U.S. patent application number 10/720951 was filed with the patent office on 2004-06-03 for construction system for manufactured housing units.
Invention is credited to Don, Lawrence C., Lissiak, Victor.
Application Number | 20040103596 10/720951 |
Document ID | / |
Family ID | 26966601 |
Filed Date | 2004-06-03 |
United States Patent
Application |
20040103596 |
Kind Code |
A1 |
Don, Lawrence C. ; et
al. |
June 3, 2004 |
Construction system for manufactured housing units
Abstract
The present invention relates to a new type of module in which
the floor of the module is integral with the ceiling placement upon
the module below it. This invention also provides utilization of
temperature top protection a module during shipment. This invention
also relates to a construction method where the stabilizing
structure for the building including stairs and hallways
constructed first, and the module are constructed therein.
Inventors: |
Don, Lawrence C.;
(Alpharetta, GA) ; Lissiak, Victor; (Dallas,
TX) |
Correspondence
Address: |
TROUTMAN SANDERS LLP
BANK OF AMERICA PLAZA, SUITE 5200
600 PEACHTREE STREET , NE
ATLANTA
GA
30308-2216
US
|
Family ID: |
26966601 |
Appl. No.: |
10/720951 |
Filed: |
November 24, 2003 |
Related U.S. Patent Documents
|
|
|
|
|
|
Application
Number |
Filing Date |
Patent Number |
|
|
10720951 |
Nov 24, 2003 |
|
|
|
09946101 |
Sep 4, 2001 |
|
|
|
6651393 |
|
|
|
|
60291147 |
May 15, 2001 |
|
|
|
Current U.S.
Class: |
52/79.1 ; 52/144;
52/234 |
Current CPC
Class: |
E04B 2001/34892
20130101; E04B 1/3483 20130101 |
Class at
Publication: |
052/079.1 ;
052/144; 052/234 |
International
Class: |
E04H 001/00; E04B
001/82 |
Claims
What is claimed is:
1. In a construction system for a structure, the structure being
formed of manufactured units, an improvement to the construction
system comprising: manufactured units that are approximately at
least majority-finished at a site distant the building site of the
structure, the approximately at least majority-finished
manufactured units assembled together to form the structure at the
building site; and a floor/ceiling assembly locatable between
vertically adjacent units, the floor/ceiling assembly incorporating
a sound attenuation member.
2. The construction system of claim 1, wherein the floor/ceiling
assembly comprises: structural members with top and bottom flanges
wherein the sound attenuation member in communication with the
bottom flanges; a floor in communication with the top flanges; and
a ceiling in communication with either or both of the top flanges
and the sound attenuation member.
3. The construction system of claim 1, wherein the floor/ceiling
assembly comprises: a balcony portion that is open to the
environment upon construction of the structure; and an
interconnection system enabling the connection of units at the
building site, which interconnection assembly does not
significantly inhibit the finishing of the units at a site distant
the building site of the structure.
4. The construction system of claim 3, the interconnection system
being a non-welding connection means.
5. The construction system of claim 1 further comprising a
stabilization assembly erected at the building site, the
stabilization assembly providing a stable construction assembly to
which the units can be attached during construction of the
structure.
6. In a construction system for a structure, the structure being
formed of manufactured units, an improvement to the construction
system comprising: manufactured units that are approximately at
least majority-finished at a site distant the building site of the
structure, the approximately at least majority-finished
manufactured units assembled together to form the structure at the
building site; and a load-bearing assembly for a unit, the
load-bearing assembly to transfer at least a majority of the loads
of the structure, thus freeing the walls of the units from such
load transfer, enabling the walls of the units to be approximately
at least majority-finished distant from the building site of the
structure.
7. The construction system of claim 6, the load-bearing assembly
comprising: load-bearing members; and connection subassemblies to
connect the load-bearing members of two adjacent units.
8. The construction system of claim 7, the load-bearing members
being at least approximately vertical members and the connection
subassemblies connecting the at least approximately vertical
members of two vertically adjacent units.
9. The construction system of claim 8, the vertical members of the
load-bearing assembly being of unitary size.
10. The construction system of claim 6 further comprising a
stabilization assembly erected at the building site, the
stabilization assembly providing a stable construction assembly to
which the units can be attached during construction of the
structure.
11. In a construction system for a structure, the structure being
formed of manufactured units, an improvement to the construction
system comprising: manufactured units that are approximately at
least majority-finished at a site distant the building site of the
structure, the approximately at least majority-finished
manufactured units assembled together to form the structure at the
building site; and a temporary roof assembly to protect the
approximately at least majority-finished unit during transit to the
building site, the temporary roof assembly removable from the unit
prior to completion of the structure.
12. The construction system of claim 11, the temporary roof
assembly including a lifting assembly by which the unit can be
lifted and placed during construction of the structure; the
temporary roof assembly maintaining the structural integrity of the
unit during the stressful lifting process at the building site, and
providing rigidity to the unit during transit in order offset the
stresses of racking and shearing during such transport.
13. The construction system of claim 11 further comprising a
load-bearing assembly for a unit, the load-bearing assembly to
transfer at least a majority of the loads of the structure, thus
freeing the walls of the units from such load transfer, enabling
the walls of the units to be approximately at least
majority-finished distant from the building site of the structure;
the temporary roof assembly being attached to the load-bearing
assembly adding strength and rigidity to the units during transit
to the building site.
14. The construction system of claim 11 further comprising a
stabilization assembly erected at the building site, the
stabilization assembly providing a stable construction assembly to
which the units can be attached during construction of the
structure.
Description
RELATED US APPLICATION DATA
[0001] This application claims priority from U.S. application Ser.
No. 09/946,101 filed 4 Sep. 2001, now U.S. Pat. No. 6,651,393,
which claims priority from U.S. Provisional Application No.
60/291,147 filed 15 May 2001, both incorporated herein by
reference.
BACKGROUND OF THE INVENTION
[0002] 1. Field of the Invention
[0003] The present invention relates generally to the modular
construction industry, and relates more specifically to a
construction system for manufactured housing units, which units can
form multi-story structures at a building site.
[0004] 2. Description of Related Art
[0005] The conventional building construction art for years has
recognized the cost and efficiency advantages of having
construction in most part completed at the manufacturing plant, as
opposed to significant construction on-site. "Manufactured housing"
as used herein means a virtually complete and finished housing
unit, wherein a significant portion of the construction of the unit
is completed at the manufacturing plant. In current construction
techniques, manufactured housing includes, for example, mobile
homes that are built in most part at the factory. The interior
partitions, doors, fixtures, equipment, windows, among others, are
installed in the mobile home before it leaves the plant.
Manufactured housing thus is not meant to include simply modular
core constructions with little to no finishing that are shipped to
a construction site for finishing and integration into a building
structure.
[0006] Manufactured housing fills a tremendous need for affordable,
single-family housing in rural areas of the country. In fact,
manufactured housing accounts for approximately one-third of the
total housing starts over the last several years.
[0007] Specific advantages and limitations of prior art building
construction techniques follows. A first set of points outlines
many advantages of manufactured housing, vis--vis on-site
construction. Conversely, a second set of points illustrates
construction applications where on-site construction is preferred
over manufactured housing techniques. Typically, a building
structure comprises only one of these two types of construction
techniques; they are often mutually exclusive. For example,
multi-story structures comprises almost exclusively of on-site
construction elements. While it is undisputed that costs would be
lower and construction efficiencies increased if multi-story
structures could comprise in significant portions manufactured
housing, the current state of the manufactured housing art does not
enable such construction.
[0008] Thus, a third set of points are discussed that particularly
identify the current limitations and roadblocks of utilizing
manufactured housing units in a multi-story structure, as opposed
to simply cornering manufactured housing techniques for only
single-story modular structures. It is the specific prior art
deficiencies of this third set that the present invention primarily
addresses and overcomes, such that multi-story structures can
indeed comprise in significant portions manufactured housing.
[0009] A. Benefits of Manufactured Housing
[0010] Manufactured housing as embodied in, for example, the
present manufacture of mobile homes offers several advantages over
site-built housing construction. In the factory environment:
[0011] Construction can occur year round, regardless of the
weather.
[0012] Production in the factory with the use of jigs and assembly
line techniques leads to a more uniform product under quality
control supervision.
[0013] Assembly line efficiencies enable one man to do more than
one task.
[0014] Completion time for construction is reduced.
[0015] Typical factory wages are substantially less than field
wages.
[0016] Units are almost fully pre-finished in the factory, so that
interior partitions, doors, fixtures, equipment and windows, among
others, are installed in the units at the factory.
[0017] Site setup requirements are reduced since the modules are
shipped with most of siding, roofing and interior finishes
complete.
[0018] It is clear from the above non-inclusive list of advantages
that generally the more construction carried out at the
manufacturing floor, the better. Yet, present manufactured housing
has its limitations.
[0019] B. Benefits of On-Site Construction
[0020] Site-built construction conventionally is preferred over
manufactured housing for multi-story structures. Several reasons
for this include:
[0021] Flexibility in design without being restricted to the use of
"rectangular" rooms or sections.
[0022] Compliance with current building and life-safety codes that
typically require the use of materials such as concrete and steel
that are stronger and less flammable than wood, and thus more
expensive and time consuming to ship to the site as complete.
[0023] The perception that manufactured housing as it relates to
multi-story structures is simply "stack-a-shack" construction.
[0024] C. Limitations of Manufactured Housing with Multi-Story
Structures
[0025] It is known only in some very specific and limited
applications to use manufactured housing elements in a multi-story
structure. Yet only a very few of the advantages attributable to
manufactured housing reside in these limited applications:
[0026] Each manufactured housing unit is typically built with a
separate floor and ceiling. Thus, when stacking units one atop
another at the site, the floor on an upper unit is set upon the
ceiling of a lower unit. This results in a redundant doubling of
the number of structural joist members. This is unlike conventional
on-site construction that uses the same joist members for both the
upper floor and the lower ceiling between two modules.
[0027] According to most building and life-safety codes, it is
prohibited from building wood structures over three stories in
height. For a building to have more than three stories, steel or
concrete structural members typically must be used. This additional
building height requires supporting structural members in a
diversity of sizes. For example, the lower floors typically require
wider vertical members with varying spacing. Concerns about the
weight, shear, and wind loads as more floors are added put even
greater emphasis on the positioning of the exterior load bearing
walls, thus reducing the flexibility in floor plan design.
[0028] The use of concrete for a manufactured housing unit's walls
and floors necessitates time-consuming form preparation with more
complicated handling considerations. Typically, the units are
smaller, thus requiring several units per floor in a building. This
increases transportation costs along with the need for more
material per floor.
[0029] Steel is easier than concrete to use in a manufacturing
plant. The art is well developed in the use of steel for building
multi-story structures. However, the typical assembly techniques
utilizing steel have limited the amount of the manufactured housing
unit's interior and exterior finish that can be completed in the
factory. For example, the art has heretofore relied heavily on
welding to connect most of the structural steel elements that are
required in a multi-story building. Welding units together on-site
is very cumbersome and can generate heat and sparks that can easily
damage any factory-constructed interior or exterior finish that is
near the joint to be welded. Thus, truly finished manufactured
housing units cannot be used in such building techniques.
[0030] A major portion of the construction of a modular-built,
multi-level structure still is completed at the site. Most of the
exterior finish is not completed until the manufactured housing
units are set because of the access required by men and machine to
attach the units together, both horizontally and vertically, which
access would destroy a factory-constructed exterior finish.
[0031] Multi-story modular buildings are typically erected by first
setting the manufactured housing units in place both horizontally
and vertically, and then building and attaching connecting
breezeways, corridors and stairs. This progression of setting the
units first (prior to breezeways, corridors and stairs) creates its
own four distinct problems.
[0032] (1) The more units that are used (especially the higher the
units are stacked), the more difficult it is to keep each
subsequently higher unit level and plumb.
[0033] (2) For buildings exceeding two floors, it is very difficult
to maneuver each unit into place at the site. Although a crane can
come close to setting a module fairly accurately on top of another
module, it typically requires construction workers around the
perimeter of the module to pull, push and adjust the alignment of
the upper module, which can further compromise the exterior finish
of a unit.
[0034] (3) Beyond two stories, it becomes very difficult just to
get workers to the necessary exterior surfaces to attach the units
to each other.
[0035] (4) Because the connecting corridors and stairs are erected
after the units are set, the exterior sides of the modules that
abut the halls and stairs can not be finished in the plant because
of the potential for damage as the stairs and corridors are built
on site, thus necessitating more on-site construction.
[0036] These problems effectively negate the savings and
efficiencies realized with construction in a manufacturing
plant.
[0037] Prior Art References
[0038] Several designs for floor/ceiling units are disclosed
representatively in U.S. Pat. Nos. 1,886,962, 3,510,997, 3,724,141,
4,211,043 and 5,575,119. Each of these designs are basically hybrid
panelized construction methods; that is, the floor of an upper unit
functions as the ceiling for a lower unit just as conventional
on-site construction builds multi-story structures. One can go to
any construction site where a multi-floor complex is being built
and watch as one floor is built over another over another. Yet, in
such prior art designs, the floors and ceilings of the manufactured
housing units are not substantially finished at the factory, but
on-site. Thus, these conventional panel assemblies still require
extensive finishing at the site, including wall and ceiling
finishes, floor coverings and installation of cabinets and
fixtures. Further, a majority of these panels are built from
concrete, a very difficult material to use for mass production.
[0039] Conceptually, a major portion of U.S. Pat. No. 4,202,339 to
Fisher addresses the prior art problems of the redundancy of
materials in a floor/ceiling combination. Fisher addresses the
redundancy of materials by proposing the use of "U-shaped" and
"Tubular" modules that are to be stacked. Theoretically, where a
"U-shaped" module is stacked upon another "U-shaped" module, the
horizontal portion of the upper "U" acts as a ceiling for the lower
"U".
[0040] However, because the modules are presumably shipped to the
site on standard flatbed carriers, the ceiling portion of the upper
"U" can not be finished, for example, painted or stippled, until
after the modules are erected on site. Accordingly, since the
ceiling needs to be finished at the site, the degree of factory
finishing of the walls, floors and fixtures is limited because of
the potential damage to these areas while the ceilings are being
shipped and completed. Although this proposed modular construction
method theoretically eliminates the redundancy of wall and
floor/ceiling materials, it does very little to take advantage of
the pre-finishing opportunities that factory construction
offers.
[0041] Fisher provides no details regarding the make up of the
"floor" (the horizontal section) of each "U-shaped" module.
Further, the reference is silent as to how the pre-finished
"U-shaped" module can be shipped other than "it can be braced
during transportation". Regarding the amount of factory work, or
pre-finishing, possible with this design, Fisher broadly notes that
"the modules are pre-finished as much as possible in the factory;
exactly how much depends upon the specific manufacturer". Lastly,
Fisher is similarly limited when it comes to the types of
pre-finishing that can be completed at the factory as the
"tube-shaped module 34 is pre-finished with a textured surface or
other desired surface to form the ceiling for the room beneath",
yet provides no specific examples on how this could be done. For
example, how could such a pre-finished surface be shipped without
sustaining damage during shipping? How could such a pre-finished
surface be erected at site without sustaining damage while being
placed into the proper alignment?
[0042] It thus can be seen that a need yet exists for a
floor/ceiling assembly that avoids the redundancy of materials for
prior art floors and ceilings of stacked units, and enables
finishing of the assembly at the plant, rather than on-site.
[0043] The success of manufactured housing construction also is
limited in view of the prior art deficiencies in providing adequate
load-bearing systems that can accommodate the load pressures of
stacked units. Typically, the walls of the unit must be
significantly thick so as to bear the weight of the structure, or
obtrusive exterior or interior load-bearing pillars must be used in
connection with panels of the module. Yet, significantly thick
walls on manufactured housing units would lead to soaring
transportation costs, while load-bearing pillars are unsightly.
[0044] Prior art references disclose the use of vertical steel
tubing in combination with the units to provide the load-bearing
capacity. U.S. Pat. Nos. 3,925,679 and 4,592,175 disclose tubing
assemblies that primarily act as reinforcing agents in the walls of
the unit. U.S. Pat. Nos. 3,927,498 and 5,755,062 disclose building
techniques wherein the tubes basically are used as framework to
which wall and floor panels are attached. U.S. Pat. No. 4,470,227
makes use of angle iron only as temporary exterior bracing.
[0045] U.S. Pat. Nos. 4,723,381 and 5,528,866 propose the use of
exposed vertical structural steel members for the exterior support
of the assemblies. Yet such a method of construction is contrary to
manufactured housing as the proposed external supports lack the
practical considerations of aesthetics, exposure to the elements,
and code restrictions.
[0046] It thus can be seen that a need yet exists for a
load-bearing assembly that can accommodate the load pressures of
stacked units, thus freeing the exterior walls from a majority of
this support.
[0047] Present interconnection techniques between adjacent modules
utilize welding. Welding is used to connect most of the structural
steel elements that are required in a multi-story building. Yet,
welding is very cumbersome and generates heat and sparks that can
easily damage any finish that is near the joint to be welded,
nearly eliminating the capability of using fully-finished modular
units in a multi-story structure. U.S. Pat. No. 3,927,498
illustrates the prefabricated panels being fastened to the vertical
support tubes with bolts, but the bolts are exposed to the interior
of the structure. Further, the bolts can not act as assembly guides
because they are not fixed in position, nor are they used for the
purpose of interconnecting independent structures.
[0048] U.S. Pat. No. 4,592,175 also discloses the use of bolts to
connect the stacked modules both horizontally and vertically. The
connection of one unit on top of another is accomplished by
aligning pre-drilled holes in the base channel for the top unit to
the holes in the rear plate on the bottom unit. Horizontally, "side
plates" with pre-drilled holes are welded to the floor channels
that are bolted together as the channels abut. These connections
are made from the exterior of the module. The connections then need
to be covered (hidden) by applying "any desired facade" at the
site.
[0049] U.S. Pat. No. 5,761,862 relates to the construction of
buildings using "pre-formed concrete sections". This is basically a
panelized system using concrete sections. The walls, floors and
roofs are slabs that are put together at the site. There are
primarily two types of connections. One is a vertical connection
for two wall sections, and the other is a rod placed into holes
that align the walls vertically on top of each other. None of the
surfaces are pre-finished, and as with any panel system, no
fixtures are pre-installed.
[0050] It thus can be seen that a need yet exists for an
interconnection assembly to connect the units at the site, which
interconnection assembly does not inhibit the pre-finishing of all
of the interior and exterior walls.
[0051] There exists prior art attempting to overcome the
disadvantages associated with multi-story modular construction,
wherein the modules are first set in place both horizontally and
vertically, and then connecting breezeways, corridors and stairs
are built around them. This progression of setting the modules
first presents stabilization problems. U.S. Pat. No. 3,830,026
relates to a staircase that is "fabricated only from a relatively
small number of pre-cast or pre-formed substantially planar slabs
and a plurality of pre-formed stairways having risers and treads".
U.S. Pat. No. 3,927,518 discloses prefabricated stairs for
multi-story buildings. Neither of these references teach or suggest
a complete core assembly that includes the stairs in addition to,
for example, the hallways, utility rooms and elevator shafts. An
additional limitation of the above staircases is that the
construction of the main building will still require the use of
some scaffolding and ladders, wherein a complete core assembly
could eliminate such expense and time.
[0052] Therefore, it can be seen that a need yet exists for a
stabilization assembly that provides a way to effect the erection
of the units without damaging the pre-finished units. It can
further be seen that a need certainly exists for a manufactured
housing unit construction system capable of providing solutions to
the above-identified problems of conventional multi-story modular
construction. It is to such a construction system that the present
invention is primarily directed.
SUMMARY OF INVENTION
[0053] Briefly described, in its preferred form, the present
invention provides interrelated embodiments of a construction
system for a multi-story structure comprising manufactured housing
units that enables the finishing and completion of considerably
more of the housing unit at the manufacturing plant (as opposed to
on-site construction) than is presently available. A housing unit
may refer to a permanent housing structure such as condominiums and
apartments, and more temporary housing like motels and hotels.
[0054] The present invention discloses construction techniques for
"manufactured housing units" so as to distinguish the present
"units" from the rather broad term "modules" as used in the art.
"Module" is used in the art to denote any standardized unit of
measurement, and thus open to numerous interpretations. For
example, the present manufactured housing units are distinguishable
from "modular utility core units" that are well known and have been
used in hybrid site construction for years. The manufactured
housing units of the present invention are finished and habitable
units, and not simply blocks made up of panels. The present units
as described are preferably units of residential housing used in
connection with, among others, apartments, condominiums, student
housing, assisted care residences, motels and hotels.
[0055] The present construction system comprises a floor/ceiling
assembly, which floor/ceiling assembly avoids the redundancy of
materials for prior art floors and ceilings of stacked modules by
providing a ceiling membrane made from gypsum, for example,
attached to the floor joists of a unit in the plant. Another
distinction between the present floor/ceiling assembly and the
prior art attempts at such assemblies is the extent that the prior
art units must be finished on-site versus completion in the
factory. Further, the floor/ceiling assembly can be constructed out
of building materials that are familiar to a typical manufacturer,
in the case of present modular housing, the use of steel and gypsum
board. The present floor/ceiling assembly concurrently required the
development of a way to be able to finish the underside of the
floor/ceiling assembly, while still being able to ship it and erect
it at the site without damage to the very finishing completed at
the factory.
[0056] The floor/ceiling assembly additionally comprises an
interconnection assembly to connect the units at the site, which
interconnection assembly does not inhibit the pre-finishing of the
interior and exterior walls. The floor/ceiling assemblies are
interconnected at the site at only strategic interior locations,
without the use of welding. This allows the exterior walls to be
almost completely finished in the plant rather than at the site.
Furthermore, the use of the temporary top assembly as a lifting
frame eliminates the need for the conventional steel bands around
the exterior shell. These prior art steel bands inhibit the
finishing of the exterior walls in the plant since the steel bands
tend to dig into and distort any finish in which they come in
contact.
[0057] The present invention further provides a load-bearing
assembly that can accommodate the load pressures of stacked units,
thus freeing the exterior walls from this support. The present
load-bearing assembly is unlike the prior art as it incorporates
tubes that are the supporting structural element themselves, with
no involvement of the walls. Engineered vertical steel tubes
(pipes), preferably all of one size, are strategically placed
around the perimeter of the floor/ceiling system. These tubes
provide the bearing strength for loads that result from the
stacking of the units. Accordingly, all interior and exterior walls
are non-load bearing walls. This allows for the units' walls to be
located wherever they are of most use based solely on the
aesthetics and functionality of the desired floor plans.
[0058] The present invention further comprises a removable and
reusable temporary roof for the protection of the interior of the
virtually completely finished manufactured housing unit as it is
without a permanent ceiling. The roof is attached to a unit at the
same connection points that are used for the vertical connection of
the units atop each other at the site. Lifting eyes can be attached
to the roof allowing the roof to be used effectively as a lifting
device in lieu of other conventional banding or frame techniques.
The roof maintains the structural integrity of the unit during the
stressful lifting process. This top is temporarily attached to the
unit in such a way as to add rigidity to the unit during transit in
order offset the stresses of racking and shearing.
[0059] The present further comprises a permanent roof assembly for
those modules that will make up the top floor of the structure.
[0060] Further, the present construction system comprises a
stabilization assembly. The stabilization assembly provides a way
to effect the erection of the units without damaging the
pre-finished units. A free standing, self-supporting hallway/stair
assembly can be built at the site before the units are erected. The
present multi-story stabilization assembly solves the four problems
identified above with the progression of setting the units first,
without any stabilizing structure.
[0061] (1) Since the stabilization assembly is in place with its
supporting structural members already leveled and plumbed, the
stabilization assembly acts as an effective guide to which the
units are attached
[0062] (2) Workers can stand on the stabilization assembly to be in
a position to maneuver the units into alignment with each
other.
[0063] (3) The connections required to attach the units together
can be accomplished primarily from the interior of the units.
Access to the interiors of the units is facilitated by the walkways
as they are already in place at each level. The units that abut the
stabilization assembly can be attached directly to the
stabilization assembly, such attachments enhancing the stability
and strength of the units.
[0064] (4) Since walkways and stairs have been built prior to the
erection of the units, a greater majority of the exterior surfaces
of the units that abut the stabilization assembly can be finished
in the plant.
[0065] The present construction system can be used during the
construction of but a single story structure, but provides numerous
efficiencies and benefits when utilized with multi-story
structures, more specifically with the construction of structures
of at least three stories. This preference of structure stories
will be understood by those of skill in the art upon review of the
drawings and detailed description.
[0066] Further, while the manufactured housing units of the present
invention can be built of conventional materials, the present
construction system provides numerous efficiencies and benefits
when utilized with units that comprise a majority of non-wood
and/or non-cement infrastructure, wherein wood and/or cement make
up a majority of the infrastructure of conventional units. For
example, in a preferred embodiment of the present invention, the
manufactured housing units comprise a mainly steel infrastructure.
This preference of the material make up of the units will be
understood by those of skill in the art upon review of the drawings
and detailed description.
[0067] One of the benefits of the present system is the ability to
"pre-finish" more of the unit at the manufacturing plant. While it
is understandably difficult to label the present invention as
enabling the finishing and completion of considerably more of the
housing unit at the manufacturing plant (as opposed to on-site
construction) than is presently available, the Applicants believe
that the line (of how much more finishing can be completed with the
present invention than allowable in the present art). In another
attempt to define the abilities of the present invention, the
present construction system enables approximately a majority of the
unit to be pre-finished at the manufacturing plant, which is not
possible in current building techniques save for mobile home
construction. The approximately a majority of pre-finishing is
preferably related to the amount of exterior finishing of the unit,
but can also relate to the amount of interior finishing of the
unit, or both combined. This preference of the amount of
pre-finishing will be understood by those of skill in the art upon
review of the drawings and detailed description.
[0068] It is an object of the present invention to overcome the
problems of traditional modular construction wherein each modular
unit is built with a separate floor and ceiling.
[0069] It is a further object of this invention to build
manufactured housing units that are capable of stacking one upon
another, wherein the floor of an upper unit can be hooked with the
ceiling of a complementary lower unit.
[0070] Another object of the present invention is to develop
manufactured housing units that can be stacked at least three
stories high.
[0071] It is a further object of the present construction system to
overcome the problem of traditional modular construction wherein
the lower floors of a multi-story structure require vastly wider
vertical members with varying spacing to support the upper floors.
Concern about the weight, shear, and wind loads as more floors are
added puts greater emphasis on the positioning of the exterior load
bearing walls, thus reducing the flexibility in floor plan
design.
[0072] An object of this invention is to utilize steel in the
construction of housing units that are to be stacked over three
stores in height, the steel capable of minimizing the amount of
welding that is necessary to tie units together.
[0073] Yet another object of the present invention to maximize the
amount of housing unit construction at the plant, instead of
on-site. Presently, most of the exterior finish is not completed
until the modules are set at the site because of the typical access
required at the site to attach the modules together, both
horizontally and vertically. With steel modular construction, this
accessibility is even more essential since structural steel members
are typically welded together.
[0074] Another object of the present invention is to provide a free
standing, self-supporting hallway/stair (stabilization assembly)
built at the site before the units are erected that would solve the
problem of instability in present modular structures being, for
example, more than three stories in height.
[0075] Yet another object of the present invention is to develop a
construction system for manufactured housing units wherein the
corridors and stairs are erected before the units are set.
[0076] These and other objects, features and advantages of the
present invention will become more apparent upon reading the
following specification in conjunction with the accompanying
drawing figures.
BRIEF DESCRIPTION OF THE DRAWINGS
[0077] FIG. 1 illustrates a building according to the preferred
embodiment of the present construction system.
[0078] FIG. 2 illustrates the floor plan of a one-bedroom unit for
the building of FIG. 1.
[0079] FIG. 3 illustrates a building plan for a floor in the
building of FIG. 1.
[0080] FIG. 4 illustrates a preferred embodiment of the present
floor/ceiling assembly of the present invention.
[0081] FIG. 5 illustrates a plan view of the structural members of
one embodiment of the floor/ceiling assembly of the present
invention.
[0082] FIG. 6 illustrates a plan view of the structural members of
the floor/ceiling assembly of FIG. 5 including a balcony.
[0083] FIG. 7 illustrates the structural details of a section of
the balcony of FIG. 6.
[0084] FIG. 8 illustrates the structural details of another section
of the balcony of FIG. 6.
[0085] FIG. 9 illustrates the interconnection assembly of the
present invention being a channel to channel connection of two
floor/ceiling assemblies.
[0086] FIG. 10 illustrates the details of one embodiment of the
load-bearing assembly of the present invention, and its attachment
to the structural framing of the floor/ceiling assembly as part of
one module.
[0087] FIG. 11 illustrates the details of a load-bearing assembly
that is part of a lower floor module, and its connection to the
structural framing of the floor/ceiling assembly that is part of an
upper floor module.
[0088] FIG. 12 illustrates a plan view of a load-bearing assembly
that is attached to a corner of the structural framing of a
floor/ceiling assembly.
[0089] FIG. 13 illustrates a plan view of a columnar tube that is
part of the load-bearing assembly from FIG. 12 in relation to
adjacent pre-finished walls of a module.
[0090] FIG. 14 illustrates load-bearing assemblies and the
structural framing for the floor/ceiling assembly of a "wet"
module.
[0091] FIG. 15 illustrates the use of load-bearing assemblies and
the structural framing of a floor/ceiling assembly of a "dry"
module.
[0092] FIG. 16 illustrates the positioning of load-bearing
assemblies and the structural framing of the floor/ceiling
assemblies when modules are connected to each other at the
site.
[0093] FIG. 17 illustrates the positioning of load-bearing
assemblies and the structural framing of the floor/ceiling
assemblies when a module for an upper floor unit is placed onto a
module that is part of a lower floor unit.
[0094] FIG. 18 illustrates the framing of the interior and exterior
walls of modules with relation to the load-bearing assemblies and
the structural framing of the floor/ceiling assemblies.
[0095] FIG. 19 illustrates a plan view of the structural components
of a temporary lifting-transportation roof assembly according to a
preferred embodiment of the present invention.
[0096] FIG. 20 illustrates a section of a temporary
lifting-transportation roof assembly where an interior joist is
attached to a perimeter joist.
[0097] FIG. 21 illustrates a section of a temporary
lifting-transportation roof assembly where it is attached to a
load-bearing assembly that is part of a pre-finished module.
[0098] FIG. 22 illustrates a section of a temporary
lifting-transportation roof assembly having an eyebolt
attached.
[0099] FIG. 23 illustrates the use of a temporary
lifting-transportation roof assembly during the placement of an
upper module onto a lower module.
[0100] FIG. 24 illustrates a section of pre-finished permanent roof
assemblies that are attached to separate top-floor modules in the
factory.
[0101] FIG. 25 illustrates sectional details of a pre-finished
permanent roof assembly for a top-floor module.
[0102] FIG. 26 illustrates sectional details of a pre-finished
permanent roof assembly for a top-floor module.
[0103] FIG. 27 illustrates sectional details of the structural
components of a pre-finished roof assembly for a top-floor
module.
[0104] FIG. 28 illustrates one embodiment of the stabilization
assembly of the present invention.
[0105] FIG. 29 illustrates the structural details in a plan view of
a corridor that is part of stabilization assembly as shown on the
building floor plan in FIG. 3.
[0106] FIG. 30 illustrates structural components for the
moment-resistant framing that is part of stabilization
assembly.
[0107] FIG. 31 illustrates sectional details of a floor/ceiling
assembly for a corridor.
[0108] FIG. 32 illustrates the attachment of a module to a
stabilization assembly.
[0109] FIG. 33 illustrates sectional details where a pre-finished
exterior wall is attached to a floor/ceiling assembly.
[0110] FIG. 34 illustrates sectional details where a pre-finished
exterior wall of lower floor module is attached to the
floor/ceiling assembly of a pre-finished upper floor module.
[0111] FIG. 35 illustrates sectional details of a pre-finished
exterior and railing walls where they are attached to a
floor/ceiling assembly at a balcony.
[0112] FIG. 36 illustrates the placement of several apartment
modules on the stabilization assembly of FIG. 28.
[0113] FIG. 37 illustrates a section of a building showing a
relationship of the stabilization assembly of FIG. 28 to attached
pre-finished modules.
DETAILED DESCRIPTION OF A PREFERRED EMBODIMENT
[0114] Referring now in detail to the drawing figures, wherein like
reference numerals represent like parts throughout the several
views, FIG. 1 illustrates a preferred embodiment of a building 210
built according to the present construction system for manufactured
housing units. As will be described in detail, the present
construction system for manufactured housing units comprises a
floor/ceiling assembly 10, a load-bearing assembly 60, a temporary
lifting/transportation roof assembly 80, a permanent roof assembly
140, and a stabilization assembly 170.
[0115] The exemplary building 210 of FIG. 1 is a 4-story apartment
structure made up of 96 one and two-bedroom residential units. Each
apartment itself comprises two modular units that are assembled and
pre-finished in a factory distantly located from the construction
site. The 192 modules (making up the 96 units) are shipped to the
site where they can be lifted by crane and set at an appropriate
location to create building 210. After the generic stucco exterior
walls 212 and the generic membrane roof 214 have been finished at
the mating lines of the modules, apartment building 210 will look
similar to any traditionally "stick-built" structure. To further
enhance the marketability of building 210, the apartments have been
set over a secure parking deck 216. As used herein, an upper floor
module 218 is so-called as it is atop a lower floor module 220 in
building 210. It will be understood that distinctions between
modules 218 and 220 are relative, as a once described upper floor
module 218 may in a second reference be identified as a lower floor
module 220 to yet a third module.
[0116] A typical one-bedroom apartment 230 of the building 210 is
illustrated in FIG. 2 comprising two modules, a "wet" module 222
and a "dry" module 224. As used herein, a "wet" module 222 is so
designated because it contains the plumbing lines and fixtures, and
accordingly, the "dry" module 224 contains no plumbing lines or
fixtures. The one-bedroom apartment 230 floor plan shown in FIG. 2
representatively features a kitchen 232, laundry room 234, bathroom
236, closets 238, living and dining areas 240, bedroom 242, and
exterior balcony 244.
[0117] The modules 222, 224 are preferably approximately a majority
pre-finished, approximately at least a majority-finished, in the
manufacturing factory distant the eventual building site. This
majority-finishing preferably includes the finishing of both sides
of the interior and exterior walls, the floors and the ceilings.
Further, the plumbing and electrical lines preferably are
pre-installed at the factory with terminations at a mechanical
chase 246 for inter-floor connection at the site. In addition, the
HVAC ducting can pre-installed with connections to the built-in air
handler. Likewise, many, if not most, of the cabinets, fixtures,
appliances, doors and windows can pre-installed at the factory.
[0118] A typical building floor plan for building 210 is
illustrated in FIG. 3. The "wet" modules 222 are placed against and
attached directly to the stabilization assembly 170 of the present
invention. The "dry" modules 224 are then placed against and
attached to the previously set "wet" modules 222. On this
particular floor of building 210, various components of the
stabilization assembly 170 are shown, including corridors 172,
corridor landings 174, and stairs 176. Also shown as part of this
building are two elevators 178.
[0119] Under this general backdrop, the several elements of the
present construction system will be described, and then a
discussion of the construction of building 210 will follow.
[0120] I. Floor/Ceiling Assembly
[0121] The present construction system for manufactured housing
units preferably comprises a floor/ceiling assembly 10, which
floor/ceiling assembly 10 reduces, if not avoids, the redundancy of
materials necessary in the construction of conventional floors and
ceilings of stacked units. The floor/ceiling assembly 10 is
designed to limit the duplication of costly structural members that
traditionally occurs with modular construction, as each modular
unit typically is built with a separate floor and ceiling.
[0122] The addition of a ceiling in the factory provides a weather
barrier during transit so that the interior of the module can be
pre-finished. The ceiling also provides structural stability during
the transport of the module from the factory to the erection site.
Both the "stick-built" and modular construction methods for a
multi-floor building require substantial floor joists to
accommodate the various live and dead loads. Modular construction
requires even greater joist strengths because the spans are
typically long (12 to 16 feet wide modules) and, thus, the floor
must provide extra rigidity during transit. Similar ceiling spans
also require stronger and more costly joists. Because of the
additional strength requirements of the joists, the use of a
separate floor and ceiling in modular construction can cost over
twice as much as the single floor/ceiling combination that is used
in "stick-built" construction.
[0123] The present invention successfully transforms the idea of
the single floor/ceiling combination that is used in "stick-built"
construction to the realm of manufactured housing. As more
particularly shown in FIG. 4, the floor/ceiling assembly 10 of the
present construction system preferably comprises perimeter members
12 in combination with interior members 14, a floor 16, sound
attenuation members 18 and ceiling 20. It will be understood that
the present floor/ceiling assemblies 10 of an upper unit 218 will
also be the ceiling for a lower unit 220. The floor/ceiling
assemblies 10 can further comprise a balcony portion 28 having a
layer 38 of water-resistant material and a waterproofing membrane
system 40 applied to the floor 16. Additionally, the floor/ceiling
assemblies 10 can comprise an interconnection system 50 to join two
floor/ceiling assemblies 10 that are part of two adjacent modules,
together.
[0124] FIG. 5 illustrates a plan view for the framing of the
floor/ceiling assembly 10 of FIG. 4 for a "wet" module 222. The
perimeter members 12 can be perimeter joists 12, and the interior
members 14 can be interior joists 14, each of sufficient size and
design. For example, the perimeter joists 12 can be C15x33.9
structural steel channels, and the interior joists 14 can be 12"-16
ga steel channels. The interior joists 14 commonly are located
24"o.c. Joists 12, 14 can comprise any suitable material, but are
described as formed of steel because most codes at the present time
require steel's use in buildings over three stories in height.
Except where specifically noted herein, the steel fabrication
(splices, connections, etc.) is constructed in accordance with
established techniques familiar to those active in this art.
[0125] The location of the floor/ceiling assembly 10 of FIG. 4 is
identified in sectional view 22 in FIG. 5. The top flange of the
interior joist 14 can be coped so that the surfaces of the flanges
on both joists 12 and 14 when joined are on the same plane. Joist
14 is shown attached to joists 12 at 90 degree angles using 16 ga
clip fasteners 24. A wood floor 16 can be fastened in accordance
with applicable codes to the top flanges of the steel joists 12,
14. In one embodiment, the floor 16 is formed of 3/4" T&G
plywood screwed and glued to the top flanges of the steel
joists.
[0126] Sound attenuation members 18 aid with sound attenuation
vertically between the modules, and can be resilient channels 18
screwed to the bottom flanges of the interior joists 14. The
ceiling 20 can comprise any suitable material, for example, sheets
of 5/8" gypsum (type, number or layers and thickness of each
depending on code), which sheets are screwed to the resilient
channels 18. The gypsum ceiling 20 can be pre-finished in the
factory with tape, mud, and paint. In one embodiment, the ceiling
20 can be cut to terminate approximately 4" from the web of the
perimeter joists 12 to allow access for making the inter-module
connections.
[0127] The finished face of the ceiling 20 preferably is recessed
above the bottom flange of the perimeter joists 12. Besides
facilitating access to the inter-module connection points, both
horizontally and vertically, recessing the ceiling 20 allows the
placement at the factory of a temporary and disposable covering
(not shown) over the finished surface of the ceiling to protect it
during transit to the construction site. Also not shown in FIG. 4
are the pipes, ducts, insulation, wiring, carpet, pad, etc. that
can be parts of the pre-finished floor/ceiling assembly 10 when it
leaves the factory.
[0128] There are some variations between the floor/ceiling
assemblies 10 used in connection with, on the one hand wet modules
222, and on the other hand dry modules 224. For example, the
mechanical chase 246 in wet module 222 is identified in FIG. 5. For
additional strength, two heavier 12"-12 ga steel channels 26 are on
each side of the area adjacent to mechanical chase 246.
[0129] FIG. 6 illustrates a plan view for the framing of the
floor/ceiling assembly 10 for dry module 224. As with the framing
for module 222 as illustrated in FIG. 5, the perimeter joists 12
are C15x33.9 structural steel channels and the interior joists 14
are 12"-16 ga steel channels. Yet, the floor/ceiling assembly 10
for module 224 further comprises a balcony portion 28. Because the
balcony portion 28 of floor/ceiling assembly 10 will be open to the
environment upon construction of the module, this balcony portion
28 of the floor/ceiling assembly 10 should be weatherproofed and
sloped so that any water can be drained. For additional strength at
balcony portion 28, two heavier C12x20.7 structural steel channels
30 can be used on each side of the balcony portion.
[0130] Sectional view 32 of balcony portion 28 is identified on
FIG. 6, wherein FIG. 7 illustrates the details and components of
the floor/ceiling assembly 10 at sectional view 32. As shown, one
interior joist 14 has been replaced with the heavier channel 30.
For the portion of the floor/ceiling assembly 10 that remains part
of the interior of module 224, floor 16, resilient channels 18 and
ceiling 20 have been attached and the assembly 10 has been
pre-finished as detailed in FIG. 4. Balcony joists 36 can be
utilized and, for example, can be 4"-16 ga steel channels set at
12"o.c. Where the balcony joists 36 are attached to the interior
joists 14, the top flanges of the balcony joists 36 can be set
about one inch below the top flanges of the interior joists. The
balcony joists 36 can be set so that there is a downward slope from
the sides and back of the balcony to its center and front. Floor 16
is attached to the balcony joists 36 by, for example, gluing and
screwing to the top flanges of the balcony joists 36. Preferably, a
layer(s) 38 of water-resistant gypsum (number of layers and
thickness of each layer as specified by the appropriate code) is
screwed directly to the bottom flanges of balcony joists 36.
Additionally, a membrane system 40, preferably a waterproofing
system, is applied to the top of floor 16 in accordance with the
specific manufacturer's instructions.
[0131] Sectional view 34 of balcony portion 28 is also identified
on FIG. 6, wherein FIG. 8 illustrates the details and components of
the floor/ceiling assembly 10 at sectional view 34. The materials
and components in this sectional view 34 are similar to those
described for sectional view 32. Yet in this detail, fasteners 24,
for example, 16 ga clip fasteners 24, are used to attach the
balcony joists 36 to both the interior joist 14 and the perimeter
joist 12. Here also the balcony joists 36 are set so that there is
a downward slope from the sides and back of the balcony to its
center and front. A section of 11/2" PVC pipe 42 can be inserted
through an upper web portion of the perimeter joist 12 to drain
water from the balcony.
[0132] Interconnection system 50 of the floor/ceiling assemblies 10
enables the connection of units at the construction site, which
interconnection assembly 50 does not inhibit the pre-finishing of
the interior and exterior walls. FIG. 9 illustrates the
interconnection system 50 comprising a horizontal connection
between two floor/ceiling assemblies 10 that are part of two
adjacent modules. An example of a location for the interconnection
system 50 is shown as sectional view 52 in FIG. 6. Slots 54 can be
48"o.c. and are provided along the base of the webs on the
perimeter joists 12 that are part of the floor/ceiling assemblies
10. When two modules are placed next to each other, the slots 54
are aligned and connected using, for example, 1/2" bolts 56 to
connect the opposing channels. The recessed ceilings of the
floor/ceiling assemblies 10 allow access to the slots for the bolt
connections without penetrating the pre-finished ceiling. The areas
around the bolts 56 and along the bottom flange of the perimeter
joists 12 are subsequently finished on the site with gypsum ceiling
20, molding 58 and paint.
[0133] Among other advantages, the present floor/ceiling assembly
10 enables module connection systems to be employed other than that
of traditional welding. The floor/ceiling assembly 10 overcomes the
need to weld the modules together at the site. If the modules had
to be welded to each other, the sparks and molten material
generated from the welding process would extensively damage a
considerable amount of the desired pre-finish on the interior and
exterior wall surfaces. The design of floor/ceiling assembly 10
allows for inter-module connections at the site without the need
for welding.
[0134] II. Load-Bearing Assembly
[0135] The present invention can further comprise a load-bearing
assembly 60 to transfer a majority, if not all, of the loads from
the roof of the top floor to the foundation of building 210. Each
module preferably has a number of load-bearing assemblies 60
attached to the perimeter joists 12 at specifically engineered
locations. When any upper floor module 218 is "stacked" on to any
lower floor module 220, the weight of the upper floor module is
supported by the load-bearing assemblies 60. The use of these
load-bearing assemblies 60, or sometimes referred to as vertical
support assemblies 60, opens up the possibilities for varying the
design of the modules since few to none of the walls of any module,
neither the interior walls nor the exterior walls, are secondarily,
if at all, load-bearing. Since none of the walls bear significant
loads, every wall can be uniformly constructed at the factory
without concern about varying the sizes, groupings, and spacing of
the studs. And because the load-bearing assemblies 60 are designed
to fit within the wall cavities, virtually all of the interior and
exterior surfaces of a module's walls can be pre-finished in the
factory. This pre-finishing is further made possible because the
vertical support assemblies 60 are connected vertically from one
module to another without the need for welding. When the modules
are also connected to the stabilization assembly 170 of the present
invention, the load-bearing assemblies 60 enable modules to be
stacked up to at least seven stories in height.
[0136] The vertical support assembly 60 comprises vertical member
62, vertical member cap 64 and connection subassemblies 70, as
shown in FIG. 10. Vertical member 62 can be a variety of geometries
and strengths to carry the described load, as, for example, a
3.times.3.times.0.25 steel column 62. A column cap 64 of, for
example, 1/4" thick steel, can be welded to one end of a steel
column 62. The connection subassemblies 70 can include
3/4".times.2" long threaded studs 72 that can be welded to cap 64,
holes 74 bored into the bottom flange of perimeter joist 12, and
nuts 76. At specific locations, the end of steel column 62 opposite
the end having the cap 64 can be attached in the factory, for
example by way of welding or the use of bolts, to the top flange of
a perimeter joist 12 that is part of a floor/ceiling assembly 10.
Where steel column 62 is attached to perimeter joist 12, web
stiffeners 66 can be used and welded to the joist. The centers of
holes 74 are positioned to match the locations of the centers of
the threaded studs 72 that are part of the above load-bearing
assembly 60.
[0137] When an upper floor module 218 is to be stacked on to a
lower floor module 220, the vertical support assemblies 60 from
each of these modules align vertically. As illustrated in FIG. 11,
when module 218 is set onto module 220, the threaded studs 72 that
are part of a load-bearing assembly 60 on module 220 are inserted
into the holes 74 that are part of floor/ceiling assembly 10 on
module 218. Nuts 76 are then tightened onto the studs 72.
[0138] FIG. 12 illustrates a plan view of vertical support assembly
60 where two perimeter joists 12 intersect at an exterior corner of
a module. Shown are the relative positions of steel column 62 and
web stiffeners 66. At this particular location, cap plate 64 is
L-shaped, the exterior dimension of each leg of cap plate 64 being
6-3/4" with an interior dimension of 35/8", and the plate being
35/8" wide. The threaded studs 72 are centered 11/2" from the ends
of the legs and 13/8" from the inside of the legs of cap plate
64.
[0139] As previously mentioned, the entire load-bearing assembly 60
can be encapsulated within the walls of a module as illustrated in
FIG. 13. The exterior walls for building 210 are typically
constructed using, for example, 35/8"-20 ga metal studs 162, 5/8"
type X gypsum wall sheathing 164, and 31/2" batt insulation 166,
among other materials. Shown is the steel column 62 positioned at
an exterior corner of a module as detailed in FIG. 12. The wall
sheathing 164 completely surrounds and hides the parts of vertical
support assembly 60, including column 62. Thus all of the surfaces
of the interior and exterior walls can be pre-finished in the
factory.
[0140] The one-bedroom apartment floor plan illustrated in FIG. 2
indicates locations for the load-bearing assemblies 60 for modules
222 and 224, according to one embodiment of the present system.
FIGS. 14 and 15 isolate these vertical support assemblies 60 and
the structural framing from the floor/ceiling assemblies 10 in
perspective views for modules 222 and 224, respectively. Locations
for the mechanical chase 246 and the balcony 244 also are
shown.
[0141] FIG. 16 provides a perspective view of the relative
positions of the assemblies from FIGS. 14 and 15 when module 224 is
attached to module 222. The typical channel to channel location of
the interconnection system 50 (sectional view 52) between two
floor/ceiling assemblies 10 is illustrated in FIG. 9. FIG. 17
illustrates the relative positions of the assemblies when a module
222 is "stacked" onto a module 222 from FIG. 14 that is already in
place. Sectional view 68 indicates the location of the connection
between a load-bearing assembly 60 and a floor/ceiling assembly 10
illustrated in detail in FIG. 11.
[0142] FIG. 18 illustrates the framing of the interior and exterior
walls of modules 222 and 224 with relation to the vertical support
assemblies 60 and the structural framing of the floor/ceiling
assemblies 10 as shown in FIG. 16. The wall framing of FIG. 18
further illustrates top tracks 78, bottom tracks 204 and studs 162
of the metal wall framing. Note that all of the assemblies and
walls are actually enclosed as part of the pre-finished modules
when brought to the site from the factory.
[0143] III. Temporary Lifting-Transportation Roof Assembly
[0144] The present invention can further comprise a temporary roof
assembly 80 incorporating perimeter members 82 in combination with
a plurality of interior members 84, and a roof 86.
[0145] As previously mentioned, with typical modular construction
there is a substantial duplication of materials by having a
separate floor and ceiling for each module. The elimination of this
duplication has been achieved in part by using the floor/ceiling
assembly 10. Yet, without the attachment of the separate ceiling, a
need arises to protect the pre-finished module from the elements
during transit from the factory to the site, and during the
erection stage wherein the modules are lifted into position in the
building 210.
[0146] One of the functions of the present temporary roof assembly
80 is to temporarily cover and protect the pre-finished module. The
temporary roof assembly 80 further beneficially limits construction
site material waste. After the roof assembly 80 has been used as a
temporary protection for a module being transported and removal
from the module at the site, the entire temporary roof assembly 80
can be shipped back to the factory for reuse on another module.
[0147] The temporary lifting-transportation roof assembly 80
somewhat structurally resembles the present floor/ceiling assembly
10. FIG. 19 illustrates a plan view of the temporary roof assembly
80, wherein the outside dimensions of the assembly 80 are similar
if not identical to those of the floor/ceiling assembly 10 on the
module that is to be covered. Perimeter joists 82 can be C10x15.3
steel structural channels, and the interior joists 84 can be 6"-18
ga steel channels set at 2'-0"o.c. Roof deck 86 shown in FIG. 20
preferably covers the steel frame, and the temporary unit can be
made watertight by fastening on to temporary assembly 80 the same
generic membrane roof 214 that is used for the permanent surface of
the roof on building 210, shown in FIG. 1.
[0148] FIG. 20 illustrates details of the sectional view 88 (see
FIG. 19) of temporary assembly 80 where an interior joist 84 is
attached to a perimeter joist 82 using 16 ga clip fasteners 24. As
with the floor/ceiling assembly 10, the flange of interior joist 84
is coped so that the top of the flange is at the same plane as the
top of the flange on perimeter joist 82. Preferably, the
waterproofing membrane 214 extends six inches below the point where
the membrane 214 is fastened to the bottom of the face of perimeter
joist 82. This six inch extension provides a temporary covering
over the exposed joint where the top of the module meets the
temporary roof assembly 80.
[0149] A method of attaching the temporary lifting-transportation
roof assembly 80 to the pre-finished module contributes to a second
function of the temporary roof assembly 80. The temporary roof
assembly 80 is attached directly to the load-bearing assemblies 60
of the pre-finished module. This temporary attachment thus adds
strength and rigidity to the pre-finished module during transit
from the factory to the erection site. This temporary assembly 80
further assures the continued stability of the vertical support
assemblies 60 because the spacing between the attachment points of
the temporary roof assembly 80 is similar, if not identical, to the
spacing between the attachment points of the module that is to be
set upon this current module.
[0150] FIG. 21 illustrates details of the sectional view 90 (see
FIG. 19) of the temporary roof assembly 80 where it is attached to
a load-bearing assembly 60. One way to attach the temporary roof
assembly 80 with the vertical support assembly 60 is to bore slots
92 into the bottom flange of the perimeter channel 82. These holes
92 match the same location of the holes 74 that were previously
bored into the perimeter channel 12 that is part of the
floor/ceiling assembly 10 on which the illustrated load-bearing
assembly 60 has been attached (see FIG. 11). When the temporary
roof assembly 80 is placed upon the pre-finished module, the
threaded studs 72 that are part of vertical support assembly 60 are
inserted into the holes 92. Nuts 76 are then only finger-tightened
onto the studs 72.
[0151] Yet a third function of the temporary lifting-transportation
roof assembly 80 is to provide a method by which the pre-finished
module can be lifted by a crane and placed onto the stabilization
assembly 170 at the construction site. The lifting feature of the
temporary roof assembly 80 can also be used within the factory when
the module has to be raised or moved as part of the assembly and
pre-finishing process. FIG. 22 illustrates details of the sectional
view 94 (see FIG. 19) of the temporary lifting-transportation roof
assembly 80 at the location of an eyebolt 96. A steel channel 98 is
attached to perimeter joist 82 with a welded
4.times.4.times.1/4.times.0'-6" clip 24. The eyebolt 96 is bolted
rather than welded to the perimeter joist 82. This allows for the
removal of the eyebolt so that the temporary roof assemblies 80 can
be stacked upon each other for transport back to the factory. In a
preferred embodiment, four 1/4" eyebolts 96 with 3" inside
diameters are bolted to the top flange of a perimeter joist 82, two
on each side of the temporary roof assembly 80. The specific
locations of these eyebolts 96 along the perimeter joists 82 are
based on the weight distribution required to lift the module while
keeping it level. As shown in FIG. 19, two C6x8.2 structural steel
channels 98 can be substituted for the interior channels 84 between
the locations of two opposite lift points.
[0152] FIG. 23 illustrates a temporary lifting-transportation roof
assembly 80 that is being used to lift a module 224 at the site.
This upper module unit 218 is being placed on a lower module unit
220. Module 220 had been shipped from the factory to the site with
a temporary roof attached. It was removed when upper module 218 was
ready to be placed on top of module 220. The upper module unit 218
will be set onto module 220 so that the threaded studs 72 (not
shown) that are part of the load-bearing assemblies 60 on module
220 can be inserted into holes 74 (not shown) that are located on
the bottom flange of the perimeter joists 12 of module 218 (see
FIG. 11). A lifting frame 132 that is hung from a crane (not shown)
can come in different shapes and sizes as determined by contractors
familiar with this state of the art. Lines (chains, metal straps,
etc.) from the lifting frame are attached to the eyebolts 96 on the
temporary roof assembly 80. Note that modules 224 will actually be
delivered to the site in a pre-finished condition. It will be
understood that FIG. 23 shows only structural members to better
illustrate the inter-relationships of the various assemblies.
[0153] IV. Permanent Roof Assembly
[0154] The temporary lifting-transportation roof assembly 80 can be
used on all of the modules that make up the apartments in building
210. The permanent roof assembly 140 of FIG. 24 preferably is
attached in the factory to top floor modules, but need not be as
the permanent roof assembly 140 can be shipped to the construction
site and then arranged on a module. This permanent roof assembly
140 has some of the same functions as the temporary roof assembly
80; it covers and protects the pre-finished module, it adds
rigidity and strength to the module, and it serves as a lifting
platform during erection at the site. The difference is that this
roof assembly is made to stay permanently in place as part of
building 210. The generic roof membrane system 214 is attached to
each module. The open gaps between the roof membranes on each
module are sealed at the site. Individual manufacturers specify the
methods for sealing their product, but typically the sealing occurs
by heat welding together overlapping membrane flaps. The structural
framing for the individual permanent roof assemblies 140 is sloped
to provide drainage for water. The use of the permanent roof
assemblies 140 with the protective roofing material 214 already
attached once again eliminates a tremendous amount of site work
compared to the typical stick-built construction.
[0155] FIG. 24 illustrates a section of two top floor modules 222
and 224 that have been set in place against stabilization assembly
170. The permanent roof assemblies 140 have been attached to the
vertical support assemblies 60 in the plant by inserting the
threaded studs 72 into the holes 74 that have been bored into the
perimeter joists 142. The eyebolts 96 will be removed and the
residual holes will be sealed. Since building 210 eliminates its
roof rainwater through interior drains that are part of
stabilization assembly 170, a consistent slope from the front face
of building 210 to the center core must be maintained.
[0156] FIG. 25 illustrates details of the sectional view 144 (see
FIG. 24) of the permanent roof assembly 140 that is attached to top
floor module 222. The construction of permanent roof assembly 140
in sectional view 144 is similar to floor/ceiling assembly 10. In
this case, the perimeter joists 142 are C12x20.7 structural
channels. Each of the interior roof/ceiling joists is made from two
channels attached back-to-back as illustrated in FIG. 27. Each
interior roof/ceiling joist pairs an 8"-16 ga channel 146 with a
6"-16 ga channel 148. Interior joists 146 are attached as
horizontal members to perimeter joists 142 with clip fasteners 24.
Gypsum sheathing 164 is attached directly to the bottom flange of
interior joists 146; the ceiling is subsequently pre-finished.
Interior joists 148 are screwed to each joist 146 to provide a
slope of 1/4" in 12". As with the temporary roof assembly 80, four
holes are bored into the top flanges on the perimeter joists 142 to
accept the lifting bolts 96. Nuts 150 are welded to the underside
of the top flanges. After the module 222 has been attached to
stabilization assembly 170 and the other contiguous modules, the
lifting bolts 96 will be unscrewed and removed. A plywood deck 152
is attached to the top flanges of interior joists 148. The roof
membrane 214 is then attached to the roof deck 152. After the bolts
96 are removed, the four holes in the roof membrane 214 are plugged
as specified by the roofing manufacturer.
[0157] FIG. 26 illustrates details of the sectional view 154 (see
FIG. 24) of the permanent roof assembly 140 that is attached to top
floor module 224. The construction of permanent roof assembly 140
in sectional view 154 is similar to the construction of sectional
view 144 as described with reference to FIG. 25. Since the slope of
the roof from module 222 continues upward on module 224, 10"-16 ga
channels 156 are substituted in sectional view 154 for the 6"-16 ga
channels 148 that are used in sectional view 144. The roof/ceiling
joists 156 are attached to joists 146 so that a continuous roof
pitch of 1/4" in 12" is maintained across both sections of modules
222 and 224 (refer to FIG. 24). The outer ends of joists 156 are
terminated at curtain wall 158. Made from metal studs 162 (FIG. 27)
that are sheathed with roof deck 152, this 8" high curtain wall 158
is attached to the top flange of perimeter joist 142. The roof
membrane 214 extends over and around the curtain wall sealing the
stucco finish 212 in accordance with the manufacturers'
specifications.
[0158] FIG. 27 illustrates details of the sectional view 160 (see
FIG. 24) of the connection of joist 156 to joist 146. Pre-finished
details are likewise identified. Sectional view 160 illustrates the
continuation of curtain wall 158 along an exterior wall of module
224. As shown in FIG. 27, pre-finished roof membrane 214 extends
down to and seals pre-finished stucco 212 in accordance with
details provided by the respective material manufacturers.
[0159] V. Stabilization Assembly
[0160] The stabilization assembly 170 is yet another aid in the
ease and efficiency of the construction of building 210. Referring
back to FIG. 3, and shown in perspective view in FIG. 28, the
corridors 172, corridor landings 174, and stairs 176 erected prior
to the delivery of the pre-finished modules to the site enable the
stabilization assembly 170 to provide a stable base to which the
modules can be attached. Workmen have platforms from which to
maneuver the setting of the modules and the interconnection of the
modules, and utilities can be immediately staged for a quick
completion.
[0161] The design of the foundations and the layout of the
structural steel of the stabilization assembly 170 will vary based
on the site, size of building, etc. These variations include the
sizes and locations of the steel components that are engineered for
the stresses anticipated at each location. However, there are
several details of the stabilization assembly 170 that facilitate
its use with modules. FIG. 29 illustrates a plan view of the
typical corridor framing that is part of the building 210. To
minimize the number of beams that are exposed in the finished
corridor 172, a moment-resistant framework is used for the support
structure. The horizontal members 180 of the moment resistant
framework (sectional view 182 in FIG. 30) are hidden from view by a
corridor ceiling that is finished after the modules have been set.
The attachment of open-web steel joists 184 to the beam frames 180
(sectional view 186 in FIG. 31) provides the additional structural
support required for the concrete corridor floors that are
pre-finished prior to the arrival of the modules. Each of the
modules 222 is attached to the framework of stabilization assembly
170 as shown in sectional view 188 in FIG. 32.
[0162] The moment-resistant framework detail is illustrated in FIG.
30. Preferably, W8x24 beams are used for columns 190 and W10x12
beams are used for the horizontal support members 180. Beam to
column flange connections and beam to column web connections are
made using techniques familiar to those in this field of
construction.
[0163] FIG. 32 illustrates sectional details where two modules 222
are attached to the stabilization assembly 170 at the location
identified by sectional view 188 in FIG. 29. At this section, a
W10x12 beam 180 and an open-web 14K3 joist 192 are shown running
lengthwise along the corridor. A 9.times.2.times.3/8" steel angle
194 is welded to the outside half of the top flange of beam 180.
{fraction (9/16)}" permanent metal form 196 spans between two
parallel beams 180. The metal form 196 and the angel 194 form a 2"
pan into which concrete 198 is poured. After reinforcing, the
concrete 198 becomes the floor of corridor 172. All of this occurs
before the modules are shipped from the factory.
[0164] In sectional view 188 of FIG. 32, module 220 has already
been set in place. The corridor pre-finished wall 200 that is part
of module 220 is shown. Module 218, with its pre-finished
floor/ceiling assembly 10 and its corridor pre-finished wall 200,
is then attached to module 220 making use of the load-bearing
assemblies 60 (not shown). Perimeter joist 12 that is part of
floor/ceiling assembly 10 is then welded to angle 194. Site trim is
then completed which includes the attachment of the corridor
ceiling 202.
[0165] Open-web 14K3 steel joists 192 are used to span between the
beams that make up the framework of the stability assembly 170 as
illustrated in FIG. 31. In sectional view 186 in FIG. 31, the
open-web joists 192 are attached to a W10x12 beam 180. Reinforced
2" concrete 198 covers {fraction (9/16)}" permanent metal forms 196
that are attached to the top chord of the open-web joists 192. The
finished ceiling 202 is shown below the corridor framing.
[0166] VI. Pre-Finishing Modules
[0167] FIG. 33 is a section illustrating the attachment in the
factory of an exterior wall of a module to a pre-finished
floor/ceiling assembly 10 (as detailed in FIG. 4). The wall is
framed using 35/8"-20 ga metal studs 162 16"o.c. The bottom track
204 of the metal wall framing is screwed to the floor 16 that is
part of the pre-finished floor/ceiling assembly. The interior
surface of this wall is covered with 5/8" type X gypsum 164 (see
FIG. 13) that is glued and screwed to the wall framing. After the
interior gypsum 164 is finished, paint, wallpaper, or paneling is
applied over the gypsum at the factory. The exterior surface of
this wall also is covered with 5/8" type X gypsum 164 or the like.
After the exterior gypsum is finished, the generic stucco system
212 is applied over the gypsum and pre-finished in the factory.
Note that the exterior gypsum and stucco are extended to cover the
face of the of the perimeter joist 12 that is part of the
floor/ceiling assembly 10. Not shown in this illustration are the
insulation, wiring, windows, etc. that are parts of the
pre-finished exterior walls.
[0168] FIG. 34 illustrates a vertical connection between an upper
module 218 and a lower module 220 at a section where there is no
vertical support assembly 60. The pre-finished floor/ceiling
assembly and exterior wall as detailed in FIG. 33 that are a
pre-finished section of module 218 are shown after having been
placed over the exterior wall that is a pre-finished section of
module 220. The height of the pre-finished wall is 3/8" shorter
than the top of the cap plate 64 on the load-bearing assembly 60.
Accordingly, when the bottom flange of perimeter joist 12 is set on
top of cap plate 64 (see FIG. 11), the 3/8"+/- gap occurs as shown.
At the site, this gap is filled with a fire rated caulk. The
longitudinal gap between the inner pre-finished gypsum on the
exterior wall of module 220 and the pre-finished ceiling 20 of
floor/ceiling assembly 10 of module 218 is sealed with an
application of 5/8" type X gypsum. This added length of gypsum is
then covered with a decorative trim 58. The exterior of the gap is
sealed in accordance with the instructions of the manufacturer of
the stucco cement system 212. At certain locations an exterior trim
252 may also be applied.
[0169] FIG. 35 illustrates a typical finish at the connection of an
upper module 218 and a lower module 220 at sectional view 34 (see
FIGS. 6 and 8) of exterior balcony 244. The vertical wall shown as
part of module 218 was attached and finished at the factory. The
wall includes studs 162, gypsum 164, and insulation (not shown). At
this location, a cement wallboard 206 that provides more durability
during frequent physical contact is used for the exterior surface
of the wall. This wallboard 206 was also pre-finished at the
factory. Likewise railings 208 were added to the module at the
factory to complete the balcony 244. The connection between the
pre-finished ceiling in module 218 and the wall of module 220 is
finished at the site as described for FIG. 34. After the short
horizontal header wall that is part of the balcony 244 on module
220 is attached to the perimeter joist 12 that is part of module
218, the interior web of the perimeter joist is fireproofed and
also covered with a crown molding 58.
[0170] VII. Construction of Building 210.
[0171] The construction of building 210 begins with the erection of
the stabilization assembly 170 as illustrated in FIG. 28. As in
FIG. 3, shown are the main components of the stabilization
assembly, including the four corridors 172 on each floor of the
building, the four corridor landings 174 on each floor at the
corners of the building, and the two sets of stairs 176. The
structural steel framing 248 is shown as it typically appears
before the modules are placed on and attached to the stabilization
assembly 170; the configuration of the steel framing varies from
site to site. The design of the concrete foundation for the
stabilization assembly also varies from site to site based on
factors such as soil conditions, building height, building codes,
etc. In this embodiment, a parking deck 216 is incorporated that
functions both as part of the building's foundation and as a secure
place for the residents to park and gain access to their
apartments. Engineering for the design of any specific foundation
is based on techniques currently available to the art.
[0172] Erection and placement of the modules on stabilization
assembly 170 is illustrated in FIG. 36. All of the modules for the
lower floors are delivered pre-finished from the factory with
temporary lifting-transportation roof assemblies 80 attached to
each module. "Wet" modules 222 are placed on and attached to the
stabilization assembly 170 before "dry" modules 224 are set in
place. Since part of the function of the temporary roof assembly 80
is to keep the modules sealed from the weather, the temporary roof
assembly 80 typically remains attached until another module is
ready to be set on the module already placed. Then the temporary
roof assembly 80 is removed and shipped back to the factory for
re-use on the construction of another module.
[0173] FIG. 36 further illustrates a set of modules 222 and 224
wherein the vertical support assemblies 60 and the structural
framing from the floor/ceiling assemblies 10 are isolated, as this
set of modules is presented in FIG. 17.
[0174] Modules used for the top floor of building 210 do not make
use of the temporary roof assembly 80. These modules have a
permanent roof assembly 140 attached in the factory. The generic
roof membrane system 214 is pre-finished as part of the permanent
roof assemblies 140. When all of the top floor modules are in
place, the pre-finished membrane roofs 214 on the individual
modules are joined making one continuous sealed roof membrane for
the entire building.
[0175] A section of building 210 at one of the corridors 172 is
illustrated in FIG. 37. This section shows the interrelationship of
the various components of the building. Stabilization assembly 170
forms the center core of the building that at this section includes
portions of the structural steel framing 248 and the foundation
250. Eight modules 222 have been attached to the stabilization
assembly 170, four on each side. Eight modules 224 have been
attached to the exterior side of the modules 222. The use of
floor/ceiling assemblies 10 and load-bearing assemblies 60 are
shown. The permanent roof assemblies 140 are shown as part of the
top floor modules. Two areas of site work are shown, the exterior
trim molding 252 that is used as part of the seal between two
vertical modules and the crown molding 254 that is a design feature
to enhance the aesthetic attractiveness of the building.
[0176] While the invention has been disclosed in its preferred
forms, it will be apparent to those skilled in the art that many
modifications, additions, and deletions can be made therein without
departing from the spirit and scope of the invention and its
equivalents as set forth in the following claims.
* * * * *