Patent | Date |
---|
Down-hole transmitter system, method of inducing a transient electromagnetic field in an earth formation, method of obtaining a transient electromagnetic response signal, and method of producing a hydrocarbon fluid Grant 8,356,673 - Bass , et al. January 22, 2 | 2013-01-22 |
Wellbore communication, downhole module, and method for communicating Grant 8,358,220 - Savage January 22, 2 | 2013-01-22 |
System and method for measuring a time-varying magnetic field and method for production of a hydrocarbon fluid Grant 8,258,784 - Pearce , et al. September 4, 2 | 2012-09-04 |
Transmitter System, Method Of Inducing A Transient Electromagnetic Field In An Earth Formation, Method Of Obtaining A Transient Electromagnetic Response Signal, And Method Of Producing A Hydrocarbon Fluid App 20110080172 - Banning-Geertsma; Eric Jan ;   et al. | 2011-04-07 |
Down-hole Transmitter System, Method Of Inducing A Transient Electromagnetic Field In An Earth Formation, Method Of Obtaining A Transient Electromagnetic Response Signal, And Method Of Producing A Hydrocarbon Fluid App 20110036569 - Bass; Ronald Marshall ;   et al. | 2011-02-17 |
System And Method For Measuring A Time-varying Magnetic Field And Method For Production Of A Hydrocarbon Fluid App 20110006764 - Pearce; Jeremiah Glen ;   et al. | 2011-01-13 |
Wellbore Communication, Downhole Module, And Method For Communicating App 20100194584 - Savage; William Mountjoy | 2010-08-05 |
Amplifier, analogue to digital converter, methods of amplifying and of converting an analogue input signal to a digital output signal and of producing a mineral hydrocarbon fluid Grant 7,436,334 - Savage , et al. October 14, 2 | 2008-10-14 |
Controllable production well packer Grant 7,322,410 - Vinegar , et al. January 29, 2 | 2008-01-29 |
Amplifier, Analogue To Digital Converter, Methods Of Amplifying And Of Converting An Analogue Input Signal To A Digital Output Signal And Of Producing A Mineral Hydrocarbon Fluid App 20070257830 - Savage; William Mountjoy ;   et al. | 2007-11-08 |
Wireless reservoir production control Grant 7,259,688 - Hirsch , et al. August 21, 2 | 2007-08-21 |
Oil well casting electrical power pick-off points Grant 7,170,424 - Vinegar , et al. January 30, 2 | 2007-01-30 |
Use of downhole high pressure gas in a gas-lift well and associated methods Grant 7,147,059 - Hirsch , et al. December 12, 2 | 2006-12-12 |
Wireless communication using well casing Grant 7,114,561 - Vinegar , et al. October 3, 2 | 2006-10-03 |
Power generation using batteries with reconfigurable discharge Grant 7,075,454 - Hirsch , et al. July 11, 2 | 2006-07-11 |
Wireless downhole well interval inflow and injection control Grant 7,073,594 - Stegemeier , et al. July 11, 2 | 2006-07-11 |
Toroidal choke inductor for wireless communication and control Grant 7,055,592 - Bass , et al. June 6, 2 | 2006-06-06 |
Controlled downhole chemical injection Grant 6,981,553 - Stegemeier , et al. January 3, 2 | 2006-01-03 |
Permanent downhole, wireless, two-way telemetry backbone using redundant repeaters Grant 6,958,704 - Vinegar , et al. October 25, 2 | 2005-10-25 |
Electro-hydraulically pressurized downhole valve actuator and method of use Grant 6,851,481 - Vinegar , et al. February 8, 2 | 2005-02-08 |
Wireless downwhole measurement and control for optimizing gas lift well and field performance Grant 6,840,317 - Hirsch , et al. January 11, 2 | 2005-01-11 |
Tracker injection in a production well Grant 6,840,316 - Stegemeier , et al. January 11, 2 | 2005-01-11 |
Permanent downhole, wireless, two-way telemetry backbone using redundant repeaters App 20040263350 - Vinegar, Harold J. ;   et al. | 2004-12-30 |
Toroidal choke inductor for wireless communication and control App 20040144530 - Bass, Ronald Marshall ;   et al. | 2004-07-29 |
System and method for fluid flow optimization Grant 6,758,277 - Vinegar , et al. July 6, 2 | 2004-07-06 |
Toroidal choke inductor for wireless communication and control App 20040079524 - Bass, Ronald Marshall ;   et al. | 2004-04-29 |
Controllable gas-lift well and valve Grant 6,715,550 - Vinegar , et al. April 6, 2 | 2004-04-06 |
Controlled downhole chemical injection App 20040060703 - Stegemeier, George Leo ;   et al. | 2004-04-01 |
Petroleum well having downhole sensors, communication and power Grant 6,679,332 - Vinegar , et al. January 20, 2 | 2004-01-20 |
Induction choke for power distribution in piping structure Grant 6,662,875 - Bass , et al. December 16, 2 | 2003-12-16 |
Measuring focused through-casing resistivity using induction chokes and also using well casing as the formation contact electrodes Grant 6,633,164 - Vinegar , et al. October 14, 2 | 2003-10-14 |
Permanent downhole, wireless, two-way telemetry backbone using redundant repeaters Grant 6,633,236 - Vinegar , et al. October 14, 2 | 2003-10-14 |
Controllable gas-lift well and valve App 20030164240 - Vinegar, Harold J. ;   et al. | 2003-09-04 |
Oil well casing electrical power pick-off points App 20030066671 - Vinegar, Harold J. ;   et al. | 2003-04-10 |
Wireless downhole well interval inflow and injection control App 20030066652 - Stegemeier, George Leo ;   et al. | 2003-04-10 |
Tracker injection in a production well App 20030056952 - Stegemeier, George Leo ;   et al. | 2003-03-27 |
Electro-hydraulically pressurized downhole valve actuator App 20030051881 - Vinegar, Harold J. ;   et al. | 2003-03-20 |
Wireless downwhole measurement and control for optimizing gas lift well and field performance App 20030047308 - Hirsch, John Michele ;   et al. | 2003-03-13 |
Power generation using batteries with reconfigurable discharge App 20030048697 - Hirsch, John Michele ;   et al. | 2003-03-13 |
Wireless communication using well casing App 20030042016 - Vinegar, Harold J. ;   et al. | 2003-03-06 |
Controllable production well packer App 20030042026 - Vinegar, Harold J. ;   et al. | 2003-03-06 |
Wireless reservoir production control App 20030038734 - Hirsch, John Michael ;   et al. | 2003-02-27 |
Permanent downhole, wireless, two-way telemetry backbone using redundant repeaters App 20020126021 - Vinegar, Harold J. ;   et al. | 2002-09-12 |
Induction choke for power distribution in piping structure App 20020121366 - Bass, Ronald Marshall ;   et al. | 2002-09-05 |
Petroleum well having downhole sensors, communication and power App 20020043369 - Vinegar, Harold J. ;   et al. | 2002-04-18 |
Toroidal choke inductor for wireless communication and control App 20020036085 - Bass, Ronald Marshall ;   et al. | 2002-03-28 |
System and method for fluid flow optimization App 20020029883 - Vinegar, Harold J. ;   et al. | 2002-03-14 |
Focused through-casing resistivity measurement App 20010033164 - Vinegar, Harold J. ;   et al. | 2001-10-25 |
Heater control Grant 6,023,052 - Carl, Jr. , et al. February 8, 2 | 2000-02-08 |