more
iterations will be required, however, the chances of obtaining a
stable solution increase. The particular optimum choice of .alpha.
is problem specific, however, it has been found that values of
.alpha. around 0.05 work well in the process described above. Once
the airflows are computed using the process above, temperatures and
mass species concentrations can be calculated, if desired. It
should be noted that control volumes may be used to compute
temperatures or concentrations regardless of the method used to
initially compute airflows.
[0213] The CVA technique described above can be conducted
separately, one for each cluster of racks in a facility to obtain a
complete cooling analysis of the facility. When a retrofit of a
facility is to be done, the control volume analysis may be done for
all clusters, or only for those in the vicinity of any changes to
the facility.
[0214] Three different methods, CFD, CGCFD and CVA, have been
described above for determining cooling data in embodiments of the
present invention to determine placement of location of equipment
in data centers. In still another embodiment, empirical rules are
used either alone or in combination with one of the methods
described above to determine proper placement of equipment and the
adequacy of cooling air. The empirical rules that are used may take
a number of different forms, and programs incorporating the
empirical rules may be updated as more data is generated to support
the empirical rules. In one embodiment, empirical rules are based,
at least in part, on the ability of equipment racks to borrow
unused capacity from surrounding neighbors. The amount that may be
borrowed may be limited to an allowable fraction (or weight) of the
unused capacity and the particular allowable fraction may differ
depending on a number of variables such as borrower-donor
separation distance, tile flow rate, and the total power draw of
both the borrower and the donor.
[0215] In one particular embodiment, the cooling air available to a
given rack is computed based on a weighted summation of the
available airflows from airflow sources (i.e., supply devices,
including in-row cooling units, or vents), net of airflows computed
to be used by other racks, where the weights associated with the
available airflows for a given rack decrease with distance between
the rack and the air supply devices or vents. For example, with
reference to FIG. 9, the cooling air available to each rack may
initially be set equal to the cooling air supplied by the
perforated tile in front of the rack, or to reflect possible
losses, and provide safety margin, the cooling air available may be
set equal to some amount (i.e. 90%) of the total air from the
perforated tile. The cooling load for each rack is then subtracted
from the available air to provide a net available cooling air
figure for each perforated tile and to provide an initial
indication of a lack of cooling air for any equipment rack. For
each equipment rack, the available cooling air is then increased by
assigning to each rack, a percentage of the net available cooling
air from nearby perforated tiles. For example, the cooling air
available may include 10% of the net available cooling air from a
perforated tile associated with either an adjacent rack or a rack
across an aisle, and 5% of the net available cooling air from a
perforated tile of a diagonal rack or a rack two positions over in
a row. The particular percentages or weights used may be changed
based on actual results or as a result of analyses conducted. The
loads of each rack may then be compared with the total available
cooling air to determine remaining cooling capacity and to identify
any potential problem racks.
[0216] In at least one embodiment, empirical rules may be used in
combination with superposition to analyze data centers and provide
recommended equipment layouts. Using superposition, complex
problems may be broken down into simpler problems that can then be
solved using empirical rules.
[0217] In one embodiment, empirical rules are established by
initially performing a number of CFD analyses on typical rack
layouts, and the results of these analyses are used to produce
simple equations or look-up tables that can be used in real-time to
design layouts of equipment. In such an analysis, the side-to-side
airflows, such as those shown in FIG. 9 may be determined for each
rack one at a time with one rack turned "on" and all other racks
turned "off". The airflows at the ends of a cluster for a number of
different configurations may also be determined using CFD. The
airflows may be determined for a number of different air intake
values for each rack and a number of different values of air flow
from the perforated tiles. The total air flows for different
configurations can then be determined in real-time using
superposition and the stored results. The airflows through the top
(in or out) of the volume in front of each rack may then be
determined based on conservation of mass. In one embodiment, when
the airflow into the top of one of the volumes exceeds some
percentage (i.e., 20%) of the total air flow into the rack
associated with the volume, then an overheating problem may exist
requiring a design around. In other embodiments, mass species
concentration analyses may be used in combination with empirical
rules to determine what percentage of the total air entering a
control volume is recirculated air to determine when an overheating
problem may exist.
[0218] In determining the airflows for each rack of a cluster,
symmetry of the clusters can be used to reduce the number of CFD
analyses that need to be performed, and the control volumes
discussed above with respect to FIG. 9 may be used to establish a
reference grid for the analysis. For example, with reference to the
cluster of racks 710 of FIG. 9, CFD analyses need only be performed
for Rack A.sub.i-1 and Rack A.sub.i, and the results for each other
rack may be determined based on the resulting airflows and the
relative position of the racks. For example, the airflows in the
cluster associated with Rack B.sub.i+1 are the same as those
associated with Rack A.sub.i-1 with the direction of some of the
airflows changed for corresponding Rack A and Rack B inlet airflow
and tile airflow rates.
[0219] In one example, which will now be described, the concepts of
symmetry and superposition are used in conjunction with CFD
analyses and empirical rules to provide a practical real-time
solution for determining air flows in a cool aisle. Further, air
flows are used to determine a recirculation index (RI) for a row of
racks, which can be used to identify potential "hot spots" in a
data center. As discussed above, one cooling objective in a data
center is to manage the equipment rack inlet air temperatures. The
rack inlet air temperatures are dominated by the airflow patterns
within the cold aisle and the temperatures within and around the
cold aisle. Air drawn in from outside the cold aisle is generally
heated to some degree by the rack exhaust and will be hereafter
referred to as "recirculated air". While the temperature of the
recirculated air is highly application dependent, air that passes
directly from a perforated tile to a rack inlet will be very near
the supply temperature. Thus, good cooling performance can be
achieved if all of the airflow ingested by a rack comes directly
from the perforated tiles.
[0220] A cluster of racks, which receives its required cooling air
exclusively from the perforated tiles within the cluster,
represents an autonomous scalable unit from which a larger facility
with predictable cooling performance may be constructed. A
reasonable requirement is therefore to ensure that racks are
adequately cooled by air originating from the racks own cold aisle.
Conversely, it is acceptable for the rack to ingest no more than a
small fraction of recirculated air.
[0221] With the above in mind, the recirculation index (ri) is
defined as the fraction of recirculated air ingested by the rack.
An ri of 0% implies that all of the rack inlet air was drawn
directly from the perforated tiles while an ri of 100% implies that
all of the rack inlet air was drawn from outside of the cold aisle.
Note that a low ri is sufficient to guarantee cool inlet
temperatures; however, a high ri does not guarantee excessively
high inlet temperatures.
[0222] The concepts of control volumes, symmetry and superposition
are used in the present example to determine air flows and
ultimately RI for a cold aisle. In using superposition, a sum of
velocity potentials (or actual velocity components or total
airflows over a consistent area) of simpler, elemental flow
solutions is used to obtain a new, composite flow solutions. For
example, assume we know the airflow pattern associated with only
Rack A1 "on" subject to a particular tile airflow rate and we also
know the airflow pattern with Rack B3 "on" subject to the same
perforated tile airflow rate. The relevant horizontal airflow
components can be added to obtain a solution, which approximates
the airflow pattern resulting from Racks A1 and B3 both "on"
simultaneously. The airflow pattern resulting from the
superposition of the two separate airflow patterns is not exactly
the same as the full solution--even for an ideal flow. Using
superposition two solutions are added together which individually
(and when added together) satisfy conservation of mass criteria.
The use of superposition does not guarantee that the combined
solution will be the unique solution and the difference is in the
boundary conditions. As an illustration of this, consider a 2-rack
example. In using superposition, the top airflow condition floats
freely as a constant-pressure boundary condition in all cases. In
reality, the airflow pattern constructed from superposition may not
provide a perfect match to air velocity over the top surface of the
cold aisle. Also, when one rack is off, an assumption is made that
the face (inlet) of the rack is a symmetry boundary condition
(which is consistent with an inviscid analysis). This result
creates the opportunity for some flow parallel to the face of the
rack, which would probably not exist when the rack is actually
drawing air.
[0223] In the example, superposition is used to establish only the
3 n-2 internal horizontal airflows (n being equal to the length of
the row in terms of racks) while end-of-row horizontal airflows are
computed based on separate empirical correlations. Vertical airflow
components are computed from a mass balance performed on each
control volume. The horizontal airflows clearly depend on tile
airflow. For example, a rack of a given airflow rate may be able to
draw cooling air from a distance of many tile-widths when the
perforated tile airflow rate is very low. However, this range of
influence is much less as the tile flow rate is substantially
increased. (As we know from the non-dimensional argument, the
results would be identical if all airflows are scaled by the tile
flow rate.) Therefore, the tile airflow rate is included in the
analysis; the floor tiles should be "turned on" in the CFD analysis
used to correlate airflow patterns. However, if the floor tiles are
left "on" and the effect of each rack is considered individually,
when the flows for each rack are summed, the sum would have more
airflow leaving the top of the cold aisle than in reality. The
answer is to correlate only the horizontal airflows and then simply
compute the correct airflow into or out of the top of each control
volume based on conservation of mass.
[0224] It is worth emphasizing that the use of the non-dimensional
airflow and, in particular, superposition, simplifies the method.
Without these simplifications, there would be many combinations of
rack and tile airflows to evaluate and store empirically to cover a
range of practical applications.
[0225] Based on the above discussion, the complete airflow
solutions to any rack layout of interest can be constructed using
superposition. Elemental building-block airflow patterns are
associated with each rack and each of the four end-of-row airflows
are turned on individually as illustrated in FIG. 11 for the case
of a 2-rack cluster 1002. It is important to stress that FIG. 11
illustrates which airflow boundary conditions are turned on and off
in each of the elemental airflow solution to yield the total
solution with all airflow boundary conditions "on". Each of arrows
1004a to 1004f represents one of the airflows. It is the airflow
components internal to the cold aisle that are actually being
combined. There are, in general, a total of 2 n+4 elemental
solutions for any layout, which makes up a complete airflow
solution. Obviously, fewer elemental solutions are required if some
racks have zero airflow and the ends of the cold aisle are sealed
(e.g. with doors).
[0226] The elemental airflows used with superposition may be
determined in any manner including physical testing. In the present
example, CFD modeling for the cold aisle is performed using the
following boundary conditions: [0227] Fixed velocity of air leaving
the computational domain over the area of a rack face for any rack
which is "on" [0228] Fixed velocity entering or leaving the domain
over the area of the end of the rows for any end-of-row flow "on".
[0229] The top of the solution domain is "open" for air to enter or
exit to the surrounding environment held at constant pressure.
[0230] All other surfaces are "symmetry" surfaces.
[0231] As stated above, there are in general 2 n+4 elemental
solutions for each row length; 2 n elemental solutions associated
with each rack turned on plus four end-of-row elemental solutions.
Each elemental solution covers a range of dimensionless flow rates
so that any arbitrary, but practical, rack or end airflow rate can
be considered. So, the task is reduced to determining and storing
the 3 n-2 internal horizontal control volume airflows over an
appropriate range of dimensionless airflow rates.
[0232] Because of the geometric symmetry of a cluster of racks,
only the 3 n-2 internal airflows for approximately one quarter of
the 2 n+4 rack and end-of-row boundary conditions are considered
and stored; n/2+1 boundary conditions if n is even and (n+1)/2+1 if
n is odd. The remaining internal airflows are determined from an
appropriate reinterpretation of the smaller data set by changing
variable indices and signs. In addition to being efficient, this
use of symmetry, forces the final output from the rack cooling
performance tool to be perfectly symmetric. Each of these boundary
conditions are driven individually through a range of dimensionless
airflow rates while keeping track of all of the "response" airflow
rates internal to the cluster. The result can be summarized in a
plot of "response" airflow rates; one plot for each elemental
boundary condition.
[0233] As an example, internal horizontal airflows associated with
boundary condition Rack A1 for an n=2 cluster are shown in FIG. 12.
There are 4 curves in FIG. 12 because there are 4 horizontal
internal airflows associated with an n=2 cluster of racks. All of
these curves can be conveniently approximated with a least-squares
fit to a cubic polynomial of the generic form
Q*=c.sub.1(QRA.sub.1*)+c.sub.2(QRA.sub.1*).sup.2+c.sub.3(QRA.sub.1*).sup-
.3 (8)
so that only the coefficients c.sub.1, c.sub.2, and C.sub.3 must be
stored for all airflows associated with all unique boundary
conditions for all n's. Storing the "response" airflow as an
equation offers the additional benefit compared to a simple look-up
table in that results outside the domain of FIG. 12 are
automatically interpolated.
[0234] The process involved in compiling the curves in FIG. 12 and
the constants of Equation 8 is repeated for all unique boundary
conditions for all n's considered. Determining all internal airflow
correlations, for example, up to n=30 requires several hundreds of
CFD runs. Therefore, in at least one embodiment, the process of
converting the raw CFD data into the curve-fit constants of
Equation 8 is automated. In at least some examples above, the flow
in the cold aisle is considered to be ideal with no viscosity or
turbulence. To verify this assumption, sample CFD cases were run
with turbulence and viscosity included, and little difference was
detected between models that included viscosity and turbulence and
those that did not. The discussion above describes a process for
all internal cold-aisle airflows for any row length, perforated
tile airflow, and rack airflow distribution assuming that that the
end airflow is known. A process for predicting the end airflow will
now be described. Unlike the airflow within the cold aisle, the end
airflow is strongly coupled to the airflow in the surrounding room
environment. Buoyancy forces can be significant; direct
superposition of rack-induced airflows may not work well and the
end airflows do not depend simply on the dimensionless rack airflow
rates. The end airflow can still be determined using empirical
correlations of CFD data; however, a relatively large number of CFD
simulations typically should be performed in order to achieve
reasonable accuracy over a useful range of actual layouts. A
comprehensive model for end airflow, which takes into account
different geometric and thermal environments, may be included in
other embodiments. In one embodiment, described herein, a method
includes predicting end airflow as a function of rack power and
airflow distribution for any row length and perforated tile flow
rate while assuming a fixed room environment. The example
environment is large and free of other racks or objects. Air is
supplied at 60.degree. F. and is exhausted uniformly over a 14
ft-high ceiling. As discussed above, under ideal-flow conditions,
we can expect air velocity at points near the racks to scale with
the dimensionless rack inlet velocities. Further, as discussed
above these "response" velocities vary nearly linearly with
dimensionless rack flow rate (or velocity). It is, therefore,
reasonable to estimate the dimensionless end airflows based on the
following expression:
QAx.sub.0*=a.sub.0+a.sub.A1QRA.sub.1*+a.sub.A2QRA.sub.2*+ . . .
+a.sub.AnQRA.sub.n*+a.sub.B1QRB.sub.1*+a.sub.B2QRB.sub.2+ . . .
+a.sub.BnQRB.sub.n* (9)
where QAx.sub.0* is one of four dimensionless end airflows for a
cluster and the coefficients a.sub.Ai and a.sub.Bi effectively
weight the relative importance of each rack on the end airflow. The
weighting coefficients associated with racks located near the end
of the row will be much larger than those associated with more
interior racks. Further, empirically it is found that only racks in
the first four or five positions nearest the end of the row need be
retained in Equation 9. For the fixed conditions considered, the
constant a.sub.0 is negative, implying that the flow is "out"
(driven by buoyancy) when there is zero rack airflow.
[0235] To determine the values of the coefficients in Equation 9
for a particular set of room environment and cluster geometry, many
(on the order of 100) CFD simulations may be performed at a number
of different perforated tile flow rates. A large pool of rack power
values may be created from which the many CFD simulations draw rack
power and airflow data from, either randomly or systematically. The
rack power values may be based on the frequency distribution of
actual data center racks as determined from a survey. The rack
power and airflow values used in the CFD simulations may be scaled
as necessary to achieve practical total supply-to-equipment airflow
ratios in the range of, for example, 0.9 to 3 for each perforated
tile flow rate considered. The CFD data is then used to determine a
least-squares fit of the coefficients in Equation 9 for each tile
flow rate considered.
[0236] In summary, a simple end airflow model has been described
which accurately accounts for a non-uniform distribution of rack
airflow and power for a fixed set of room conditions. In at least
one embodiment, the model is generalized to include the effects of
geometric environment, the thermal environment, and supply airflow
rate. The effects of the end airflow penetrate only a few rack
distances down the row; for longer row lengths predictions for the
majority of the racks in the cluster will be good even if the end
airflow model is not as accurate as desired.
[0237] The airflow into or out of the top of each control volume
has been left "floating" as necessary degrees of freedom in the
above example. Now, with all of the horizontal airflows computed as
discussed above, the airflow at the top of each control volume is
computed based on the conservation of mass. With reference to FIG.
13, using dimensional quantities, the equations for A-row and B-row
control volumes are determined using equations 9(a) and 9(b).
QAtop.sub.i=Q.sub.T-QRA.sub.i+QAx.sub.i-1-Qz.sub.i-QAx.sub.i
(10a)
QBtop.sub.i=Q.sub.T-QRB.sub.i+QBx.sub.i-1-Qz.sub.i-QBx.sub.i
(10b)
Applied to all control volumes, equations 9a and 9b represent a
total of 2 n equations. At this stage, there is only one unknown
per equation (QAtop.sub.i and QBtop.sub.i) so they may be solved
sequentially.
[0238] At this point, all airflows within the cold aisle are known
for the example. What remains is to track the airflow into each
rack so that its origin may be identified and the recirculation
index (RI) can be calculated for each rack. As discussed above, RI
is the fraction of recirculated air ingested by a rack. The
recirculated air can enter the cold aisle at any point where there
is inflow at the ends of the rows or along the top of the cold
aisle. Further, the warm recirculated air need not directly enter
the cold aisle via the control volume immediately adjacent to a
rack of interest; it may enter anywhere, travel anywhere the
airflow patterns take it, and end up at the inlet of any rack.
[0239] To compute RI for each rack the cool supply air is
distinguished from the warm recirculated air at all points in the
cold aisle. Mathematically, this is accomplished by defining the
concentration of recirculated air at any point in the cold aisle
using Equation 11.
C.sub.recirc=(mass of recirculated air)/(total mass of air)
(11)
It follows from Equation 11 that the supply airflow emerging from
the tiles has a C.sub.recirc=0 and that anywhere the recirculated
air enters the cold aisle along the sides or top of the cold aisle
and C.sub.recirc may be set equal to 1. In practice, C.sub.recirc
may be set to a value less than 1 for the ends of the cold aisle
recognizing that, on average, the top is generally much warmer than
the ends of the cold aisle. Accordingly, in one embodiment,
C.sub.recirc=0.5 for any inflow at the ends of the cold aisle.
[0240] The recirculated air can be assumed to have the same
physical properties as the cool supply air so that it has no
effect, e.g. due to a density difference, on the airflow patterns
in the cold aisle.
[0241] Now consider a small volume just covering a rack inlet.
Equation 11 applied to this volume represents the average
C.sub.recirc over this volume. Dividing the numerator and
denominator by a small time increment .DELTA.t and taking the limit
as .DELTA.t.fwdarw.0, demonstrates that the average C.sub.recirc
over a rack inlet is precisely the rack recirculation index. Thus,
to determine the RR's for each rack the average C.sub.recirc over
each rack inlet is determined. Referring back to FIG. 8, we can
estimate the RR for each rack as the average C.sub.recirc of the
control volume immediately adjacent to the rack of interest.
C.sub.recirc over all 2 n control volumes can be computed from the
conservation of mass of the recirculated air using Equation 12.
All CV Faces C recirc Q = 0 ( 12 ) ##EQU00002##
where Q is the total airflow rate through each control volume face
and is a known value at this stage of the calculation.
[0242] FIG. 13, shows control volumes 1008 and 1010 of a transverse
section of a cold aisle 1006. Equation 12 is applied to the control
volumes 1008 and 1010. For convenience, we label the C.sub.recirc
crossing each control volume surface with same convention used for
airflows while dropping the "recirc" subscript. The result is
C.sub.TQ.sub.T+(CAx.sub.i-1)(QAx.sub.i-1)=(CRA.sub.i)(QRA.sub.i)+(CAx.su-
b.i)(QAx.sub.i)+(Cz.sub.i)(Qz.sub.i)+(CAtop.sub.i)(QAtop.sub.i)
(13a)
C.sub.TQ.sub.T+(CBx.sub.i-1)(QBx.sub.i-1)+(Cz.sub.i)(Qz.sub.i)=(CRB.sub.-
i)(QRB.sub.i)+(CBx.sub.i)(QBx.sub.i)+(CBtop.sub.i)(QBtop.sub.i)
(13b)
Equations 13a and 13b are not solved directly because the number of
C.sub.recirc values exceeds the number of equations. Estimating
each C.sub.recirc as the average C.sub.recirc from the "upwind"
control volume, results in a proper balance of 2 n unknown
C.sub.recirc's and 2 n equations. Based on this "upwind" approach,
the appropriate C.sub.recirc values are inserted into Equations 13a
and 13b after the airflow patterns in the cold aisle have been
computed thereby establishing the direction of airflow crossing
each face of each control volume.
TABLE-US-00004 TABLE 4 C.sub.recirc Settings Based on Airflow
Direction Upwind Value of C.sub.recirc Airflow Airflow .gtoreq. 0
Airflow < 0 Q.sub.t 0 0 QAx.sub.i CA.sub.i CA.sub.i+1 QBx.sub.i
CB.sub.i CB.sub.i+i Qz.sub.i CA.sub.i CB.sub.i QAtop.sub.i CA.sub.i
1 QBtop.sub.i CB.sub.i 1
Table 4 shows the appropriate upwind values of C.sub.recirc to be
used in Equations 13a and 13b where the CA.sub.i and CB.sub.i are
the average C.sub.recirc over the relevant "A" or "B" control
volumes respectively. Not shown in the table are the settings for
QAx.sub.i and QBx.sub.i at the end of the row, i.e. Qax.sub.0,
QBx.sub.0, QAx.sub.n, and QBx.sub.n. In this case C.sub.recirc may
be set to 0.5 as discussed above for any "inflow".
[0243] With the values of C.sub.recirc taken from Table 4, the 2 n
Equations represented by 13a and 13b may be solved simultaneously
for the 2 n CA.sub.i and CB.sub.i values. These simple linear
equations can be solved without iteration virtually instantaneously
for any practical row length using common computing hardware.
Finally, as discussed above, the computed CA.sub.i and CB.sub.i
values may be directly interpreted as the recirculation index of
the adjacent "A" and "B" racks respectively. In other embodiments,
because of the similarity between the energy and concentration
equations, bulk average temperature could be determined over each
control volume instead of RI following a very similar
procedure.
[0244] A summary of a process 1050 for determining recirculation
index for a cluster of racks using the methodology described above
will now be provided with reference to FIG. 14. In a first stage
1052 of the process, the row length, tile airflow, rack airflow and
rack power are defined for a cold aisle to be analyzed. Next, in
stage 1054, empirical data used for computing airflows is imported
from a CFD analysis as described above. The end airflows are then
determined at stage 1056 based on details of the cluster and
details of the room environment. All horizontal airflows are then
determined at stage 1058. At stage 1060, horizontal airflows
induced by the 4 end airflows are computed, and at stage 1062,
complete horizontal airflows are computed by adding the airflows
from stages 1058 and 1060. Vertical airflows are computed at stage
1064, and then at stage 1066, the recirculation index may be
determined for each rack by solving a set of conservation equations
for the recirculated air as described above.
[0245] In one embodiment, to determine cooling capacity for a given
rack based on the recirculation index, a threshold recirculation
index is first established, below which a design is considered
unsatisfactory. For each rack, after a satisfactory design is
achieved, the power of the rack is increased until the
recirculation index of the that rack (or any other rack) reaches
the threshold level, and the power at which that occurs represents
the maximum cooling capacity for the rack. A similar method for
determining cooling capacity can be used with other analyses
described herein, including the analysis using capture index values
described below.
[0246] In other embodiments, the control volume and superposition
methods described above may be modified. These modifications may
include the use of more complex statistical methods (e.g., the use
of neural networks) to determine end airflow conditions from large
pools of CFD data. Further, the number of control volumes may be
substantially increased to improve accuracy and resolution of
computed variables. In particular, the latter improvement would
allow airflow variations at various rack elevations (e.g., due to a
variety of equipment installed in a rack) to be considered. The
basic methodology could further be modified to include layouts
beyond the scope discussed above including layouts involving an
arbitrary number of perforated tiles of arbitrary flow rate, an
arbitrary cold aisle width, arbitrary rack dimensions or other such
variations from examples discussed above.
[0247] In processes described above, cooling analyses of a data
center have focused primarily on determining airflows in the cool
aisle for a cluster of racks located in a data center having a
raised floor. Embodiments described above, however, are not limited
for use in data centers having raised floors, and aspects of the
embodiments are also applicable to data centers that do not include
raised floor cooling systems. At least one embodiment described
above provides a decoupling of the cold aisle from the remainder of
the data center to compute airflows in the cold aisle. The effect
of the room environment is then built back into the analysis using
end-of-row airflows that are computed, for example, in separate CFD
calculations that may be computed offline and made available
through look-up tables or empirical correlations. As described
below, in a similar manner to that described above, a hot aisle in
a data center can be analyzed by decoupling the aisle from the
remainder of the room and later building the effects of the room
environment back into the analysis.
[0248] In additional embodiments that will now be described,
processes are provided for evaluating a cluster of racks based on
airflows that occur in a hot aisle for a cluster of racks. In at
least one version of the additional embodiments, a raised floor
data center is not used, but rather, cooling is provided using
in-row cooling units as described above. In one particular process
of one embodiment, a capture index (CI) is calculated and used to
analyze a cluster of racks in a data center. The capture index is
used in one embodiment with a row or cluster of racks having one or
more in-row cooling units, and the capture index is defined as the
percentage of air released by a rack into a hot aisle, which is
captured by cooling units bounding the hot aisle. The CI may be
considered as a complementary metric to the RI described above for
use with the hot aisle. However, CI techniques may also be used
with cold aisle analysis as discussed further in U.S. Provisional
Application 60/897,076, filed on Jan. 24, 2007 which is hereby
incorporated herein for all purposes. The CI is useful when the
focus of a design is to keep the hot air within the hot aisle. As
discussed above, rack inlet temperatures are typically the ultimate
cooling metric, however, if all of the hot air is captured in the
hot aisle, the rest of the data center (including rack inlets) can
be designed and controlled to remain at "room temperature."
[0249] The cold-aisle capture index is defined as the fraction of
air ingested by the rack which originates from local cooling
resources (e.g., perforated floor tiles or local coolers). The
hot-aisle capture index is defined as the fraction of air exhausted
by a rack which is captured by local extracts (e.g., local coolers
or return vents). CI therefore varies between 0 and 100% with
better cooling performance generally indicated by greater CI
values. In a cold-aisle analysis, high CI's ensure that the bulk of
the air ingested by a rack comes from local cooling resources
rather than being drawn from the room environment or from air which
may have already been heated by electronics equipment. In this
case, rack inlet temperatures will closely track the
perforated-tile airflow temperatures and, assuming these
temperatures are within the desired range, acceptable cooling will
be achieved. In a hot-aisle analysis, high CI's ensure that rack
exhaust is captured locally and there is little heating of the
surrounding room environment.
[0250] While good (high) CI values typically imply good cooling
performance; low CI values do not necessarily imply unacceptable
cooling performance. For example, consider a rack in a raised-floor
environment which draws most of its airflow from the surrounding
room environment rather than from the perforated tiles. The rack's
cold-aisle CI will be low; however, if the surrounding room
environment is sufficiently cool, the rack's inlet temperature will
be acceptable anyway. However, in this case, the rack's cooling
needs are met by the external room environment rather than
perforated tiles within the rack's cluster. If this process is
repeated many times across the data center, facility cooling will
be complex and unpredictable. Thus, high CI values lead to
inherently scalable cluster layouts and more predictable room
environments.
[0251] Note that, although CI has been defined above as a
rack-level quantity relative to local cooling resources, the
definition of CI could be extended to any grouping of inlets and
outlets, for example, a single server with reference to a single
perforated tile. In this case, the metric would indicate the
fraction of airflow ingested by the server which originated from
the single perforated tile.
[0252] In one embodiment, the use of chemical concentrations with,
for example a CFD analysis, can be used to quantitatively determine
CI for both a hot aisle and a cold aisle. For the hot aisle, the
exhaust of each rack is identified in such an analysis as a
separate species having the same properties as air, so as not to
change the physics of airflow. The fraction of hot air released
from rack.sub.i (identified as C.sup.i) which is captured by an
in-row cooler identified as cooler.sub.j may be computed using
Equation 14 below.
f.sub.ij=C.sub.j.sup.i(Q.sub.coolerj)/Q.sub.racki) (14)
where:
[0253] C.sub.ji is the concentration of C.sup.i at the inlet of
cooler j
[0254] Q.sub.coolerj is the airflow rate (e.g. in cfm) through
coolerj
[0255] Q.sub.racki if the airflow rate (e.g. in cfm) through
racki
[0256] As an example, if the cooler and rack airflow are equal, and
the concentration of exhaust air C.sup.i from rack i at the cooler
inlet is measured to be 0.5, then this implies that half of the
exhaust air from rack i is captured by cooler j. In a hot aisle
having N coolers, then the capture index (CI) is the sum of all of
the f.sub.ij's over all N coolers and can be expressed using
Equation 15 below.
C I i = j = 1 N C j i Q coolerj Q racki ( 15 ) ##EQU00003##
[0257] As will now be described, with reference to FIG. 15, which
shows a cluster of racks 1080, a set of empirical rules can be used
to determine the CI for each rack 1082 of the cluster. As shown in
FIG. 15, the resulting CI values may be displayed on a display with
the associated racks. In one example, racks having a CI less than
60% are identified in red indicating a warning, racks having a CI
between 60% and 80% are indicated in yellow as a caution, and racks
having a CI greater than 80% are indicated in green indicating that
the CI is satisfactory.
[0258] In one embodiment, a large pool of CFD runs can be performed
to establish and refine empirical rules. In other embodiments,
neural networks and other techniques may be used to refine rules.
The cluster 1080 includes two rows (row A and row B) of parallel
racks that exhaust air to a common hot aisle 1084. Each Rack is
labeled A1-A6 and B1-B7, identifying the row and position in the
row of the rack, and for the example shown each rack has a power
draw of 2 kW. The cluster also includes in-row cooling units 1086.
In FIG. 15, a number of half-rack cooling units 1086 are shown, but
embodiments of the invention may also be used with full-width rack
cooling units or other devices. The half-rack cooling units used in
the example associated with FIG. 15 have a nominal cooling capacity
of 17 kW. Also shown in FIG. 15 is the CI in terms of percentage
for each rack. The CI is shown as a percentage and indicates for
each rack, the percentage of its exhaust air that is captured by
one of the cooling units.
[0259] The CI is determined based on the concept that all
rack-cooling unit interactions depend only on the magnitude of
airflow associated with the racks and cooling units and their
relative geometric positions. Each rack location can be thought of
as having a certain potential to supply airflow to other rack
locations. This potential varies inversely with the distance of
separation. For example, rack A1 in FIG. 15 could potentially
supply a large portion of its airflow to the area near rack A2.
However, much less of rack A1's airflow could make its way to
position A6. Further, the amount of airflow a rack can supply to
other locations is in direct proportion to its own total airflow.
The net airflow which can be supplied to a particular rack location
A1 can be represented using Equation 16 below.
( Q Ai ) net = ( Q Ai ) self + all other racks j ( Q Aj ) self A -
B .DELTA. x + c { ( Q Bi ) self + all other racks j ( Q Bj ) self A
- B .DELTA. x } ( 16 ) ##EQU00004##
[0260] where [0261] (Q.sub.Ai).sub.net=The net maximum airflow that
can be supplied to location Ai including contributions from all
other racks. [0262] (Q.sub.Ai).sub.self=The actual airflow supplied
by the rack at location Ai. [0263] A=empirical constant. [0264]
B=empirical constant.
[0265] C=empirical "coupling" constant for accounting for effects
from opposite row.
[0266] The net maximum airflow that can be supplied to various
locations in the B row is computed using a similar expression.
Finally, the same expression is used to compute the net maximum
airflow, which can be captured at any rack location--with the sum
over all coolers instead of racks. The CI is then estimated as the
ratio of net airflow captured and net airflow supplied at any
location expressed as a percentage and with values capped at 100%.
The constants A, B, and C are selected to provide the best
statistical fit to benchmark CFD data. Different values of the
constants may be used to account for alternative configurations
including different cooler types, different average rack power or
peak-to-average power ratios and alternative hot-aisle spacing, row
lengths, or room environments. As an example, consider a cluster of
average power racks with modest rack-to-rack power variations. The
cluster is 14 ft. long, contains a 3 ft. wide hot aisle, and is
assumed to be in a fairly tightly packed data center environment
with a 12 ft. ceiling height. In this case, reasonable predictions
are made with the empirical constants taken as A=0.56, B=0.33, and
C=0.65.
[0267] In the embodiment described above, the CI is calculated for
a cluster of racks having uniform depth and width. In other
embodiments, the same processes may be used for racks of
non-uniform depth and width. In one embodiment, the CI calculations
described above are programmed into a Microsoft Excel Spreadsheet
program that allows a user to add and move cooling units to see the
effect of different numbers of cooling units and their placements.
In other embodiments, the process for determining CI described
above may be incorporated into data center design and management
systems, such as system 200 discussed above.
[0268] In the embodiment above, an exponential expression is used
for modeling the rack and cooler interactions. In other
embodiments, other expressions may be used, such as a polynomial or
any other mathematical expression which contains a number of
parameters which may be tuned to provide the best fit to benchmark
performance data. Further, different curves and/or different
coefficients may be used for the portion of the calculation
associated with determining air supplied by racks than used in the
portion of the calculation used for determining air captured by
cooling units. In another embodiment, the rules may be further
refined to address specific situations. For example, a Rack A may
have no effect on another Rack B where a third rack C is located
between Rack A and Rack B and has greater airflow than either Rack
A or Rack B.
[0269] In still another embodiment, the effects of the ends of rows
may be accounted for explicitly in hot aisle and cold aisle CI
analysis. Separate CFD simulations may be conducted to determine
the net inflow or outflow of air at each end of a row for given
layouts of racks and cooling units. The results of the CFD
simulations may be incorporated into the empirical methods
described above to determine CI for racks in a cluster. The results
of the CFD simulations can be used to provide correct airflow
estimates at the ends of the row, while one of the algorithms
discussed above may be used to determine CI at more interior
portions of the row. Similarly, the effects of a missing rack or
racks may be simulated using CFD with the results incorporated into
the empirical methods.
[0270] The capture index method of analysis discussed above
provides a rack-by-rack, or local, cooling performance metric for
equipment racks in a data center. In addition to using CI as a
rack-level metric in a hot aisle analysis or cold aisle analysis,
in another embodiment, cluster-wide performance metrics are
determined, and the overall cooling performance of the cluster may
be determined based on both the CI metric and the global metric.
The cluster-wide performance metrics indicate whether the cluster
as a whole will have adequate cooling performance. The CI
identifies which racks are not having their exhaust airflow
adequately captured. If a rack having a low CI is a low power rack,
this may not result in a problem. Furthermore, a rack may have a
relatively high CI, yet still cause problems if it is a high power
rack with a high outlet temperature. In one embodiment, for a hot
aisle analysis the global metric that is used is a determination of
the net power which escapes the hot aisle. The net escaped power
can be determined using equation 17.
all racks i ( 1 - C I i ) P i ( 17 ) ##EQU00005##
where, CI.sub.i=the capture index for rack i expressed as a
fraction (rather than percentage), and P.sub.i=the power of rack
i.
[0271] The net escaped power determined by equation 17 may be
correlated to maximum cluster inlet temperatures (e.g., a net
escaped power of 25 kW may imply a maximum cluster rack inlet
temperature of seventy-nine degrees F.) for clusters of particular
geometric layouts (e.g., hot aisle width, row length, etc.), room
environments and rack and cooler details (e.g., cooling unit flow
rate and rack airflow/power (cfm/kW)). Accordingly, the net escaped
power may be used to determine the highest rack inlet
temperature.
[0272] In other embodiments, other techniques described above for
calculating airflows in a cool aisle may be applied to a hot aisle
or cold aisle analysis to determine CI, including the use of CFD,
CGCFD and control volumes. The use of superposition may be less
applicable in hot aisle analyses because the airflow patterns are
not ideal. In still another embodiment, a process 1100 is provided
for determining CI in a hot aisle using a CFD analysis. The CFD
analysis is performed only on the hot aisle itself and end of row
airflows are determined separately and may be patched into the CFD
solution. Common computer hardware can be used to conduct such a
CFD analysis in 10 to 20 seconds. The process 1100 is shown in
flowchart form in FIG. 16. In a first stage 1102 of the process
1100 data related to the layout is loaded either manually, read
from a database, or in any other manner. The data related to the
layout may include row length, power draw and airflow for each
rack, rack dimensions, cooling unit types, locations and flow
rates, hot aisle widths and room environment details (i.e., size,
temperatures).
[0273] At stage 1104 of the process 1100, hot-aisle end of row
airflows are determined using best-fit curves, or look-up tables
based on prior CFD studies. Hot aisle end of row calculations may
be performed using the same techniques used to determine cold aisle
end of row airflows with the input rack airflow provided as a
positive value and the cooling units airflow input as a negative
value. At stage 1106, a CFD analysis of just the hot aisle is
performed using results of the end airflow analysis of stage 1104
and with the top of the hot aisle taken as a constant-pressure
boundary. In the analysis, the exhaust air for each rack is
"tagged" with a particular concentration. At stage 1108, the CI for
each rack is determined based on the ratio of captured and supplied
airflows computed by equation 16 and the results of stage 1106. The
global cluster cooling metric may also be determined at this point
using equation 17. At stage 1110, the rack CI's and the global
cluster cooling metric can be used to determine if cooling for the
cluster is adequate.
[0274] In addition to the cooling analysis methods discussed above,
which provide real-time analysis of data centers, additional
cooling analysis methods may be used in embodiments of the
invention. These additional methods include a panel method, a
potential analysis method, flow network/zonal modeling, principal
component analysis or a combination of any of these and the methods
discussed above. These additional cooling analysis methods are
generally known to those of skill in the art.
[0275] Various embodiments according to the invention may be
implemented on one or more computer systems as discussed above.
These computer systems may include cellular phones, personal
digital assistants and/or other types of mobile computing devices.
Moreover, a computer system may include any sort of computing
device such as a personal computer, a workstation, a mainframe, a
networked client, a server, media servers and application servers.
For example, system 200 may be implemented in a single computer
system or in multiple computer systems. These computer systems may
be, for example, general-purpose computers such as those based on
Intel PENTIUM-type processor, Motorola PowerPC, Sun UltraSPARC,
Hewlett-Packard PA-RISC processors, or any other type of
processor.
[0276] For example, various aspects of the invention may be
implemented as specialized software executing in a general-purpose
computer system 900 such as that shown in FIG. 17. The computer
system 900 may include a processor 903 connected to one or more
memory devices 904, such as a disk drive, memory, or other device
for storing data. Memory 904 is typically used for storing programs
and data during operation of the computer system 900. The computer
system 900 may also include a storage system 906 that provides
additional storage capacity. Components of computer system 900 may
be coupled by an interconnection mechanism 905, which may include
one or more busses (e.g., between components that are integrated
within a same machine) and/or a network (e.g., between components
that reside on separate discrete machines). The interconnection
mechanism 905 enables communications (e.g., data, instructions) to
be exchanged between system components of system 900.
[0277] Computer system 900 also includes one or more input devices
902, for example, a keyboard, mouse, trackball, microphone, touch
screen, and one or more output devices 907, for example, a printing
device, display screen, speaker. In addition, computer system 900
may contain one or more interfaces (not shown) that connect
computer system 900 to a communication network (in addition or as
an alternative to the interconnection mechanism 905).
[0278] The storage system 906, shown in greater detail in FIG. 18,
typically includes a computer readable and writeable nonvolatile
recording medium 911 in which signals are stored that define a
program to be executed by the processor or information stored on or
in the medium 911 to be processed by the program to perform one or
more functions associated with embodiments described herein. The
medium may, for example, be a disk or flash memory. Typically, in
operation, the processor causes data to be read from the
nonvolatile recording medium 911 into another memory 912 that
allows for faster access to the information by the processor than
does the medium 911. This memory 912 is typically a volatile,
random access memory such as a dynamic random access memory (DRAM)
or static memory (SRAM). It may be located in storage system 906,
as shown, or in memory system 904. The processor 903 generally
manipulates the data within the integrated circuit memory 904, 912
and then copies the data to the medium 911 after processing is
completed. A variety of mechanisms are known for managing data
movement between the medium 911 and the integrated circuit memory
element 904, 912, and the invention is not limited thereto. The
invention is not limited to a particular memory system 904 or
storage system 906.
[0279] The computer system may include specially-programmed,
special-purpose hardware, for example, an application-specific
integrated circuit (ASIC). Aspects of the invention may be
implemented in software, hardware or firmware, or any combination
thereof. Further, such methods, acts, systems, system elements and
components thereof may be implemented as part of the computer
system described above or as an independent component.
[0280] Although computer system 900 is shown by way of example as
one type of computer system upon which various aspects of the
invention may be practiced, it should be appreciated that aspects
of the invention are not limited to being implemented on the
computer system as shown in FIG. 17. Various aspects of the
invention may be practiced on one or more computers having a
different architecture or components shown in FIG. 17. Further,
where functions or processes of embodiments of the invention are
described herein (or in the claims) as being performed on a
processor or controller, such description is intended to include
systems that use more than one processor or controller to perform
the functions.
[0281] Computer system 900 may be a general-purpose computer system
that is programmable using a high-level computer programming
language. Computer system 900 may be also implemented using
specially programmed, special purpose hardware. In computer system
900, processor 903 is typically a commercially available processor
such as the well-known Pentium class processor available from the
Intel Corporation. Many other processors are available. Such a
processor usually executes an operating system which may be, for
example, the Windows 95, Windows 98, Windows NT, Windows 2000
(Windows ME) or Windows XP operating systems available from the
Microsoft Corporation, MAC OS System X operating system available
from Apple Computer, the Solaris operating system available from
Sun Microsystems, or UNIX operating systems available from various
sources. Many other operating systems may be used.
[0282] The processor and operating system together define a
computer platform for which application programs in high-level
programming languages are written. It should be understood that
embodiments of the invention are not limited to a particular
computer system platform, processor, operating system, or network.
Also, it should be apparent to those skilled in the art that the
present invention is not limited to a specific programming language
or computer system. Further, it should be appreciated that other
appropriate programming languages and other appropriate computer
systems could also be used.
[0283] One or more portions of the computer system may be
distributed across one or more computer systems coupled to a
communications network. For example, as discussed above, a computer
system that performs build-out functions may be located remotely
from a system manager. These remote computer systems also may
include remote general-purpose computer systems and/or remote
computing devices. For example, various aspects of the invention
may be distributed among one or more computer systems configured to
provide a service (e.g., servers) to one or more client computers,
or to perform an overall task as part of a distributed system. For
example, various aspects of the invention may be performed on a
client-server or multi-tier system that includes components
distributed among one or more server systems that perform various
functions according to various embodiments of the invention. These
components may be executable, intermediate (e.g., IL) or
interpreted (e.g., Java) code which communicate over a
communication network (e.g., the Internet) using a communication
protocol (e.g., TCP/IP). For example, one or more database servers
may be used to store device data that is used in designing layouts,
and one or more servers may be used to efficiently perform cooling
calculations associated with embodiments of the present
invention.
[0284] It should be appreciated that the invention is not limited
to executing on any particular system or group of systems. Also, it
should be appreciated that the invention is not limited to any
particular distributed architecture, network, or communication
protocol.
[0285] Various embodiments of the present invention may be
programmed using an object-oriented programming language, such as
SmallTalk, Java, C++, Ada, or C# (C-Sharp). Other object-oriented
programming languages may also be used. Alternatively, functional,
scripting, and/or logical programming languages may be used.
Various aspects of the invention may be implemented in a
non-programmed environment (e.g., documents created in HTML, XML or
other format that, when viewed in a window of a browser program,
render aspects of a graphical-user interface (GUI) or perform other
functions). Various aspects of the invention may be implemented as
programmed or non-programmed elements, or any combination
thereof.
[0286] A variety of system elements including inputs, outputs and
interfaces may exchange information with various external entities
that may be information providers and/or information consumers.
These external entities may include users and/or systems. Each of
these system elements may both restrict exchanged information to a
predefined set of values and validate any information exchanged
prior to using the information or providing the information to
other components.
[0287] In embodiments of the invention discussed above, systems and
methods are described that provide indications of remaining cooling
capacity for equipment enclosures. The indication of remaining
cooling capacity may be a direct indication of remaining cooling in
terms of, for example, kilowatts or BTU per hour, or the indication
may be indirect such as providing the total capacity of cooling
available to an enclosure along with an indication of how much
cooling is being used, for example, in terms of percentage.
Further, calculated values, including the capture index and the
recirculation index may be used to determine the sufficiency of a
particular design and to determine additional cooling capacity
before a warning or error condition will result.
[0288] Embodiments of a systems and methods described above are
generally described for use in relatively large data centers having
numerous equipment racks, however, embodiments of the invention may
also be used with smaller data centers and with facilities other
than data centers. Further, as discussed above, embodiments of the
present invention may be used with facilities having raised floors
as well as with facilities that do not have a raised floor.
[0289] In embodiments of the present invention discussed above,
results of analyses are described as being provided in real-time.
As understood by those skilled in the art, the use of the term
real-time is not meant to suggest that the results are available
immediately, but rather, are available quickly giving a designer
the ability to try a number of different designs over a short
period of time, such as a matter of minutes.
[0290] Having thus described several aspects of at least one
embodiment of this invention, it is to be appreciated various
alterations, modifications, and improvements will readily occur to
those skilled in the art. Such alterations, modifications, and
improvements are intended to be part of this disclosure, and are
intended to be within the spirit and scope of the invention.
Accordingly, the foregoing description and drawings are by way of