- If an expedited decision is not needed, the mere filing of a provisional, design, utility or PCT (in the US receiving office) is considered a petition for a foreign filing license. See 37 CFR 5.12(a).
- If expedited processing is required, then a separate petition must be submitted to L&R pursuant to 37 CFR 5.12(b).
Categories