loadpatents
Patent applications and USPTO patent grants for Ruchti; Christoph.The latest application filed is for "combined cycle power plant".
Patent | Date |
---|---|
Combined cycle power plant Grant 10,590,807 - Arnold , et al. | 2020-03-17 |
Power plant with solar energy system Grant 9,890,665 - Carroni , et al. February 13, 2 | 2018-02-13 |
Method and configuration to reduce fatigue in steam drums Grant 9,518,731 - Bairley , et al. December 13, 2 | 2016-12-13 |
Combined Cycle Power Plant App 20160281543 - Arnold; Raimond ;   et al. | 2016-09-29 |
Power plant and method for retrofit Grant 9,181,872 - Li , et al. November 10, 2 | 2015-11-10 |
Method For Operating A Combined Cycle Power Plant App 20150226092 - BROESAMLE; Stefan Eduard ;   et al. | 2015-08-13 |
Method for operating a combined cycle power plant Grant 9,046,037 - Broesamle , et al. June 2, 2 | 2015-06-02 |
Combined Cycle Power Plant And Method For Operating Such A Combined Cycle Power Plant App 20150007577 - LI; Hongtao ;   et al. | 2015-01-08 |
Power Plant With Solar Energy System App 20130327051 - Carroni; Richard ;   et al. | 2013-12-12 |
Combined Cycle Power Plant With Co2 Capture Plant App 20130312386 - WIRSUM; Manfred ;   et al. | 2013-11-28 |
Combined Cycle Power Plant With Co2 Capture And Method To Operate It App 20130269346 - Li; Hongtao ;   et al. | 2013-10-17 |
Combined-cycle power plant having a once-through cooler Grant 8,516,787 - Oomens , et al. August 27, 2 | 2013-08-27 |
Method for Operating a Combined Cycle Power Plant App 20130160424 - Broesamle; Stefan Eduard ;   et al. | 2013-06-27 |
Power Plant And Method For Retrofit App 20130091845 - Li; Hongtao ;   et al. | 2013-04-18 |
Power plant with CO.sub.2 capture Grant 8,408,006 - Li , et al. April 2, 2 | 2013-04-02 |
Method And Configuration To Reduce Fatigue In Steam Drums App 20120240871 - Bairley; Donald W. ;   et al. | 2012-09-27 |
Combined-cycle Power Plant App 20120167546 - Oomens; Gijsbertus ;   et al. | 2012-07-05 |
Method for operating a combined-cycle power plant, and combined-cycle power plant useful for carrying out the method Grant 8,146,366 - Oomens , et al. April 3, 2 | 2012-04-03 |
Power Plant With Co2 Capture App 20110302922 - LI; Hongtao ;   et al. | 2011-12-15 |
Controlling Variables In Boiler Pressure Vessels App 20110174240 - Bairley; Donald W. ;   et al. | 2011-07-21 |
Steam generator Grant 7,958,853 - Ruchti June 14, 2 | 2011-06-14 |
Method For Operating A Combined-cycle Power Plant, And Combined-cycle Power Plant Useful For Carrying Out The Method App 20090064656 - Oomens; Gijsbertus ;   et al. | 2009-03-12 |
Steam Generator App 20070227469 - Ruchti; Christoph | 2007-10-04 |
Cooling air cooler for power plants Grant 5,797,259 - Nielsen , et al. August 25, 1 | 1998-08-25 |
Method for feed water control in waste heat steam generators Grant 5,771,846 - Ruchti June 30, 1 | 1998-06-30 |
uspto.report is an independent third-party trademark research tool that is not affiliated, endorsed, or sponsored by the United States Patent and Trademark Office (USPTO) or any other governmental organization. The information provided by uspto.report is based on publicly available data at the time of writing and is intended for informational purposes only.
While we strive to provide accurate and up-to-date information, we do not guarantee the accuracy, completeness, reliability, or suitability of the information displayed on this site. The use of this site is at your own risk. Any reliance you place on such information is therefore strictly at your own risk.
All official trademark data, including owner information, should be verified by visiting the official USPTO website at www.uspto.gov. This site is not intended to replace professional legal advice and should not be used as a substitute for consulting with a legal professional who is knowledgeable about trademark law.