Componentized Automatic Provisioning And Management Of Computing
Environments For Computing Utilities
Abstract
The present invention provides systems, methods and apparatus
for automatically provisioning and managing re-sources in a
computing utility. Its automation procedures are based on a
resource model which allows resource specific provisioning and
management tasks to be encapsulated into components for reuse.
These components are assembled into more complex structures and
finally computing services. This invention provides a method for
constructing a computing service from a set of resources given a
high level specification. Once constructed, the service includes a
component that provides management function, which can allow
modification of its underlying set of resources.
Inventors: |
Eilam; Tamar; (New York,
NY) ; Miller; Sandra D.; (Irvington, NY) ;
Mummert; Lily Barkovic; (Mahopac, NY) ; Hunt; Guerney
Douglass Holloway; (Yorktown Heights, NY) |
Correspondence
Address: |
LOUIS PAUL HERZBERG
3 CLOVERDALE LANE
MONSEY
NY
10952
US
|
Family ID: |
34912878 |
Appl. No.: |
12/131675 |
Filed: |
June 2, 2008 |
Related U.S. Patent Documents
|
|
|
|
|
|
Application
Number |
Filing Date |
Patent Number |
|
|
10587615 |
Jun 22, 2007 |
|
|
|
PCT/US04/02637 |
Jan 30, 2004 |
|
|
|
12131675 |
|
|
|
|
Current U.S.
Class: |
718/104 ;
718/100 |
Current CPC
Class: |
G06F 9/5061
20130101 |
Class at
Publication: |
718/104 ;
718/100 |
International
Class: |
G06F 9/46 20060101
G06F009/46 |
Claims
1. A provisioning method comprising provisioning at least one
computing environment in a computing utility, said step of
provisioning comprising: employing a description of each of said at
least one computing environment, said description directing an
invocation of a first service which performs said provisioning,
said description being a composite resource definition; and
invoking said first service to perform said provisioning.
2. A method as recited in claim 1, wherein said first service is a
provisioning resource service, and said method further comprises
said first service making available a managed resource service for
managing each of said at least one computing environment.
3. A method as recited in claim 2, comprising at least one
limitation taken from a group of limitations consisting of: wherein
there is at least one provisioning resource service associated with
each type of base resource and each type of composite resource;
wherein said provisioning resource service provides a plurality of
provisioning instances; wherein said provisioning resource service
is comprised of a group of provisioning resource services, each
member of said group of provisioning resource services is
associated with a particular type of resource in said composite
resource description; wherein the step of invoking further
comprising employing said provisioning resource service for the
computing environment by recursively employing each member of said
group according to said composite resource description; wherein
each base resource has a base resource instance, and wherein there
is at least one managed resource service associated with each base
resource instance; wherein there is one managed resource service
for all instances of a resource type within a single computing
environment; wherein each composite resource has a composite
resource instance, and wherein there is at least one managed
resource service associated with each composite resource instance;
and wherein said managed resource service is comprised of a group
of managed resource services, each member of said group of managed
resource services is associated with a particular instance of
resource in said composite resource description.
4. (canceled)
5. A method as recited in claim 2, wherein the step of invoking
comprises: obtaining at least one plan to satisfy said at least one
computing environment; selecting a particular plan; requesting base
resources corresponding to said particular plan from said computing
utility; repeating the steps of selecting and requesting until said
base resources corresponding to said particular plan is obtained;
and configuring said base resources into an instance of said
computing environment.
6. A method as recited in claim 5, wherein said base resources
satisfy a request criterion taken from a group of request criteria
comprising: a designated time at which the resources will be
provisioned; duration of resource availability; resource-specific
selection criteria; and any combination of these request
criteria.
7.-11. (canceled)
12. A method as recited in claim 5, further comprising at least one
limitation taken from a group of limitations consisting of: wherein
said provisioning resource service is comprised of a group of
provisioning resource services, each member of said group of
provisioning resource services is associated with a particular type
of resource in said composite resource description; wherein the
step of invoking further comprising employing said provisioning
resource service for the computing environment by recursively
employing each member of said group according to said composite
resource description; wherein the step of obtaining said at least
one plan comprises recursively obtaining at least one plan for each
sub-resource, and combining the result; wherein the step of
configuring said base resources into an instance of said computing
environment comprises recursively configuring base resources
corresponding to each sub-resource, and configuring the result;
wherein the step of obtaining further comprises specifying at least
one condition restricting the plans obtained; further comprising
transforming reservations for base resources into allocated base
resources; wherein the step of obtaining is repeated according to a
repetition criterion taken from a group of repetition criteria
comprising: changes in the description of the computing
environment, changes in the set of base resource types, changes in
the set of composite resource types; and any combination of these
repetition criteria; wherein the steps of selecting and requesting
are repeated according to a repetition criterion taken from a group
of repetition criteria comprising: changes in the selection
criteria, changes in resource availability, changes in resource
reservation status, changes in said at least one plan; and any
combination of these repetition criteria; further comprising
iterating the steps of repeating and transforming until said base
resources are obtained; wherein the step of obtaining is repeated
according to a repetition criterion taken from a group of
repetition criteria comprising: changes in the description of the
computing environment, changes in the set of base resource types,
changes in the set of composite resource types, and any combination
of these repetition criteria; wherein the steps of selecting and
requesting are repeated according to a repetition criterion taken
from a group of repetition criteria comprising: changes in the
selection criteria, changes in resource availability, changes in
resource reservation status, changes in said at least one plan, and
any combination of these changes; wherein the steps of obtaining,
selecting, requesting, and configuring are invoked at least once by
at least one managed resource service to add resources to said
computing environment; and wherein the step of selecting said plan
satisfies a selection criterion taken from a group of selection
criteria comprising: cost, performance; and number of preferences
satisfied; and any combination of these selection criteria.
13.-19. (canceled)
20. An article of manufacture comprising a computer usable medium
having computer readable program code means embodied therein for
causing provisioning of at least one computing environment in a
computing utility, the computer readable program code means in said
article of manufacture comprising computer readable program code
means for causing a computer to effect the steps of claim 1.
21. A program storage device readable by machine, tangibly
embodying a program of instructions executable by the machine to
perform method steps for provisioning at least one computing
environment in a computing utility, said method steps comprising
the steps of claim 1.
22. A method comprising adding a base resource type to an operating
computing utility, said step of adding comprising: furnishing a
base resource library service to represent any instance of said
base resource type; adding any instance of said base resource type
to the base resource library service; developing an implementation
of a provisioning resource service for said base resource type;
activating said provisioning resource service; and creating an
implementation of a managed resource service for said base resource
type.
23. A method as recited in claim 22, further comprising: updating
any provisioning resource service of any composite resource type to
use said provisioning resource service for said base resource type;
and updating any managed resource service of any composite resource
type to use said managed resource service for said base resource
type.
24. A method as recited in claim 22, wherein the step of adding a
base resource type is performed by a service provider to increase
service offerings to at least one customer of said service
provider.
25. A method comprising adding a composite resource type to an
operating computing utility, said step of adding comprising:
creating an implementation of a provisioning resource service for
said composite resource type, said provisioning resource service
using the provisioning resource services for sub-resources of said
composite resource type; activating said provisioning resource
service; and developing an implementation of a managed resource
service for said composite resource type, said managed resource
service using the managed resource services for sub-resources of
said composite resource type.
26. A method as recited in claim 25, further comprising: updating
any provisioning resource service for a composite resource to use
said provisioning resource service for said composite resource
type; and updating any managed resource service for a composite
resource to use said managed resource service for said composite
resource type.
27. A method as recited in claim 25, wherein the step of adding a
composite resource type is performed by a service provider to
increase service offerings to at least one customer of said service
provider.
28. A method comprising adapting at least one third party workload
management system for a computing environment to a computing
utility, said step of adapting comprising: developing a managed
resource service, said managed resource service interpreting a
state of said at least one third party workload management system;
and modifying a set of base resources comprising said computing
environment as indicated by the state of said at least one third
party workload management system.
29. A method as recited in claim 2, further comprising: receiving
an event for returning at least one base resource from said at
least one base resource from at least one computing environment of
said at least one computing environment; unconfiguring said at
least one base resource from at least one computing environment of
said at least one computing environment; returning said at least
one base resource to said computing utility; and making available
said at least one base resource for allocation to another computing
environment.
30.-31. (canceled)
32. A method as recited in claim 1, further comprising at least one
limitation taken from a group of limitations consisting of: further
comprising receiving a customer request for at least one of said at
least one computing environment; further comprising a Provisioned
and Managed Resource Service of a composite resource using the
Provisioned and Managed Resource Service of a sub-resource to
create and manage instances of the sub-resource; wherein said
description further comprises at least one condition on said
composite resource definition; and wherein said composite resource
definition is a recursive combination of resources, said
combination being a combination taken from a group of combinations
consisting of: at least one base resource, at least one other
composite resource and any combination of base resources and
composite resources.
33. (canceled)
34. A method as recited in claim 2, wherein said managed resource
service is comprised of a group of managed resource services, each
member of said group of managed resource services is associated
with a particular instance of resource in said composite resource
description, and wherein said managed resource service employs at
least one operation available to a particular member of said group
of managed resource services, said operation being performed by at
least one member of said group of managed resource services, said
at least one operation being taken from a group of operations
comprising: delivering at least one metric based on monitored data
from said computing environment; delivering at least one event
based on monitored data from said computing environment; modifying
a state of said computing environment; modifying at least one
resource of said computing environment; invoking at least one
particular operation to modify the computing environment in
response to at least one particular metric; and invoking at least
one particular operation to modify the computing environment in
response to at least one particular event.
35. An article of manufacture comprising a computer usable medium
having computer readable program code means embodied therein for
causing addition of a base resource type to an operating computing
utility, the computer readable program code means in said article
of manufacture comprising computer readable program code means for
causing a computer to effect the steps of claim 1.
36. An apparatus to provision at least one computing environment in
a computing utility, said apparatus comprising: a first processor
module to employ a description of each of said at least one
computing environment, said description directing an invocation of
a first service which performs said provisioning, said description
being a composite resource definition; and a second processor
module to invoke said first service to perform said
provisioning.
37. An apparatus as recited in claim 36, wherein said second
processor module makes available a managed resource service to
manage each of said at least one computing environment.
38. A computer program product comprising a computer usable medium
having computer readable program code means embodied therein for
causing provisioning of at least one computing environment in a
computing utility, the computer readable program code means in said
computer program product comprising computer readable program code
means for causing a computer to effect the functions of claim
36.
39. A program storage device readable by machine, tangibly
embodying a program of instructions executable by the machine to
perform method steps for adding a base resource type to an
operating computing utility, said method steps comprising the steps
of claim 22.
40. An article of manufacture comprising a computer usable medium
having computer readable program code means embodied therein for
causing addition of a composite resource type to an operating
computing utility, the computer readable program code means in said
article of manufacture comprising computer readable program code
means for causing a computer to effect the steps of claim 25.
41. A program storage device readable by machine, tangibly
embodying a program of instructions executable by the machine to
perform method steps for adding a composite resource type to an
operating computing utility, said method steps comprising the steps
of claim 25.
42. An apparatus comprising: a plurality of provisioning resource
services to transform a description of a computing environment into
a plan for constructing a set of resources to provide said
computing environment, wherein the computing environment is
represented as a composite resource definition.
43. An apparatus as recited in claim 42, wherein said plurality of
provisioning resource services is to construct said resources into
said computing environment according to said plan, and said at
least one provisioning resource service to make available a managed
resource service to manage the computing environment.
44. A method comprising: obtaining a description of a computing
environment, wherein said description is represented as a composite
resource definition; and transforming a description of a computing
environment into a plan for constructing a set of resources to
provide said computing environment.
45. An method as recited in claim 44, further comprising:
constructing said resources into said computing environment
according to said plan; and making available a managed resource
service to manage the computing environment.
46. An article of manufacture comprising a computer usable medium
having computer readable program code means embodied therein for
obtaining a description of a computing environment, the computer
readable program code means in said article of manufacture
comprising computer readable program code means for causing a
computer to effect the steps of claim 44.
47. A program storage device readable by machine, tangibly
embodying a program of instructions executable by the machine to
perform method steps for obtaining a description of a computing
environment, said method steps comprising the steps of claim
44.
48. An article of manufacture comprising a computer usable medium
having computer readable program code means embodied therein for
causing adaptation of at least one third party workload management
system for a computing environment to a computing utility, the
computer readable program code means in said article of manufacture
comprising computer readable program code means for causing a
computer to effect the steps of claim 28.
49. A program storage device readable by machine, tangibly
embodying a program of instructions executable by the machine to
perform method steps for adapting at least one third party workload
management system for a computing environment to a computing
utility, said method steps comprising the steps of claim 28.
50. A computer program product comprising a computer usable medium
having computer readable program code means embodied therein for
causing development of a plan, the computer readable program code
means in said computer program product comprising computer readable
program code means for causing a computer to effect the functions
of claim 42.
51. (canceled)
Description
CROSS REFERENCES
[0001] The present application is cross-referenced to application
entitled "Hierarchical Resource Management for a Computing
Utility", having docket number YOR920030587PCT1, and application
entitled "Apparatus for Arbitration in a Computing Utility System",
having docket number YOR920030589US1, even dated, and which are
included herein by reference in entirety for all purposes.
FIELD OF THE INVENTION
[0002] The present invention is directed to provisioning and
management of resources in a computing utility, which uses the
resources to provide computing services to customers. It is more
particularly directed to componentized automatic provisioning and
management of computing environments for the computing utility.
BACKGROUND
[0003] A hosting center provides computing services to multiple
customers. Each customer is allocated a subset of the service
provider's infrastructure resources, such as servers, to meet its
needs. Customer needs change over time, and in particular, peak
demands for resources can exceed average demands by orders of
magnitude. A simple static allocation of resources to satisfy peak
demand leaves resources underutilized. Reconfiguring infrastructure
resources dynamically, in response to customer needs, demands
prompt attention from administrative personnel, increasing both
operational costs and the risk of failing to provide adequate
service. The problem for the hosting center is how to respond
quickly to changes in customer needs such that infrastructure
resources and staff are employed in an efficient and cost effective
way. Computing utilities attempt to address this problem by
automating the creation and management of one or more computing
services on shared infrastructures.
[0004] Previous work in computing utilities varies in the types of
services that are offered, the resources that are used, and the
extent to which operation is automated. Operations subject to
automation are wide ranging, and include creating services,
deploying a service for a customer, modifying the set of resources
used to provide the service, and incorporating new resource
instances and types into the hosting center and its services.
[0005] One system automated the provisioning of front end servers
in Web sites based on metrics such as server load and response
time. It included a component that discovered server and network
topology automatically. Another system provided a variety of
multi-tier Web sites in which pre-configured servers could be
allocated to different tiers automatically based on metrics such as
server load. Another system also allocated server resources in
response to server load, but modeled both the value of allocating
resources to each customer and the cost of employing those
resources, with an emphasis on energy cost. More recent work
includes allocation of other resource types such as memory and
storage, and allocation of servers for general use.
[0006] A growing number of industrial products aim to provide
multi-tier applications over a physical infrastructure consisting
of a variety of resource. They vary in many respects, such as the
types of resources provided (e.g., servers and storage); specific
operating systems and middleware supported; assumptions and
characteristics of the network infrastructure (e.g., whether or not
network isolation is provided via VLAN); level of monitoring
support (e.g., resource usage, failure detection, SLA, threshold
based alerting); support for resource discovery; support for
modifying service resources once deployed; whether modifications
can occur automatically (e.g., triggered by SLAs); and the extent
to which the products can or must be customized to fit preexisting
hosting center infrastructures.
[0007] Work is being done at the application layer to automate
deployment and management of distributed applications. An
application is described as a collection of related, reusable
components, which may represent resources or subsystems. The
description of an application includes dependency information to
ensure that, for example, components are started in the correct
sequence. This is not used for low level resource configuration
tasks such as installing operating systems on servers, but for
higher level application specific configuration.
[0008] Provisioning refers to the process of allocating a set of
infrastructure resources and configuring them to provide the
desired computing services for use by a customer. Provisioning is a
complex set of tasks that can include configuring network devices,
installing operating systems and application software, obtaining
software licenses, installing monitors, and enabling customer
access by creating user accounts.
[0009] Provisioning is automated by codifying the procedures or
scripts for these tasks. Some products provide a GUI interface to
assist in the creation and selection of these procedures. For
example, a drag and drop interface may be used to specify the
"virtual wiring" of resources for an application environment to be
deployed. Virtual wiring could include the tier structure of the
environment, rules for firewalls, and which operating system to
install on servers. The wiring diagram is captured as a template
description. This description is used to create and delete
environments, and it may be modified to add or remove resources
from a computing environment.
[0010] In some systems codifying the procedures is done on a
service specific basis. Changes in resource types, connectivity, or
service requirements can require re-implementation of these
procedures. If they are implemented in an ad hoc manner or
independently, it can be difficult to systematically enforce best
practices or operational constraints. Thus, it is desirable to
provide a system that improves upon the prior art.
SUMMARY OF INVENTION
[0011] This invention provides methods and apparatus for
automatically provisioning and managing resources in a computing
utility. Its automation procedures are based on a resource model
which allows resource-specific provisioning and management tasks to
be encapsulated into components for reuse. These components are
assembled into more complex structures and finally computing
services. Included are methods and apparatus for automatically
provisioning and managing resources in a computing utility. Its
automation procedures are based on a resource model which allows
resource-specific provisioning and management tasks to be
encapsulated into components for reuse. These components are
assembled into more complex structures and finally computing
services. This invention also provides a method for constructing a
computing service from a set of resources given a high level
specification. Once constructed, the service includes a component
that provides management function, which can allow modification of
its underlying set of resources.
[0012] In an example embodiment, this invention provides a method
for provisioning at least one computing environment in a computing
utility. The method comprising: employing a description of each of
said at least one computing environment, said description directing
an invocation of a first service which performs said provisioning,
said description being a composite resource definition; and
invoking said first service to perform said provisioning.
[0013] In an example embodiment, this invention provides a method
for adding a base resource type to an operating computing utility.
The step of adding comprising: furnishing a base resource library
service to represent any instance of said base resource type;
adding any instance of said base resource type to the base resource
library service; developing an implementation of a provisioning
resource service for said base resource type; activating said
provisioning resource service; and creating an implementation of a
managed resource service for said base resource type.
[0014] In some embodiments, the method further comprising: updating
any provisioning resource service of any composite resource type to
use said provisioning resource service for said base resource type;
and updating any managed resource service of any composite resource
type to use said managed resource service for said base resource
type.
[0015] In a further example embodiment, this invention provides a
method for adapting at least one third party workload management
system for a computing environment to a computing utility. The step
of adapting comprising: developing a managed resource service, said
managed resource service interpreting a state of said at least one
third party workload management system; and modifying a set of base
resources comprising said computing environment as indicated by the
state of said at least one third party workload management
system.
[0016] In an further example embodiment, this invention provides a
method for constructing a computing service from a set of resources
given a high level specification. Thus, this invention is also an
element of a computing utility.
[0017] In a still further example embodiment, this invention
provides an apparatus to provision at least one computing
environment in a computing utility. The apparatus comprising: a
first processor module to employ a description of each of said at
least one computing environment, said description directing an
invocation of a first service which performs said provisioning,
said description being a composite resource definition; and a
second processor module to invoke said first service to perform
said provisioning.
BRIEF DESCRIPTION OF THE DRAWINGS
[0018] The foregoing and other objects, aspects and advantages will
be better understood from the following detailed description of
advantageous embodiments of the invention with reference to the
drawings, in which:
[0019] FIG. 1 depicts a hosting center, a system in which the
present invention may be used;
[0020] FIG. 2 shows an example of a computing utility structure, in
which the PMRS, in accordance with the present invention, is one of
the components;
[0021] FIG. 2a shows an example of an internal structure of the
PMRS in accordance with the present invention;
[0022] FIG. 3 shows a composite resource instance for a Web
site;
[0023] FIG. 4 shows an MRS hierarchy that corresponds to the
composite resource instance of FIG. 2 in accordance with the
present invention;
[0024] FIG. 5 shows a PRS hierarchy that corresponds to the
composite resource instance of FIG. 2 in accordance with the
present invention;
[0025] FIG. 6 shows a realization for a Web site composite resource
in accordance with the present invention;
[0026] FIG. 7 shows a Web site realization pruned by tier attribute
in accordance with the present invention;
[0027] FIG. 8 shows a Web site realization pruned by server
attribute in accordance with the present invention;
[0028] FIG. 9 shows a Web site realization pruned by tier, Server,
and, WAS attributes in accordance with the present invention;
[0029] FIG. 10 shows a Web site realization and its components,
where each component corresponds to a PRS and MRS structure in
accordance with the present invention;
[0030] FIG. 11 shows an example of operations of the Realizers
involved in the construction of a Web site realization in
accordance with the present invention;
[0031] FIG. 12 shows a process used to construct a composite
resource in accordance with the present invention;
[0032] FIG. 13 shows a process used to construct a composite
resource in a system with advanced reservations in accordance with
the present invention;
[0033] FIG. 14 shows an example of PMRS interaction with BRDS in
accordance with the present invention;
[0034] FIG. 15 shows an example of MRS interaction with a third
party workload management system in accordance with the present
invention;
[0035] FIG. 16 shows s an example of how to add a new base or
composite resource type to the system in accordance with the
present invention;
[0036] FIG. 17 is a use case that describes adding a Linux server
to a Linux server group service based on a load event in accordance
with the present invention; and
[0037] FIG. 18 is a use case that describes adding a Web server to
a Web site service based on a load event in accordance with the
present invention.
DEFINITION OF TERMS
[0038] A computing environment is a computing service provided to a
customer. It includes hardware and software resources such as
servers, operating systems, and middleware. This invention assumes
that the resources allocated to a computing environment are
dedicated to that computing environment for the duration of their
allocation.
[0039] A service provider is assumed to be providing service for
multiple computing environments. A service provider supplies a set
of resources that may be allocated to provide computing services to
its computing environments.
[0040] A base resource is a resource that is atomic; it cannot be
broken down into other resources. An example of a base resource is
a server or a software license. Any resource that a service
provider does not want to subdivide can be treated as a base
resource. Adding, removing, or modifying a base resource changes
the overall capacity of the system. We assume that both the number
and types of the base resources change over time. The notion of
base resource is service provider specific.
[0041] A composite resource is built out of other resources to
perform a specified function. A composite resource may have a set
of dependencies associated with it. An example of a composite
resource is a Web site. It may be composed of some number of
front-end servers, back end servers, a load balancer, a set of IP
addresses for the servers, Web server software, database software,
and licenses associated with the software. The set of base
resources used to implement the function of a composite resource
can change over time, though not all composite resources may have
this capability. In some cases, a resource within a composite
resource is referred to as a sub-resource.
[0042] A resource may be requested by a computing environment
either for an immediate or future allocation. The promise of a
future resource allocation is a reservation.
DESCRIPTION OF THE INVENTION
[0043] This invention provides methods, systems and apparatus for
automatically provisioning and managing resources in a computing
utility in an environment that possesses the characteristics listed
below. Together, these characteristics generalize the environments
studied in previous work.
[0044] The present invention provides methods and apparatus for
automatically provisioning and managing resources in a computing
utility. Its automation procedures are based on a resource model
which allows resource-specific provisioning and management tasks to
be encapsulated into components for reuse. These components are
assembled into more complex structures and finally computing
services. This invention provides a method for constructing a
computing service from a set of resources given a high level
specification. Once constructed, the service includes a component
that provides management function, which can allow modification of
its underlying set of resources.
[0045] An example method provides for constructing a computing
environment from a set of resources given a high level
specification. It is a component of a computing utility that
operates in an environment that possesses at least one of the
characteristics listed below. Together, these characteristics
generalize the environments studied in previous work. [0046] First,
resources may be allocated to customers in combinations which are
heterogeneous, may be interdependent, and vary over time. [0047]
Second, the types of computing environments provided to each
customer may be different. For example, one customer may be
provided resources for a Web site, and another for a scientific
computing cluster. Resource types, quantities, dependencies, and
allocation patterns will thus vary between customers. [0048] Third,
there can be multiple ways to construct a computing environment
from the resources in a service provider's infrastructure. A
customer may have preferences or requirements for particular
variations of a given computing environment, such as for particular
brands of servers. [0049] Fourth, the resource infrastructure
varies between service providers. Further, for a given service
provider, the infrastructure varies over time. These variations can
be a result of upgrades or additions to the physical
infrastructure, engaging the services of another provider, or
inclusion of additional resources when idle or at certain times of
day. [0050] Finally, resources may be allocated in advance, or
reserved.
[0051] The system in which the present invention is used is a
distributed computer system which has multiple computing resources
interconnected via a network. A diagram of such a system, which
would be found in a hosting or data center, is shown in FIG. 1. The
computing resources in the physical infrastructure include
processors 101, storage 103, firewalls 105, and software 107. The
software can be operating systems, middleware or applications. In
FIG. 1 the available software has been pre-configured into business
processes, business applications, or services. The hardware
resources are connected by a network 109 as indicated by the grid
of lines interconnecting all of these resources. This network may
be configure into one or more tiers, where each tier is separated
by a router or firewall. Software resources are assigned to
physical resources by a management infrastructure. In this
environment a subset of the resources are assigned to the
management infrastructure. In FIG. 1 these resources 111, 113, and
115 are indicated by a dotted line surrounding them. The resources
assigned to the management infrastructure run the management
software described in this invention. This software manages the
rest of the resources. The resources used for the management
infrastructure are not assigned to customers of the hosted
environment. The remaining resources are assigned to customers as
necessary. It is expected that clients 117 will primarily receive
service by connecting to their resources through the Internet 119.
However, clients can receive service if they are connected to their
resources by any means, such as through a direct connection to a
managed resource.
[0052] FIG. 2 shows a high level view of a computing utility in
which the present invention is a component. There are three layers
of components. The bottom layer 201 represents the base resources.
Each base resource type has a service that provides reservation and
allocation of instances of that resource type, called the Base
Resource Library Service (BRLS). This invention assumes that both
the number and types of the base resources change over time. FIG. 2
shows four types of base resources and their BRLSs: DB2 software
licenses 203, zSeries logical partitions 205, xSeries server
hardware 207, and AIX licenses 209. The BRLS provides information
such as cataloging, check out (allocation), check in
(deallocation), and reservation. Each computing environment has a
service which is invoked to provision and manage its resources,
called the Provisioned and Managed Resource Service (PMRS). In FIG.
2, the top layer 211 shows the computing environments and their
PMRSs. FIG. 2 shows three examples of computing environments, a DB2
environment 213, a Linux environment 215, and a Web site
environment 217. In the middle layer, the Base Resource
Distribution Service (BRDS) 219 determines how to distribute the
base resources across the various computing environments. The BRDS
specifies which sets of resources are available to which computing
environments and automatically redistributes those resources based
on business policies when resources are constrained.
[0053] The resources assembled for a computing environment are
modeled as composite resources. The model defines the structure of
the composite resource in terms of its constituent resources. A set
of services, called Provisioned and Managed Resource Services
(PMRS), which are the focus of this invention, provision and manage
composite resources. Every resource type has a PMRS that
encapsulates the knowledge of how to create a resource of that
type, and how to manage an instance of a resource of that type.
Managing the resource may include such actions as adding or
removing capacity from the resource instance. Thus, as shown in
FIG. 2a, a PMRS 251 is composed of two parts: a Provisioning
Resource Service (PRS) 253, which creates instances of the
composite resource, and a Managed Resource Service (MRS) 255, which
manages an instance of the composite resource. There is a single
PRS for each resource type, and there is an MRS for every instance
of a resource type.
[0054] Composite resources may be assembled using other composite
resources. For example, a Web site composite resource instance may
be composed of a load balancer, and a group of front end servers. A
front end server is a composite resource which may be composed of a
server, operating system, and Web server software. For this reason,
PMRSs can be composed in a containment hierarchy that represents
the structure of the composite resources in the computing
environment. FIG. 3 shows an example of a Web site composite
resource instance. Every node in the tree represents either a basic
or a composite resource. The root of the tree 301 is the Web site
composite resource. It contains a load balancer resource 303, which
is a basic resource, and a Web server group composite resource 305.
The Web server resource in turn contains a server resource 307.
[0055] A PMRS of a composite resource may use the PMRS of a
sub-resource to create and manage instances of the sub-resource.
This approach allows resource provisioning and management to be
encapsulated on a per resource type basis. A PMRS for a composite
resource only has to incorporate and reflect knowledge of the
interdependencies between the sub-resources of the composite, since
the internal knowledge of a sub-resource is encapsulated in the
sub-resource's PMRS.
[0056] FIG. 4 shows the MRS hierarchy which corresponds to the Web
site composite resource instance 301. Every MRS is responsible to
manage a single resource instance. Thus, a Web-site MRS 401 is
responsible to manage the entire Web site, whilst a Web server MRS
403 is responsible for managing Web server 309. An arrow from an
MRS box to another indicates that the former uses the latter in
order to perform its function. Thus, a Web-site MRS 401 may use
information provided by the load balancer MRS 405 and the various
Web server MRSs 407 in order to determine the root cause of a
problem in the performance of the Web site, and web server MRS may
in turn use server MRS 409. Web site MRS 401 may further use the
MRSs of the sub-resources in order to perform corrective
configuration actions on some composed resources. The process will
be further described later.
[0057] FIG. 5 shows the PRS hierarchy which corresponds to the Web
site composite resource instance from FIG. 3. A PRS in this figure
is responsible to create all instances of resource from the
corresponding type. Thus, the root of the hierarchy is a Web site
PRS 501 which is responsible for creating all Web site composite
resource instances in the computing utility. The Web server PRS 503
is responsible for creating all Web server instances in the
computing utility and so on. As in the case of the MRS hierarchy,
an arrow from a PRS box to another indicate the former uses the
latter in order to perform its function. Thus, the Web site PRS 501
uses both the Web server PRS 503 and the load balancer PRS 505 in
order to build a Web site resource. It does not need to know how to
build a Web server or a load balancer; this knowledge is
encapsulated in the corresponding PRSs that it uses. It only needs
to know that a Web site consists of Web servers and a load balancer
and how to configure them, once they are created, to work together.
The process will be further described later.
[0058] FIG. 3, FIG. 4, and FIG. 5 illustrate the idea of applying a
recursive structure to the provisioning and management of systems.
Thus, PRSs, and MRSs serve as generic building blocks for building
more complex resources. An implementer of a PRS or MRS for a new
composite resource does not have to re-implement the logic to
create and manage any of the sub-resources. The implementer only
needs to implement the increment; how the resources can be created
and managed to work together to perform a higher function beyond
the function that any single resource performs.
Provisioned Resource Service
[0059] A PRS creates instances of a composite resource type. It
implements two phases in the creation of a composite resource--a
planning phase and a building phase. In the PRS, the planning phase
is implemented by a component called the realizer. The realizer
maps an abstract description of a resource to a schema that
describes the possible combinations of base resources needed to
create it and the corresponding composite resource structure. It
essentially supplies a plan for building the composite resource.
Since there may be more than one way to create the resource, the
realizer can supply multiple plans. The realizer takes into account
resource types, but not availability of instances of a particular
type, when providing plans. A realizer may use the realizers in
PRSs of sub-resources, to create plans.
[0060] A second component, the builder, builds a resource instance
given resource handles for the base resources required and a plan.
It also disassembles resources when requested. Creating an instance
of a composite resource may be multi-staged, where at each stage,
resources are built from sub-resources incrementally by calling the
Builder services of the sub-resources provisioning services, and
then configured with respect to each other. The creation of a
resource instance includes the instantiation of an MRS to manage
it. Following the same logic, in the process of a creation of a
composite resource a set of MRSs will be instantiated to manage the
composite resource and its sub-resources cooperatively.
Realizer
[0061] The realizer encapsulates the possibilities for constructing
a resource of a particular type from the base and composite
resources available in the computing utility. It may supply one or
more alternative plans for constructing the resource. In this case,
it may also expose certain settings that can be used to restrict
the set of alternatives it supplies. A realization is a structure
that encodes the different alternatives. The realization can be
represented in a number of structures such as a graph or binary
decision diagram. The representation should be compact because the
possible number of realizations of a complex structure could be
large.
[0062] An example realization for a Web site resource is shown in
FIG. 6. The nodes in the graph with children are of two types: AND
nodes, shown in black, and OR nodes, shown in white. An AND node
means that all the children of the node are required to construct
the resource represented by the parent. An OR node means that any
of its children may be used to construct the resource represented
by the parent. The root node of the Web site graph 601 is an OR
node, representing a two-tier alternative 603 and a three-tier
alternative 605. The two-tier node 603 is an AND node composed of a
load balancer 607 and a Web server 609. The three-tier node 605 is
also an AND node composed of a load balancer 611, front end Web
server 613, and back end Web server 615. The load balancer nodes
607 and 611 are base resources; they have no outgoing edges. The
two-tier Web server node 609 is an OR node, with only one
alternative; server node 617. The server node 617 is an OR node
representing alternatives Apache Web server 619 and WAS Web server
621. The three-tier front end Web server node 613 is identical in
structure to the two-tier Web server node 609. Apache Web server
node 619 is an OR node representing servers of three IBM
architectures, iSeries 623, xSeries 625, and pSeries 627. WAS Web
server 621 is an OR node representing servers of four IBM
architectures, iSeries 629, xSeries 631, pSeries 633, and zSeries
635. These servers are base resources, as is DB2 node 637.
[0063] A realizer for a resource type may allow the setting of
certain attributes that can restrict the set of alternatives it
supplies. These settings are specified as part of the
realization-spec parameter of the realize( ) function described
above. In the AND-OR graph representation shown in FIG. 7, an
attribute 701 specifies a condition on the value of the descendant
that is chosen for an OR node. The graph is pruned to eliminate
descendants that do not satisfy the condition in the attribute.
FIG. 7 shows the possible realizations corresponding to the "web
site is two-tier" attribute. This attribute, if set, prunes the
graph at the "web site" OR node 601. The resulting realization is
the sub-tree rooted at node 603, shown with solid edges.
[0064] A more complex example is shown in FIG. 8. The attribute
"Server is Apache" 801 specifies that any "server" OR node in the
realization must have an "Apache" node as a direct descendant, such
as the descendant of server node 617. Other descendants of the
"server" OR node are pruned, such as node 621. If an "Apache" node
is not specified as a direct descendant of a "server" node in the
initial realization, as in node 807, the entire "server" node is
pruned. If the pruned "server" node is the only direct descendant
of an OR node, or if it is any direct descendant of an AND node
then this node is pruned, such as node 615, and so on in a
recursive manner, with node 605. The application of this process
results in the realization that is the two-tier realization rooted
at node 603, with a web server 617 realized as Apache server 619.
The realization is shown as with solid arrows. Any descendant of
node 619 is an acceptable alternative.
[0065] Multiple attributes may be specified as part of the
realization-spec. FIG. 9 shows a realization-spec with multiple
attributes 901. The resulting realization is three-tier web site
605 with front end server 905 realized as WAS server 907 on server
type zSeries 909. Similarly, back end web server realized as WAS
server 911 is also realized with zSeries 913. This realization is
shown with solid arrows.
[0066] The above pruning algorithm can be semi-formally described
as follows:
TABLE-US-00001 Prune_one (S,R): For an attribute S = [ NODE_NAME is
CONDITION ], and for a realization R with a set of nodes NODES. 1.
Let Pruned = empty-set. 2. For every node N .epsilon.NODES: If N is
an OR node then If N=NODE_NAME then For every direct descendant M
of N in R: If M does not satisfy CONDITION then Pruned = pruned
.orgate. {M} 3. For every node N .epsilon. NODES\Pruned : If N is
an OR node then If all descendants of N are in Pruned then Pruned =
pruned .orgate. {N} 4. For every node N .epsilon. NODES\Pruned: If
N is an AND node then If N has a descendant M s.t. M .epsilon.
Pruned then Pruned = pruned .orgate. {N} 5. Repeat steps 3 and 4
until an iteration is reached where the set Pruned is not changed.
6. Return the tree of nodes that are reachable from the root and
are not pruned (if the root is pruned return the empty tree).
Prune_all(LS,R): For a list of attributes LS=L1,L2,..., Ln, And for
a realization R 1. New_R = R 2. For i=1,...,n: New_R =
prune_one(New_R,Li) 3. Return New_R
[0067] Note that these examples are based on a realizer that allows
all of the OR node attributes to be specified in the realize
request. The realizer need not expose all of these choices. It may
also group a set of choices as a single attribute, such as
"non-Intel servers".
[0068] Also note that more complex attributes may be defined and
used. For example, using the keyword contains instead of is,
attributes can be specified on nodes in the sub-tree rooted by a
node and not only on direct descendant of it. The pruning algorithm
can be changed in a straight forward way to handle also these
cases. As an example, consider again the result of the realization
described in FIG. 9. The same realization result also corresponds
to the following realization-spec with only two attributes:
"Web-site is two-tier" and "Server contains z". Although it is not
specified that a server must be WAS, the Apache possibility 915 is
pruned because the sub-tree rooted by it does not contain a "z"
resource.
Operation of the Realizers
[0069] Since composite resources may be assembled using base or
other composite resources, realizers invoke the realizers of
sub-resources. FIG. 10 shows the Web site example using two
sub-resources, Web server and server. The Web server realizer
supplies the sub-graphs rooted at striped nodes 1001, 1003, and
1005. This realizer can supply front end or back end web server
types. Node 1005 is darker than nodes 1001 and 1003 because it is
both an AND node and a sub-resource node. The server realizer
supplies the sub-graphs rooted at dotted nodes, such as node 1007.
The server realizer can supply servers of the different IBM server
architectures with compatible operating systems. Note that in this
example, the Apache Web server realizer calls the server realizer
1007 with only the iSeries, xSeries, or pSeries server type. The
zSeries option is not shown for Apache in the graph.
[0070] FIG. 11 shows the process of generating the realization. The
Web site PRS 501 receives Realize request 1103 with a
realization-spec with the attribute "two-tier". Web site realizer
501 calls the web server realizer 503 with Realize request 1107.
The web server realizer 503 in turn calls the server realizer 507
twice, with Realize requests 1111 and 1113. The results of requests
1111 and 1113 are the realizations R1 1115 and R2 1117 returned by
responses 1119 and 1121. The Web server realizer uses R1 and R2 to
build the realization R3 1123 which is returned on response 1125 in
answer to request 1107. Last, the Web-site realizer user R3 to
construct the realization R4 1127 which is returned on response
1129 from the initial request 1103.
[0071] Realizations may be obtained well in advance of the time
that a composite resource is constructed, and they may be retained
for long periods. Circumstances under which realizations should be
regenerated include changes in requirements and changes in the base
or composite resource types available in the system. Note that a
realization does not depend on resource availability. Therefore,
changes in the availability of resources do not require
regeneration of realizations.
Resource Selection
[0072] Once a realization is obtained, the resources corresponding
to a single alternative must be allocated. Since a realization can
describe multiple alternatives, a ranking mechanism can be used to
order the alternatives according to some metric. For example, a set
of preferences can be indicated for the remaining alternatives
within the realization, and the alternatives could be ordered in
terms of number of preferences satisfied. Another ranking metric
could be cost. The alternatives are then selected in turn and the
base resources are requested for a specific alternative. If the
resource request is successful, the tree is annotated with the
resource identifiers of the base resources (e.g., reservation
tickets or resource handles). Once base resources are obtained, the
builder can be invoked to construct the resource. Note that if
resource availability changes (e.g., a reservation is canceled by
the system), the realization can be used to secure an alternative
set of resources.
Builder
[0073] The builder receives as input a realization and a set of
base resources from which to assemble the resource. The procedures
needed for construction of the resource type are encoded in the
builder. These procedures encapsulate details of resource
dependencies and proper ordering of operations. The realization is
annotated with the alternative corresponding to the base resources.
The builder traverses the tree in depth-first manner, invokes the
builders of sub-resources at nodes as indicated and supplies them
with the sub tree of the realization that corresponds to the sub
resource.
[0074] FIG. 12 shows the process of constructing a composite
resource. The process begins in step 1201, in which the realize
function of the PRS for the composite resource is called with
requirements supplied as attribute settings in the
realization-spec, if any. Next in step 1203 the realizations are
ranked and ordered by rank. If there are preferences over the
alternatives they are addressed in this step. The process then
examines the alternatives embodied by the realizations in turn,
starting in step 1205 with the first realization. The set of base
resources is obtained for the realization in step 1207, and a
resource request is issued for the set in step 1209. The result of
the request is examined in step 1211. If the request succeeds, flow
passes to step 1217, in which the realization is annotated with the
current alternative and the resource-ids of the set of base
resources secured for it. Then in step 1219 the build function of
the PRS is invoked. If in step 1211 the request was not successful,
flow passes to step 1213 to determine if there is an alternative
realization that may be tried. If there is an alternative
realization, the next realization on the list is selected in step
1215 and the process continues with step 1207. If there are no
alternatives left, flow passes to step 1221 and the construction of
the composite resource fails.
[0075] In a system that supports advance reservations, the resource
identifiers returned may represent reservations for the resource.
In that case, another step is needed to claim the resources
associated with the reservation. There may be a considerable period
before this step occurs, and as a result of other activities during
that period, this step may eventually fail. For example, the
resources may not be available at the time the reservation is due
to begin, for reasons such as failure of the resource, or
overbooking of reservations. If the initial attempt to claim the
resources is not successful, other alternatives can be tried and
recovery may be possible with another set of base resources. The
process of constructing a composite resource in a system that
supports advance reservations is shown in FIG. 13. The process
begins in step 1301, in which the realize function of the PRS for
the composite resource is called with requirements supplied as
attribute settings in the realization-spec, if any. Next in step
1303 the realizations are ranked and ordered by rank. If there are
preferences over the alternatives they are addressed in this step.
The process then examines the alternatives embodied by the
realizations in turn, starting in step 1305 with the first
realization. The set of base resources is obtained for the
realization in step 1307, and a resource request is issued for the
set in step 1309. The result of the request is examined in step
1311. If the request succeeds, flow passes to step 1317, in which
the realization is annotated with the current alternative and the
resource identifiers of the set of base resources reserved for it.
When the construction time arrives in step 1318, the process
attempts to claim the resources associated with the reservation in
step 1319. The construction time allows for sufficient time to
construct the resource so that it is available at the desired start
time. If all of the resources are acquired in step 1321, flow
passes to step 1323 where the build function of the PRS is invoked.
If all of the resources are not acquired in step 1321, control
passes back to step 1305 where the process is repeated starting
with the first realization. If in step 1311 the resource request
was not successful, flow passes to step 1313 to determine if there
is an alternative realization that may be tried. If there is an
alternative realization, the next realization on the list is
selected in step 1315 and the process continues with step 1307. If
there are no alternatives left, flow passes to step 1325 and the
construction of the composite resource fails.
Provisioning Operations
[0076] Realize(n, realization-spec)->realization[ ] [0077] This
request is issued to create a plan for building a resource of the
type represented by the PMRS. [0078] Inputs: [0079] n, the maximum
number of realizations desired realization-spec, the settings for
attributes exposed by this realizer These attributes control
represent possible variations in the resource. Their settings
determine the realizations supplied Unspecified attribute settings
represent additional degrees of freedom. [0080] Outputs: [0081]
Realization[ ]. A structure representing the realizations. (list,
tree, etc.). Each realization includes a schema that contains the
base resources required for it ("shopping list") and their
structure.
[0082] Build(base-resource-handles, r)->resource-handle [0083]
This interface is used to request the build of a resource of the
type represented by the PMRS from the base resources indicated by
base-resource-handles. [0084] Inputs: [0085] Base-resource-handles[
], a list handles for the base resources in the realization [0086]
Realization, provided previously by the realizer that is used to
describe the structure of the composite resource. [0087] Outputs:
[0088] Resource-handle, a handle to the newly constructed resource
[0089] On failure this may be set to a `null` handle
[0090] UnBuild(composite-resource-handle)->resource-handle[ ]
[0091] The interface is used to disassemble a composite resource
into the set of base resources used to build it. It is used when
resources are to be returned to the BRDS. [0092] Inputs: [0093]
Composite-resource-handle, handle of the composite resource. [0094]
Outputs: [0095] Resource-handle[ ], array of handles to the base
resources
Managed Resource Service
[0096] As described earlier, an MRS for a resource type (composite
or base) encapsulates the knowledge of the operation of the
resource. An MRS is instantiated for a resource when the resource
is created by the corresponding PRS. A reference to the MRS
instance is returned from the build operation on the PRS.
[0097] Recall that an MRS for a composite resource type can use the
MRSs of the sub-resources in the management of the composite
resource. This structure is shown in FIG. 14 for the web site
computing environment of FIG. 4. Every computing environment that
has resources allocated to it has one designated root MRS. The root
MRS in FIG. 14 is the Web site MRS 401. All other MRS instances are
associated beneath this root MRS. Only the root MRS communicates
with the BRDS 219. The root MRS generates resource management
requests 1405 based on the system's knowledge taking into account
factors such as the system's performance and health. These requests
may modify the set of base resources used by computing environment
corresponding to the root MRS. An MRS must implement the operations
described in the BRDS resource management interface described in
cross-referenced application "Hierarchical Resource Management for
a Computing Utility", having docket number YOR920030587PCT1. Lower
level MRSs can only generate internal requests for more capacity
that will be propagated through the hierarchy to the root MRS. Note
that an MRS for a given resource type may be a root MRS in one
computing environment but not in another.
[0098] To compose MRSs, the resource management interface is
replicated at each level, with upper level interfaces receiving and
propagating requests between BRDS and the lowest level MRSs, such
as between web server MRS 493 and web site MRS 401. Intermediate
MRSs may filter out requests when appropriate. For example, web
site MRS 401 may choose to respond to a resource request from a
lower level MRS by reconfiguring existing resources instead of
requesting resources from the BRDS. The reasoning behind this
structure is that a high level MRS can make more intelligent
decisions based on knowledge of the entire composite including
interdependencies between the requesting sub resource and other
resources.
[0099] Third party workload management systems, such as eWLM which
is described in an application entitled "SYSTEM AND METHOD FOR
ADAPTIVE ADMISSION CONTROL AND RESOURCE MANAGEMENT FOR SERVICE TIME
GUARANTEES", having docket number YOR920020201US1, can also be
represented in the PMRS structure as shown in FIG. 15. Two
computing environments 1501 and 1503 employ resources such as
servers 1505, and workload management software 1507 to manage
workload over the servers. The workload management software is
configured and build into the composite resource for the computing
environment by the PRS part of PMRS 1509. The MRS part of PMRS 1509
functions as an adapter capable of interacting with the workload
management software. This adapter layer interprets its state and
requests more resources if necessary from BRDS 219.
Internal Structure of MRS
[0100] The functionality and operational interface provided by an
MRS is resource specific. A wide variety of functions are possible.
In general, all of the functions contained within an MRS are
associated with the management of a resource which includes
configuration, operation, and maintenance. For example, an MRS may
be capable of monitoring, which includes gathering events or other
metrics from other sources in the system, applying some function
such as smoothing or aggregation, and generating metrics events
that describe the operational state of the resource. A generic
interface may be provided to indicate which metrics or events are
produced and consumed by an MRS. The metrics collected within an
MRS may be reported to another part of the system such as a billing
system or another MRS. Another type of functionality is
configuration, and generic operations may be provided to get and
set configuration parameters, and to change the state of a resource
to optimize its behavior. A third type of functionality provides
self-managing capabilities by receiving metrics or events that
describe the state of the managed resource and determining what
action to take, if any, to keep the resource operating at the
required level (e.g., as specified in an SLA). There are
essentially two types of operations that can be initiated in this
way: changing the operational state of the resource by
reconfiguring it or its sub-resources using the appropriate
configuration operations, and changing the capacity of a resource
or sub-resource. Changing the configuration of a sub-resource can
be done through its MRS. Changing capacity of resources is a more
involved process. An increase in capacity could be requested
because of failure to meet an SLA or because of some projected
future load modification. Either the requested new resources would
have to be specified on the request or an analysis would have to be
done to determine where the bottleneck is and what resources (or
configurations) would be required to alleviate the bottleneck. Once
this is done a realizer service is used to obtain a shopping list
of basic resources, and requests are sent to the BRDS to obtain the
resources. Once the resources are obtained, the builder is invoked
with the resource handles. A decrease in capacity could also be
caused by an SLA and would not require a realization step because
existing resources would be returned.
Process and Methodology to Incorporate New Resources or
Services
[0101] One of the benefits of the invention is the ability of the
apparatus to cope with a dynamic system in which new resource types
and services are introduced. FIG. 16 shows a process to be followed
when a new base resource is introduced. The process begins in step
1601 with a determination of whether or not the resource to be
introduced is a base resource. If the resource is a base resource,
flow passes to step 1613, where a BRLS for the new base resource
type needs to be provided. The BRLS is then activated in step 1615,
and updated in step 1617 with the information on available resource
instances through the BRLSs administrative interfaces (see
cross-referenced application YOR920030587PCT1). Next in step 1619 a
PRS implementation must be provided for the new resource. The new
PRS is activated in step 1621, as there must be a single PRS for
every resource type in the system. In step 1623, an MRS
implementation must be provided for the new resource. Finally in
step 1611, the logic of any component that wishes to leverage the
new resource needs to be updated. It is this step that allows
preexisting services to take advantage of the newly defined
resource. The circumstances which a new resource is incorporated
into preexisting services, and the extent to which this
incorporation is automated, can be a matter of service provider or
installation policy. Examples of components that need to be updated
are PRSs and MRSs of composite resources that can now realize the
resource they represent using the new base resource. For example,
introducing a new type of machine (such as an xSeries server), a
Web server PRS may need to be updated to offer realizations which
includes also the possibility of using the new machine type. In
particular, both the realizer function of a PRS and the build
function may need to be updated. No changes are necessary in other
parts of the system.
[0102] For a composite resource, the process continues with step
1603, modeling the composite resource's possible structures; list
of sub resources, how are they interrelated and in particular how
they are configured to work together. The result is step 1605, an
implementation of a realizer and builder functions in a PRS for the
new composite resource that uses existing resources' PRSs as part
of its logic to realize and build the composite resource. In step
1607 the new PRS is activated. Next in step 1609, an MRS
implementation is provided for the new composite resource that uses
existing sub resources' MRSs as part of its logic to manage the
composite resource. The process completes with updating existing
higher level composite resources where necessary to take advantage
of the new composite resource in step 1611. For example, a Web site
composite resource may be updated to take advantage of a new Secure
Web server composite resource (assuming that previously only simple
Web server composite resource was available).
[0103] The process to incorporate and support a new service type is
similar to the one for composite resources as services are modeled
as composite resources. These processes enable a service provider
or other agent involved with the operation of the computing utility
to increase the services offered to customers. Note that the
implementer of the new services may be distinct from the service
provider or operator of the computing utility; new implementations
of resources may be provided as packaged upgrades to the service
provider, who then installs them to add new resources. A service
provider in this context could represent entities either external
or internal to a customer or customer's organization. An example of
the latter is an IT department within a company. Other steps that
may be necessary for a service beyond what is needed for an
internally used composite resource, such as publishing the service
to the public, are beyond the scope of this invention.
Use Cases
[0104] Two use cases are shown in the Figures to illustrate the
componentized operation of provisioned and managed resources. The
first use case, in FIG. 17, shows a computing environment
consisting of a set of servers. The set is modeled as a composite
resource for which a PRS 1701 and an MRS 1703 exist. The MRS 1703
is the designated root MRS for the computing environment. Each
individual server is modeled as a resource, with PRS 1705. There
are three servers in the set, as exemplified by MRS 1707. Server
set MRS receives monitoring data 1709 that indicates that the
capacity of the group should be increased. MRS 1703 decides to add
a server. It issues realize request 1713 to server PRS 1705 to
obtain a resource list B and plan to build another server. Only B
is shown in the figure. It then issues a resource request 1715 to
the BRDS 219 to obtain the resources. In this case there are no
advance reservations; the BRDS returns resource handles. MRS 1703
then invokes the builder of server PRS 1705 via request 1719 with
the resource handles. A new server MRS 1721 is instantiated. Upon
completion of the build request, MRS 1703 may update its state with
the new server's resource handle and additionally perform any
configuration needed to add the new server to the set.
[0105] The second use case, in FIG. 18, shows a more complex
resource structure in the form of a capacity increase for a Web
site. The root MRS is the web site MRS 401. Again, monitoring data
1803 arrives at the root MRS that indicates that the capacity of
the Web site must be increased. MRS 401 decides to add a Web
server. It issues a realize request 1807 to the Web server PRS 503.
The Web server MRS in turn invokes the realize operation 1811 of
the server PRS 507. The list of base resources is obtained and a
request 1815 is issued to BRDS 219 as in the previous use case. The
resource handles are returned and passed to the builders of the
component resources via build requests 1819 and 1821. The server
and Web server builders instantiate MRSs 1825 and 1827 to represent
the new server and Web server instances, respectively. Finally, the
root MRS 401 configures the new server via configure request 1831
to the load balancer through its MRS 405 to include the new server
as part of the Web site.
[0106] Thus, the present invention includes a method for
provisioning one or more computing environment in a computing
utility, said method comprising: employing a description of each of
the one or more computing environment, the description directing an
invocation of a first service which performs the provisioning, the
description being a composite resource definition; and invoking the
first service to perform the provisioning.
[0107] In some embodiments of the method, the step of obtaining a
plan, or realization, is repeated when there are changes in the
description of the computing environment, changes in the set of
base or composite resource types, or any combination of these
changes.
[0108] In some embodiments of the method, the steps of selecting a
plan and requesting the resources associated with it are repeated
when there are changes in the selection criteria, resource
availability, resource reservation status, changes in plans, or any
combination of these changes.
[0109] In further embodiments of the present invention, the mapping
of provisioning resource services and managed resource services to
resource types and instances may vary based on considerations such
as performance, availability, and security. For example, multiple
provisioning resource services may be used to supply instances of a
resource type for better performance. A single provisioning
resource service that accepts the type as input may be used for
provisioning all resource types. A single managed resource service
may manage all instances of a resource type. Alternatively, if
isolation is required between components of different computing
environments, a single managed resource service may manage multiple
instances of a resource type within a computing environment.
Further, the partitioning of provisioning and managed resource
services into two components can also vary. For example, they can
be realized as a single service or a collection of services.
Finally, provisioning resource services and managed resource
services may themselves be realized as single services or
collections of services. For example, the builder and realizer
functions of the provisioning resource service could be
instantiated as separate services. Those skilled in the art will
realize that many such variations are possible, and that these
embodiments are merely illustrative and not restrictive of the
invention.
[0110] The invention also includes an apparatus comprising a set of
provisioning resource services that transform a description of a
computing environment into a plan for constructing a set of
resources to provide the computing environment, where the computing
environment is represented as a composite resource definition. In
some embodiments of the apparatus, the set of provisioning resource
services is to construct the resources into the computing
environment according to the plan, and the one or more provisioning
resource service to make available a managed resource service to
manage the computing environment.
[0111] The invention also includes a method that obtains a
description of a computing environment, wherein the description is
represented as a composite resource definition, and transforms a
description of a computing environment into a plan for constructing
a set of resources to provide the computing environment. In some
embodiments of the method, it also constructs the resources into
the computing environment according to the plan, and makes
available a managed resource service to manage the computing
environment.
[0112] Variations described for the present invention can be
realized in any combination desirable for each particular
application. Thus particular limitations, and/or embodiment
enhancements described herein, which may have particular advantages
to a particular application need not be used for all applications.
Also, not all limitations need be implemented in methods, systems
and/or apparatus including one or more concepts of the present
invention.
[0113] The present invention can be realized in hardware, software,
or a combination of hardware and software. A visualization tool
according to the present invention can be realized in a centralized
fashion in one computer system, or in a distributed fashion where
different elements are spread across several interconnected
computer systems. Any kind of computer system--or other apparatus
adapted for carrying out the methods and/or functions described
herein--is suitable. A typical combination of hardware and software
could be a general purpose computer system with a computer program
that, when being loaded and executed, controls the computer system
such that it carries out the methods described herein. The present
invention can also be embedded in a computer program product, which
comprises all the features enabling the implementation of the
methods described herein, and which--when loaded in a computer
system--is able to carry out these methods.
[0114] Computer program means or computer program in the present
context include any expression, in any language, code or notation,
of a set of instructions intended to cause a system having an
information processing capability to perform a particular function
either directly or after conversion to another language, code or
notation, and/or reproduction in a different material form.
[0115] Thus the invention includes an article of manufacture which
comprises a computer usable medium having computer readable program
code means embodied therein for causing a function described above.
The computer readable program code means in the article of
manufacture comprises computer readable program code means for
causing a computer to effect the steps of a method of this
invention. Similarly, the present invention may be implemented as a
computer program product comprising a computer usable medium having
computer readable program code means embodied therein for causing a
function described above. The computer readable program code means
in the computer program product comprising computer readable
program code means for causing a computer to effect one or more
functions of this invention. Furthermore, the present invention may
be implemented as a program storage device readable by machine,
tangibly embodying a program of instructions executable by the
machine to perform method steps for causing one or more functions
of this invention.
[0116] It is noted that the foregoing has outlined some of the more
pertinent objects and embodiments of the present invention. This
invention may be used for many applications. Thus, although the
description is made for particular arrangements and methods, the
intent and concept of the invention is suitable and applicable to
other arrangements and applications. It will be clear to those
skilled in the art that modifications to the disclosed embodiments
can be effected without departing from the spirit and scope of the
invention. The described embodiments ought to be construed to be
merely illustrative of some of the more prominent features and
applications of the invention. Other beneficial results can be
realized by applying the disclosed invention in a different manner
or modifying the invention in ways known to those familiar with the
art.
* * * * *