loadpatents
name:-0.03093695640564
name:-0.018022060394287
name:-0.0053839683532715
Wu; Naiqi Patent Filings

Wu; Naiqi

Patent Applications and Registrations

Patent applications and USPTO patent grants for Wu; Naiqi.The latest application filed is for "systems and methods for reducing cpu time to compute state space of resource allocation system".

Company Profile
4.15.16
  • Wu; Naiqi - Taipa MO
  • Wu; Naiqi - Macau CN
  • Wu; Naiqi - Mo MO
*profile and listings may contain filings by different individuals or companies with the same name. Review application materials to confirm ownership/assignment.
Patent Activity
PatentDate
Cluster tool apparatus and a method of controlling a cluster tool apparatus
Grant 10,643,873 - Wu , et al.
2020-05-05
Multi cluster tool system and a method of controlling a multi tool cluster system
Grant 10,520,914 - Wu , et al. Dec
2019-12-31
Systems and methods for reducing CPU time to compute state space of resource allocation system
Grant 10,346,214 - Li , et al. July 9, 2
2019-07-09
Systems and Methods for Reducing CPU Time to Compute State Space of Resource Allocation System
App 20190018708 - LI; Zhiwu ;   et al.
2019-01-17
Cluster tool apparatus and a method of controlling a cluster tool apparatus
Grant 10,134,613 - Qiao , et al. November 20, 2
2018-11-20
System and method for determining an optimized schedule of a production line
Grant 10,101,721 - Wu , et al. October 16, 2
2018-10-16
System for controlling a power transmission system
Grant 10,103,569 - Li , et al. October 16, 2
2018-10-16
Petri net-based optimal one-wafer cyclic scheduling of treelike hybrid multi-cluster tools
Grant 10,073,444 - Wu , et al. September 11, 2
2018-09-11
System, Method, Computer Program And Data Signal For Fault Detection And Recovery Of A Network
App 20180227167 - Li; Zhiwu ;   et al.
2018-08-09
Optimal one-wafer scheduling of single-arm multi-cluster tools with tree-like topology
Grant 10,001,773 - Wu , et al. June 19, 2
2018-06-19
Optimally scheduling of close-down process for single-arm cluster tools with wafer residency time constraints
Grant 10,001,772 - Wu , et al. June 19, 2
2018-06-19
Linear programming-based approach to scheduling of crude oil operations in refinery for energy efficiency optimization
Grant 9,957,959 - Wu , et al. May 1, 2
2018-05-01
System and method for operating a follower vehicle in a vehicle platoon
Grant 9,927,816 - Li , et al. March 27, 2
2018-03-27
Cluster Tool Apparatus And A Method Of Controlling A Cluster Tool Apparatus
App 20180082878 - Qiao; Yan ;   et al.
2018-03-22
Multi Cluster Tool System And A Method Of Controlling A Multi Tool Cluster System
App 20180081336 - Wu; Naiqi ;   et al.
2018-03-22
Cluster Tool Apparatus And A Method Of Controlling A Cluster Tool Apparatus
App 20180076064 - Wu; Naiqi ;   et al.
2018-03-15
System And Method For Operating A Follower Vehicle In A Vehicle Platoon
App 20170329348 - Li; Zhiwu ;   et al.
2017-11-16
System For Controlling A Power Transmission System
App 20170279298 - Li; Zhiwu ;   et al.
2017-09-28
Multi-agent Oriented Method For Forecasting-based Control With Load Priority Of Microgrid In Island Mode
App 20170262007 - Zhiwu; Li ;   et al.
2017-09-14
Method For Implementing A New Reactive System
App 20170131700 - Li; Zhiwu ;   et al.
2017-05-11
System And Method For Determining An Optimized Schedule Of A Production Line
App 20170115651 - Wu; Naiqi ;   et al.
2017-04-27
Scheduling start-up process for time-constrained single-arm cluster tools
Grant 9,618,930 - Wu , et al. April 11, 2
2017-04-11
Petri Net-based Scheduling of Time Constrained Single-arm Cluster Tools with Wafer Revisiting
App 20170083000 - Wu; Naiqi ;   et al.
2017-03-23
Linear Programming-based Approach to Scheduling of Crude Oil Operations in Refinery for Energy Efficiency Optimization
App 20170083028 - Wu; Naiqi ;   et al.
2017-03-23
Petri Net-Based Optimal One-Wafer Cyclic Scheduling of Treelike Hybrid Multi-Cluster Tools
App 20170083009 - Wu; Naiqi ;   et al.
2017-03-23
Scheduling Start-up Process for Time-constrained Single-arm Cluster Tools
App 20170080563 - Wu; Naiqi ;   et al.
2017-03-23
Optimally Scheduling of Close-down Process for Single-arm Cluster Tools with Wafer Residency Time Constraints
App 20170083010 - Wu; Naiqi ;   et al.
2017-03-23
Optimal One-Wafer Scheduling of Single-Arm Multi-Cluster Tools with Tree-Like Topology
App 20170083008 - Wu; Naiqi ;   et al.
2017-03-23
Optimization of start-up transient processes for dual-armed cluster tools with wafer revisiting
Grant 9,333,645 - Wu , et al. May 10, 2
2016-05-10
Optimal buffer space configuration and scheduling for single-arm multi-cluster tools
Grant 9,227,318 - Bai , et al. January 5, 2
2016-01-05
Method for scheduling single-arm cluster tools with wafer revisiting and residency time constraints
Grant 9,223,307 - Wu , et al. December 29, 2
2015-12-29

uspto.report is an independent third-party trademark research tool that is not affiliated, endorsed, or sponsored by the United States Patent and Trademark Office (USPTO) or any other governmental organization. The information provided by uspto.report is based on publicly available data at the time of writing and is intended for informational purposes only.

While we strive to provide accurate and up-to-date information, we do not guarantee the accuracy, completeness, reliability, or suitability of the information displayed on this site. The use of this site is at your own risk. Any reliance you place on such information is therefore strictly at your own risk.

All official trademark data, including owner information, should be verified by visiting the official USPTO website at www.uspto.gov. This site is not intended to replace professional legal advice and should not be used as a substitute for consulting with a legal professional who is knowledgeable about trademark law.

© 2024 USPTO.report | Privacy Policy | Resources | RSS Feed of Trademarks | Trademark Filings Twitter Feed