Patent | Date |
---|
Distributed control of electric power grids Grant 11,181,564 - Ghosh , et al. November 23, 2 | 2021-11-23 |
Managing time-substitutable electricity usage using dynamic controls Grant 10,816,942 - Ghosh , et al. October 27, 2 | 2020-10-27 |
System and method for modeling and forecasting cyclical demand systems with dynamic controls and dynamic incentives Grant 10,628,838 - Ghosh , et al. | 2020-04-21 |
Congestion Control In Electric Power System Under Load And Uncertainty App 20190393700 - Ghosh; Soumyadip ;   et al. | 2019-12-26 |
Congestion control in electric power system under load and uncertainty Grant 10,404,067 - Ghosh , et al. Sep | 2019-09-03 |
Real-time forecasting of electricity demand in a streams-based architecture with applications Grant 10,282,795 - Ghosh , et al. | 2019-05-07 |
Planning economic energy dispatch in electrical grid under uncertainty Grant 9,953,117 - Ghosh , et al. April 24, 2 | 2018-04-24 |
Real-Time Forecasting of Electricity Demand in a Streams-Based Architecture with Applications App 20170371308 - Ghosh; Soumyadip ;   et al. | 2017-12-28 |
Congestion Control In Electric Power System Under Load And Uncertainty App 20170324243 - GHOSH; SOUMYADIP ;   et al. | 2017-11-09 |
Managing Time-substitutable Electricity Usage Using Dynamic Controls App 20170060109 - GHOSH; Soumyadip ;   et al. | 2017-03-02 |
Managing time-substitutable electricity usage using dynamic controls Grant 9,576,327 - Ghosh , et al. February 21, 2 | 2017-02-21 |
Data center physical infrastructure threshold analysis Grant 9,454,449 - Bagchi , et al. September 27, 2 | 2016-09-27 |
Distributed charging of electrical assets Grant 9,260,031 - Ghosh , et al. February 16, 2 | 2016-02-16 |
Distributed Control Of Electric Power Grids App 20150377936 - Ghosh; Soumyadip ;   et al. | 2015-12-31 |
Planning Economic Energy Dispatch In Electrical Grid Under Uncertainty App 20150278412 - Ghosh; Soumyadip ;   et al. | 2015-10-01 |
Planning economic energy dispatch in electrical grid under uncertainty Grant 9,058,443 - Ghosh , et al. June 16, 2 | 2015-06-16 |
Planning economic energy dispatch in electrical grid under uncertainty Grant 9,058,444 - Ghosh , et al. June 16, 2 | 2015-06-16 |
Systems and methods for generating wind power scenarios for wind-power-integrated stochastic unit commitment problems Grant 8,949,160 - Ghosh , et al. February 3, 2 | 2015-02-03 |
Managing Time-Substitutable Electricity Usage using Dynamic Controls App 20140365022 - Ghosh; Soumyadip ;   et al. | 2014-12-11 |
Managing Time-Substitutable Electricity Usage using Dynamic Controls App 20140365024 - Ghosh; Soumyadip ;   et al. | 2014-12-11 |
System And Method For Modeling And Forecasting Cyclical Demand Systems With Dynamic Controls And Dynamic Incentives App 20140324532 - Ghosh; Soumyadip ;   et al. | 2014-10-30 |
Distributed Charging Of Electrical Assets App 20140266041 - Ghosh; Soumyadip ;   et al. | 2014-09-18 |
Assessment and rationalization of resiliency of data center strategies Grant 8,768,742 - Ghosh , et al. July 1, 2 | 2014-07-01 |
Optimizing procurement spend compliance Grant 8,732,090 - Chowdhary , et al. May 20, 2 | 2014-05-20 |
Planning Economic Energy Dispatch In Electrical Grid Under Uncertainty App 20140025351 - GHOSH; Soumyadip ;   et al. | 2014-01-23 |
Planning Economic Energy Dispatch In Electrical Grid Under Uncertainty App 20140025352 - GHOSH; Soumyadip ;   et al. | 2014-01-23 |
Managing capacities and structures in stochastic networks Grant 8,635,175 - Dieker , et al. January 21, 2 | 2014-01-21 |
Integration of demand response and renewable resources for power generation management Grant 8,626,353 - Ghosh , et al. January 7, 2 | 2014-01-07 |
Data Center Physical Infrastructure Threshold Analysis App 20140005982 - Bagchi; Sugato ;   et al. | 2014-01-02 |
Data center physical infrastructure threshold analysis Grant 8,560,291 - Bagchi , et al. October 15, 2 | 2013-10-15 |
Systems And Methods For Generating Wind Power Scenarios For Wind-power-integrated Stochastic Unit Commitment Problems App 20130238530 - Ghosh; Soumyadip ;   et al. | 2013-09-12 |
Assessment And Rationalization Of Resiliency Of Data Center Strategies App 20130211871 - Ghosh; Soumyadip ;   et al. | 2013-08-15 |
Modeling distribution of emergency relief supplies for disaster response operations Grant 8,494,885 - Ettl , et al. July 23, 2 | 2013-07-23 |
Optimizing Procurement Spend Compliance App 20130173493 - Chowdhary; Pawan R. ;   et al. | 2013-07-04 |
Optimizing Product Portfolios Under Customer Choice App 20130018700 - Ervolina; Thomas R. ;   et al. | 2013-01-17 |
Managing Capacities And Structures In Stochastic Networks App 20130018829 - Dieker; Antonius B. ;   et al. | 2013-01-17 |
Fast and accurate method for estimating portfolio CVaR risk Grant 8,355,976 - Ghosh , et al. January 15, 2 | 2013-01-15 |
Effective cycle time management employing a multi-horizon model Grant 8,285,409 - Ghosh , et al. October 9, 2 | 2012-10-09 |
Heuristic cross shipping of disaster relief supplies at points of distribution Grant 8,285,649 - Ettl , et al. October 9, 2 | 2012-10-09 |
Integration Of Demand Response And Renewable Resources For Power Generation Management App 20120185106 - Ghosh; Soumyadip ;   et al. | 2012-07-19 |
FAST AND ACCURATE METHOD FOR ESTIMATING PORTFOLIO CVaR RISK App 20120185406 - Ghosh; Soumyadip ;   et al. | 2012-07-19 |
System And Method For Lowest Cost Aggregate Energy Demand Reduction App 20120078687 - Ghosh; Soumyadip ;   et al. | 2012-03-29 |
Data Center Physical Infrastructure Threshold Analysis App 20110313727 - Bagchi; Sugato ;   et al. | 2011-12-22 |
Effective Cycle Time Management Employing A Multi-horizon Model App 20110282475 - Ghosh; Soumyadip ;   et al. | 2011-11-17 |
Analytics For Setting Up Strategic Inventory Systems To Handle Small Lot Orders In The Steel Industry App 20110258087 - Ghosh; Soumyadip ;   et al. | 2011-10-20 |
Modeling Distribution Of Emergency Relief Supplies For Disaster Response Operations App 20110087514 - Ettl; Markus ;   et al. | 2011-04-14 |
Heuristic Cross Shipping Of Disaster Relief Supplies At Points Of Distribution App 20110071877 - Ettl; Markus ;   et al. | 2011-03-24 |
Integration of job shop scheduling with discreet event simulation for manufacturing facilities Grant 7,702,411 - Bagchi , et al. April 20, 2 | 2010-04-20 |
Integration Of Job Shop Scheduling With Discrete Event Simulation For Manufacturing Facilities App 20080300705 - Bagchi; Sugato ;   et al. | 2008-12-04 |
Method and system for estimating order scheduling rate and fill rate for configured-to-order business App 20070010904 - Cheng; Feng ;   et al. | 2007-01-11 |
Method and system for small-lot orders to optimize production runs in the steel industry Grant 7,130,712 - Ghosh , et al. October 31, 2 | 2006-10-31 |