Research |
![]() ![]() ![]() ![]() ![]() |
Serial Number | 79244683 |
Registration Number | 5911033 |
Mark Drawing Code | 4000: Illustration: Drawing with word(s)/letter(s)/number(s) in Block form |
Law Office Assigned | N40 |
Employee Name | BLAZICH, JOAN MICHELE |
2018-09-24 | Application Filed |
2019-01-04 | Location: TMO LAW OFFICE 122 |
2019-01-04 | Status: Live/Pending |
2019-01-04 | Transaction Date |
2019-09-03 | Published for Opposition |
2019-11-19 | Trademark Registered |
Owner: | ![]() |
Address | Parc d'Activités de L'Eraudière, 34 rue Eric Tabarly; F-85170 DOMPIERRE-SUR-YON XP |
Legal Entity Type | |
Legal Entity State | XP |
Click the blue "Refresh" button to load certificates, specimines, application, and other documents.
International Codes: | 6 |
U.S. Codes: | 002,012,013,014,023,025,050 |
International Codes: | 12 |
U.S. Codes: | 019,021,023,031,035,044 |
International Codes: | 14 |
U.S. Codes: | 002,027,028,050 |
International Codes: | 21 |
U.S. Codes: | 002,013,023,029,030,033,040,050 |
International Codes: | 25 |
U.S. Codes: | 022,039 |
International Codes: | 28 |
U.S. Codes: | 022,023,038,050 |
International Codes: | 37 |
U.S. Codes: | 100,103,106 |
Type Code | Type |
---|---|
GS0371 | Shipbuilding and repair services; maintenance and repair of boats and ships, including maintenance and repair of motors and engines, marine propulsion units, inboard and outboard motors, boats and ships, navigation accessories and equipment; maintenance and repair of inboard and outboard marine propulsion units and navigation equipment; construction of ports, port facilities and port berths; services of construction, repair and installation of transportable constructions; construction, installation and repair services for non-transportable constructions; information on construction; supervising (directing) construction work; construction of residential estates and leisure parks |
GS0061 | Common metals and their alloys including stainless steel; pre-fabricated single-family houses of metal; metal construction materials, namely, metal piles, fabricated metal components for building foundations, braces, supports, shores, metal staples; metal constructions, namely, floating docks of metal for mooring boats, anchors, transportable buildings; transportable metal constructions; metal building frameworks, metal toilet partitions; metal partitions for building; metal door frames, metal windows, metal doors, metal roof coverings; ironmongery and small items of metal hardware, namely, metal fasteners in the nature of marine anchors, bolts, nails, rivets, and screws; non-electric cables and wires of common metal; metal tubes and pipes; anchors and metal mooring equipment for boats and ships, namely, mooring buoys, bollards, and cables of metal; steel masts; floating metal quays for anchoring boats and ships; metal mooring parts in the nature of metal dock cleats; screw rings of metal; non-luminous metal beacons; metal swimming pools; metal mooring buoys; metal bells, metal floating docks, metal containers for storage and transport of goods, metal rope thimbles, metal ropes, metal ladders, stairs and gangways, metal mobile boarding stairs, for passengers, metal prefabricated platforms |
Description | Date | Event Coding |
---|---|---|
SN ASSIGNED FOR SECT 66A SUBSEQ DESIG FROM IB | 2018-11-01 | 1 SDRC M: |
LIMITATION FROM ORIGINAL APPLICATION ENTERED | 2018-11-05 | 2 LIMI I:Incoming Correspondence |
NEW APPLICATION OFFICE SUPPLIED DATA ENTERED IN TRAM | 2018-11-08 | 3 NWOS I:Incoming Correspondence |
APPLICATION FILING RECEIPT MAILED | 2018-11-13 | 4 MAFR O:Outgoing Correspondence |
ASSIGNED TO EXAMINER | 2019-01-04 | 5 DOCK D:Assigned to Examiner |
NON-FINAL ACTION WRITTEN | 2019-01-07 | 6 CNRT R:Renewal |
NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | 2019-01-08 | 7 RFCR E:E-Mail |
REFUSAL PROCESSED BY MPU | 2019-01-17 | 8 RFRR P: |
NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | 2019-01-17 | 9 RFCS P: |
REFUSAL PROCESSED BY IB | 2019-02-01 | 10 RFNT P: |
CORRECTION CREATED FOR IB | 2019-05-08 | 11 CRCR E:E-Mail |
CORRECTION SENT TO IB | 2019-05-08 | 12 CRSN M: |
CORRECTION TRANSACTION RECEIVED FROM IB | 2019-06-07 | 13 CRCV M: |
USPTO CORRECTION PROCESSED BY IB | 2019-06-07 | 14 RINX P: |
USPTO CORRECTION PROCESSED BY IB | 2019-06-07 | 15 RINX P: |
USPTO CORRECTION PROCESSED BY IB | 2019-06-07 | 16 RINX P: |
USPTO CORRECTION PROCESSED BY IB | 2019-06-07 | 17 RINX P: |
USPTO CORRECTION PROCESSED BY IB | 2019-06-07 | 18 RINX P: |
USPTO CORRECTION PROCESSED BY IB | 2019-06-07 | 19 RINX P: |
USPTO CORRECTION PROCESSED BY IB | 2019-06-07 | 20 RINX P: |
USPTO CORRECTION PROCESSED BY IB | 2019-06-07 | 21 RINX P: |
USPTO CORRECTION PROCESSED BY IB | 2019-06-07 | 22 RINX P: |
USPTO CORRECTION PROCESSED BY IB | 2019-06-07 | 23 RINX P: |
CORRECTION FROM IB ENTERED - ATTORNEY REVIEW REQUIRED | 2019-06-27 | 24 CREV I:Incoming Correspondence |
ATTORNEY REVIEW COMPLETED | 2019-06-27 | 25 ATRV O:Outgoing Correspondence |
TEAS RESPONSE TO OFFICE ACTION RECEIVED | 2019-07-17 | 26 TROA I:Incoming Correspondence |
CORRESPONDENCE RECEIVED IN LAW OFFICE | 2019-07-17 | 27 CRFA I:Incoming Correspondence |
TEAS/EMAIL CORRESPONDENCE ENTERED | 2019-07-17 | 28 TEME I:Incoming Correspondence |
EXAMINERS AMENDMENT -WRITTEN | 2019-07-22 | 29 CNEA R:Renewal |
EXAMINERS AMENDMENT E-MAILED | 2019-07-22 | 30 GNEA O:Outgoing Correspondence |
NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | 2019-07-22 | 31 GNEN O:Outgoing Correspondence |
EXAMINER'S AMENDMENT ENTERED | 2019-07-22 | 32 XAEC I:Incoming Correspondence |
APPROVED FOR PUB - PRINCIPAL REGISTER | 2019-07-22 | 33 CNSA O:Outgoing Correspondence |
ASSIGNED TO LIE | 2019-07-30 | 34 ALIE A:Allowance for Publication |
NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | 2019-08-14 | 35 NONP E:E-Mail |
NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | 2019-08-14 | 36 OP2R P: |
NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | 2019-08-14 | 37 OPNS P: |
NOTIFICATION PROCESSED BY IB | 2019-08-30 | 38 GPNX P: |
PUBLISHED FOR OPPOSITION | 2019-09-03 | 39 PUBO A:Allowance for Publication |
OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | 2019-09-03 | 40 NPUB E:E-Mail |
REGISTERED-PRINCIPAL REGISTER | 2019-11-19 | 41 R.PR A:Allowance for Publication |
FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | 2020-02-19 | 42 FICR P: |
FINAL DISPOSITION PROCESSED | 2020-03-11 | 43 FIMP P: |
FINAL DISPOSITION NOTICE SENT TO IB | 2020-03-11 | 44 FICS P: |
FINAL DECISION TRANSACTION PROCESSED BY IB | 2020-03-27 | 45 FINO P: |
NEW REPRESENTATIVE AT IB RECEIVED | 2022-06-19 | 46 NREP P: |
NEW REPRESENTATIVE AT IB RECEIVED | 2023-04-29 | 47 NREP P: |
uspto.report is an independent third-party trademark research tool that is not affiliated, endorsed, or sponsored by the United States Patent and Trademark Office (USPTO) or any other governmental organization. The information provided by uspto.report is based on publicly available data at the time of writing and is intended for informational purposes only.
While we strive to provide accurate and up-to-date information, we do not guarantee the accuracy, completeness, reliability, or suitability of the information displayed on this site. The use of this site is at your own risk. Any reliance you place on such information is therefore strictly at your own risk.
All official trademark data, including owner information, should be verified by visiting the official USPTO website at www.uspto.gov. This site is not intended to replace professional legal advice and should not be used as a substitute for consulting with a legal professional who is knowledgeable about trademark law.